HomeMy WebLinkAbout01. 17-226 MAY 9, 2017 17-226 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE FINAL RESOLUTION FOR SPECIAL ASSESSMENTS — EVELINE STREET (CEAPE AVENUE TO SAY SHORE DRIVE) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the Common Council of the City of Oshkosh held a public hearing on the 91h day of May, 2017, at 6:00 p.m. for the purpose of hearing all interested persons concerning the preliminary resolution and report of the City Manager (Board of Public Works) on the proposed improvements as listed below, pursuant to the initial resolution adopted April 11, 2017, by the Oshkosh Common Council of the following named streets: Grading and Graveling, Concrete Pavement, Asphalt Pavement, Sidewalk, Driveway Aprons, Sanitary Sewer Laterals (new and relay), Storm Sewer Laterals ,new and relay, and Water Laterals (new and relay): Eveline Street from Ceape Avenue to Bay Shore Drive NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh as follows: 1. That the proposed street grade(s), from a datum plane established by the official United States Coast and Geodetic Survey, as identified and on file in the Department of Public Works is/are hereby permanently established. 2. The Common Council for the City of Oshkosh hereby orders that sidewalk be constructed according to the established grade pursuant to Section 66.0907 of the Wisconsin Statutes and the ordinances of the City of Oshkosh on the following locations: MAY 9, 2017 17-226 RESOLUTION CONT'D 3. That the report of the City Manager, acting as the Board of Public Works, pertaining to the construction of the above described public improvements,including plans and specifications therefor, is hereby adopted and approved with the following modifications: a. b. C. d. 4. That the action of the City Manager in advertising for bids and to carry out the work of such improvements in accordance with the reports of the City Manager and in accordance with the said resolution heretofore adopted, is hereby approved, ratified and confirmed. 5. That payment for said improvements be made by assessing the cost to the property benefited as indicated in said report, except as modified herein. 6. Assessments shown on the report represent an exercise of the police power and have been determined on a reasonable basis and are hereby confirmed. 7. That the assessments for all projects included in said report are hereby combined as a single assessment but any interested property owners shall be entitled to object to each assessment separately or all assessments jointly for any purpose or purposes. 8. That the assessments may be paid in cash, or in installments pursuant to Section 25-83 thru 25-89 of the Oshkosh Municipal Code, said deferred payments to bear interest at the rate of six percent (6%) per annum on the unpaid balance. The City Clerk shall publish an installment assessment notice in accordance with Section 66.0715(3)(e) of the Wisconsin Statutes in the official newspaper of the City. 9. The City Clerk is directed to publish this resolution in the OSHKOSH DAILY NORTHWESTERN, the official newspaper of the City. 10. The City Clerk is further directed to mail a copy of this resolution to every property owner whose name appears on the assessment roll whose post office address is known or can with reasonable diligence be ascertained. City of Oshkosh 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54902-1130 L Pamela R. Ubrig City Clerk Angela J. l Deputy Cityy Clerk erk Oshkosh F tE. Karl Election Aide April 28, 2017 Dear Property Owner: Please find enclosed the following documents for your information and review: A letter of explanation from Public Works Assistant Director Steven Gohde. 1A. Information sheet on parking during construction. 113. Information sheet on lead service line replacement program. 2. The Initial Resolution adopted by the Oshkosh Common Council, which began the process for the improvement(s) adjacent to your property. 3. Notice of Public Hearing to be held by the Oshkosh Common Council on May 9, 2017 regarding assessments, which will be set with the adoption of the final resolution, also scheduled for adoption on May 9, 2017. 4. Special assessment payment plan options explaining the payment choices after Contract No. 17-04 is certified as complete — payment choice or payment is not accepted at this time. 5. Assessment sheet indicating properties involved in the proposed project, the property footage, price per foot and estimated total assessment to the property. If you wish to appear before the Council before the final resolution is adopted to proceed with the construction, please refer to the 'Notice of Public Hearing" enclosed. If you have any questions regarding the above listed documents, please contact the Public Works Department (236-5065) or the City Clerk (236-5011), Monday through Friday, 8:00 a.m. until 4:30 p.m. Sincerely, TY OF OSHK PAMELA R. UBRIG City Clerk CITY HALL 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903-1130, City of Oshkosh April 28, 2017 Subject: Assessments for Concrete Paving, Asphalt Paving, Sanitary Sewer Laterals (New & Relay), Water Laterals (New and Relay), Storm Sewer Laterals (New and Relay), Sidewalk Repair, New Sidewalk, and Concrete Drive Approaches Eveline Street To Property Owners on: ➢ EVELINE STREET, from Ceape Avenue to Bay Shore Drive A public hearing is scheduled for Tuesday, May 9, 2017, in the Common Council