Loading...
HomeMy WebLinkAboutCORP Proposals Section VIII: Recommendations Proposals The following specific proposals have been developed based on input from the needs assessment as well as direction from City staff and the Advisory Park Board. Parks not identified in the following list do not have immediate needs and/or recommendations at this time. The proposals include estimated costs for each individual component. Typically, these costs include furnishing and installation as well as appropriate allowances for demolition, mobilization, permits, etc. The strategies detailed below are intended to provide guidance to the decision makers responsible for implementing the plan and are organized into a matrix of short-, mid- and long-term strategies based on time increments of 1-5 years, 6-9 years and 10 years and beyond. The schedule of improvements for each facility will be determined at a later date as presented and approved by the Common Council. City of Oshkosh 67 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Individual Park Recommendations and Concepts Table of Contents MINI PARKS ............................................................................................................................................... 69 CATL .................................................................................................................... 69 ONGRESS VENUE OT OT GCP ................................................................................................................................. 70 ARDEN LUB ARK WWP ........................................................................................................................... 70 ILLIAM ATERS LAZA NEIGHBORHOOD PARKS ........................................................................................................................ 71 44PP ............................................................................................................................... 71 TH ARALLEL ARK AP ............................................................................................................................................. 72 BBEY ARK ARP .................................................................................................................................. 73 BE OCHLIN ARK BP .......................................................................................................................................... 75 AUMAN ARK FP ..................................................................................................................................... 76 UGLEBERG ARK MJP ................................................................................................................................. 77 ARY EWELL ARK QP .......................................................................................................................................... 77 UARRY ARK RP ................................................................................................................................................. 78 OE ARK SP ......................................................................................................................................... 79 TEVENS ARK SP .................................................................................................................................. 81 TOEGBAUER ARK TP ................................................................................................................................... 82 EICHMILLER ARK WAP ................................................................................................................................ 84 EST LGOMA ARK WCP ........................................................................................................................ 85 ESTHAVEN IRCLE ARK COMMUNITY PARKS ................................................................................................................................ 87 MP ..................................................................................................................................... 87 ENOMINEE ARK RP ......................................................................................................................................... 87 AINBOW ARK RAP .................................................................................................................................... 88 ED RROW ARK SP ............................................................................................................................................. 89 OUTH ARK WATERFRONT RECREATION .................................................................................................................. 