HomeMy WebLinkAboutAmendment/Fernau Ave.-N. Main Street Detention Basin-16-69 CITY OF OSHKOSH DEPARTMENT OF PUBLIC WORKS 215 CHURCH AVENUE, P,O- BOX 1130 OSHKOSH, Wi 54903-1130 PHONE- (920)236-5065 FAX(920)236-5068 LETTER OF TRANSMITTAL To: Mr. Jim Bachhuber Brown and Caldwell t"§i 168383 Greenway Boulevard AmendmentMiddleton, W! 53562 d Bid Support Services for enue Watershed/Main Detention Basin Please find: ® Attached Q Under Separate Dover ❑ Copy of Letter ❑ Contracts ❑ Meeting Notes ❑ Photos ® Amendment ❑ Report Q SpecificationsElMyfars El Agenda ❑ Estimates El Diskette ❑ Zip Disk Change Order ❑ Plans ❑ Other Quantit Description Executed Amendment These are being transmitted as indicated below; ❑ For Approval ® For Your Use ❑ As Requested E3 For Review& Comment Remarks: . Enclosed is a cagy of the executed amendment for the design and bid su Area Detention Basin. Please refere Of Your invoices. pport services for the Fernau Avenue Watershed/North Main Street Ar nee Res. No. 16_69 on all If you have any questions, please contact us. City Clerk's Office — Original cc; � File_Original �-- Signed: Trac . Taylor I:lFngineerinpojs CONTRACTSI15_W FernauAYe Wfrshed'Pro'et InformationlContract Inrolf5-03 B&C LOT-Des&Bid Support CA#i 4-1.16.doc i AMENDMENT N0. ? The CITY OF OSHKOSH, hereinafter referred to as CITY, and BROWN AND CALDWELL, 8383 Greenway Boulevard, Suite 600, Middleton,WI 53582, hereinafter referred to as the CONSULTANT, entered into an agreement for DESIGN AND RID SUPPORT SERVICES FOR 1'ERNAU AVENUE WATERSHEDINORTH MAIN STREET AREA DETENTION BASIN on January 14, 2015. Paragraph C In ARTICLE XI. PAYMENT included the provision that costs for additional services shall be negotiated and set forth in a written amendment to this AGREEMENT executed by both parties prior to proceeding with the work covered under the subject amendment. THEREFORE, the CITY and the CONSULTANT agree to insert the following paragraph after the first paragraph in ARTICLE Ill. SCOPE OF WORK: The CONSULTANT shall provide the services described in the CONSULTANT's Amend inent#9 dated February 15,2015. The CITY and the CONSULTANT further agree to insert the following bullet point after the first bullet point in Paragraph A of ARTICLE Xl. PAYMENT: • Payment for Amendment No. 1 shall be a Time and Materials Sum not to exceed $31,523 (Thirty One Thousand Five Hundred Twenty Three Dollars). All other terms contained within the January 14, 2015 agreement remain unchanged and In effect. In the Presence of: CONSULTANT By: ice .-r Seal of Consultant if a Corporation (Specify Title) By: (Specify Title) CITY OF OSHKOSH By: (Witness) Mak A. Rohloff, City Manager And: (Witness) � a-P,.- ri , er APP VED: I hereby certify that the necessary provisions have been made to pay the liability which which will accrue under this Agreement. City t rney I y Compfrol er � l:lEogneerMV0i5 CONfRAOTSM-W rewo Ava ftshemro,`eculntprmatlonlcontract famiriv 090CAfl-Desasws�atse<v s•r-�e.aorx Page 1 of i Attachment A RJaCJ,IVJD Amendment I11 to F=ernau Avenue Watershed/North Main Street Area Detention Basin Brown and Caldwell Project It 147344 FEB 16 N16 City of Oshkosh Reference M Res. No. 15-11 February 15, 2016 vE.P't'01' P1J131.fC 11/0€tFN This Attachment A documents additional scope and tasks requested of Brown and Caldwell (BC) by the City of Oshkosh (City)for services under the F=ernau Avenue Watershed/ North Main Street Area DetentionBasl project(City Res. No. 1541; BC Project# x.47344)dated January 14, 2015- This project is also referred to as "Work unit B" In this amendment. Scope Changes Addl.tional Effort#1 - State Peder CountyCouniy Permittin Changes to the project design required additional state and federal permit applications (Fn addition to the permits Identified under Task 6 in the original scope of work), Each additional permit and description is provided below. 1. Stream Realignment and Enclosure Individual Permit(WDNR). The proposed culvert alignment to convey streamflow from west to east across North Main Street required a WDNR Individual Permit submittal. BC prepared the Individual Permit application followingthe guidance as provided on the WDNR's webpage, A list of submittal requirements and responsibilities under this task Is given below. BC Performed: a. Upload the required files on behalf of the City. b. Prepare the Application form "Water Resources Application for Project Permits" (Form # 3500-53). c. Prepare and compile required project plan drawings for altering stream d. Prepare and compile site maps for permit application. e, Prepare a narrative description as described_ on the WDNR's Application Checklist (09/2014). f, prepare hydrologic and hydraulic computations as described on the WDNR's Application Checklist(09/2014). g. Prepare a narrative identifying the sequence of construction events. h. Attend one(1)face-to-face meeting with the WDNR. It is assumed that the one meeting will cover Issues related to this task and Task 2 of the amendment, City; a. Signed Individual Permit submittal b. Paid application fee c. Provided a copy of the deeds or similar proofs of ownership for submittal d. Was responsible for preparing and publishing Public Notice Newspaper Posting: e. Submitted prepared documents on the WDNRS website. 