Chambers at City Hall to consider improvements to your street. Staff will be available beginning at 4:30 p.m. in Room 310 of City Hall to answer questions about the project and the estimated costs. Residents may also call the Department of Public Works Engineering Division at (920)236-5065 to have questions answered. The public hearing covers the proposed improvements, which include the following: paving, utilities, sidewalks, and/or driveway approaches and the levy of special assessments that partially cover the cost of the improvements. Assessments are not due until the project is certified as complete and these charges can be paid by any one of the plans as outlined by the City Clerk's information on payment plan options. Based upon the City of Oshkosh assessment policy, the assessable portions of the project have been identified and are outlined on the attached assessment worksheet(s). The estimated distance for construction on side streets is estimated high to allow adequate area for the new construction to be transitioned to the existing pavement. The quantities and costs are estimates and will be adjusted to the actual quantity installed. Unit costs will be adjusted according to the assessment policy based on bid prices. The estimated quantities for sidewalk include up to six (6) additional squares of sidewalk to allow for private utility lateral construction. Only squares actually removed and replaced to repair defective sidewalk or facilitate the private utility lateral construction will be billed to the property owner. Additional sidewalk squares removed will not be billed to the property owner if the Construction Access Agreement previously mailed to them was signed and returned by the property owner. Property owners who have not returned the Construction Access Agreement will only have partial sidewalk squares removed and patched. These property owners will be sent orders to replace the patched sidewalk with permanent concrete sidewalk in 2018. These property owners will be financially responsible for replacing all patched concrete sidewalk, all defective sidewalk, and all sidewalk that does not meet the Americans with Disabilities Act (ADA) standards. Sidewalk squares needing replacement only to meet ADA standards will not be billed to the property owner if the property owner returns the Construction Access Agreement before commencement of the street reconstruction project. If needed, please contact the Department of Public Works Engineering Division at (920)236-5065 or attend the meeting listed above to get a copy of the agreement form. The enclosed assessment information assumes the Construction Access Agreement was signed and returned by the property owner. I:\ Engineering\2017 CONTRACM 17-04 Conc Paving & Util\ Eveline Page 1 of 3 100 St\Project_Information\Correspondence\Letters\Eveline St Assessments Letter#1_4-28-17.dooc Enclosed with this letter is information about lead water services and a program to replace lead services on private property. Please review this information in Attachment 1B, in addition to this letter. The enclosed assessments do not include replacing the private water service line. The final assessment cost will not increase above the estimated total without another public hearing. Questions in regard to payment of Special Assessments can be answered by calling the City Clerk's office at (920)236- 5011. Questions in regard to the construction project in general can be answered by calling the Department of Public Works Engineering Division at (920)236-5065. The sequence of construction has been tentatively scheduled by the Contractor. Work on Eveline Street is tentatively scheduled to begin in late June and be completed in approximately 14 weeks. Residents will be notified approximately one (1) week before construction will begin on a particular street. Each street identified in this year's paving program has been designated a specific time frame in which the contractor will need to complete their work on that street. The construction time frames vary from 9 to 18 weeks depending upon the amount of work and the complexity of the work associated with a specific street. All work within this contract is scheduled to be completed by the end of November 2017. Wisconsin Public Service and other utility companies will be relocating some of their facilities prior to the City contractor beginning work. This work is not part of the above time frame. A specific description of the project construction consists of the following elements: concrete pavement with curb and gutter; relay or installation of specific segments of water and sanitary sewer mains and their associated laterals at various locations along the project; relay or installation of storm sewer and storm sewer laterals, as needed, along the project to accommodate the drainage needs for the street and the adjacent properties; new concrete driveway aprons will be constructed; and the existing concrete sidewalk will be repaired, as needed. Gaps in the sidewalk system will be completed with construction of new sidewalk. It is recommended that no salt or harsh chemicals be put on the new sidewalk for one (1) year. If you know of any underground wires and/or piping (examples: invisible electric fence, conduit for exterior lighting, irrigation system, etc.) on your property which are located near the sidewalk, right-of-way, or driveways, please contact the Engineering