HomeMy WebLinkAboutChange Order Contract 15-23 Vinton Constr. qz e---) DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 D��1H Fax(920)236-5068 OtJ THE WATER February 26,2016 Mr. Lyle Wettstein Vinton Construction Company PO Box 1987 Manitowoc, WI 54.221-1987 Subject: Change Order No. I (Final) Contract 15-23 Dear Mr. Wettstein: Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and Vinton Construction Company regarding the abovementioned project. If you have any questions,please call our office at(920)236-5065. Sincerely, Jokes Rabe, P.E., CPESC Director of Public Works 7BR/tlt Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk{w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) 1:1Engineering520I5 CO:1'CAACTS5IS-23 Rivuslde Pik Prking L.ot Ph I]&Eoatxorks Riverwzfk Prking I-ol Page � lmpr\Proatcd lnformationlContract lnfolChange Orders\[5-23 Erecuted CO 91 W-2-26-16-docs g 1 OP 1 ` [f TO: VINTON CONSTRUCTION COMPANY CHANGE ORDER#1 (FINAL) PO BOX 1987 DATE: JANUARY 28, 2016 MANITOWOC, WI 54221-1987 Your present contract with the City of Oshkosh, Contract No. 15-23, awarded March 24, 2015, is hereby amended and changed as follows: NET DECREASE TO. SECTION 1 ($182,087.13) NET DECREASE TO CONTRACT ($182,087.13) SECTION I TOTALS BID TOTAL $1,069,849.06 '$1.;069049.06 CO#1 ($182,087.13) "($182;087.13) CONTRACT TOTAL $887,761.93 : $8870761.93 CITY OF OSHKOSH BY: City Mana er r } g ; City Clerk Approved and..accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as orm: City Att rney CONTRACT 16.23 CHANGE ORDER#1 (FINAL) SECTION I-Riverside Park Parking Lot Phase II and Boat Works Riverwalk Parking Lot Improvements ITEM CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE Remove existing signs; A-1015 complete asspecified Each 8.00 6.00 -2.00 $25.00 $50.00 Removal&disposal of clean construction debris/ foundations,complete as Cubic A-1017 specified Yards 500.00 500.00 $6.00 Remove and dispose of timber piles;complete as A-1019 specified Each 50.00 7.00 -43.00 $60.00 $2,580.00 Furnish and install sign posts;completed as A-1023 specified Each 5.00 4.00 -1.00 $190.00 $190.00 Removing pavement; Square A-11100 cam fete as 5 ecified Yards 7,866.00 9,046.00 1,180.00 $13.70 $826.00 Common excavation; Lump A-1201 complete asspecified Sum 1.00 1.00 $35,000.00 Excavation below subgrade; unsuitable subgrado soils; Cubic A-1203 complete asspecified Yards 1 500.00 45.50 -454.50 $14.00 $6,363,00 Excavation special(paving); A-1220 complete asspecified Tons 2,500.00 21.85 -2,478.15 $5.00 $12,390,75 Heavy,non-woven geotextile Square A-1235 fabric;complete asspecified Feet 85,000.00 29,693.00 -55,307.00 $0.25 $13,826.75 Bi-axial geogrid;complete as Square A-1240 ispecified Feet 43,000.00 29,931.00 -13,069,00 $0.35 $4,574.15 Protect existing monitoring A-1260 wells;complete asspecified Each 1.00 2.00 1.00 $750.00 $750.00 8"concrete pavement,with 6"CABC and grading; Square A-1311 complete asspecified Yards 2,500.00 1,167.00 -1,333.00 $45.50 $60,651.50 8"concrete pavement HES, with 6"CABC and grading; Square A-1313 complete asspecified Yards 900.00 792.00 -108.00 $48.50 $5,238.00 Pavement ties;complete as A-1350 specified Each 60.00 71.00 11.00 $10.00 $110.00 Adjust manholes and inlets; A-1360 complete