Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cardinal Const-South Park restroom reno C/O#1 (2016)
City of Oshkosh Parks Department 805 Witzel Ave.,PO Box 1130 Ray Maurer �fHKQfH Oshkosh,Wi 54903-1130 Director (920)236-5080 (920)232-5316 FAX ON THE WATER February 3, 2016 Cardinal Construction Co.,Inc. HGM Architecture 1183 Industrial Parkway ATTN—Ron Hansche PO Box 564 PO Box 976 Fond du Lac W154936-0564 Oshkosh WI 54903-0976 Re: South Park Restrooms (Oshkosh, W1) Enclosed please find duplicate original of CHANGE ORDER#1 and ATA Document G701-2001 with respect to the above project duly signed by all parties. Thank you for your cooperation in this matter. Sincerely, CITY OF OSHKOSH Ray Maurer Director of Parks I I RM/tmm Enc. Cc: City Manager Mark Rohloff City Attorney Lynn Lorenson i City Clerk Pam Ubrig City Finance Director Trena Larson City Purchasing Department i Tire Exceptional Parks Experience— Committed to Purpose and People Visit our website at lrttp://wane,c1.oshkoslr.wi,us i - i CHANGE ORDER#1 DATED: January 12, 2016 TO: CARDINAL CONSTRUCTION COMPANY, INC. 1183 INDUSTRIAL PARKWAY PO BOX 564 FOND DU LAC WI 54936-0564 Your present contract with the City of Oshkosh, for the South Park Restroom/Shelter Facility Construction project is hereby amended and changed as follows: Remove unstable soils and replace with compact stone material $3,390.00 NET INCREASE TO CONTRACT: $3,390.00 CITY OF OSHKOSH BY: Recommended: C4 Manager Parks Director City Clerk Approved and accepted: �a Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: �Ci.� A erney �...., SOUTH PARK RESTROOM/SHELTER FACILITY CONSTRUCTION PROJECT- CHANGE ORDER#1 UNSTABLE SOILS REMOVAL/COMPACT"STONE MATERIAL FILL ITEM BID REMOVED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE Remove 132 cub icyards 1 soli, Replace Each' with 132 0 1 1 $3,390.00 cubic yards compact granular material. I - i REMOVE SOILS AND REPLACE WITH COMPACT STONE MATERIAL $3,390.00 NET INCREASE TO CONTRACT $3,390.00 Page 1 of 1 f �;_•�� 1A Document G701rpt i 2001 Change Order PROJECT(Mame and address): CHANGE ORDER NUMBER:G-1 OWNER: ❑ South Park Restroom and Shelter DATE:December 17,2015 Oshkosh,WI ARCHITECT:❑ TO CONTRACTOR(Arante and address): ARCHITECT'S PROJECT NUMBER: 1115 CONTRACTOR:❑ Cardinal Construction Co„Inc. CONTRACT DATE: 1115115 FIELfJ:❑ 1183 htdustrial Parkway CONTRACT FOR:General Constntetion Fond du 1.ac,Wl 54937 OTHER:❑ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable,any undisputed amount attributable to previously executed Construction Change Directives) Remove 132 cubic yards of unsuitable soils that were located in areas of concrete paitos and walks at building and replaace with compacted granular fill. Add; $3,390.00 Contractors Proposal attached. The original Contract Sum was $ 312,122.00 'fire net change by previously authorized Change Orders 0.00 The Contract Sum prior to this Change Order was $ 312,122.00 The Contract Suns will be increased by this Change Order in the amount of $ 3,390.00 The new Contract Surn including this Change Order wil l be $ 315,512.00 The Contract Titne will be increased by Zero(0)days. The date of Substantial Cornpletion as of the date of this Change Order therefore is unchanged. NOTE:This Change Order does not include changes in tire Contract Surn,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. HGM Architecture,Inc. Cardinal Construction Co.,Inc. City of Oshkosh Parks Dept, ARCHITECT(firm name) CONTRACTOR(Firm pante) OWNER(firm name) 805 N Street 1183 Industrial Parkway 805 Witzel Ave. Os osh I 54901 Fond du I ac, WI 54937 Oshkosh,WI 54902 SS ADDRESS _ ADDRESS BY nature (Sig ) BY(Signature) B (Sigttadure) Ronald D.Hansche Robert; J . Kette>: (7�ped iratne) (Typed name) (Typed name) December 17,2015 DATE DATE DATE AIA Document G701*"—2001.Copyright©1979,1987,2000 and 2001 by The American institute of Architects.All rights reserved.WARNING:This AIA° Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 08:22:22 on 1211712016 under Order No,0107571316 1 which expires on 03/1212016,and is not for resale. User Notes: (2017799033) ange Order Number: 2016-SPS-001 Page 1 1183 industrIal Parkway P.O. Box 564 FOND DU LAC, WISCONSIN 64936-0664 P FEho n 6: Phone: (920) 922-4446 FAX: (920)922-1455 Job Namw So' uth Park Shelter Ron Hanche Job Lootion: Oshkosh Vi TO: HGM Architecture, Inc. Job No. 201&SPS Job Phone; PO Box 976 Existing Contract No,: Date�)daling contract 805 N. Main Street We hereby agree to make the change(s)s�_pPo below: ---------- ------------------- Poor Soils Undercut.and haul I off site 24"of unsult able soil In a 31_3_0 sq ft area fe s's' --- ------ ------ 744 sq R overdig area x;132 cuoq=p rds ................ Provfde,_plaq@.pnd qqMact granular material In overdig 132 cubic yards at$24.00 ------------ $ 3,168.00 —-------- ----- --------- General Contractor mark-up $ 222,00 .......... -------------- NOTE: This Change Order becomes part of and In conformance with the existing contract, WE AGREE hereby to make the change(s) specified above at this price ADD $ 3,390.00 DATE: 12/1612016 PREVIOUS CONTRACT AMOUNT tOTOR)' REVISED CONTRACT TOTAL ACOSPUD-:The ObXo prices and speolftcations of this Change OrderDate of acceptance. are eatleftotory and are hereby accepted, All works to be performed under game terms and condillons as speolfled In original contrast unless Signature: otherwise stipulated, (OWNER) TEAMWORK Divides the Task---Dotibles the Success