Division as soon as possible. Any private improvements within the right-of-way, brick pavers, shrubs, lights, etc. will be removed by the contractor during construction and will not be replaced. In the event you wish to replace certain items, a permit must be obtained from the Department of Public Works prior to your beginning the work. Prior to the completion of the project, all disturbed areas will be topsoiled, seeded, and covered with erosion mat. The property owner is responsible for watering the newly vegetated areas. The matting placed over the seed is biodegradable. Please do not remove the mat because it serves as mulch for the new grass. Please set your lawn mower to the highest setting when mowing the new grass areas until the new grass areas are well established. As part of the construction, a storm lateral is proposed to be installed for each residential lot on the project. An eight -inch (8") diameter surface drain with a slotted drain cover will be placed into your yard. The storm sewer lateral and drain will allow you to direct drainage and/or sump pump hoses to this location. This drain is connected to the storm sewer system and drains directly to local streams and lakes. The lateral is to be used for "clear water" only. "Clear water" is typically groundwater discharged by a sump pump or runoff from precipitation (i.e. rainfall or snow melt). Do not place pet waste, yard waste, or other waste material into the storm sewer system. In the event conditions on the property prevent the installation of the drain (example: a substantial retaining wall), a drain will not be installed, but the storm sewer lateral will be installed underground to the property line. You will be receiving additional information about the storm sewer lateral and drain, including a telephone number for contact to coordinate the lateral's and drain's final location. The drain is part of your private lateral and it will be yours to maintain. The drain will have a fabric filter installed as a part of the construction. Please leave the filter in place until the grass surrounding the drain is well established. The fabric will prevent dirt and debris from filling the pipe until the grass is established. I:\Engineering\2017 CONTRACTS\17-04 Conc Paving & Util\Eveline Page 2 of 3 St\ Project_Information\Correspondence \Letters\Eveline St Assessments Letter #1_428-17.docx Commercial properties will receive a larger diameter storm sewer lateral installed onto the property. The previous two paragraphs assume the Construction Access Agreement was signed and returned by the property owner. During construction, there will be periods of time when access to residential properties will be restricted. There will only be a few instances when this situation will occur. Typically, short access restrictions occur during the underground utility installation and longer restrictions occur during the placement of concrete pavement and driveways. To minimize the inconvenience, the contractor will provide a one-week notice prior to the access being restricted for concrete work. Per the Police Department, a Construction Parking Permit is not required to park on a street overnight, if you park within two (2) blocks of the street under construction (see enclosed information). All "No Parking" areas and/or posted time zones must be obeyed. Vehicles parking overnight must be parked on the house address side of the street that corresponds to the current date before midnight. On odd calendar dates, the vehicles should be parked on the odd address side of the street. On even calendar dates, vehicles should be parked on the even address side of the street. Provisions will be made with the Fire Department and the Sanitation Division so fire protection and City garbage/recycling collection will continue at all times. Please ensure your garbage/recyclables are at the curbside by 7:00 a.m. on your regular collection day. Crews schedule collection of garbage/recyclables in construction areas at the start of each day. If rural -type mailboxes exist on your street, the contractor will remove them during construction. This removal will make it necessary for you to pick up your mail at the Post Office. The contractor will be responsible so as not to damage the mailboxes. Upon completion of the paving work, the contractor will reset the mailboxes. For commercial properties, the contractor is required to maintain access. Business owners are encouraged to provide the City's Engineering Division with contact information, which will be shared with the contractor. Communication between you, the City, the City's contractor, and your customers and delivery personnel will help the project proceed as quickly as possible. Although terrace trees may need to be removed at specific locations, they will be preserved as much as possible. Property owners at locations where a tree needs to be removed will receive advance notice of the removal and replacement options. Roots and branches may be cut to allow for paving operations. Cutting and pruning will either be done by, or under the direction of, the City Forester. The City has implemented a way for you to receive project updates via e-mail. The updates will provide information about access and construction progress. To receive these updates, please send a blank e-mail to contractl704-subscribe@lists.ci.oshkosh.wi.us. You will receive an e-mail stating your subscription