89 24ABL .................................................................................................................... 89 TH VENUE OAT AUNCH ABMG ........................................................................................................... 89 L ROULLIRE EMORIAL ARDEN B ............................................................................................................................................. 90 OATWORKS BSFD .................................................................................................................. 90 OWEN TREET ISHING OCK CE.SP ............................................................................................................................. 90 ARL TEIGER ARK FBL ....................................................................................................................... 91 UGLEBERG OAT AUNCH MSFD .............................................................................................................. 91 ICHIGAN TREET ISHING OCK MSBL ...................................................................................................................... 92 ILL TREET OAT AUNCH RP ....................................................................................................................................... 92 IVERSIDE ARK WA.SP ........................................................................................................................ 93 ILLIAM TEIGER ARK SPECIAL USE PARKS ............................................................................................................................... 94 CBM .......................................................................................................................... 94 AMP RAGG EMORIAL HM ................................................................................................................................... 94 IKERS ONUMENT WG.SF .................................................................................................................. 95 ILLIAM PANBAUER IELD NATURAL RESOURCE AREAS ................................................................................................................ 97 GNP ................................................................................................................................ 97 LATZ ATURE ARK NHCP ............................................................................................................ 97 ORTH IGH ONSERVANCY ARK SC ........................................................................................................................................ 98 AWYER REEK City of Oshkosh 68 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations MINI PARKS Congress Avenue Tot Lot Mini Park 0.45 acres Install energy efficient lighting. Provide a park identification sign. Provide accessible route to playground structure. Provide perimeter walk at play area. Upgrade the perimeter fence (4 ft. vinyl coated). Replace play equipment and provide poured in place surface in play area (8,400 S.F.). Site Name Proposed Development Cost Priority Development Congress Avenue Site Lighting $5,000 High Tot Lot Park Sign $7,500 Medium Accessible Route $2,500 High Perimeter Walk $18,000 High Perimeter Fencing $20,000 High Play Equipment: Play Equipment and $35,000 Poured in Place Play High Poured in Place Play Surface Surface: $65,000 Total $153,000 City of Oshkosh 69 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Garden Club Park Mini Park 0.35 acres Proposed Features Install energy efficient lighting. Provide park identification sign. Provide new park benches. Update pathways throughout park. Site Name Proposed Development Cost Priority Development Garden Club Park Site Lighting $5,000 Low Park Sign $7,500 Medium Benches $6,000 Medium Pathways $8,500 Medium Total $27,000 William Waters Plaza Mini Park 0.18 acres Proposed Features Currently being designed by the city City of Oshkosh 70 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations NEIGHBORHOOD PARKS 44th Parallel Park Neighborhood Park 4.90 acres Proposed Features Install energy efficient lighting. Provide park identification sign. Provide accessible route to playground structure. Provide perimeter walk at play area. Expand concrete base at existing open shelter. Add benches around play area. Add 20-foot diameter open shelter with concrete base and electricity near play area. Provide ball field es, outfield fence and backstop. Develop new trails and paths throughout facility ($1,000/L.F. of 10-foot path). Replace play equipment