asspecified Each 4.00 4.00 $350.00 30"curb and gutter with 12" curb head,8",with 6"CABC and grading;complete as Linear A-1445 specified Feet 950.00 1,233.00 283.00 $17.80 $5,037.40 30"curb and gutter with tapered 12"curb head,8", with 6"CABC and grading; Linear A-1470 complete asspecified Feet 300.00 318.00 18.00 $19.25 $346.50 4"concrete sidewalk with 3" CABC and grad€ng;complete Square A-1500 ass ecified Feet 11300,00 1,479.00 179.00 1 $5,05 $903.95 8"concrete sidewalk/ driveway/ramp with 3"CABC and grading;complete as Square A-1520 specified Feet 1,325.00 175.50 -1,149.50 $5.51 $6,333.75 Curb ramp detectable warning field(natural/non- painted);complete as Square A-1540 s ocified Feet 40.00 48.00 8,00 $28.00 $224.00 Saw cutting existing pavement;complete as Lump A-1730 specified Sum 1.00 1.00 $2,000.00 Base aggregate dense,3/4"; A-1800 com fete asspecified Tons 2,200.00 1,184.00 -1,016.00 $6,50 $6,604,00 Base aggregate dense,1- A-1801 114";complete asspecified Tons 4,000.00 1 4,368.00 1 368.00 1 1 $11.10 1 $4,084.80 Page 1 of 6 CONTRACT 15-23 CHANGE ORDER#1 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE Tack coat;complete as A-1900 specified Gallons 75.00 75.00 $3,50 HMA Pavement Type E-1.0; A-1902 complete asspecified Tons 750.00 471.76 -278.24 $66.50 $18,502.96 Pavement markings; Lump A-1921 completed asspecified Sum 1.00 1.00 $6,850.00 Mobilization;complete as Lump A-2000 specified Sum 1.00 1.00 1 $70,000.00 Strip and stockpile topsoil; Square A-2002 complete asspecified Yards 100.00 100.00 $10.00 Furnish and Install 6" perforated storm sewer; Linear A-2031 complete asspecified Feet 210.00 199.00 -11.00 $0.01 $0.11 Furnish and install 12"RCP Class III storm sewer; Linear A-2038 complete asspecified Feel 1 180.00 175.00 -5.00 $56.20 $281.00 Furnish and Install 15"RCP Class 111 storm sewer; Linear A-2044 complete asspecified Feet 180.00 169.00 -11.00 $56.60 $622.60 Furnish and install standard storm sewar manhole riser (4'diameter);complete as Vertical A-2584 specified Feet 1 6.00 5.80 -0.20 $410.00 $82.O0 Furnish and Install Type 1 A-2612 inlet;complete asspecified Each 2.00 2.00 $1,518.00 Furnish and install Type 3 A-2616 Inlet;complete asspecified Each 2.00 2.00 $1,833.00 Connect to existing storm sewer main;complete as A-2800 specified Each 4.00 1.00 1 -3,00 $425.00 $1,275,00 Remove storm sewer manholes and inlets; A-2832 complete asspecified Each 2.00 2.00 $880.00 Furnish,install,maintain,and remove Type D modified inlet protection;complete as A-2858 specified Each 30.00 20.00 -10,00 $60.00 $600.00 Sediment removal-Type D modified inlet protection; A-2860 complete asspecified Each 30.00 8.00 -22.00 $5.00 $110.00 Furnish,install,maintain,and remove stone tracking pad; A-2862 complete asspecified Each 1 1.00 1.00 $1,500.D0 Furnish,install,maintain,and remove sill fence;complete Linear A-2864 asspecified Feet 800.00 750.00 -50.00 $3.00 $150.00 Furnish and install topsoil 6" Square A-2900 depth;complete asspecified Yards 3,220.00 3,696.20 476.20 $4.00 $1,904.80 Furnish and Install turf grass; Square A-2920 complete asspecified Yards 1 3,220.00 3,696.20 476.20 $0.20 $95.24 Furnish and install landscape vegetation in Island A; complete as specified Lump A-2929A Sum 1.00 1.00 $2,272,00 Furnish