HomeMy WebLinkAboutCORP Proposals
Section VIII: Recommendations
Proposals
The following specific proposals have been developed based on input from the needs
assessment as well as direction from City staff and the Advisory Park Board. Parks not
identified in the following list do not have immediate needs and/or recommendations at
this time.
The proposals include estimated costs for each individual component. Typically, these
costs include furnishing and installation as well as appropriate allowances for
demolition, mobilization, permits, etc.
The strategies detailed below are intended to provide guidance to the decision makers
responsible for implementing the plan and are organized into a matrix of short-, mid-
and long-term strategies based on time increments of 1-5 years, 6-9 years and 10 years
and beyond.
The schedule of improvements for each facility will be determined at a later date as
presented and approved by the Common Council.
City of Oshkosh 67
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Individual Park Recommendations and Concepts
Table of Contents
MINI PARKS ............................................................................................................................................... 69
CATL
.................................................................................................................... 69
ONGRESS VENUE OT OT
GCP
................................................................................................................................. 70
ARDEN LUB ARK
WWP
........................................................................................................................... 70
ILLIAM ATERS LAZA
NEIGHBORHOOD PARKS ........................................................................................................................ 71
44PP
............................................................................................................................... 71
TH ARALLEL ARK
AP
............................................................................................................................................. 72
BBEY ARK
ARP
.................................................................................................................................. 73
BE OCHLIN ARK
BP
.......................................................................................................................................... 75
AUMAN ARK
FP
..................................................................................................................................... 76
UGLEBERG ARK
MJP
................................................................................................................................. 77
ARY EWELL ARK
QP
.......................................................................................................................................... 77
UARRY ARK
RP
................................................................................................................................................. 78
OE ARK
SP
......................................................................................................................................... 79
TEVENS ARK
SP
.................................................................................................................................. 81
TOEGBAUER ARK
TP
................................................................................................................................... 82
EICHMILLER ARK
WAP
................................................................................................................................ 84
EST LGOMA ARK
WCP
........................................................................................................................ 85
ESTHAVEN IRCLE ARK
COMMUNITY PARKS ................................................................................................................................ 87
MP
..................................................................................................................................... 87
ENOMINEE ARK
RP
......................................................................................................................................... 87
AINBOW ARK
RAP
.................................................................................................................................... 88
ED RROW ARK
SP
............................................................................................................................................. 89
OUTH ARK
WATERFRONT RECREATION .................................................................................................................. 89
24ABL
.................................................................................................................... 89
TH VENUE OAT AUNCH
ABMG
........................................................................................................... 89
L ROULLIRE EMORIAL ARDEN
B
............................................................................................................................................. 90
OATWORKS
BSFD
.................................................................................................................. 90
OWEN TREET ISHING OCK
CE.SP
............................................................................................................................. 90
ARL TEIGER ARK
FBL
....................................................................................................................... 91
UGLEBERG OAT AUNCH
MSFD
.............................................................................................................. 91
ICHIGAN TREET ISHING OCK
MSBL
...................................................................................................................... 92
ILL TREET OAT AUNCH
RP
....................................................................................................................................... 92
IVERSIDE ARK
WA.SP
........................................................................................................................ 93
ILLIAM TEIGER ARK
SPECIAL USE PARKS ............................................................................................................................... 94
CBM
.......................................................................................................................... 94
AMP RAGG EMORIAL
HM
................................................................................................................................... 94
IKERS ONUMENT
WG.SF
.................................................................................................................. 95
ILLIAM PANBAUER IELD
NATURAL RESOURCE AREAS ................................................................................................................ 97
GNP
................................................................................................................................ 97
LATZ ATURE ARK
NHCP
............................................................................................................ 97
ORTH IGH ONSERVANCY ARK
SC
........................................................................................................................................ 98
AWYER REEK
City of Oshkosh 68
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
MINI PARKS
Congress Avenue Tot Lot
Mini Park 0.45 acres
Install energy efficient lighting.
Provide a park identification sign.
Provide accessible route to playground structure.
Provide perimeter walk at play area.
Upgrade the perimeter fence (4 ft. vinyl coated).
Replace play equipment and provide poured in place surface in play area (8,400 S.F.).