and provide poured in place surface in play area (7,000 S.F.). Provide wood fiber mulch in play area (annual maintenance expense). Redevelop tennis courts Site Name Proposed Development Cost Priority Development th 44 Parallel Park Site Lighting $25,000 Medium Park Sign $7,500 Medium Accessible Route $2,500 High Perimeter Walk $16,000 High Concrete Base $5,500 Low Benches $8,000 Medium Open Shelter w/ $39,000 Medium Electricity Ball Field $135,000 High Improvements New Trails/Paths $60,000 Low Play Equipment: Play Equipment and $35,000 Poured in Place Play High Poured in Place Play Surface Surface: $56,000 Wood Fiber Mulch $5,000 High Redevelop Tennis $40,000 Low Courts Total $389,000 City of Oshkosh 71 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Abbey Park Neighborhood Park 9.01 acres Install energy efficient site lighting. Provide park identification sign. Provide accessible route to playground structure. Provide perimeter walk at play area. Add 20-foot diameter open shelter with concrete base and electricity near play area. Replace play equipment and provide poured in place surface in play area (12,800 S.F.). Remove existing benches from play structure area and replace with new benches throughout park site. Create trail connection to main walks. Provide wood fiber mulch in play area (annual maintenance expense). Site Name Proposed Development Cost Priority Development Abbey Park Site Lighting $10,000 High Park Sign $7,500 Medium Accessible Route $2,500 High Perimeter Walk $16,000 High Open Shelter w/ $39,000 Medium Electricity Play Equipment: Play Equipment and $35,000 Poured in Place Play High Poured in Place Play Surface Surface: $102,400 Benches $20,000 Medium Trail connection to $10,000 main Low Wood Fiber Mulch $7,000 High Total $248,400 City of Oshkosh 72 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Abe Rochlin Park Neighborhood Park 5.16 acres Install energy efficient lighting. Provide park identification sign. Provide accessible route to playground structure. Provide perimeter walk at play area. Provide new universal playground structure to site (installed at South Park). Update existing shelter amenities, including bathroom restoration/accessibility. Redevelop existing volleyball court including concrete curb. Provide shoreline restoration, including riprap and native plantings (800 L.F.). Provide accessible pier. Provide new benches throughout park. Provide wood fiber mulch in play area (annual maintenance expense). Replace play equipment and provide poured in place surface in play area (5,600 S.F.). Add h electricity along rivers edge. Redevelop parking lot.* Site Name Proposed Development Cost Priority Development Abe Rochlin Park Site Lighting $50,000 High Park Sign $7,500 Medium $2,500 High Accessible Route to Playground Perimeter Walk $16,000 High Universal $350,000 High Playground Shelter Restoration $80,000 High Volleyball Court $20,000 Low Shoreline $30,000 Medium Restoration Accessible Pier $25,000 Low Benches $24,000 High Wood Fiber Mulch $7,000 High Play Equipment: Play Equipment and $35,000 Poured in Place Play Low Poured in Place Play Surface Surface: $45,000 Open Shelters w/ $78,000 Medium Electricity Parking Lot TBD TBD Redevelopment* Total $212,000 *Redevelop and maintain Parking Lots per City of Oshkosh Parking Lot Study City of Oshkosh 73 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations City of Oshkosh 74 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Bauman Park Neighborhood Park 2.02 acres Install energy efficient lighting. Provide park identification sign. Provide accessible route to playground structure. Provide perimeter walk at play area. Provide new benches throughout park. Replace play equipment and provide poured in place surface in play area (8,000 S.F.). Provide ball field improvements: bleac, baseline fence and backstop. Add 20-foot diameter open shelter with concrete base and electricity near play area. Provide shoreline restoration, including riprap and native plantings (600 L.F.). Provide wood fiber mulch in play area (annual maintenance expense). Site Name Proposed Development Cost Priority Development Bauman Park Site Lighting $25,000 Low Park Sign $7,500 Medium Accessible Route $2,500 High Perimeter Walk $16,000 High Benches $12,000 Medium Play Equipment: Play Equipment and $35,000 Poured in Place Play High Poured in Place Play Surface Surface: $65,000 Ball Field $25,000 Medium Improvements Open Shelter w/ $39,000 Medium Electricity Shoreline $22,800 Medium Restoration Wood Fiber Mulch $5,000 Medium Total $201,300 City of Oshkosh 75 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Fugleberg Park