February 26, 2016
Mr, Todd Dorner
Dorner, Inc.
PO Box 129
Luxemburg, WI 54217
Subject; Change Order No. l (Final)
Contract 14-10
Dear Mr. Dorner:
Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and Dorner,
Inc. regarding the abovementioned project.
If you have any questions, please call our office at(920)236-5065.
Sincerely,
es Rabe, P.E., CPESC
Director of Public Works
JER/11t
Enclosure: Change Order No. I (Final)
cc: Pam Ubrig, City Clerk(w/original)
Tara Wendt, Assistant Finance Director(w/copy)
File (w/original)
IAEnginminj 12014 CONTRACTSU 4.10 SW Ind M Exp(TrD#23)Ph 3&4 UIiD?rojed InformationlCuntract Page OP i
In PolChange Orders114-10 F-xecuted CO Al(Final)Ltr 2-26.16.docx
TO: DORNER,INC. CHANGE ORDER#1 (FINAL)
PO BOK 129 DATE: FEBRUARY 5,2016
LUXEMBURG,WI 54217
Your present contract with the City of Oshkosh, Contract No, 14-10,awarded October 14,2014, Is hereby
amended and changed as follows:
NET INCREASE TO: SECTION I-PAVING $10,949.11
NET INCREASE TO: SECTION lE-STORM SEWER $60,924.17
NET DECREASE TO: SECTION III-SANITARY SEWER ($1,116.33)
NET DECREASE TO: SECTION IV-WATER MAIN ($2,774.00)
NET INCREASE TO CONTRACT $57,986.85
SECTION I SECTION If SECTION III SECTION IV
(PAVING) (STORM) (SANITARY) (WATER) TOTALS
BID TOTAL, $170,955.70 $2,709,645.76 $147,679.25 $378,864.00
CO#1 $10,849.11 $50,924.17 ($1,116.33) ($2,770,01):'
$116;552:92 •'$37'6,094.00 :.: 3,466,131.' 61
CITY OF OSHKOSH
City anager-
City Clerk t
A roved and c pted;
Co tractor
1 certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin,
under the within Change Order.
� I fll'Y1
Co pfrollar
Approved a to r
ity Attor
CONTRACT 14-10 CHANGE ORDER#1(FINAL)
SECTION I-PAVING
IMAM DESCRIPTION UNIT coNrRAcr INsrALLED NET NET UNIT INCREASEIN DECREASEIN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE COMTRACrPRICB CONTRACTPRICE
Removing pavement, Square
1100 complete ass eclfled Yards 115.00 113.89 -1.11 $5.00 $5.56
36"mountable curb and
gutter,8",vAth 6"CASC and
grading,complete as Linear
9450 s eolfted I Feet 1 170.00 169.10 -0.90 $60.10 $64.09
Sawing existing pavement, Linear
1700 complete asspecified Feet 160.00 178.90 -1.10 $2.00 $2.20
Base aggregate dense,IX",
1801 complete ass ec€fled Tons 13,000.00 13,782.23 782.23 $10.71 $8,377.68
Tack coat,complete as
1900 Ispeolfied Gallons 12,00 1 20.04 1 8.00 $10.14 1 $80.90
HMR Pavement Type E-3.0,
1903 com lete ass eoiflad Tons 1 150.00 1 166.72 1 18.72 1 1 $136.35 $2,552-471
SECTION I-(BID ITEMS 1100-1903)-SUBTOTAL $11,010.96 ($61.84)
NET INCREASE TO: SECTION 1 $10,949.11
SECTION Il-STORM SEWER
ITEM DESCRIPTION UNIT CONrWT INSTALLED mer NET UNIT INCRCASEIN Di;CRE4SEIN
NUMVER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONWAOTPRICE CONTRAGTPRIC.E
Mobilization,complete as Lump
2000 S eofffod Sum 1.00 1.00 $183,315.40
Strip and stockpile topsol% Square
2002 complete as specified Yards 586,600.00 586 500.00 $0.25
Clear trees,complete as Lump
2005 specified Sum 1.00 1.00 $6565.00
Clear shrubs,complele as Lump
2008 specified Sum 1.00 1.00 1 $2 525.00
Grub stumps,complete as Lump
2012 sec€fied Sum 1 Z 1.00 413,635.00
General excavation, Lump
2020 complete ass ecifled Sum 1.00 1.00 $1,212,OOO.QO