and install landscape vegetation in Island B; complete as specified Lump A-2929B Sum 1.00 1.00 $595.00 Furnish and install landscape vegetation in Island C; complete as specified Lump A-2929C Sum 1.00 1.00 $4,835.00 Page 2 of 6 CONTRACT 15-23 CHANGE ORDER#1(FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT Furnish and install Class 1, PRICE PRICE Urban,Type A erosion control mat;complete as Square A-2932 s ecified Yards 3,220.00 3,220.00 $190 Furnfsh and install blofilier, Lump A-2933 oom late ass ecified Sum 1.00 1.00 $44,000.00 Furnish and install biofilter Plantings;complete as Lump A-2955 s oclfied Sum 1.00 1.00 $28,772.00 Excavation special(storm); A-2990 con late ass ecified Tons 2,500.00 259.52 -2,240.48 $5.00 $11,202.401 Bentonite slurry dam(storm); complete as specified A-2992 Each 3.00 3.00 $750.00 Furnish and install pull box (steel);24"x 36";complete A 5016ass ecified Each 8.00 3.00 -5.00 $600.00 Furnish and Install $3,000.00 communication vault;30"x A-5032 48';com leto as s ecified Each 4.00 2.00 -2.00 $1,500.00 $3,000.00 Furnish and install'1" Schedule 40 PVC;complete Linear A-51 00 ass ecified Feet 1,242.00 1,109.003" 133.00 $4.00 $532.00 Furnish and install' Schedule 40 PVC;complete Linear A-5130 ass ecified Feet 1,53$,00 734.00 8Dq.00 $6.00 $4,824.00 Furnish and Install Type 2 A-5502 Base;com late ass ecified Each 8.00 7.00 1.00 $875.00 $875.00 Removal&disposal of clean construction debris/ foundations;complete as Cubic 13-1017 s ocifed Yards 500.00 0.00 -500.00 58.00 53,000.00 Furnish and Install sign Posts;completed as B-1023 s ecified Each 1.00 1.00 $190.00 Removing pavement; Square B-1100 com lete ass ecified Yards 1,300.00 1,480.Q0 180.Q0 $0.70 5126 00 Common excavation; Lump B-1201 com fete ass ecified Sum 1.00 1.00 $17,000.00 Excavation below subgrade; unsuitable subgrade soils; Cubic B-1203 com tete ass ecified Yards 500.00 0.00 -500.00 $14.00 $7,000.00 Excavation special(paving); B-1220 complete ass ecified Tons 500.00 0.00 -500.00 $5.00 $2,500.00 Adjust manholes and Inlets; B-1360 cam ]eta ass ecified Each 1.00 1.00 $350.00 30"curb and gutter with 12" curb head,8",with 6"CABC and grading;complete as Linear B-1445 s ocified Feet 825.00 697.00 -128.00 $17.80 $2,278.40 30"headless curb&gutter, 7",with 6"CABG and grading;complete as Linear B-1455 s ecified Feet 330.00 145.00 -185.06 $19.25 4"concrete sidewalk with 3" $3,561.25 CABG and grading;complete Square B-1500 ass ecified Feet 4,000.00 4,407.58 407.50 $4.14 $1,687.05 6"concrete sidewalk/ driveway/ramp with 3"CABG Square B-1510 and grading;complete as Feet 140.00 276.80 136.80 $4.95 $677.16 Curb ramp detectable warning field(natural/non- painted);complete as Square B-1540 s ecified Feet 40.00 32.00 -8.00 $28.00 $224.00 Pago 3 of 6 CONTRACT 15.23 CHANGE ORDER 41(FINAL) ITEM CONTRACT INSTALLED NET NET UNIT IN IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE Saw cutting existing pavement;complete as Lump B-1730 s acified Sum 1.00 1.00 $1,000.00 Base aggregate denso,314"; 6-1800 complete asspecified Tons 11000.00 0.00 -1,000,00 $11.10 $11,100.00 Base aggregate dense, 1- B-1801 114";complete asspecified Tons 11000.00 1,407.00 407.00 $11,10 $4,517,70 Tack coat;complete as B-1900 specified Gallons 76.00 50.00 -25.00 $3.50 $87,50 HMA Pavement Type E-1.0; B-1902 complete asspecified Tons 600.00 447.20 -152,80 $66.50 $10,161.20 Pavement markings; FLUmp B-1921 completed asspecified Sum 1.00 1.00 $5,410.00 Mobilization;complete as Lump B-2000 specified Sum 1.00 1.00 $48,000.00 Strip and stockpile topsoil; Square B-2002 complete asspecified Yards 1,000.00 1,433.00 433.00 $2.50 $1,082.50 Furnish,install,maintain,and remove Type D modified inlet protection;complete as B-2858 specified Each 10.00 10.00 $60.00 Sediment removal-Type D modified inlet protection; B-2860 complete ass ecified Each 10.00 10.00 $5.00 Furnish,install,maintain,and remove stone tracking pad; B-2862 complete asspecified Each 1.00 0.00 -1.00 $1,000.00 $1,000,00 Furnish,install,maintain,and remove silt fence;complete Linear B-2864 ass ecified Feet 1,860.00 11010.00 -650.00 $2.25 $1,462.50 Furnish and install topsoil 6" Square B-2900 depth;complete asspecified Yards 2,300.00 :2:,6:82.00 382.00 $4.00 $1,528.00 Furnish and install turf grass; Square B-2920 complete asspecified Yards 2,300.00 2,682.00 382.00 $0.20 $76.40 Furnish and install trees; B-2926 complete ass ecified Each 8.00 8.00 $350.00 Furnish and install Class I, Urban,Type A erosion control mat;complete as Square B-2932 specified Yards 2,300.00 2,682.00 382.00 $1.40 $534.80 Furnish and install biofilter; Lump B-2933 complete asspecified Sum 1.00 1.00 $11,500.00 Furnish and install biofilter plantings;complete as Lump B-2955 specified Sum 1.00 1.00 $9,188.00 Furnish and install pull box (steel);24"x 36";complete B-5016 asspecified Each 7.00 7.00 $600.00 Furnish and install communication vault,30"x B-5032 48";complete asspecified Each 3.00 3.00 $1,500.00 Furnish and install 1" Schedule 40 PVC;complete Linear B-5100 asspecified Feet 1,500.00 1,349.00 -151.00 $4.00 $604.0p Furnish and Install 3" Schedule 40 PVC;complete Linear B-5130 asspecified Feet 1,500.00 928.00 -572.00 $6.00 $3,432.00 Furnish and install all wiring as shown on drawings; Lump B-5290 complete asspecified Sum 1.00 1.00 $12,500.00 Furnish and install Type 2 B-5502 Base;complete asspecified 1 Each 7.00 6.00 1.00 $875.00 $875.00 Page 4 of 6 CONTRACT 16-23 CHANGE ORDER#1 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE Furnish and install bollard base and luminarie Installation;complete as B-5510 specified Each 9.00 7.00 -2.00 $1,550.00 $3,100.00 Alternate schedule April 1 to Lump B1 October 30,2015 Sum 1.00 1.00 -$10,000.00 Turf restoration;complete as Square C-1370 specified Yards 200.00 200.00 $6.00 Saving existing pavement; Linear C-1700 complete asspecified Feet 335.00 385.00 50.00 $3.00 $150.00 4"asphaltic surface with 6" CABC and grading;complete Square C-1916 asspecified Yards 25,00 61.00 36.00 $44.50 $1,602.00 Furnish,install,maintain,and remove Type D modified inlet protection;complete as C-2858 specified Each I 5.00 0.00 -5.00 $60.00 $300.00 Sediment removal-Type D mod€tied inlet protection; C-2860 complete asspecified Each 6.00 0.00 -5.00 $5.00 $25.00 Furnish,install,maintain,and remove stone tracking pad; C-2862 complete asspecified Each 1,00 0.00 -1.00 $0.01 50.01 Furnish,install,maintain,and remove stone bag;complete 0-2866 asspecified Each 20.00 0.00 -20.00 $10.00 $200.00 Furnish,install,maintain,and