Site Name Proposed Development Cost Priority
Development
Congress Avenue Site Lighting $5,000 High
Tot Lot
Park Sign $7,500 Medium
Accessible Route $2,500 High
Perimeter Walk $18,000 High
Perimeter Fencing $20,000 High
Play Equipment:
Play Equipment and
$35,000
Poured in Place Play High
Poured in Place Play
Surface
Surface: $65,000
Total $153,000
City of Oshkosh 69
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Garden Club Park
Mini Park 0.35 acres
Proposed Features
Install energy efficient lighting.
Provide park identification sign.
Provide new park benches.
Update pathways throughout park.
Site Name Proposed Development Cost Priority
Development
Garden Club Park Site Lighting $5,000 Low
Park Sign $7,500 Medium
Benches $6,000 Medium
Pathways $8,500 Medium
Total $27,000
William Waters Plaza
Mini Park 0.18 acres
Proposed Features
Currently being designed by the city
City of Oshkosh 70
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
NEIGHBORHOOD PARKS
44th Parallel Park
Neighborhood Park 4.90 acres
Proposed Features
Install energy efficient lighting.
Provide park identification sign.
Provide accessible route to playground structure.
Provide perimeter walk at play area.
Expand concrete base at existing open shelter.
Add benches around play area.
Add 20-foot diameter open shelter with concrete base and electricity near play area.
Provide ball field es, outfield fence
and backstop.
Develop new trails and paths throughout facility ($1,000/L.F. of 10-foot path).
Replace play equipment and provide poured in place surface in play area (7,000 S.F.).
Provide wood fiber mulch in play area (annual maintenance expense).
Redevelop tennis courts
Site Name Proposed Development Cost Priority
Development
th
44 Parallel Park Site Lighting $25,000 Medium
Park Sign $7,500 Medium
Accessible Route $2,500 High
Perimeter Walk $16,000 High
Concrete Base $5,500 Low
Benches $8,000 Medium
Open Shelter w/
$39,000 Medium
Electricity
Ball Field
$135,000 High
Improvements
New Trails/Paths $60,000 Low
Play Equipment:
Play Equipment and
$35,000
Poured in Place Play High
Poured in Place Play
Surface
Surface: $56,000
Wood Fiber Mulch $5,000 High
Redevelop Tennis
$40,000 Low
Courts
Total $389,000
City of Oshkosh 71
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Abbey Park
Neighborhood Park 9.01 acres
Install energy efficient site lighting.
Provide park identification sign.
Provide accessible route to playground structure.
Provide perimeter walk at play area.
Add 20-foot diameter open shelter with concrete base and electricity near play area.
Replace play equipment and provide poured in place surface in play area (12,800
S.F.).
Remove existing benches from play structure area and replace with new benches
throughout park site.
Create trail connection to main walks.
Provide wood fiber mulch in play area (annual maintenance expense).
Site Name Proposed Development Cost Priority
Development
Abbey Park Site Lighting $10,000 High
Park Sign $7,500 Medium
Accessible Route $2,500 High
Perimeter Walk $16,000 High
Open Shelter w/
$39,000 Medium
Electricity
Play Equipment:
Play Equipment and
$35,000
Poured in Place Play High
Poured in Place Play
Surface
Surface: $102,400
Benches $20,000 Medium
Trail connection to $10,000
main Low
Wood Fiber Mulch $7,000 High
Total $248,400
City of Oshkosh 72
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Abe Rochlin Park
Neighborhood Park 5.16 acres
Install energy efficient lighting.
Provide park identification sign.
Provide accessible route to playground structure.
Provide perimeter walk at play area.
Provide new universal playground structure to site (installed at South Park).
Update existing shelter amenities, including bathroom restoration/accessibility.
Redevelop existing volleyball court including concrete curb.
Provide shoreline restoration, including riprap and native plantings (800 L.F.).
Provide accessible pier.
Provide new benches throughout park.
Provide wood fiber mulch in play area (annual maintenance expense).
Replace play equipment and provide poured in place surface in play area (5,600 S.F.).
Add h electricity along rivers edge.