request has been received. You must reply to the message within five (5) days to complete the subscription. The City will stop sending updates upon completion of the project. If at any time you wish to unsubscribe, please send an e- mail to this address, contractl704-unsubscribe@lists.ci.oshkosh.wi.us. Please feel free to contact the Public Works Engineering Division at (929)236-5065 prior to the scheduled public hearing if you have any questions on the proposed assessments or the project construction. Sincerely, Steven M. Gohde, P.E. Assistant Director of Public Works SMG/tlt Enclosures I:\ Engineering\ 2017 CONTRACM\ 17-04 Conc Paving & Util\ Eveline Page 3 of 3 St\Project_Information\Correspondence\Letters\Eveline St Assessments Letter U1_4-28-17.docc City of Oshkosh Police Department 420 Jackson Street Oshkosh, Wl 54901 Tel: 920-236-5720 Fax: 920-236-5087 dsmith@ci.oshkosh.wi.us PROFESSIONALISM • PRIDE • INTEGRITY • TEAMWORK Dean Smith Chief of Police As per Sections 27-27, 27-28, and 27-29 of the Municipal Code of the City of Oshkosh, there is no parking on City streets, 2 AM to 5 AM, unless the owner of vehicle was granted permission or has purchased a City parking permit. If your street or sidewalk is under construction, it is NOT necessary to obtain a parking permit if you park your car within two blocks of the street under construction. All City ordinances and parking rules/guidelines must be followed, and all posted parking restrictions, including time zones and no parking areas, must be obeyed. You will need to follow the odd -even rules. On odd days of the week, the vehicle should be parked on the side of the street with odd -numbered houses. On even days of the week, the permit holder should park on the side of the street with even -numbered houses. Each night, the car should be parked on the opposite side of the street as the night before. NOTE: Odd and even dates are figured before midnight. If parking is only allowed on one side of the street, the Odd -Even rule DOES apply. Vehicles can only park on the side of the street that does not have restricted parking and are only allowed to park overnight on the appropriate Odd -Even days. In the case of a declared Snow Emergency, parking on City streets is restricted to one side of the street using the Odd -Even rule with dates figured from noon on the calendar date to noon on the following calendar date. It is the responsibility of the vehicle owner/operator to find appropriate parking in the event of a snow emergency. Vehicles in violation of snow emergency parking will be towed at the owner's expense. Disabled vehicles are not allowed to park overnight at anytime and should be moved within 24 hours. Motor busses, truck tractors, semi -trailers and motor trucks designed, used, or maintained primarily for the transportation of property as defined in Municipal Code 27-26(3) are not permitted to park overnight on City streets. All street parking is subject to the following guidelines: • May not park in signed / designated "No Parking" areas. • Vehicles may not stop or park in a designated "Fire Lane". • No parking within 10 feet of a fire hydrant (an official traffic sign may indicate a greater distance is required). • No parking in loading zones. • No parking within 4 feet of an alley or private roadway or driveway. • No parking within 15 feet to the near limits of a crosswalk. Failure to follow the above rules could result in parking citations being issued. Individuals wishing to appeal a parking citation may do so by completing a Request to Review Parking Citation form which is available at the Oshkosh Police Department Telecommunications Desk, on the Police Department website (oshkoshpd.com) or on the City of Oshkosh website. The Mission ofthe Oshkosh Po/ice Department is to promote pub/ic safety and to enhance the quatityof/ife in ourcommunitythrough innouatiue po/icingandcommunitypadnerships city fV� Oshkosh Lead Service Line Replacement Information The purpose of this document is to inform property owners of the potential existence of a lead water service line at your property and a City program to replace it. Lead service lines and home plumbing are potential sources of lead in drinking water. Lead is harmful to human health, particularly the health of small children. For this reason, the City of Oshkosh (City) uses corrosion control treatment at the water filtration plant to minimize the potential for lead in the City's drinking water. As part of the construction project adjacent to your property, the City will replace the water main and the City -owned portion of the water service line to your home. The City owns and is responsible for maintaining the water service line up to the curb stop (the first valve) off the water main. For a vast majority of residential properties, the curb stop is typically located in the terrace or in the sidewalk adjacent to the street. The water service line from inside your building out to the curb stop is owned and maintained by the property owner. vate Service Ld ay be lead) Homeowner's Responsibility Sidewalk City Water Main Curb Stopy (no lead) Public Service Line (may be lead) s4— City Responsibility —► I:\Engineering\Tracy Taylor\ Public Works Contracts\Miscellaneous\Lead Water Lateral Program_2-3- Page 1 of 3 17.docx Recent studies have shown that replacing only a portion of a lead service line can increase the risk of lead exposure from drinking