Loading...
HomeMy WebLinkAbout27. 17-323 JUNE 27, 2017 17-323 ORDINANCE FIRST READING (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CLOSURE OF OSHKOSH AVENUE FROM NORTH WESTFIELD STREET TO EAGLE STREET INITIATED BY: DEPARTMENT OF PUBLIC WORKS A GENERAL ORDINANCE OF THE CITY OF OSHKOSH AUTHORIZING A VARIANCE TO SECTION 25-23 OF THE OSHKOSH MUNICIPAL CODE PERTAINING TO STREETS TO REMAIN OPEN TO TRAFFIC DURING THE COURSE OF EXCAVATION WORK. WHEREAS,the City of Oshkosh Municipal Code Section 25-23 requires a passageway of not less than ten(10)feet in the travelled portion of the street to remain open on various streets within the City of Oshkosh, including Oshkosh Avenue; and WHEREAS,Domer,Inc.has requested a variance from the terms of section 25-23 for the purposes of providing a safe work area and reducing congestion during construction extending deeper sanitary sewer and concrete paving during for a twelve day period during the summer 2017 construction season; and WHEREAS,the timing of the closure is dependent upon progress of the work,weather and other factors, making determination of the specific dates for closure difficult. NOW,THEREFORE the Common Council of the City of Oshkosh do ordain as follows: SECTION 1. that Dorner, Inc. is hereby granted a variance from the provisions of Section 25-23 of the City of Oshkosh Municipal Code for purposes of providing a safe work area and reducing congestion during construction extending deeper sanitary sewer and concrete paving during for a twelve day period during the summer 2017 construction season subject to the following conditions: A. Oshkosh Avenue shall not be closed during the period that the annual EAA Airventure convention is being held within the City. JUNE 27, 2017 17-323 ORDINANCE FIRST READING CONTD S. Dorner, Inc. shall provide at least seven (7) day notice to the Department of Public Works prior to the anticipated closure of Oshkosh Avenue. C. Dorner, Inc. shall provide all necessary and required signage for the closure of the street and detour of traffic. D. Dorner, Inc. shall work with the Department of Public Works to minimize the effects of the street closure upon emergency services and the public. E. The Director of Public Works is hereby authorized to approve such closure, approve such closure with conditions or take such other action as may be necessary and appropriate in consultation with the Police and Fire Chiefs of the City of Oshkosh to protect the health, safety and welfare of the citizens. SECTION 2. This ordinance shall be in full force and effect from and after its passage, publication and placement of the appropriate temporary signage indicating the closure. SECTION 3. Publication Notice. Please take notice that the City of Oshkosh enacted ordinance #17-XXX (A GENERAL ORDINANCE OF THE CITY OF OSHKOSH TO APPROVE CLOSURE OF OSHKOSH AVENUE AT NORTH WESTFIELD STREET on July 11, 2017. The ordinance allows the temporary closure of Oshkosh Avenue at North Westfield Street, for purposes of providing a safe work area and reducing congestion during construction extending deeper sanitary sewer and concrete paving during for a twelve day period during the summer 2017 construction season. The full text of the ordinance may be obtained at the Office of the City Clerk, 215 Church Avenue and through the City's website at www.ci.oshkosh.wi.us. Clerk's phone: 920-236-5011. (0 Of HKOlH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the eCon Council FROM: James Rabe, Director of Public Works DATE: June 22, 2017 RE: Approve Closure of Oshkosh Avenue from North Westfield Street to Eagle Street BACKGROUND The Common Council awarded Contract 17-12 to Dorner Inc. of Luxemburg, Wisconsin at their June 13, 2017 meeting. The project includes extending deeper sanitary sewer and concrete pavement replacement from the North Westfield Street to North Eagle Street on Oshkosh Avenue. The contract documents construction work on Oshkosh Avenue from North Westfield Street to North Eagle Street to be completed within five (5) weeks. The contract documents further allow a closure of Oshkosh Avenue for up to twelve (12) calendar days. The closure period may include only one (1) weekend. The contract documents require Oshkosh Avenue be fully open to traffic for EAA Air Venture 2017 (July 24, 2017 through July 30, 2017). The contract documents further require the road be fully open to traffic prior to August 25, 2017. A detour route will be posted using Sawyer St, Witzel Ave and Koeller St. The closure is anticipated in to begin July 10, 2017 and last through July 21, 2017. Advanced warning signs will be placed 7 days prior to the closure to warn drivers. ANALYSIS Based on the traffic volumes and close proximity of the excavation limits to traffic there is a high likelihood of substantial traffic backups if only one lane is available for traffic. Additionally, worker safety and driver safety will be compromised during the construction work if done under traffic. The proposed detour route uses roadways identified as truck routes. FISCAL IMPACT The closure was included in the contract documents so there is no fiscal impact to this ordinance. RECOMMENDATIONS I recommend approval of the Closure of Oshkosh Avenue from North Westfield Street to Eagle Street for a period not to exceed twelve (12) days. Approved: n M k A�f � Rohlof City anager JER/tlt I:\Engineering\2017 CONTRACTS\17-12 WIT Mn Relays\Project_Information\Correspondence\Memo\17-12 Memo for Oshkosh Ave Closure. docx