Construct clay€finer,complete Lump
2024 asspecified Sum 1.40 1.00 $121,200.00
E=xcavation below subgrado-
Pub0o:Improvoments, Cubic
2025A complete asspecified Yards 2100,40 946.00 -1,154.00 $4.04 $4,662.16
Excavation below subgrade-
Non-Public Improvements, Cubic
202593 1 complete ass oolfled Yards 1,500.00 0.00 -1,500.00 $4.04 $6,060.00
Furnish and Install 16a RCP
Gass III storm seiner, Linear
2044 complete asspecified Feet 615.00 479.90 -135,10 $29.00 $3,512.60
Furnish and Install 18"RCP
Class III storm sewer, Linear
2050 complete ass eclfled Feet 100.00 1 94.80 -5.20 1 $28.40 $145.60
Furnish and Install 24"RCP
Class III storm sewer, Linear
2062 complete ass ecif€ed Feel 2,475.00 2,440.00 -25.10 $32,00 $803.24
Furnish and Install 30"RCP
Class III storm sewer, Linear
2074 complete as specified Feet 1 535.005 34.60 -0.40 $43.00 517,20
Page i ore
CONTRACT 94.10 CHANGE ORDER#1 (FINAL)
ITEM DESCRIPTION UNIT CONTRACT INSTAUU4 NET NET UNIT INCRE"EIN DCGREASI:IN
NUAMPR QUANTITY QUANTITIES INCREASE DECREASP PRfC✓~ CONTRACTPRICE CONTRACTPRlCE
Furnish and Install 36"RCP
Class III storm sewer, Linear
2080 complete asspecified feet 510.00 501.30 -8.70 $52.00 $462.40
Furnish and Install 42"RCP
Class III storm sower, Linear
2086 complete ass ecifled t=eat 595.00 588.40 8.fi0 $70.00 $462,00
Furnish and install 48"RCP
Class III storm sewer. Linear
2092 complete ass ecifled Feet 1,520.00 1,489.00 -30.40 $82.00 ($2,492. 0
Furnish and Install 15"RCP
Class III apron endwalf with
joint ties,complete as
2302 S ecifled Each 2.00 2.00 $947.60
Furnish and install 18"RCP
Class III apron ondwall with
joint ties,complete as
2304 sec€fled Each 1.00 1.00 $1,014,00
Furnish and Install 24"RCP
Class Ili apron endwoll with
joint ties,complete as
2308 s eeffled Each 4,00 4.00 $1234.00
Furnish and install 48"RCP
Class III apron endwall wilh
joint ties,complete as
2318 s ecifled Each 2.00 2.00 $2,32&00
Furnish and Install standard
storm savior manhole(4'
diameter),complete as Vertical
2532 Specified Feet 53.00 31.14 -21,86 $314.00 $6,864,04
Furnish and Install standard
storm sewer manhole(6'
diameter),complete as Vertical
2534 s eotfted Feat 67.0087.81 20.81 $387.00 $8,053.47
Furnish and Install standard
storm sewer manhole(0'
diameter),complete as Vertical
2536 s ecifled Feet 18.00 18.56 0.56 5551.00 $308.58
Furnish and install standard
storm sewer manhole(7`
diameter),complete as Vertical
2538 specified Feet 24.00 23.03 -0.87 568300 $602.51
Furnish and Install standard
storm sower manhole(6'x 0' Vertical
2548 box),complete ass ecir€ed Feet 14.00 12.34 -1.66 $863.00 $1432.68
Furnish and Install standard
storm sewer Inlet manhole 0'
diameter),complete as Vertical
2656 specified Feat 6.60 4.09 1 491 $354.00 $322.14
Furnish and Install standard
storm sewer Inlet manhole(7'
diameter),complete as Vertical
2882 specified feet 6.00 5.91 0.91 $774.00 $704.34
Furnish and install standard
storm sewer Inlet manhole(6'
x 6'box),complete as Veritoal
2572 s ecifled Feet 9.00 0.00 -9.00 5842.00 $7,578.00
Furntsh and Install storm
sewer outlet structure,
25820 com feteass eciffed Each 1.00 1.00 $4,454.00
Page?.ofS
CONTRACT 14.10 CHANGE ORDER#1(FINAL.)