2. Utility Structure, Bridge, Wetland General Permit(WDNR) As proposed, the outlet pipe from the North Main Street Detention Basin passes through a delineated wetland that was not Identified at the time of the project's original contract. A state permit application was required for this proposed construction. RC prepared the General Permit application per instructions under the "Reporting Application" provided by the WDNR(General Permit Application Checklist,02/13/201.5). F'ernau-N Main Amendment 1 Attachment A v6(2) Attachment A Amendment#1 to Fernau Avenue Watershed/North Main Street Area Detention Basin Brown and Caldwell Project it 147344 City of Oshkosh Reference#: Res. No. 15-11 February 15,2016 The City signed the permit application,submitted and paid the application fee. 3, US Army Corp of Engineers Waterway Permitting(Federal) The proposed culvert alignment to convey streamflow from west to east across North Main Street also required a permit from the USACE. For budgeting purposes BC directly forwarded the permit documentation to the USACE. BC budgeted up to 4 hours to respond to USACE additional requests for Information. 4. Wisconsin Department of Transportation The project required construction within the Jackson Street(USH 45) right-of-way. BC prepared the "Application/Permit To Work On Highway Right-Of-Way". The City signed the permit application,submitted and paid the application fee. 5. Winnebago County Erosion Control Permit The project required a county erosion control permit for the portion of the project outside the city limits. This area encompasses the construction at Jackson Street and east to the detention basin. RC prepared the Winnebago County Erosion Control and Stormwater Management Application Form for submittal by the City. The City signed the permit application,submitted and paid the application fee. Additional Effort#2: Qes Jgn of North Main StreetCrossln Culy The City requested a new crossing at North Main Street to convey the North Fernau channel. The new crossing will improve the hydraulics of the current channel configuration, but will require an east-west box culvert across North Main Street, and then a bend to the south to daylight Just south of the existing WPS driveway. BC: J.. Prepared 60%, 90%and final construction plan sheets (included within the Fernau Avenue Watershed-North Main Street Area Detention Basin design package) limited to: a. Two(2) plan and profile sheets b. One (J.)sheet with culvert cross and abandoned stream sections C. The 60% and 90% plan sheets were reviewed by the City. 2. BC incorporated specifications related to the culvert construction into the project's Special Conditions document. 3. BC prepared final plans. 4. Survey services were conducted to prepare the necessary drainage easement description to be located on the WPS property(east side of North Main Street). Additional Effort#3: Engin-Bering Services Related to a Basin Un,derdralnSyatem The design, bid and construction services related to the permanent underdraln/ dewatering system and the clay liner for the North Main Street Detention Basin were performed by another engineering firm (AECOM)under a separate agreement between tho.Clty and AECOM. BC budgeted time to moot with AECOM to coordinate design issues and provide necessary Information so that AECOM can conduct the design. AECOM provided separate plan drawings and Special Conditions, with appropriate professional engineer's or professional geologist's seals to the City. As requested by the Fernau—N Main Amendment 1 Attachment A v6(2) 2 Attachment A Amendment#1 to Fernau Avenue Watershed North Main Street Area Detention Basin Brown and Caldwell Project# 147344 City of Oshkosh Reference#: Res. No. 15-11 February 15, 2016 City,AECOM's plan drawings and Special Conditions for the underdraln/dewatering system and the clay liner were referenced In BC's North Main Street Area Detention Basin Construction Drawings