water to the occupants. As a result, the City is implementing new policies and procedures to reduce the risk of lead exposure to its residents. The City's proposed new ordinance will require full Lead Service Line Replacement (LSLR), replacement of both the public and privately -owned lead service lines, within six (6) months of work on a lead water service line. Because water utility rates cannot be used to fund private lead service line replacement, the City obtained grant money to help reduce the cost to private property owners in 2017. While the City's Lead Service Line Replacement Program is still being developed, program features will conform to the proposed City ordinance revisions and a new City Lead Service Line Replacement Policy. The ordinance will make replacement of lead water service lines mandatory and the policy will describe how the ordinance will be implemented. Approval of the ordinance and policy are anticipated at the February 28, 2017 Common Council meeting. To utilize grant funding in 2017, the City will solicit bids from licensed contractors to complete private lead service line replacements. The selected private LSLR contractor will be responsible for coordinating with the contractor performing the construction work on the City's water main and public water service line, and coordinating with the property owner. The City will provide property owners with the name and contact information of the selected private LSLR contractor. Residential property owners, who work with the City's private LSLR contractor to complete the lead service line replacement as part of the project, will be eligible to receive a fifty percent (50%) reduction of the lead service line replacement's total cost, up to $1,500 per parcel. The actual cost of private lead service line replacement can vary significantly. Some of the factors include: length of service line, method of service line replacement, and construction methods of the building. It is anticipated a majority of the private lead service line replacements will cost between $1,000 and $2,500 each. The City will send a separate bill to private property owners for the cost of the lead service line replacement less the grant -funded cost share. By law, private lead service line replacement costs are not eligible for assessments or a payment plan. Disturbing and replacing lead water service lines may result in temporarily increased lead levels in drinking water. To minimize exposure to this risk during construction, the City will be providing a faucet filter and a replacement filter cartridge, certified for lead removal by NSF International, to each living unit on a parcel with a lead water service line. Based on available information, the City anticipates your water service line is likely made of lead. To determine if your water service line is lead, you may contact a certified plumber, the City's Water Utility at (920)232-5330, or perform a self -inspection. To perform the self -inspection, simply take a metal tool, like a coin, and scratch the surface of the pipe protruding from the floor or wall prior to the water meter. If the pipe is easy to scratch and the scratched area is a shiny grey color, the pipe is made of lead. The figure on the next page provide basic guidance for performing a self -inspection: I:\Engineering\Tracy Taylor\ Public Works Contracts\Miscellaneous\Lead Water Lateral Program -2-3- Page 2 of 3 17.docc Lead is dull, very soft, and will turn a shiny silver color when scratched. Galvanized Steel Lead TO ' ' FROM HOME WAVER METLR JMV_ s•rRULT Plastic Copper Magnets will ONLY stick to steel. They will NOT stick to lead or copper. If you choose to hire a plumber to perform the inspection, the City is developing a form that will be required for all certified plumbers to use for inspections. Additional information about lead in drinking water can be found on the City's web page at https://www.ci.oshkosh.wi.us/Public Works/water utility.asp. Property owners may wish to consider replacement of building's plumbing (pipe, valves, or fixtures) that contain lead-based materials. Please contact Pete Gulbronson at (920)232-5258 or the Department of Public Works at (920)236-5065 with any questions regarding lead in drinking water. I:\Engineering\Tracy Taylor\Public Works Contracts\ Miscellaneous \Lead Water Lateral Program -2-3- Page 3 of 3 17.doc APRIL 11, 2017 (CARRIED PURPOSE: INITIATED BY: #2 17-174 RESOLUTION 7-0 LOST LAID OVER WITHDRAWN ) APPROVE INITIAL RESOLUTION FOR SPECIAL ASSESSMENTS — EVELINE STREET (CEAPE AVENUE TO BAY SHORE DRIVE) DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED BY the Common Council of the City of Oshkosh as follows: 1. The Common Council hereby declares its intention to exercise its police power under Section 66.0703 and 66.0705 of the Wisconsin Statutes to levy special assessments upon property within the following described areas for benefits conferred upon such property by improving the following: Concrete Paving, Asphalt Paving, Sidewalk, Driveway Aprons, Sanitary Sewer Laterals (new and relay), Storm Sewer Laterals (new and relay), and Water Laterals (new and relayL Eveline Street from Ceape Avenue to Bay Shore Drive 2. The total amount assessed against such district shall not exceed the total cost of the improvements and the amount assessed against any parcel shall not be greater than the benefits accrued thereto from said improvements. 