Neighborhood Park 2.50 acres Install energy efficient lighting. Provide park identification sign. Provide accessible route to playground structure. Provide perimeter walk at play area. Replace and provide new picnic tables and benches throughout park. Provide concrete slabs under picnic tables. Remove and provide a new 20-foot diameter open shelter with concrete base and electricity near play area. Resurface (overlay bituminous) existing basketball court. Replace perimeter fencing Replace play equipment and provide poured in place surface in play area (9,600 S.F.). Provide wood fiber mulch in play area (annual maintenance expense). Site Name Proposed Development Cost Priority Development Fugleberg Park Site Lighting $25,000 Medium Park Sign $7,500 Medium Accessible Route $2,500 High Perimeter Walk $16,000 High Benches & Picnic $20,000 Medium Tables Concrete Slab $6,000 Medium Open Shelter w/ $39,000 Medium Electricity Resurface $20,000 Medium Basketball Court Replace Perimeter $25,000 Low Fencing Play Equipment: Play Equipment and $35,000 Poured in Place Play High Poured in Place Play Surface Surface: $76,800 Wood Fiber Mulch $10,000 Medium Total $107,500 City of Oshkosh 76 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Mary Jewell Park Neighborhood Park 4.64 acres Install energy efficient lighting. Provide ball field improvements such as es, outfield fence and backstop dugouts, lighting, permanent outfield fence. Provide restroom shelter. Provide park identification sign Site Name Proposed Development Cost Priority Development Mary Jewell Park Site Lighting $15,000 Low Ball Field $200,000 High Improvements Restroom Shelter $250,000 Medium Park Sign $7,500 Medium Total $222,500 Quarry Park Neighborhood Park 8.02 acres Install energy efficient lighting. Provide dog park development. Update existing shelter amenities, including bathroom restoration/accessibility. Redevelop parking lot.* Provide new site furnishings for park. Site Name Proposed Development Cost Priority Development Quarry Park Site Lighting $25,000 Low Dog Park Fencing $75,000 Low Shelter Restoration $120,000 High Parking Lot TBD TBD Improvements* Site Furnishings $15,000 Medium Total $235,000 *Redevelop and maintain Parking Lots per City of Oshkosh Parking Lot Study City of Oshkosh 77 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Roe Park Neighborhood Park 1.65 acres Install energy efficient lighting. Provide accessible route to playground structure. Provide perimeter walk at play area. Provide new site furnishings for park. Provide wood fiber mulch in play area (annual maintenance expense). Replace play equipment and provide poured in place surface in play area (3,600 S.F.). Site Name Proposed Development Cost Priority Development Roe Park Site Lighting $25,000 High Accessible Route $2,500 High Perimeter Walk $16,000 High Site Furnishings $5,500 Medium Wood Fiber Mulch $8,000 High Play Equipment: Play Equipment and $35,000 Poured in Place Play Medium Poured in Place Play Surface Surface: $28,800 Total $77,300 City of Oshkosh 78 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Stevens Park Neighborhood Park 4.85 acres Install energy efficient lighting. Provide accessible route to playground structure. Provide perimeter walk at play area. Redevelop (overlay bituminous) existing basketball court. Update and redevelop tennis court. Provide ball field improvements such as bleac fence and backstop. Provide new shelter with amenities including accessible bathroom. Resurface tennis courts. Provide wood fiber mulch in play area (annual maintenance expense). Replace play equipment and provide poured in place surface in play area (8,644 S.F.). Install two new park identification signs. Site Name Proposed Development Cost Priority Development Stevens Park Site Lighting $25,000 High Accessible Route $2,500 High Perimeter Walk $16,000 High Overlay Basketball $20,000 Medium Court Tennis Court $65,000 High Redevelopment Ball Field $135,000 High Improvements Shelter $250,000 High Resurface Tennis $25,000 Low Courts Wood Fiber Mulch $7,000 Low Play Equipment: Play Equipment and $35,000 Poured in Place Play Low Poured in Place Play Surface Surface: $58,400 Park Signs (2) $15,000 Medium Total $175,400 City of Oshkosh 79 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations City of Oshkosh 80 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Stoegbauer Park Neighborhood Park 1.87 acres Install energy efficient lighting. Provide park identification sign. Provide ball field improvements such as Redevelop (overlay bituminous) existing basketball court. Install irrigation system. Develop perimeter access walk. Replace