ITEM DESCRIPTION UNIT CONTRACT INSTAL ED NET NST UNIT INCREASEIN 1 DECRE46EIN
NUmiER QUANTITY QUANTITl1 S INCREASE DECREASE PRICE CONTRACTPRICR CONTRACTPRICR
Furnish and Install storm
seweroulfet structure,
2582B complete asspecified Each 1.00 1.00 $4,549.00
Furnish and Install storm
sewer oultet structure,
25820 complete ass ectffed Each 1.00 1.00 $4,426.00
Furnish and Install Type 3
Info((with 18"sump),
2614 complete asspecified Each 33.00 3$.00 1 $1,157.00
Furnish,Install,maintain,and
remove Type 0 modified Inlet
protection,complete as
2858 specified Each 36.00 36,00 $91.00
Sediment removal-Typo D
modlffed Inlet protoollon,
2864 complete as-specified Each 72.00 36,00 -36.00 $68.68 $2,472,48
Furnish,Install,matntain,and
remove stone tracking pad,
2862 complete as.9eciffed Each 2,00 1.00 -1.00 $1,010.00 $1,010.00
Furnish,Install,maintain,and
remove slit fence,complete Linear
2864 ass ecifiad Feat 20,000.00 18,004.40 -1995.60 $1.44 $2,873.66
Furnish,Install,mainfaln,and
remove stone tag,complete
2866 ass ecified Each 200.06 20.00 -180,00 $7.58 $1,364.40
Furnish,Install,maintain,and
remove ditch check,
2872 com tole asspecified Each 45.00 62.00 1 17.00 $70.70 $1201.90
Install salvaged topsoil b" Square
2942 depth,complete as specified Yards 543100.00 651,667,95 8,567.95 $0.40 $3,427.18
Install salvaged topsoil 12" Square
2906 depth,complete as$pacified Yards 4,700.00 4 700.00 $0.71
Furnish and Install wetland square
2908 pluas.complete ass ecified Yards 6,400.00 4,665.51 -1734.49 1 $4.04 $7,007.34
Furnish and Install native
seeding(Sldostope), Square
2910 complete asspecified Yards 28,500.00 42,2$4,60 13,794.60 $0.85 $11,725.41
Furnish and Install nattve
seeding(Shoreline), Square
2912 complete asspecified Yards 3,500.00 1 3,382.44 -117.56 1 $0.78 $89.35
Furnish and Install WQOT
Seed mixture#10,complete Square
2921 asspecified Yards 482,890.00 501,485.96 16,69195 $0.22 _$4,091.11
Furnish and install no-mow
fescue,complete as spocified Square
2822 Yards 24,900,00 41,680.92 1 16,780.92 $0.26 1 $4,363.04
Furnish and Install Class I,
Type A eroslon control mat, Square
2930 complete asspecified Yards 69,000,00 80,839.42 21$39.42 $0.86 $18,781.90
Furnish and Install turf
reinforcement mat system, Square
2938 complete ass eciffed Yards 4,700.00 4,462.26 -237.74 $7.88 ($1,873.39)[
Furnish and Install medium
rip-rnpvrllh filter fabric, square
2946 complete asspecified Yards 200.00 190.28 -9.72 $35.35 $343,00
Page 3 of 0
CONTRACT 14.10 CHANGE ORDER#1(FINAL)
ITEM DESCRIPTION UNIT CONTRACT rNSrALLF4 NIrr MIT UNIT INCREASRIN DECI ASFiIN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
Furnish and Install heavy TIP-
Tap with filter fabric,complete Square
2948 asspecified Yards 110.00 101.55 -8.05 $35.35 $284,57
SECTION 11-(BID ITEMS 2000-2948)-SUBTOTAL $52,656.87 ($62,786.02)
SECTION fi-ADDITIONAL WORK REQUIRED: CO 91
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTMCE
Furnish and Install standard
storm sewer Inlet manhole(6'
diameter),complete as Verileal
12560 s eolfled Feet 0.00 8.84 8.94 $640.00 $5,304.00
Exoavation below subg rade
and restoration swale; Square
20000 complete asspecified Yards 0.00 1,400.00 1,400.00 $2.00 $2,800.00
Excavation below subgrade
and restoration sump pits; Square
20009 complete ass eclffed Yards 0.00 278.00 278.00 $2.00 $556.00
Cover crop;complete as Square
20002 s ecifled Yards 0.00 160,018.00 160,018.00 $0.19 $30,403.42
ESS soft areas,hauled off Cubic
20003 site,com fete as specified Yards 0.00 106.50 105.50 $14.35 $1,513.93
Replace gravel in EBS areas;
20004 complete,ass ecfffed Tons 0,00 121.60 121.80 $17.25 $2,101.05
Filter fabric;complete as Square
20005 IspeGined Yards 0.00 145650 1,456.50 1 $5.75 $8,374.88
SECTION If-(ADDITIONAL WORK REQUIRED, CO#1-(ITEMS 12660-20005)-SUBTOTAL $51,063,28 $0.00
NET INCREASE T0; SECTION It $50,924.17
SECTION III-SANITARY SEWER