3. The assessments against any parcel may be paid according to the provisions of Section 25-83 through 25-89 of the Oshkosh Municipal Code. 4. The governing body determines that the improvements constitute an exercise of the police power for the health, safety, and general welfare of the municipality and its inhabitants. 5. The Board of Public Works is directed to prepare a report consisting of: (a) Final plans and specifications for said improvements. APRIL 11, 2017 17-174 RESOLUTION CONT'D (b) An estimate of the entire cost of the proposed work or improvements. (c) An estimate as to each parcel of property within the assessment district of: (1) The assessment of benefits to be levied for each improvement. (2) The damages to be awarded for property taken or damages by each improvement. (3) The net amount of benefits over damages or the net amount of damages over benefits for each improvement. (4) The total assessment against each parcel Upon completion of such report, the Board of Public Works is directed to file a copy thereof in the City Clerk's Office for public inspection. 6. Upon receiving the report of the Board of Public Works, the City Clerk is directed to give notice of a public hearing on such reports as specified in Section 66.0703(7)(a) of the Wisconsin Statutes. The hearing shall be held before the Common Council at the Council Chambers, Room 406 in the City Hall at a time set by the Clerk in accordance with the Wisconsin Statutes. The assessment against any parcel may be paid in cash, paid with the first property tax installment, or in ten (10) installments if the total amount of the assessment is greater than five hundred dollars ($500.00) or fifteen (15) installments if the total amount of the assessment is greater than one thousand dollars ($1000.00). 7. The installation of said street improvements shall be accomplished according to the provisions of Section 25-3 through 25-11 of the Oshkosh Municipal Code. W, NOTICE OF PUBLIC HEARING Office of the City Clerk, City of Oshkosh, Winnebago County, Wisconsin: Please take notice that the City Council of the City of Oshkosh has declared its intention to exercise its power under Section 66.0703(7)(a) of the Wisconsin Statutes, to levy assessments upon property for benefits conferred upon such property by providing the following improvements fronting upon the following described streets: CONCRETE PAVEMENT, ASPHALT PAVEMENT, SIDEWALK, DRIVEWAY APRONS, SANITARY SEWER LATERALS (NEW & RELAY), STORM SEWER LATERALS (NEW & RELAY), WATER LATERALS (NEW & RELAY) Eveline Street from Ceape Avenue to Bay Shore Drive The report of the Public Works Director and City Manager showing proposed plans and specifications, estimated costs of improvements, proposed assessments and awards of damages is on file in the Office of the City Clerk and can be inspected there on any business day between the hours of 8:00 a.m. and 4:30 p.m. Notification that the City Manager (Board of Public Works) and City Council will hear all persons interested or their agents or attorneys concerning the matters in the preliminary resolutions authorizing awards of damages at 6:00 p.m. in the Council Chambers in the City Hall, Oshkosh, Wisconsin on MAY 9, 2017. All objections will be considered at said hearing and thereafter the amount of assessment will be finally determined. PUBLISH: 4/29/2017 CITY OF OSHKOSH PAMELA R. UBRIG CITY CLERK 'l SPECIAL ASSESSMENT PAYMENT PLAN OPTIONS AFTER CONTRACT NO. 17-04 IS CERTIFIED AS COMPLETE CONTRACT NO 17-04 WILL CONSIST OF CONCRETE PAVEMENT, ASPHALT PAVEMENT, SIDEWALK, DRIVEWAY APRONS, SANITARY SEWER LATERALS (NEW & RELAY), STORM SEWER LATERALS (NEW & RELAY), WATER LATERALS (NEW & RELAY) Eveline Street from Ceape Avenue to Bay Shore Drive Included in this mailing, is an estimated amount (quantities and costs) of the special assessment (sheet #5) against your property or properties. A statement of the same is on file in the office of the City Clerk. Once Contract No. 17-04 is certified as complete by the Public Works Department, the final amount (quantities and costs) of the special assessment against your property or properties will be mailed to you. At that time you will also receive the paperwork to select a payment choice for the special assessments. PAYMENT CHOICE OR PAYMENT IS NOT ACCEPTED AT THIS TIME. THE PAYMENT OPTIONS SHEET YOU WILL RECEIVE AFTER THE CONTRACT IS CERTIFIED AS COMPLETE WILL HAVE THE FOLLOWING OPTIONS: INVOICE - PAYMENT WITHIN 30 DAYS If you choose this option, the City of Oshkosh will then send you a special assessment invoice and you must make payment within thirty days of that notice. If the payment is not made within thirty days after receiving the special assessment invoice, 6% interest accrues from the date of notification. If after making this selection, the property owner fails to make payment to the City Treasurer; the entire amount including interest will be placed on the next property tax bill. TOTAL ASSESSMENT ON NEXT TAX BILL IN FULL Property owners may elect to pay 100% of the assessment on the next designated real estate property tax bill, without interest. The total amount of the assessment will be included on and payable in conjunction with the next designated property tax bill. TEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL (ASSESSMENT MUST BE IN EXCESS OF $500.00) read other side The amount of the assessment will be placed on the property tax bill