remove 12"diameter sediment logs;complete as linear C-2868 specified Feet 20.00 0.00 -20,00 $10.00 5200.00 Furnish and Install 6"ductile Iron water main(relay)with polywrap;complete as Linear C-4002 s ecified Feet 25.00 16.00 -9.00 $120.00 $1,080.00 Furnish and install 8"ductile iron water main(relay)with polywrap;complete as Linear C-4004 specified Feet 625.00 594.50 -30.50 $107.30 $3,272.65 Furnish and install connections to existing 6" water main;complete as C-4058 specified Each 1.00 1.00 $850.00 Furnish and install connections to existing 8" water main;complete as 0-4060 specified Each 1.00 1.00 $1,560.00 Furnish and install 8"x 6" water main tee;complete as C-4110 specified Each 1.00 1.00 $540.00 Furnish and install 8"22-112° water main bend;complete C-4228 asspecified Each 2.00 0.00 -2.00 $361.00 $722.00 Furnish and install 8"45° water main bend;complete C-4237 asspecified Each 5.00 7.00 2.00 $364.00 $728.00 Furnish and Install 8"x 6" water main reducer; C-4264 complete asspecified Each 1.00 1.00 $323.00 Furnish and install 6"water main gate valve;complete as C-4401 spa ified Each 1.00 1.00 $1,330.00 Furnish and install 8"water main gate valve;complete as C-4402 specified Each 2.00 2.00 $1,812.00 Page5of6 CONTRACT 15-23 CHANGE ORDER 41(FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCRE'ASE1N DECREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE Furnish and install hydrant; C-4500 complete as s ecified Each 1.00 1.00 $3,382.00 Jack and bore 18"steel water main casing pipe; Linear C-4700 complete ass ecifled Feet 35.00 35.00 $558.00 Abandon water main on Michigan Street;complete as Lump 0-4900 s ecifled Sum 1100 1.00 $500.00 C-4990 Excavations ecial water Tons 1 650.00 318.41 -331.59 1 $8.75 $2,901.41 C-4992 Bentonile slur dam water Each 2.00 0.00 -2,00 $910.00 $1,820.00 Over-excavation(water); Cubic C 4994 complete asspecified Yards 60.00 0.00 60.00 $40.00 $2,400.00 SECTION I-(BID ITEMS A-1015-C-4994)-SUBTOTAL $26,992.30 ($227,166.88) SECTION I-ADDITIONAL WORK REQUIRED: CO 41 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE 1N NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 6"concrete sidewalk/ drivewaylramp with 3"CABG Square A-1510 and gradinQ Feet 0.00 1,421.00 1,421.00 $4.95 $7,033.95 Furnish and Install cover Square B-12924 crop:complete asspecified Yards 0.00 2,682.00 2,682.00 $0.25 $670.50 Furnish and install 2"copper water service(rest room); Linear B-14046 complete asspecified Feet 0.00 43.00 43.00 $78.00 $3,354.00 Furnish and Install 2" corporation stop and saddle (rest room);complete as B-14053 specified Each 0.00 1,00 1.00 $507.00 $507.00 Furnish and install 8"11-114° C-14219 bend;com fete ass ecifled Each 0.00 1.00 1.00 $361.00 $361.00 Furnish and install 6"45° C-14236 bend;complete asspecified Each 0.00 2.00 2.00 $305.00 $610.00 Furnish and install 1 1114" CABG backfill spring line to subgrade STA 10+75 to C-14995 1 12+75;complete as specified Ton 1 0.00 1 500.00 500.00 1 1 $11.10 $5,550.00 SECTION I-(ADDITIONAL WORK REQUIRED: CO#1 (FINAL)ITEMS A-1610-C-14996)-SUBTOTAL $18,086.45 $0.00 NET DECREASE TO: SECTION I ($182,087.93) NET INCREASE TO SECTION 1: $45,078.75 NET DECREASE TO SECTION is ($227,165.88) NET DECREASE TO CONTRACT: ($182,087.13) Page 6 of 6