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREAWIN DECIM?MIN
NUMER QUANTITY QUANTITWS INCREASE DBCREASI; PRICE CONTRACrPRICE CONTRACTPRICE
Furnish and Install 12"
sanitary sower(new), Linear
3039 complete ass eclffed Feet 3,025.00 3,026.30 1,30 $28.00 $36.40
Furnish and Install standard
sanitary sovror monholo(4'
diameter),complete as Vertical
3100 s eoifled Feet 180.00 177.14 1 -12.86 $227.00
Furnish and Install external
sanitwy sewer manhole
chimney seal,complete as
3114 specified Each 6.00 8>00 2100 _ _ $358.00 $716.00
Reconstruct-sanitary sewer
manhole(4'dlameter), Vertical
3122 complete ass ecifled Feet 26.00 27.19 1 1.19 $502.00 $597.38
Furnish and Install sanitary
sewer lateral marker balls,
3236 complete ass eciffad Each 1.00 1.00 1 $30.00
Core Into existing manhole,
3332 com fete ass eclfled Each 1.00 0.00 -1.00 $2,048.00 ($2,048.0 )
Page 4 a(g
CONTRACT 14-10 CHANGE ORDER#1(FINAL)
ITEM DESCRIPTION UNiT CONTRACT INSTALLEDNET NET UNIT INCREASCIN DaOREASEIN
NUMBER QUANTITY QUANTITIES PIC ASE DECREASE PRICE CONTRACTPRICE CONTRACTPRica
Closed circuit televising, Linear
3700 Com lute ass eelffed Feet 3,025.00 3,026.30 1130 $0.83
SECTION III-(131p iTlwMS 3034.3700)-SUBTOTAL $1,360.139 ($4,967.22)
SECTION III-ADDITIONAL WORK REQUIRED: CO#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLt:D NET NET UNIT INCREASEIN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRAC7PRICE CONTRACTPRICE
Furnish and install 20'
swillary sower open cut
casing pipes,complete as Llnear
13419 s ecified Feet 0.00 20.00 20.00 5125.00 $2,500.00
SECTION III-(ADDITIONAL WORK REQUIRED. 00#1-ITEM 13419)-SUBTOTAL $2,600.00 $0.00
NET DECREASE TO: SECTION III
SECTION IV-WATER MAIN
fTEtr Dl SCRIP7lON UNIT CONTRACT INSTALLED NET NET UNiT lNCRFASEIN DECREASElN
NUMBER QUANTITY QUANTITIES IN DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
Furnish and Install new 6"
duals iron water main with
polywrap,complete as Linear
4020 s ecifted Feet 275.00 1 235.50 -39.50 $34.00 $1,343.00
Furnish and Install new 10"
duct€le iron water main with
polywrap,complete as Linear
4024 s ecifted Foot 5190.00 5,177.50 -12.60 $40.00 500.00
Furnish and install
connections to existing 10"
water main,complete as
4062 Ispeolfled I I Each 1 i,00 1 1.00 $1210.00
Furnish and install 10"x 6"
water main tee,complete as
4919 Isoacifled Each 13.00 13.00 $536.00
Furnish and Anstalt 10"1i'/,°
water main bend,complete
4220 ass ecifted Each 18.00 17.00 -1.00 $361.00 5351.00
Furnish and install 10"22!/?
water main bend,complete
4229 ass ecifted I Each 7.00 7.00 $343.00
Fumish and install 6"45°
vialer main bend,completei
4236 ass ectfied Each 26.00 1 22.00 •4.00 $174.00 $696.00
Furnish and Install 10"454
water main band,complete
4238 lasspectfled I Each 8.00 8,00 $348.00
Furnish and install 10"x S"
water main reducer,complete
4266 ass ecified Each 1.00 1 1.00 $236.00
Furnish and install 6"water
main gate valve,complete as
4401 s actfled Each 14.00 14.00 $1082.00
Furnish and Install 10"water
main gate valve,complete as
4403 spaclfied Each 13.00 73.00 $2,157.00
Furnish and Install hydrant,
4500
complete ass ooiFled Each 13.00 13.00 $3,067.00
I
Page 5 of 8
CONTRACT 14.10 CHANGE ORDER#1(FINAL)
ITEM DESCRIPTION UNIT CONTRACT lNSTAGGEO NET NET UNIT INCREASEIN DEOREASEIN
QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRIC✓
Relocate existing hydrant,
9509 Com tete ass edified Each 1.00 1.00 633.00
Jack and bore 24"steef water
main casing Alpe,compfete linear
4702 ass ecifled Feet 111.00 111.00 $340.00
Furnish and Install 24°steel
water main casing pipe, Linear
4730 corn Tete as s edlffed Feel 732.00 133,00 1.00 $120.00 $920.00
SECTION IV-(I310 ITE=MS 40204730)-SUBTOTAL $120.00 ($2,890.00)
NET DE=CREASE TO: SECTION IV ($2,770.00)
NET INCREASE TO SECTIONS I,11,111,$s IV $118,692.03
NET DECREASE TO SECTIONS I,11,fit,&IV ($80,706.08)
NET INCREASE TO CONTRACT. $57,985.96
Page 6 of 0