Redevelop parking lot.*
Site Name Proposed Development Cost Priority
Development
Abe Rochlin Park Site Lighting $50,000 High
Park Sign $7,500 Medium
$2,500 High
Accessible Route to
Playground
Perimeter Walk $16,000 High
Universal $350,000 High
Playground
Shelter Restoration $80,000 High
Volleyball Court $20,000 Low
Shoreline $30,000 Medium
Restoration
Accessible Pier $25,000 Low
Benches $24,000 High
Wood Fiber Mulch $7,000 High
Play Equipment:
Play Equipment and
$35,000
Poured in Place Play Low
Poured in Place Play
Surface
Surface: $45,000
Open Shelters w/
$78,000 Medium
Electricity
Parking Lot
TBD TBD
Redevelopment*
Total $212,000
*Redevelop and maintain Parking Lots per City of Oshkosh Parking Lot Study
City of Oshkosh 73
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
City of Oshkosh 74
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Bauman Park
Neighborhood Park 2.02 acres
Install energy efficient lighting.
Provide park identification sign.
Provide accessible route to playground structure.
Provide perimeter walk at play area.
Provide new benches throughout park.
Replace play equipment and provide poured in place surface in play area (8,000 S.F.).
Provide ball field improvements: bleac, baseline fence and
backstop.
Add 20-foot diameter open shelter with concrete base and electricity near play area.
Provide shoreline restoration, including riprap and native plantings (600 L.F.).
Provide wood fiber mulch in play area (annual maintenance expense).
Site Name Proposed Development Cost Priority
Development
Bauman Park Site Lighting $25,000 Low
Park Sign $7,500 Medium
Accessible Route $2,500 High
Perimeter Walk $16,000 High
Benches $12,000 Medium
Play Equipment:
Play Equipment and
$35,000
Poured in Place Play High
Poured in Place Play
Surface
Surface: $65,000
Ball Field
$25,000 Medium
Improvements
Open Shelter w/
$39,000 Medium
Electricity
Shoreline $22,800 Medium
Restoration
Wood Fiber Mulch $5,000 Medium
Total $201,300
City of Oshkosh 75
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Fugleberg Park
Neighborhood Park 2.50 acres
Install energy efficient lighting.
Provide park identification sign.
Provide accessible route to playground structure.
Provide perimeter walk at play area.
Replace and provide new picnic tables and benches throughout park.
Provide concrete slabs under picnic tables.
Remove and provide a new 20-foot diameter open shelter with concrete base and
electricity near play area.
Resurface (overlay bituminous) existing basketball court.
Replace perimeter fencing
Replace play equipment and provide poured in place surface in play area (9,600 S.F.).
Provide wood fiber mulch in play area (annual maintenance expense).
Site Name Proposed Development Cost Priority
Development
Fugleberg Park Site Lighting $25,000 Medium
Park Sign $7,500 Medium
Accessible Route $2,500 High
Perimeter Walk $16,000 High
Benches & Picnic $20,000 Medium
Tables
Concrete Slab $6,000 Medium
Open Shelter w/
$39,000 Medium
Electricity
Resurface
$20,000 Medium
Basketball Court
Replace Perimeter $25,000 Low
Fencing
Play Equipment:
Play Equipment and
$35,000
Poured in Place Play High
Poured in Place Play
Surface
Surface: $76,800
Wood Fiber Mulch $10,000 Medium
Total $107,500
City of Oshkosh 76
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Mary Jewell Park
Neighborhood Park 4.64 acres
Install energy efficient lighting.
Provide ball field improvements such as es, outfield fence
and backstop dugouts, lighting, permanent outfield fence.
Provide restroom shelter.
Provide park identification sign
Site Name Proposed Development Cost Priority
Development
Mary Jewell Park Site Lighting $15,000 Low
Ball Field
$200,000 High
Improvements
Restroom Shelter $250,000 Medium
Park Sign $7,500 Medium
Total $222,500
Quarry Park
Neighborhood Park 8.02 acres
Install energy efficient lighting.
Provide dog park development.
Update existing shelter amenities, including bathroom restoration/accessibility.
Redevelop parking lot.*
Provide new site furnishings for park.