with interest at 6% on the unpaid balance per year over the ten- (10) year period. The annual assessment payment and interest will be included in each year's tax bill payment. The assessment balance may be paid in full at any time during the ten-year period, with interest pro -rated to the month of payment. (Applies to assessments in excess of $500.00.) FIFTEEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL (ASSESSMENT MUST BE IN EXCESS OF $1,000.00) The amount of the assessment will be placed on the property tax bill with interest at 6% on the unpaid balance per year over the fifteen- (15) year period. The annual assessment payment and interest will be included in each year's tax bill payment. The assessment balance may be paid in full at any time during the fifteen -year period, with interest pro- rated to the month of payment. (Applies to assessments in excess of $1,000.00.) CITY OF OSHKOSH PAMELA R. UBRIG CITY CLERK read other side IRREGULAR SHAPED LOT REDUCTION ♦) z filename: Evelina00.dwg PAGE 1 OF 4 CITY OF OSHKOSH CONCRETE PAVING, APRON, SIDEWALK AND WATER, ENGINEERING DIVISION SANITARY do STORM LATERAL ASSESSMENTS EVELINE STREET LAKE WINNEBAGO TO I ZONING :ERTIFICRTIFICATION DATE: CEAPE AVE CARR PL $0 W OF EVELINE ST TO EVELINE ST a� �S -9 O N I N G H. STEVEN'S PARK EVELINE ST _� PARCEL FRANKFORT T. w 0 a < LOC 32 > L�[�S BL CK ,IN �RS ID o z '_ �;� All PEA S SU D i� Z U [50.0" -+ m _ Z329A-7 9 15 17 21 23 27 29 '40.0' 40.0' 40.0' 40.0' 33 35 3 45 53 59 61 65 678307.3' 40.0' 40.0' 40.0' 52.2' 50.0' 50.0' 50.0' 50.0' 48.0' 50.0' 50.0' 50.0' 50.0' 40.0' 11 .3' 93.5' EVELINE ST. 1100.0' 50.0' 50.0' 55.0' 55.0' 55.0' 55.0' 58.0' 44.0' 44.0' 96 0' 48.0' 49.0' 60.0' 49.0' 83.3' 57.1' 47.1' 47.1' 68.0' 66.5' 66.0 0 2 8 10 14 16 22 24 30 32 36 4j 46 48 52 56 62 I66 70 72 76 60 84 I 62A w � EMei �K BR BEIM I RS Sv aO 31 B CK 61 OCK .31 HEP MAINSLor I LLA HS Vp l�� �IEK 37 / ao IAT SR -9 Z NI IRREGULAR SHAPED LOT REDUCTION ♦) z filename: Evelina00.dwg PAGE 1 OF 4 CITY OF OSHKOSH CONCRETE PAVING, APRON, SIDEWALK AND WATER, ENGINEERING DIVISION SANITARY do STORM LATERAL ASSESSMENTS EVELINE STREET LAKE WINNEBAGO TO REVISION DATE: :ERTIFICRTIFICATION DATE: CEAPE AVE CARR PL $0 W OF EVELINE ST TO EVELINE ST CONTRACT NO. 17-04 & 17-26 I DRAWN 03-09-2017 GRAPHIC 0 25 50 100 SCALE:(IN FEET) I HARNEY AVE 50' W OF EVELINE ST TO EVELINE ST PARCEL I.D. ADDRESS OWNER STREET NAME FOR RATE FRONTAGE ASSESSABLE CONCRETE PAVING EXISTING APRON CONCRETE SIDEWALK AA SANITARY SEWER STORM SEWER ADDRESS CORNERLOT CALCULATION _ LINEAR FEET ASSESSMENT APRON (SEE NOTE) LATERAL LATERAL ASSESSMENT70TAL 08.0439-0000 3EVELINE ST SHANNON R CONAT BAYSHORE SEE PREVIOUSLY SEW RAT SNORE SHEETS FOR INDIVIDUAL ITEMS $9,509.13 ___..._. EVELINE,,,. SINGLE FAM .._.._((6734 L27.I_/1fl= 8085 ,,.,,...._$7,08246 SHARED CONIC___ 311155_,.,,,, }140.00-____ ,. ..._..._... .._._.-... $750.00 31.75921d OR-04380000.-.._ 7 EVEL _.. ..... ._SHARED CONIC3100:00._.__. _. 39&100... _. _.-32.��00 .... -... 3750.00 _ _£7_5341X) O- 70000_9EVEUNEST _ _ _._,_ JASONJ. MANKINI/KARA WARA - E _-. IMG FAM, ....-. 33i -.........CONCRETE 169.30.....- 3B<0.00...... ..._52.2m.00 3750A0 .-.._�� .. 08-0436-D000GARAGEONLY __. IERA K CONLEY .. SINCLE FAM.._-___ ......... .......40.0 ----.-.-._37,so4W____'CONCRETE --....__.._ 3208.35 20.00 .._ 98-0435-0000 1.5 EVELINELT 7ERA KCONLEY ._._.._-__...__.._ _....SINGLEFAM ....._..-_ ... _.._ 40:0.. ....... .... _37.50400. .._........... ...NONE _._.._.. .. ..-_._.._ $420.00...... _}2,200_005,87400 _.-._.. 8-013410000._-,.I7 EVELINE ST CHARLES ATEWS SINGLE FAM .._..40.0_.-._-.__._ CONCRETE_ ...... _....13 17.05 $840:0032.2OObD__ 7W.00 ._._-�.I71.05 _.._ N043&000021 EVEUNESi MEGHAN RSCOTf SINGLEFAM40.0 _ .._37.SO4.00 __. _._CONCRETE ..._. _3142.35 __.3980.00 �2.200A0 ...-..___5750;00 .._..7,376.35 08 3200DO._ 23 EVELINESi WATERCITV PROPERTIES LLC .SINGLEFAM__...... _ -. . ....... ....._CONCRETE }168.75_-...__31.120.00.., ...... 2,200.00 _ {760.00 __7,74275 _ OB-0453-0000 27EVEUNEST RUTH I WEIGAND EEAL -.._........___.__._ -. SINGLE ... A 28.37( ) $2304.76 CONCRETE $134.65 $840.00 -. - $2.200.00 $790.. $6.229 41 08-0152-0000 29 EVEUNE ST _ RYAN A/JENIU-R SHOBERT -.. .SINGLEFAM 50.0 36,380.00 CONCRETE 310000.,...--_--... $980.00 _�2.1V0.00 _ E750_00 38,110_00 080151-0000 33 EVELINE S7 BERMAN PROPERTIES LLC,_ .._...-. SINGLEFAM____-_.. _.80_0 _._._...8800000NCRETE _ X00:00 __-31.120,00__..2,200,00 .. 37WA0 .-.__.�SSSOOp_ 08-0450-0000 35 EVELINE ST RICHARD A WILKINS EVEUNE SINGLE FAM 80.0 $4,380.00 OFF CARR $980.00 $2,200.00 $750.00 .. .. .......... -- _--CARR SINGLE FAM_ 50.Y 2- LIMITS._._.__. 140.00 _{10:64000_. $49,245.22 $1.352.00 $9,800.00 $24,200.00 $9,000.00 $103,105.35 ' CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION AA INCLUDES 6 SIDEWALK SQUARES FOR UTILITY REPLACEMENT, SEE LETTER FOR MORE INFORMATION A IRREGULAR SHAPED LOT REDUCTION APPUED SHEEP 2 OF 4 CITY OF OSHKOSH CONCRETE PAVING, APRON, SIDEWALK AND WATER, 2017 ASSESSMENT RATES' ENGINEERING DIVISION SANITARY 8 STORM SEWER LATERAL ASSESSMENTS CONTRACT R 17-04 30' CONCRETE PAVEMENT (SINGLE FAMILY RESIDENTIALI =387.60 PER LINEAR FOOT (EVELINE, CARR) DRAWN 03/09/2017 CONCRETE APRON =$5.50 PER SQUARE FOOT LESS ANY CREDIT )ESTIMATE) WARD BIN EVELINE ST-BAY SHORE DR TO CEAPE AVE SIDEWALK REHABILITATION = $5.60 PER SQUARE FOOT (ESTIMATE) SANITARY SEWER LATERAL RELAY = $2200.00 EACH (ESTIMATE) CARR PLACE- 100.0' W OF EVELINE ST TO EVELINE ST NEW STORM SEWER LATERAL FOR SUMP PUMP = $750.00 EACH REVISED CERTIFIED PARCEL I.D. ADDRESS OWNER STREETNAMELOT RATE FRONTAGE ASSESSABLE LINEAR CONCRETE CONCRETE SANITARY SEWER STORM SEWER ADDRESS CORNER IDT CAlCUl4ilON FEET PAVING ASSESSMENT EXISTING APRON APRON SIDEWALK AA SEE NOTE) LATERAL LATERAL ASSESSMENTTOTAL 080441-0000 43 EVELINE ST JAN M JUNGWIRTH ETAL EVELINE SINGLE FAM 50.0 $4.380.00 OFF CARR $1,260.00 $2200.00 $750.00 _.._____. ... .._...... ._..