HomeMy WebLinkAboutMichels Foundation & Oshkosh,Riverwalk Construction STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT(STIPULATED PRICE)
ADDENDUM 1
2N PARTIAL AWARD
THIS AGREEMENT is by and between City of Oshkosh _ ("Owner")and
Michels Foundation, Division Of Michels Corporation ("Contractors).
Owner and Contractor hereby agree as follows:
ARTICLE 1 —WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The
Work is generally described as follows:
City Contract 15-24: Riverwalk Construction—Southside Oregon Avenue to Dock Yard
ARTICLE 2--THE PROJECT
2.01 The Project for which the Work under the Contract Documents for City Contract 15-24: Southside
Riverwalk Construction—Oregon Street to Dockside may be the whole or only a part is generally
described as follows:
City Contract 15-24, Southside River Walk Oregon Street to Dock Side
15S Partial Award- RES No, 15-377
Work Unit A: --Riverwalk 1 Lighting 1 Storm Sewer/Outfall/Bulk Head Wall Construction
Oregon Street East to Dockside
Alternate 1 1 Work Unit B—Oregon Avenue Pedestrian Crossing,Walk Curb Work, Marking and
Electronic Pedestrian Signal
2`d Partial Award-RES No, 16-225
Alternate 2, 0001,Work Unit C: Bulk Head Wall,West of Oregon Street
Alternate 2, C001.1, Work Unit C: Supply and Install 3 inch to 5 inch Crushed Stone for Sheet
Pile Backfill
ARTICLE 3—ENGINEER
3.01 The Project has been designed by AECOM (Engineer), which is to act as Owner's representative,
assume all duties and responsibilities, and have the rights and authority assigned to Engineer in
the Contract Documents in connection with the completion of the Work in accordance with the
Contract Documents.
ARTICLE 4—CONTRACT TIMES
4.01 Time of fhe Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for
final payment as stated in the Contract Documents are of the essence of the Contract.
Standard Form of Agreement
Section No.00520-1
Contract 15-24:Southside Riverwalk Construction—Oregon Street to Dockside
4.02 Dates for Substantial, Final Completion and Final Payment
The work will be substantially completed on or before November 1 2016, Final Completion will
be on or before January 1, 2017. Final Payment will be per project specifications.
1. Two year warranty period for the entire project to begin starting day of notice of final
completion of 2`d partial award.
4.02 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above
and that Owner will suffer financial loss if the Work is not completed within the times specified in
Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the
General Conditions. The parties also recognize the delays, expense, and difficulties involved in
proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not
completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor
agree that as liquidated damages for delay(but not as a penalty), Contractor shall pay Owner
per 2015 Standard Specifications for City of Oshkosh, Wisconsin Section 100.46 for each day
that expires after the time specified in Paragraph 4.02 above for Substantial Completion until
the Work is substantially complete. After Substantial Completion, if Contractor shall neglect,
refuse, or fail to complete the remaining Work within the Contract Time or any proper extension
thereof granted by Owner, Contractor shall pay Owner per 2015 Standard Specifications for
City of Oshkosh, Wisconsin Section 100.45 for each day that expires after the time specified in
Paragraph 4.02 above for completion and readiness for final payment until the Work is
completed and ready for final payment.
ARTICLE 5—CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract
Documents an amount in current funds equal to the sum of the amounts determined pursuant to
Paragraphs 5.01.A, below:
A. Contract 15-24
1 sf Partial Award
Work Item A: Bid Sum, a sum of:$1,099,770.75
Work Item Alternative B: Bid Sum,a sum of:$65,000.00
2nd Partial Award
Work Item Alternative C001: Bid Sum, a sum of: $1,396.000.00
Work Item Alternative C0001.1: Bid Sum, a sum of:$17,200.00
Revised Contract Amount $2,577,970.75
Standard Form of Agreement
Section No.00520-2
Contract 15-24:Southside Riveavealk Construction—Oregon Street to Dockside
The Bid prices for Unit Price Work set forth as of the Effective Date of the Agreement are based
on estimated quantities. As provided in Paragraph 11.03 of the General Conditions, estimated
quantities are not guaranteed, and determinations of actual quantities and classifications are to
be made by Engineer as provided in Paragraph 9.07 of the General Conditions.
B. For all Work,at the prices stated in Contractor's Bid,attached hereto as an exhibit.
ARTICLE 6--PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General
Conditions. Applications for Payment will be processed by Engineer as provided in the General
Conditions.
