HomeMy WebLinkAbout16. 17-284 JUNE 13, 2017 17-284 RESOLUTION
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE PROFESSIONAL SERVICE AGREEMENT WITH
AECOM FOR SOUTH SHORE MORGAN DISTRICT RIVERWALK
($236,150)
INITIATED BY: COMMUNITY DEVELOPMENT
BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper
City officials are hereby authorized to enter into and take those steps necessary to
implement an appropriate professional services agreement with AECOM for South Shore
Morgan District Riverwalk in the amount of$236,150.00
Acct No. 534-1040-7216-07710 TIF # 20 South Shore Redevelopment Area
Acct No. 536-1040-7216-07710 TIF # 21 Fox River Corridor Project
TO: Honorable Mayor and Members of the Common Council
FROM: Allen Davis, Community Development Director
DATE: June 8, 2017
RE: Approve Professional Service Agreement with AECOM for South Shore Morgan
District Riverwalk ($236,150)
BACKGROUND
The Community Development Department is recommending entering into a professional
services to AECOM related to the construction of the riverwalk along the Fox River from
Oregon Street west along the top of the sheet pile installed in 2016, to the Morgan district
lagoon area.
Fortunately, the Wisconsin Department of Natural Resources (WisDNR) granted the City of
Oshkosh a total of $798,923, which should fund about half the cost of this riverwalk segment.
The City has also submitted another grant application this past May for another, and hopefully
last, riverwalk segment through the Morgan District, finally connecting to the Boatworks
bridge.
ANALYSIS
The proposed fees are based on an hourly contract, not to exceed $236,150. Specific elements
of the services to be performed for the project west of Oregon Street are:
• Final Construction drawings, permitting and Plan Specifications
• Bidding
• Construction survey stake out
• Construction observation/documentation
• Civil/Structural engineering as needed
• Environmental/geotechnical engineering as needed
• Grant reporting/documentation as needed.
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us
It is anticipated that the riverwalk construction would be complete in 2017, but may continue
into 2018, depending on weather conditions and availability of materials.
FINANCIAL ANALYSIS
The cost of these professional services was included in the project originally listed in the 2017
Capital Improvement Plan. City matching funding will come from TID #20 and TID #21.
RECOMMENDATION
The City Council approves the proposed contract with AECOM for $236,150.
Submitted,
Allen Davis
Community Development Director
Approved:
Mark A. Rohloff
City Manager
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us
Marion Marion Road
2011 City , ...
Center Hotel
city cente Riverside
•- and 2012-2013 Park Leach
HateI 2
4 y 2010 Amphitheater
Rive 2008
riu
S are
cr Park ■ y Fax River -- -- _ —_ -_ - -_ - t'ublkc Access
William A. � �, --� ■.■.r' �:. 5■.th w ■ ■ ■ ■ z�_� --_ r 59te
Steiger Park x
2013 a+5,4 r cpetrai ii..V.
•��_FaxRrer
Boat Works ;zona Seip wen°4
Area JeldWen Phase 1 ath :�
2014-2015 2016 are •���
+' Jeld-Wen PhSouth Shore
ase 2
;� •' ��
i Jeld-Wen Phase 3 2017/ 18 Central, South
2018/19/20 Shore East, ■ v
Pioneer Island •
To Be Determined