play equipment and provide poured in place surface in play area (9,600 S.F.). Add 20 foot diameter open shelter with concrete base near play area. Provide wood fiber mulch in play area (annual maintenance expense). Site Name Proposed Development Cost Priority Development Stoegbauer Park Site Lighting $10,000 Medium Park Sign $7,500 Medium Ball Field $30,000 High Improvements Overlay Basketball $25,000 Medium Court Irrigation System $30,000 Low Perimeter Access $17,500 High Walk Play Equipment: Play Equipment and $50,000 Poured in Place Play High Poured in Place Play Surface Surface: $76,800 Open Shelter w/ $200,000 Low Bathroom Facility Wood Fiber Mulch $5,000 High Total $341,800 City of Oshkosh 81 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Teichmiller Park Neighborhood Park 5.59 acres Install energy efficient lighting. Provide park identification sign. Provide accessible route to playground structure. Provide perimeter walk at play area. Provide ball field improvements, including a bleacher pad, bleachers, benches, baseline fence and backstop. Redevelop (overlay bituminous) existing basketball court. Restroom renovations. Update existing shelter amenities, including bathroom restoration/accessibility. Provide 700 feet of walking/pathways throughout park. Replace play equipment and provide poured in place surface in play area (8,400 S.F.). Update and redevelop tennis courts, including new surfacing and bounding board. Provide wood fiber mulch in play area (annual maintenance expense). Site Name Proposed Development Cost Priority Development Teichmiller Park Site Lighting $25,000 Medium Park Sign $7,500 Medium Accessible Route $2,500 High Perimeter Walk $16,000 High Ball Field $35,000 High Improvements Basketball Court $25,000 Low Overlay Restroom $120,000 Renovations Shelter Restoration $80,000 High Walks throughout $100,000 park Low Play Equipment: Play Equipment and $50,000 Poured in Place Play High Poured in Place Play Surface Surface: $67,200 Tennis Court $65,000 Medium Improvements Wood Fiber Mulch $7,000 High Total $206,700 City of Oshkosh 82 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations City of Oshkosh 83 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations West Algoma Park Neighborhood Park 1.80 acres Install energy efficient lighting. Provide park identification sign. Provide accessible route to playground structure . Provide perimeter walk at play area. Replace play equipment and provide poured in place surface in play area (5,950 S.F.). Add 20-foot diameter open shelter with concrete base and electricity near play area. Provide shoreline restoration, including rip rap and native plantings (200 L.F.). Provide wood fiber mulch in play area (annual maintenance expense). Site Name Proposed Development Cost Priority Development West Algoma Park Site Lighting $5,000 Low Park Sign $7,500 Medium Accessible Route $10,000 High Perimeter Walk $16,000 High Play Equipment: Play Equipment and $45,000 Poured in Place Play Low Poured in Place Play Surface Surface: $47,600 Open Shelter w/ $39,000 Low Electricity Shoreline $10,000 Medium Restoration Wood Fiber Mulch $8,000 High Total $172,100 City of Oshkosh 84 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Westhaven Circle Park Neighborhood Park 6.59 acres Install energy efficient lighting. Provide park identification sign. Provide accessible route to playground structure. Provide perimeter walk at play area. Provide ball field improvements , backstop, and improve drainage. Redevelop existing basketball court (overlay bituminous and resurface). Provide tennis court improvements: new bounding board, surfacing, and multifunction striping. Restroom renovation Replace play equipment and provide poured in place surface in play area (5,600 S.F.). Provide 700 feet of walking/pathways throughout park. Provide a splash pad. Provide wood fiber mulch in play area (annual maintenance expense). Site Name Proposed Development Cost Priority Development Westhaven Circle Site Lighting $50,000 High Park Park Sign $7,500 Medium Accessible Route $2,500 High Perimeter Walk $16,000 High Ball Field $135,000 High Improvements Basketball Court $35,000 High Surfacing Board: $45,000 Tennis Court Surfacing & Striping: Improvements $35,000 Restroom High $130,000 Renovation Play Equipment: Play Equipment and $45,000 Poured in Place Play High Poured in Place Play Surface Surface: $45,000 Pathways $48,000 High Splash Pad $150,000 Low Wood Fiber Mulch $10,000 High Total $754,000 City of Oshkosh 85 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations City of Oshkosh 86 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations COMMUNITY PARKS Menominee Park Community Park 103.39 acres Develop a Park Master Plan. Refer to the approved Menominee Park Master Plan and implement improvements and development per plan. Rainbow Park Community Park 17.05 acres Refer to the approved Rainbow Park Master Plan and implement improvements and development per plan. City of Oshkosh 87 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Red Arrow Park Community Park 26.60 acres Install energy efficient lighting. Provide park identification sign. Update existing shelter amenities, including bathroom restoration/accessibility. Replace play equipment and provide poured in place surface in play area (6,000 S.F.). Add 20-foot diameter open shelter with concrete base and electricity near play area. Provide wood fiber mulch in play area (annual maintenance expense). Redevelop parking lot.* Restoration of existing skate park. Note: City of Oshkosh should research limitations of site and make determination of future use due to history as a former old landfill. Site Name Proposed Development Cost Priority Development Red Arrow Park Site Lighting $25,000 High Park Sign $7,500 Medium Restroom $80,000 High Restoration Play Equipment: Play Equipment and $45,000 Poured in Place Play Medium Poured in Place Play Surface Surface: $48,000 Open Shelter w/ $39,000 Medium Electricity Wood Fiber Mulch $8,000 High Parking Lot TBD TBD Improvements* Skate Park $65,000 Medium Restoration Total $237,500 *Redevelop and maintain Parking Lots per City of Oshkosh Parking Lot Study City of Oshkosh 88 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations South Park Community Park 23.68 acres Refer to the approved South Park Master Plan and implement improvements and development per plan. WATERFRONT RECREATION 24th Avenue Boat Launch Riverfront Recreation 1.68 acres Install energy efficient lighting. Provide accessible route to main pier. Provide shoreline restoration, including rip rap and native plantings (1,200 L.F.). Replace and provide new bridge or boardwalk. Redevelop parking lot.* Update existing shelter amenities, including bathroom restoration/accessibility. Construct new information kiosk. Install Electronic Pay Station Site Name Proposed Development Cost Priority Development th 24 Avenue Boat Site Lighting $25,000 Medium Launch Pier Accessibility $5,000 High Shoreline $45,600 Medium Restoration Bridge $50,000 High Parking Lot TBD TBD Improvements* Shelter Restoration $80,000 High Information Kiosk $2,000 High Electronic Pay $20,000 High Station Total $97,600 *Redevelop and maintain Parking Lots per City of Oshkosh Parking Lot Study Al Broullire Memorial Garden Waterfront Recreation 0.14 acres Site to be developed in conjunction with river walk development as directed by Fox River Corridor Plan. City of Oshkosh 89 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Boatworks Waterfront Recreation 5.00 acres Bowen Street Fishing Dock Waterfront Recreation 0.33 acres Provide accessible route to pier. Provide dock updates. Convert to composite deck. Site Name Proposed Development Cost Priority Development Bowen Street Pier Accessibility $5,000 High Fishing Dock Dock Improvements $40,000 High Total $40,000 Carl E. Steiger Park Waterfront Recreation 2.43 acres Install energy efficient lighting. Provide shoreline restoration, including riprap and native plantings (750 L.F.). Provide new benches along trail. Provide 750 feet of walking/pathways throughout park. Site Name Proposed Development Cost Priority Development Carl E. Steiger Site Lighting $5,000 Low Park Shoreline Medium $28,500 Restoration Benches $30,000 Medium Pathways $55,000 High Total $63,500 City of Oshkosh 90 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Fugleberg Boat Launch Waterfront Recreation 2.40 acres Install energy efficient lighting. Provide park identification sign. Redevelop parking lot.* Renovate restroom facility Replace dock Construct new boat launch. Install electronic pay station. Site Name Proposed Development Cost Priority Development Fugleberg Boat Site Lighting $25,000 Medium Launch Park Sign $7,500 Medium Parking Lot TBD TBD Improvements* Restroom $130,000 High renovations Replace Dock $25,000 Low Construct new boat 85,000 launch Electronic Pay $20,000 High Station Total $292,500 *Redevelop and maintain Parking Lots per City of Oshkosh Parking Lot Study Michigan Street Fishing Dock Waterfront Recreation 0.6 acres Provide accessible route to dock. Provide dock updates, including water sealing rails and convert to composite deck. Provide benches. Site Name Proposed Development Cost Priority Development Michigan Street Pier Accessibility $5,000 High Fishing