and Special Conditions, for bidding and construction purposes. BC pians referred to the clay liner and underdrain system as being designed and specified by AECOM. Information shown on BC plan sheets relating to the underdraln system and associated clay liner will be for informational and clarification purposes only and will reference the plan drawings provided by AECOM. BC shall have no responsibility for the adequacy of the design nor the performance of the constructed clay liner and underdraln system. Additional Effort#4:Changes to the„(,iv1,I— nd Layout Prolect Aspects The project design budget was based on the assumption that no regulatory wetlands existed on the project site(assumption #9 of original agreement). In October, 2015 field Inspections did delineate regulatory wetlands which resulted in the re-alignment of the detention basin. Under this effort BC: 1.. Redrafted the basin grading plan to avoid disturbance of the delineated wetlands. 2. Re-modelled the detention facility to verify performance for storage volume and peak flow control 3. Re-modelled the detention facility to verify performance for pollution reduction (Total Suspended Solids and Total Phosphorus). The project design was conducted in accordance with assumption # 1.5 of the original agreement regarding use of BC CAD standards. On January 20, 2016 City requested the CAD standards to be revised per City of Oshkosh Standards. BC conducted.this conversion. Schedule Additional Effort I (Permitting): The target date for submittal of WDNR permits Is January 22, 2016 Additional Efforts 2, 3 and 4 (Design): The target date for completion of this task is to meet the scheduled bid advertising date of February 16, 2016. Budget Amendment All work will be conducted under the terms and conditions as described in the Fernau Avenue Watershed/ North Main Street Area Retention Basin agreement dated January 14, 2016, The Amendment budget is provided below. Additional Task Hours Costs #1 State, Federal,and County Permitting 143 $ 19,071 #2: Design of North Main Street Crossing Culvert 28 $ 5,447 #3: Engineering Services Related to a Basin Underdrain System 26 $ 4,498 #4:Changes to the Civil and Layout Project Aspects 22 $ 2,507 219 $ 31,523 Fernau_N Main Amendment 1 Attachment A v6(2) 3 AtkachmentA Amendment#1 to Fernau Avenue Watershed North Main Street Area Detention Basin Brown and Caldwell Project It 147344 City of Oshkosh Reference It: Res. No. 15-11 February 15, 2016 Assumptions :1) AECOM will provide hard copy and PDF format plan sheets for the permanent underdrain system and clay liner directly to the City. 2) All plan sheets and specifications provided byAECOM will be Identified as products of AECOM signed and sealed by appropriate Registered Engineer from AECOM. 3) BC is not responsible for designing or reviewing the permanent underdrain system and clay liner design Including details and calculations, or any other plan drawings or Special Conditions(specifications)provided by AECOM, BC will review the plan drawings and Special Conditions for the permanent underdrain system and clay liner for conflicts with features of the plan drawings prepared by BC. 4) AECOM will review BC's Inlet and outlet structure details and provide any coordination that may be necessary to confirm the compatibility of these structures with the clay liner and underdrain system. 5) BC prepared Special Conditions for application to Work Unit B and submitted the Special Conditions to the City. The City will assemble the Special Conditions in a manner that will result In the least complicated document for bidding, BC is not responsible for Special Conditions submitted by AECOM. 6) AECOM will be responsible for the underdrain and clay finer related bid items, bid item descriptions,and quantities, for the Proposal Form to be prepared by the City, 7) AECOM will be responsible for the underdrain and clay liner related Special Conditions, 8) It is understood that City will compile the following into a single contract bid package: a) BC work products for the facility to be described as Work Unit B Detention Basin b) Work products from AECOM for the Work Unit B clay finer and underdrain system c) Work products from AECOM for a similar facility to be described as Work Unit A Detention Basin 9) The contractor will have a single point of contact during construction as designated by the City of Oshkosh, The point of contact will coordinate construction support activities among the City, Contractor, BC and AECOM. BC will not be responsible for coordinating work of AECOM. Fernau—N Main Amendment 1 Attachment A v6 (2) 4