Site Name Proposed Development Cost Priority
Development
Quarry Park Site Lighting $25,000 Low
Dog Park Fencing $75,000 Low
Shelter Restoration $120,000 High
Parking Lot
TBD TBD
Improvements*
Site Furnishings $15,000 Medium
Total $235,000
*Redevelop and maintain Parking Lots per City of Oshkosh Parking Lot Study
City of Oshkosh 77
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Roe Park
Neighborhood Park 1.65 acres
Install energy efficient lighting.
Provide accessible route to playground structure.
Provide perimeter walk at play area.
Provide new site furnishings for park.
Provide wood fiber mulch in play area (annual maintenance expense).
Replace play equipment and provide poured in place surface in play area (3,600 S.F.).
Site Name Proposed Development Cost Priority
Development
Roe Park Site Lighting $25,000 High
Accessible Route $2,500 High
Perimeter Walk $16,000 High
Site Furnishings $5,500 Medium
Wood Fiber Mulch $8,000 High
Play Equipment:
Play Equipment and
$35,000
Poured in Place Play Medium
Poured in Place Play
Surface
Surface: $28,800
Total $77,300
City of Oshkosh 78
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Stevens Park
Neighborhood Park 4.85 acres
Install energy efficient lighting.
Provide accessible route to playground structure.
Provide perimeter walk at play area.
Redevelop (overlay bituminous) existing basketball court.
Update and redevelop tennis court.
Provide ball field improvements such as bleac fence
and backstop.
Provide new shelter with amenities including accessible bathroom.
Resurface tennis courts.
Provide wood fiber mulch in play area (annual maintenance expense).
Replace play equipment and provide poured in place surface in play area (8,644 S.F.).
Install two new park identification signs.
Site Name Proposed Development Cost Priority
Development
Stevens Park Site Lighting $25,000 High
Accessible Route $2,500 High
Perimeter Walk $16,000 High
Overlay Basketball
$20,000 Medium
Court
Tennis Court
$65,000 High
Redevelopment
Ball Field
$135,000 High
Improvements
Shelter $250,000 High
Resurface Tennis $25,000 Low
Courts
Wood Fiber Mulch $7,000 Low
Play Equipment:
Play Equipment and
$35,000
Poured in Place Play Low
Poured in Place Play
Surface
Surface: $58,400
Park Signs (2) $15,000 Medium
Total $175,400
City of Oshkosh 79
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
City of Oshkosh 80
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Stoegbauer Park
Neighborhood Park 1.87 acres
Install energy efficient lighting.
Provide park identification sign.
Provide ball field improvements such as
Redevelop (overlay bituminous) existing basketball court.
Install irrigation system.
Develop perimeter access walk.
Replace play equipment and provide poured in place surface in play area (9,600 S.F.).
Add 20 foot diameter open shelter with concrete base near play area.
Provide wood fiber mulch in play area (annual maintenance expense).
Site Name Proposed Development Cost Priority
Development
Stoegbauer Park Site Lighting $10,000 Medium
Park Sign $7,500 Medium
Ball Field
$30,000 High
Improvements
Overlay Basketball
$25,000 Medium
Court
Irrigation System $30,000 Low
Perimeter Access
$17,500 High
Walk
Play Equipment:
Play Equipment and
$50,000
Poured in Place Play High
Poured in Place Play
Surface
Surface: $76,800
Open Shelter w/
$200,000 Low
Bathroom Facility
Wood Fiber Mulch $5,000 High
Total $341,800
City of Oshkosh 81
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Teichmiller Park
Neighborhood Park 5.59 acres
Install energy efficient lighting.
Provide park identification sign.
Provide accessible route to playground structure.
Provide perimeter walk at play area.
Provide ball field improvements, including a bleacher pad, bleachers,
benches, baseline fence and backstop.
Redevelop (overlay bituminous) existing basketball court.
Restroom renovations.
Update existing shelter amenities, including bathroom restoration/accessibility.
Provide 700 feet of walking/pathways throughout park.
Replace play equipment and provide poured in place surface in play area (8,400 S.F.).
Update and redevelop tennis courts, including new surfacing and bounding board.
Provide wood fiber mulch in play area (annual maintenance expense).