6.02 Progress Payments;Retainage
A. Owner shall make progress payments on account of the Contract Price on the basis of
Contractor's Applications for Payment approximately every four weeks based on the schedule
provided at the Preconstruction Conference during performance of the Work as provided in
Paragraph 6.02.A.1 below. All such payments will be measured by the schedule of values
established as provided in Paragraph 2.07.A of the General Conditions (and in the case of Unit
Price Work based on the number of units completed) or, in the event there is no schedule of
values, as provided in the General Requirements.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the
percentage indicated below but, in each case, less the aggregate of payments previously
made and less such amounts as Engineer may determine or Owner may withhold,
including but not limited to liquidated damages, in accordance with Paragraph 14.02 of the
General Conditions.
a. 95 percent of Work completed (with the balance being retainage). If the Work has
been 50 percent completed as determined by Engineer, and if the character and
progress of the Work have been satisfactory to Owner and Engineer, then as long as
the character and progress of the Work remain satisfactory to Owner and Engineer,
there will be no additional retainage; and
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments
to Contractor to 97.5 percent of the Work completed, less such amounts as Engineer shall
determine in accordance with Paragraph 14.02.13.5 of the General Conditions and less the
Engineer's estimate of the value of Work to be completed or corrected as shown on the
tentative list of items to be completed or corrected attached to the certificate of Substantial
Completion.
6.03 Final Payment
A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 of the
General Conditions, Owner shall pay the remainder of the Contract Price as recommended by
Engineer as provided in said Paragraph 14.07.
ARTICLE 7—INTEREST
7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear
interest at the rate of I% per month.
Standard Form of Agreement
Section No.O0520-3
Contract 15-24:Southside Riverwalk Construction—Oregon Street to Dockside
ARTICLE 8—CONTRACTOR'S REPRESENTATIONS
8.01 In order to induce Owner to enter into this Agreement, Contractor makes the following
representations:
A. Contractor has examined and carefully studied the Contract Documents and the other related
data identified in the Bidding Documents,
B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local,
and Site conditions that may affect cost, progress, and performance of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and
Regulations that may affect cost, progress, and performance of the Work.
D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface
conditions at or contiguous to the Site and all drawings of physical conditions relating to existing
surface or subsurface structures at the Site (except Underground Facilities), if any, that have
been identified in Paragraph 4.02 of the Supplementary Conditions as containing reliable
"technical data," and (2) reports and drawings of Hazardous Environmental Conditions, if any,
at the Site that have been identified in Paragraph 4.06 of the Supplementary Conditions as
containing reliable"technical data."
E. Contractor has considered the information known to Contractor; information commonly known
to contractors doing business in the locality of the Site; information and observations obtained
from visits to the Site; the Contract Documents; and the Site-related reports and drawings
identified in the Contract Documents, with respect to the effect of such information,
observations, and documents on (1) the cost, progress, and performance of the Work; (2)the
means, methods, techniques, sequences, and procedures of construction to be employed by
Contractor, including any specific means, methods, techniques, sequences, and procedures of
construction expressly required by the Contract Documents; and (3) Contractor's safety
precautions and programs.
F. Based on the information and observations referred to in Paragraph 8.01.E above, Contractor
does not consider that further examinations, investigations, explorations, tests, studies, or data
are necessary for the performance of the Work at the Contract Price, within the Contract Times,
and in accordance with the other terms and conditions of the Contract Documents.
G. Contractor is aware of the general nature of work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Contract Documents.
H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or
discrepancies that Contractor has discovered in the Contract Documents, and the written
resolution thereof by Engineer is acceptable to Contractor.
1. The Contract Documents are generally sufficient to indicate and convey understanding of all
terms and conditions for performance and furnishing of the Work.
ARTICLE 9—CONTRACT DOCUMENTS
9.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement(pages 520-1 to 520-7, inclusive).
