Loading...
HomeMy WebLinkAboutAECOM Project No. 60437397 AECOM O AECOM 920.235.0270 tel �1r°• �/ 558 north Main Street 920.235,0321 fax Oshkosh,Wl 54901 :6ttaC:J;I'EID March 10, 2016 R ?016 t'1,11TO1' PUJILIC: WORKS Mr. James Rabe, PE, CPESC OSi- KO4C 11, WE",CO NI SIN Director of Public Works City of Oshkosh 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903-1130 Subject: Amendment Request for Construction Monitoring and Documentation Services Related to City Contract 15-01 —9th and Washburn Area Wet Detention Basin Construction Management—City Resolution Number 15-236 AECOM Project No. 60437397 Dear Mr, Rabe, AECOM Technical Services, Inc. (AECOM) is requesting an amendment to the agreement dated July 15, 2015, based on AECOM's proposal OPP-382282 for Construction Monitoring and Documentation Services for City Contract 15-01 --9''and Washburn Area Wet Detention Basin. The additional services related to this project were for the development of an Operation and Maintenance Plan for the basin and grant support. This amendment is necessary to cover the costs of the additional/out of scope work conducted under the City of Oshkosh's (City) direction. Below is a description of each out of scope item, along with the associated fees. Operation and Maintenance Plan The City requested that AECOM provide follow-up support on this project to include the development of an Operation and Maintenance (O&M) Plan for the detention basin. As a requirement of the Wisconsin Department of Natural Resources (WDNR) grant program that partially funded the project, this plan is required to be developed and submitted to obtain reimbursement. AECOM provided the following services for this task: 1. Patterned after the draft Operation and Maintenance Plan on the Armory Detention Basin O&M Plan previously completed by AECOM for the City. 2. Development of a pian narrative, location map, detention basin inspection form, and incorporation of record drawings. 3. A draft O&M plan was provided to the City for review in a comprehensive PDF document. 4. City staff provided comments on January 11, 2016 which were incorporated by AECOM and an updated version of the document was provided to the City on January 12, 2016. Total for O&M Pian =$2,300 60437307—Amendment Request i.docx D AECOM 2 Grant Support The City requested that AECOM provide support in completing the grant form for reimbursement under the WDNR's program. AECOM provided the following services for this task: 1. Retrieved the construction related grant report template from the WDNR and filled out the relevant information related to the project. 2. The completed grant form was provided to the City for review on December 3, 2015 along with the grant form instructions and general guidance for completing the grant reimbursement final report for submittal by the city. 3. Segregated the construction costs into water quality and quantity items for reporting. Total for Grant= $1,010 Additional Design and CM Support Extra time for out-of-scope construction services by Tim Wolf totaling 26 hours at$115/hr for the following: 1. Documentation of additional pavement replacement. Outside of project area. 2. Addition of private sump pump storm sewer lateral connections 3. Addition of future storm water lateral for area businesses Total for additional design and CM Support m$3,000 Total Amendment Amount=$6,310 The services provided were be performed in accordance with the 2015 Negotiated Fee Schedule and conditions of the General Conditions of Service—City of Oshkosh, April 2009, which are expressly incorporated into, and are an integral part of, our agreement for professional services. AECOM can begin providing these services immediately upon receipt of the signed Amendment Authorization Form (attached). If you have any questions or need to clarify a point, please call any of the undersigned at 920-236-6718. Sincerely yours, AECOM Technical Services, Inc. I &J�u px)'� Patal F. Timm Kevin L. Brehm, P.E. 4A1/V-1 Account Manager Associate Vice President Attachments: Amendment to Agreement Form Amendment Authorization Form Use or dlsdosure of data contained on this sheet is subject to the restriction on the first page of this document. K'Projects160437397_9th&wash burn CMI100-CONTRAC71110-CONTRACTS160437397_Amendment Request 1.docx f AECOM AECOM 558 North Main Street,Oshkosh,VA 54901 T 920.236.6718 F 920.235.0321 Amendment to Agreement Form Authorization Amendment No, 1 City Contract 15-01 —9`"and Washburn Area Wet Detention Basin AECOM Project No. 60437397 City of Oshkosh Resolution No. 15-236 RETURN TO: AECOM Date: March 10, 2016 558 North Main Street Oshkosh,WI 54901 Attention: Paul Timm SUMMARY: Original Contract Amount: $162,570 Total Previous Amendments: $0 Amount this Amendment: $6,310 Revised Contract Amount $168,880 Amendment# DESCRIPTION AMOUNT 1 Operation and Maintenance Plan $2,300 Grant Support $1,010 Additional Design and CM Support X3.000 TOTAL $6,310 KT(ojeds180437397-9th&Wash bum CMA 100-CONTRACT1110-CONTRACTS160437397_Amendment Request 1.doex J COM AECOM 558 North Main Street,Oshkosh,WI 54901 T 920.236.8718 F 920.235.0321 Amendment to Agreement Form Authorization March 10, 2016 1 hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. I hereby authorize AECOM to proceed with the scope of work outlined in Amendment 1, to amend AECOM's proposal OPP-382292, dated July 13, 2015 for Construction Monitoring and Documentation Services, Related to Construction 9th and Washburn Area Wet Detention Basin with a revised budget authorization of$168,880 under the general terms and conditions specified in the proposal. Sire Date Mark A Rohloff Print Name City Manager Title/Organization Signat re' Date Pamela rvR C1b'-tI ; A6� ( Print Name City Clerk Titlel0 ganizatjon Si etur Date Lynn A. Lorenson; Print Name City Attorney Title/Organization ,Aft rVI nnn 3 a6'11 S-1gnat� ' Date Trena Larson Print Name Director of Finance TitlelOrganization KAProjecfs'60437397_9th&Washburn M100-CONTRACT\110-CONTRACTS160437397—Amendment Request 1-docx