Site Name Proposed Development Cost Priority
Development
Teichmiller Park Site Lighting $25,000 Medium
Park Sign $7,500 Medium
Accessible Route $2,500 High
Perimeter Walk $16,000 High
Ball Field
$35,000 High
Improvements
Basketball Court
$25,000 Low
Overlay
Restroom $120,000
Renovations
Shelter Restoration $80,000 High
Walks throughout $100,000
park Low
Play Equipment:
Play Equipment and
$50,000
Poured in Place Play High
Poured in Place Play
Surface
Surface: $67,200
Tennis Court
$65,000 Medium
Improvements
Wood Fiber Mulch $7,000 High
Total $206,700
City of Oshkosh 82
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
City of Oshkosh 83
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
West Algoma Park
Neighborhood Park 1.80 acres
Install energy efficient lighting.
Provide park identification sign.
Provide accessible route to playground structure .
Provide perimeter walk at play area.
Replace play equipment and provide poured in place surface in play area (5,950 S.F.).
Add 20-foot diameter open shelter with concrete base and electricity near play area.
Provide shoreline restoration, including rip rap and native plantings (200 L.F.).
Provide wood fiber mulch in play area (annual maintenance expense).
Site Name Proposed Development Cost Priority
Development
West Algoma Park Site Lighting $5,000 Low
Park Sign $7,500 Medium
Accessible Route $10,000 High
Perimeter Walk $16,000 High
Play Equipment:
Play Equipment and
$45,000
Poured in Place Play Low
Poured in Place Play
Surface
Surface: $47,600
Open Shelter w/
$39,000 Low
Electricity
Shoreline $10,000 Medium
Restoration
Wood Fiber Mulch $8,000 High
Total $172,100
City of Oshkosh 84
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Westhaven Circle Park
Neighborhood Park 6.59 acres
Install energy efficient lighting.
Provide park identification sign.
Provide accessible route to playground structure.
Provide perimeter walk at play area.
Provide ball field improvements ,
backstop, and improve drainage.
Redevelop existing basketball court (overlay bituminous and resurface).
Provide tennis court improvements: new bounding board, surfacing, and multifunction
striping.
Restroom renovation
Replace play equipment and provide poured in place surface in play area (5,600 S.F.).
Provide 700 feet of walking/pathways throughout park.
Provide a splash pad.
Provide wood fiber mulch in play area (annual maintenance expense).
Site Name Proposed Development Cost Priority
Development
Westhaven Circle Site Lighting $50,000 High
Park
Park Sign $7,500 Medium
Accessible Route $2,500 High
Perimeter Walk $16,000 High
Ball Field
$135,000 High
Improvements
Basketball Court
$35,000 High
Surfacing
Board: $45,000
Tennis Court
Surfacing & Striping:
Improvements
$35,000
Restroom High
$130,000
Renovation
Play Equipment:
Play Equipment and
$45,000
Poured in Place Play High
Poured in Place Play
Surface
Surface: $45,000
Pathways $48,000 High
Splash Pad $150,000 Low
Wood Fiber Mulch $10,000 High
Total $754,000
City of Oshkosh 85
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
City of Oshkosh 86
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
COMMUNITY PARKS
Menominee Park
Community Park 103.39 acres
Develop a Park Master Plan.
Refer to the approved Menominee Park Master Plan and implement improvements
and development per plan.
Rainbow Park
Community Park 17.05 acres
Refer to the approved Rainbow Park Master Plan and implement improvements and
development per plan.
City of Oshkosh 87
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Red Arrow Park
Community Park 26.60 acres
Install energy efficient lighting.
Provide park identification sign.
Update existing shelter amenities, including bathroom restoration/accessibility.
Replace play equipment and provide poured in place surface in play area (6,000 S.F.).
Add 20-foot diameter open shelter with concrete base and electricity near play area.
Provide wood fiber mulch in play area (annual maintenance expense).
Redevelop parking lot.*
Restoration of existing skate park.
Note: City of Oshkosh should research limitations of site and make determination of
future use due to history as a former old landfill.