Dock Dock Improvements $50,000 Low composite decking Benches $15,000 Medium Total $15,000 City of Oshkosh 91 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Mill Street Boat Launch Waterfront Recreation 0.08 acres Install energy efficient lighting. Replace dock. Provide shoreline restoration, including rip rap and native plantings (80 L.F.). Develop site master plan for added parking and access. Install electronic pay station. Site Name Proposed Development Cost Priority Development Mill Street Boat Site Lighting $10,000 Low Launch Dock $25,000 Low Shoreline $40,000 Medium Restoration Site Master Plan $10,000 Medium Electronic Pay $20,000 High Station Total $85,000 Riverside Park Waterfront Recreation 2.03 acres Construct a gazebo shelter Renovate the River walk adjacent to the Leach Amphitheater. Site Name Proposed Development Cost Priority Development Riverside Park Gazebo $55,000 Medium River walk High $200,000 Renovation Total $255,000 City of Oshkosh 92 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations William A. Steiger Park Waterfront recreation 2.52 acres Install energy efficient lighting. Provide park identification sign. Add 20-foot diameter open shelter with concrete base and electricity. Replace dock. Provide benches on pier and along river walk. Provide shoreline restoration, including rip rap and native plantings (2,200 L.F.). Renovate open air shelters. Site Name Proposed Development Cost Priority Development William A. Steiger Site Lighting $25,000 Medium Park Park Sign $7,500 Medium Open Shelter w/ $39,000 Medium Electricity Dock $25,000 Low Benches $40,000 Medium Shoreline $88,000 Medium Restoration Renovate Open Air $25,000 Medium Shelters Total $210,500 City of Oshkosh 93 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations SPECIAL USE PARKS Camp Bragg Memorial Special Use 0.07 acres Install energy efficient lighting. Site Name Proposed Development Cost Priority Development Camp Bragg Site Lighting $5,000 Low Memorial Total $5,000 Hikers Monument Special Use 1.12 acres Install energy efficient lighting. . Provide walking/pathways throughout park. Site Name Proposed Development Cost Priority Development Hikers Monument Site Lighting $5,000 Medium Monument $25,000 Low Improvements Pathways $10,000 Medium Total $40,000 City of Oshkosh 94 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations William G. Spanbauer Field Special Use 2.77 acres Install energy efficient lighting. Provide park identification sign. Replace and provide new storage shed. Provide new batting cages. Provide ball field improvements such as es, outfield fence and backstop and safety netting including improved drainage. Provide a new concession stand. Restroom and concession renovations. Install irrigation system. Redevelop parking lot.* Replace scoreboard. Install landscaping in northeast corner of property. Site Name Proposed Development Cost Priority Development William G. Site Lighting $25,000 Medium Spanbauer Field Park Sign $7,500 Medium Storage Shed $10,000 Low Batting Cages $32,000 Medium Ball Field $250,000 High Improvements Concession Stand $80,000 Medium Restroom/Concession $130,000 High Stand Renovation Irrigation $35,000 High Parking Lot TBD TBD Improvements* Scoreboard $17,000 High Landscaping $5,000 Medium Total $511,500 *Redevelop and maintain Parking Lots per City of Oshkosh Parking Lot Study City of Oshkosh 95 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations City of Oshkosh 96 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations NATURAL RESOURCE AREAS Glatz Nature Park Natural Resource Area 1.77 acres Provide park identification sign. Provide park fencing. Provide paved accessible path. Site Name Proposed Development Cost Priority Development Glatz Nature Park Park Sign $7,500 Medium Park Fencing $10,000 Medium Accessible Path $10,000 Medium Total $27,500 North High Conservancy Park Natural Resource Area 12.19 acres Install energy efficient lighting. Provide park identification sign. Provide trail maintenance, adding wood chips where needed. Site Name Proposed Development Cost Priority Development North High Site Lighting $10,000 Medium Conservancy Park Park Sign $7,500 Medium Trail Maintenance $30,000 High Total $47,500 City of Oshkosh 97 Comprehensive Outdoor Recreation Plan Section VIII: Recommendations Sawyer Creek Natural Resource Area 41.27 acres Install energy efficient lighting Provide park identification sign Develop Park Master Plan for upland area at western edge of creek Refer to the approved Sawyer Creek Master Plan and implement improvements and development per plan. City of Oshkosh 98 Comprehensive Outdoor Recreation Plan