2. Performance bond (pages 610-1 to 610-3, inclusive).
Standard Form of Agreement
Section No.00520-4
Contract 15-24:Southside Riverwalk Construction—Oregon Street to Dockside
3. Payment bond (pages 615-1 to 615-3, inclusive).
4. Certificate of insurance(Contractor Insurance with Property Insurance Requirements
5. General Conditions(pages 700-1 to 700-63, inclusive).
6. Supplementary Conditions (pages 800-1 to 810 1 to 810-14, inclusive).
7. Drawings consisting of 44 sheets with each sheet bearing the following general
title: Southside River Walk Construction Oregon Street to Dock Side City Contract 15-24
Addendum 1 and 2
8. Specifications as listed in the table of contents of the Project Manual
9. Addenda(numbers 1 to 2, inclusive).
10. Exhibits to this Agreement(enumerated as follows):
a. Contractor's Bid Tabulation.
b. Contractor's Bid Bond
c. Contractor's Signature Page
d. Disclosure of Ownership
e. Contractor's Subcontractor List
11. The following which may be delivered or issued on or after the Effective Date of the
Agreement and are not attached hereto:
a. Notice to Proceed
b. Work Change Directives.
c. Change Orders,
The Contract documents are complementary; what is required by one is as binding if required by all.
In the event that any provision in any of the above component parts of this contract conflicts with any
provision in any other of the component parts, the provision in the component part first enumerated
above shall govern over any other component part with follows it numerically except as may be
otherwise specifically stated.
A. There are no Contract Documents other than those listed above in this Article 9.
B. The Contract Documents may only be amended, modified, or supplemented as provided in
Paragraph 3.04 of the General Conditions.
ARTICLE 10— MISCELLANEOUS
10.01 Terms
A. Terms used in this Agreement will have the meanings stated in the General Conditions and the
Supplementary Conditions.
Standard Form of Agreement
Section No.00520-5
Contract 15-24:Southside Riverwalk Construction—Oregon Street to Dockside
10.02 Assignment of Contract
A. No assignment by a party hereto of any rights under or interests in the Contract will be binding
on another party hereto without the written consent of the party sought to be bound; and,
specifically but without limitation, moneys that may become due and moneys that are due may
not be assigned without such consent(except to the extent that the effect of this restriction may
be limited by law), and unless specifically stated to the contrary in any written consent to an
assignment, no assignment will release or discharge the assignor from any duty or
responsibility Under the Contract Documents.
10.03 Successors and Assigns
A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal
representatives to the other party hereto, its partners, successors, assigns, and legal
representatives in respect to all covenants, agreements, and obligations contained in the
Contract Documents.
10.04 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable under any
Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be
valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be
reformed to replace such stricken provision or part thereof with a valid and enforceable
provision that comes as close as possible to expressing the intention of the stricken provision.
10.05 Contractor's Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent,collusive, or coercive practices
in competing for or in executing the Contract. For the purposes of this Paragraph 10.05:
1. "corrupt practice" means the offering, giving, receiving, or soliciting of anything of value
likely to influence the action of a public official in the bidding process or in the Contract
execution;
2. "fraudulent practice' means an intentional misrepresentation of facts made (a) to influence
the bidding process or the execution of the Contract to the detriment of Owner, (b) to
establish Bid or Contract prices at artificial non-competitive levels, or (c) to deprive Owner
of the benefits of free and open competition;
3. "collusive practice" means a scheme or arrangement between two or more Bidders, with or
without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial,
non-competitive levels;and
4. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or
their property to influence their participation in the bidding process or affect the execution of
the Contract.
10.06 None
Standard Form of Agreement
Section No.00520-5
Contract 15-24:Southside Riverwalk Construction--Oregon Street to Dockside
IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement. Counterparts have been delivered to
Owner and Contractor. All portions of the Contract Documents have been signed or have been identified by Owner
and Contractor or on their behalf.
This Agreement will be effective on May 20, 2096(which is the Effective Date of the Agreement).
OWNER CORACTOR
Signature Signf tire
Mark A Rohloff Ja es Claeys
Print Name Print Name
City Manager General Manager
—City
Title
r (if Contractor is a corporation,a partnership,or a joint
venture,attach evidence of authority to sign.)
Signature
Pamela R. Ubri ; 14AA-k
Print Name Att66t ignatu e
City Clerk Administrative Assistant III
Titl Organization Title
Address for giving notices:
n ture 16500 West Rogers Drive
_Lynn A. Lorenson; New Berlin,WI 53151
Print Name
City Attorney
Title/Organization
License No. 240616
Signature (Where applicable)
Trena Larson NOTE TO USER:Use in those states or other
Print Name jurisdictions where applicable or required
Director of Finance Agent for service of process:
Title/Organization
Standard Form of Agreement
Section No.00520-7
Contract 15-24:Southside Rivenvalk Construction—Oregon Street to Dockside