Site Name Proposed Development Cost Priority
Development
Red Arrow Park Site Lighting $25,000 High
Park Sign $7,500 Medium
Restroom $80,000 High
Restoration
Play Equipment:
Play Equipment and
$45,000
Poured in Place Play Medium
Poured in Place Play
Surface
Surface: $48,000
Open Shelter w/
$39,000 Medium
Electricity
Wood Fiber Mulch $8,000 High
Parking Lot
TBD TBD
Improvements*
Skate Park
$65,000 Medium
Restoration
Total $237,500
*Redevelop and maintain Parking Lots per City of Oshkosh Parking Lot Study
City of Oshkosh 88
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
South Park
Community Park 23.68 acres
Refer to the approved South Park Master Plan and implement improvements and
development per plan.
WATERFRONT RECREATION
24th Avenue Boat Launch
Riverfront Recreation 1.68 acres
Install energy efficient lighting.
Provide accessible route to main pier.
Provide shoreline restoration, including rip rap and native plantings (1,200 L.F.).
Replace and provide new bridge or boardwalk.
Redevelop parking lot.*
Update existing shelter amenities, including bathroom restoration/accessibility.
Construct new information kiosk.
Install Electronic Pay Station
Site Name Proposed Development Cost Priority
Development
th
24 Avenue Boat Site Lighting $25,000 Medium
Launch
Pier Accessibility $5,000 High
Shoreline $45,600
Medium
Restoration
Bridge $50,000 High
Parking Lot
TBD TBD
Improvements*
Shelter Restoration $80,000 High
Information Kiosk $2,000 High
Electronic Pay $20,000 High
Station
Total $97,600
*Redevelop and maintain Parking Lots per City of Oshkosh Parking Lot Study
Al Broullire Memorial Garden
Waterfront Recreation 0.14 acres
Site to be developed in conjunction with river walk development as directed by Fox
River Corridor Plan.
City of Oshkosh 89
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Boatworks
Waterfront Recreation 5.00 acres
Bowen Street Fishing Dock
Waterfront Recreation 0.33 acres
Provide accessible route to pier.
Provide dock updates. Convert to composite deck.
Site Name Proposed Development Cost Priority
Development
Bowen Street Pier Accessibility $5,000 High
Fishing Dock
Dock Improvements $40,000 High
Total $40,000
Carl E. Steiger Park
Waterfront Recreation 2.43 acres
Install energy efficient lighting.
Provide shoreline restoration, including riprap and native plantings (750 L.F.).
Provide new benches along trail.
Provide 750 feet of walking/pathways throughout park.
Site Name Proposed Development Cost Priority
Development
Carl E. Steiger Site Lighting $5,000 Low
Park
Shoreline Medium
$28,500
Restoration
Benches $30,000 Medium
Pathways $55,000 High
Total $63,500
City of Oshkosh 90
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Fugleberg Boat Launch
Waterfront Recreation 2.40 acres
Install energy efficient lighting.
Provide park identification sign.
Redevelop parking lot.*
Renovate restroom facility
Replace dock
Construct new boat launch.
Install electronic pay station.
Site Name Proposed Development Cost Priority
Development
Fugleberg Boat Site Lighting $25,000 Medium
Launch
Park Sign $7,500 Medium
Parking Lot
TBD TBD
Improvements*
Restroom $130,000 High
renovations
Replace Dock $25,000 Low
Construct new boat 85,000
launch
Electronic Pay $20,000 High
Station
Total $292,500
*Redevelop and maintain Parking Lots per City of Oshkosh Parking Lot Study
Michigan Street Fishing Dock
Waterfront Recreation 0.6 acres
Provide accessible route to dock.
Provide dock updates, including water sealing rails and convert to composite deck.
Provide benches.
Site Name Proposed Development Cost Priority
Development
Michigan Street Pier Accessibility $5,000 High
Fishing Dock
Dock Improvements
$50,000 Low
composite decking
Benches $15,000 Medium
Total $15,000
City of Oshkosh 91
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Mill Street Boat Launch
Waterfront Recreation 0.08 acres
Install energy efficient lighting.
Replace dock.
Provide shoreline restoration, including rip rap and native plantings (80 L.F.).
Develop site master plan for added parking and access.
Install electronic pay station.
Site Name Proposed Development Cost Priority
Development
Mill Street Boat Site Lighting $10,000 Low
Launch
Dock $25,000 Low
Shoreline $40,000 Medium
Restoration
Site Master Plan $10,000 Medium
Electronic Pay $20,000 High
Station
Total $85,000
Riverside Park
Waterfront Recreation 2.03 acres
Construct a gazebo shelter
Renovate the River walk adjacent to the Leach Amphitheater.
Site Name Proposed Development Cost Priority
Development
Riverside Park Gazebo $55,000 Medium
River walk High
$200,000
Renovation
Total $255,000
City of Oshkosh 92
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
William A. Steiger Park
Waterfront recreation 2.52 acres
Install energy efficient lighting.
Provide park identification sign.
Add 20-foot diameter open shelter with concrete base and electricity.
Replace dock.
Provide benches on pier and along river walk.
Provide shoreline restoration, including rip rap and native plantings (2,200 L.F.).
Renovate open air shelters.
Site Name Proposed Development Cost Priority
Development
William A. Steiger Site Lighting $25,000 Medium
Park
Park Sign $7,500 Medium
Open Shelter w/
$39,000 Medium
Electricity
Dock $25,000 Low
Benches $40,000 Medium
Shoreline $88,000 Medium
Restoration
Renovate Open Air $25,000 Medium
Shelters
Total $210,500
City of Oshkosh 93
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
SPECIAL USE PARKS
Camp Bragg Memorial
Special Use 0.07 acres
Install energy efficient lighting.
Site Name Proposed Development Cost Priority
Development
Camp Bragg Site Lighting $5,000 Low
Memorial
Total $5,000
Hikers Monument
Special Use 1.12 acres
Install energy efficient lighting.
.
Provide walking/pathways throughout park.
Site Name Proposed Development Cost Priority
Development
Hikers Monument Site Lighting $5,000 Medium
Monument
$25,000 Low
Improvements
Pathways $10,000 Medium
Total $40,000
City of Oshkosh 94
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
William G. Spanbauer Field
Special Use 2.77 acres
Install energy efficient lighting.
Provide park identification sign.
Replace and provide new storage shed.
Provide new batting cages.
Provide ball field improvements such as es, outfield fence and backstop
and safety netting including improved drainage.
Provide a new concession stand.
Restroom and concession renovations.
Install irrigation system.
Redevelop parking lot.*
Replace scoreboard.
Install landscaping in northeast corner of property.
Site Name Proposed Development Cost Priority
Development
William G. Site Lighting $25,000 Medium
Spanbauer Field
Park Sign $7,500 Medium
Storage Shed $10,000 Low
Batting Cages $32,000 Medium
Ball Field
$250,000 High
Improvements
Concession Stand $80,000 Medium
Restroom/Concession $130,000 High
Stand Renovation
Irrigation $35,000 High
Parking Lot
TBD TBD
Improvements*
Scoreboard $17,000 High
Landscaping $5,000 Medium
Total $511,500
*Redevelop and maintain Parking Lots per City of Oshkosh Parking Lot Study
City of Oshkosh 95
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
City of Oshkosh 96
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
NATURAL RESOURCE AREAS
Glatz Nature Park
Natural Resource Area 1.77 acres
Provide park identification sign.
Provide park fencing.
Provide paved accessible path.
Site Name Proposed Development Cost Priority
Development
Glatz Nature Park Park Sign $7,500 Medium
Park Fencing $10,000 Medium
Accessible Path $10,000 Medium
Total $27,500
North High Conservancy Park
Natural Resource Area 12.19 acres
Install energy efficient lighting.
Provide park identification sign.
Provide trail maintenance, adding wood chips where needed.
Site Name Proposed Development Cost Priority
Development
North High Site Lighting $10,000 Medium
Conservancy Park
Park Sign $7,500 Medium
Trail Maintenance $30,000 High
Total $47,500
City of Oshkosh 97
Comprehensive Outdoor Recreation Plan
Section VIII: Recommendations
Sawyer Creek
Natural Resource Area 41.27 acres
Install energy efficient lighting
Provide park identification sign
Develop Park Master Plan for upland area at western edge of creek
Refer to the approved Sawyer Creek Master Plan and implement improvements and
development per plan.
City of Oshkosh 98
Comprehensive Outdoor Recreation Plan