___..__.__ .. CARR SINGLE FAM. .__..._ 50.9/7-..___ _ 25.0_.. .$_219000 OUTSIDE LIMIT$.. -..___..-..__._...$10,7w _ 0B-0<AP! ,,-...45EVEUNEST PENNYLSCHMIEDEL ... .......... ...._._.._-___. ----------..__._ SINGLE FAM _-_-_._...-_ .50,0 __.. $4:39000 _.._._._ CONCRETE _ .. _X00.00 ___.__.-_.09._.___-00 ._.0.0 5750.00 Sa.279_oo 44 FRANKFORTST CITY OF OSHKOSH DIRECT BILL TO CITY -.- ...... 08-0113-0000_._. 53 EVEDNE ST __-..-...-.._...._.._..._.._CHRISTOPHER/KELLY iARMANN..___. -__. ______._.__... _ 380.00 CONCRETE _._..._.-..-_..._-.. 3.109.35 $1_(20.00�-...-V50-�x.559.35. .... ........ .... .-. ... OL -0417-0000,-___59 EVELINE ST._„_.,_..-.. DEBORAHC WIECHERT ...,__.__.... .--, SINGLE FAM___.._._..__. WA ..$4,38000._ SHARED, GRAVEI__;4.17.60_ 31,d00.00__{2,100_09$7W,00 F9,17760 OB-0dl6-0OOD _61 EVELINEST .__..._._ UCHARY R CHRISIIE_ _ __ SINGLE FAM ......._._____..._--. FAA _ --pmo.00 - ._.. HA 5 RED CONC ...._.._SOD.____.. ....... L-.0 _.00-_ 52_200.00....._..___.$750_00 }8.27000..__.._ 09-0415-0000 __65 EVELINE ST AUSTIN HANNEMAN_ _... SINGLE FAM _______. _..... ....._....._._ 5D.0._ .-..-X1.380.00._ SHARED CONC ,..__ A100A0_....._... ..__.�•� 0841680000 67 EVELINE ST CAROL JANSEN _...._ ..- ...-. -.-.-- ____..___ ....SINGLE FAM ....__...... 4D.0 _-..__..___13 04.00 _SHARED CONC 100.00 .5940_00..._. 522(10.00 ... 5750.00 �7_39d.00 08-D"7-= 75 EVELINE ST RAY C/MARY M RENNERT SR EVELINE SINGLE FAM 110.3'/2-= 55.15 $4,831.14 CONCRETE $100A0 $980.00 $2210,OD $750,00 .__ -.._HARNEY._.... ..._...__._SINGLE FAM._.___.-...__...-..___.._...._�0_..._ ...... .._..-. _670AO . __....__......_... $13.531.14 _ OB04964M 83 EVELINE ST KAREN A/WM J KOCH EVELINE SINGLE FAM 93.5 $8.190.60 CONCRETE $100.00 $840AD $2.200,00 $750,00 HARNEY SINGLE FAM 50.0'/2'= _......_. .... 25.0._____._....._$2_..`.:_LJ____.__._...._ .............._..__-_ )40.00 _ 080497-0000 .89 EVELINE ST MCKIL JOACHIM ..__SINGLE FAM _ ..... -_ .... ...... .-.._.._.. ..-_.__53.5_... ... _--- _�.686.d0 _ -CONCRETE _.___ {100_00.. _.57.120.00......_ ...-}1.200.00 .. _..S7W.20 60 -.__...- 09-0493.0000.._93 EVELINE ST....___. -._....._GAIL L PALECEK . _. .. .. _._.._.__ _._SINGLE FAM .............. -... ... ... ._. t$.0 ___.__$3c_ 942 W. .._..__._CONCRETE ........... _- $750.00 ._$7.991.80 080482-0000-_ 1315 CEMEAVE _ CHR6TOPHERJ UNG/ANGEUMSCHMACKIE ___,_... EVEUNE ONLY SINGLE FAM„ .. .... ........... . ....... X5,0 ,_ ...�,i,942_00____OFF CEAPE___. ._.51_260A0 _ �2,20p00-__.575D,pD $64,571.34 $1,376.75 $12,460.OD $26.40D.00 $91000.00 $113,808.09 ' CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION $113,808.09 # REDUCED FRONTAGE, OR CREDIT FOR 18125 OF 2010 HARNEY AVE CONCRETE PAVING ASSESSMENT 108E APPLIED AA INCLUDES 6 SIDEWALK SQUARES FOR UTILITY REPLACEMENT, SEE LETTER FOR MORE INFORMATION 2017 ASSESSMENT RATES: SHEET 3 OF 4 CITY OF OSHKOSH CONCRETE PAVING, APRON, SIDEWALK AND WATER, 30' CONCRETE PAVEMENT ISINGLE FAMILY RESIDENTIAL =$87.60 PER LINEAR FOOT (EVELINE. CARRY ENGINEERING DIVISION SANITARY L STORM SEWER LATERAL ASSESSMENTS 32' CONCRETE PAVEMENT (SINGLE FAMILY RESIDENTIAL) =$93.40 PER LINEAR FOOT (HARNEY) CONTRACT R 17 -DA CONCRETE APRON = $5,50 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) DRAWN 03/09/2017 SIDEWALK REHABILITATION = $5.60 PER SQUARE FOOT [ESTIMATE) WARD BM EVELINE ST- BAY SHORE DR TO CEAPE AVE SANITARY SEWER LATERAL RELAY - $2.200.00 EACH (ESTIMATE) CARR PLACE- 100.0' W OF EVELINE ST TO EVEUNE ST NEW STORM SEWER LATERAL FOR SUMP PUMP = $750.00 EACH HA[N" AVE- 100.0' W OF EVELINE ST TO EVELINE $T REVISED BOWENST-100.0'WOFEVEUNESTTO 100.0' EOF WRINEST CERTIFIED PARCEL I.D. ADDRESS OWNER STREET NAME FOR FRONTAGE RATE ASSESSABLE CONCRETE PAVING EXISTING APRON CONCRETE AA SANITARY ! STORMSEWER ADDRESS CORNER LOT CALCULATION LINEAR FEET puESSMENT APRON SIDEWALK SEE NOTE LTERAL LATERAL LATERAL ASSESSMENT TOTAL 08-0389-0000 2 EVELINE ST JENNIFER CLARKE SEE PREVIOUSLY SENT BAY SNORE SHEETS FOR INDIVIDUAL ITEMS $7,690.00 SINGLE FAM ...._....... 1000 /2'_-_.... SOA......._. - ..080387 -0000 &EVELINE ST ERICH R/NI.LUH KADEK ARI ASTITI HARRIS _ SINGLE FAM _.. 4444 50.0 ........5138000, SHARED. ASP_.._, ..5320.30 5840.00 __..52200.00 09-0386-OL1L70 _IO EVELINE ST .. ...... ........ ....__MATHIEY/-H/STACYA DODGE.. -.4444_- .-...-- SINGLE FAM .... ...... .__. ...4.444__.. .. 500.... .. .......54._ 38000_....._ CONCRETE _ _ ..._.... -....41 .00._._..._ _585000_. _$?.•250_50 ......_.3.750.00_. 5-0_270D0 _....._._ 089385-0000 14 EVELINEST RANDY N KEENLANCE/LRRIVEitt .._ _..... ..... SINGLE FAM 55.0 ,_...__55,0__ US 800 CONCRETE ;16635 51400.00..-. 32.200.00 $750.00 ..... ..... -..__���`+•` ...... _._.. 08-03840000 _ 16 EVELINE.ST.. ..............__._BRETT A,YUNK SINGLE FAM ......... __-- 550,,,- ,,,,._____54_518.00. .... . _.. 08-03880000_._ 22_EVELINE ST ...... ... ....... .__ PATRICIA A BRIGGS SINGLE FAM 55:0 ....... .-5-4,81800 _...__... CONCRETE..__.. ;118.15 ...._ ..__}980.00 5.2.200.00 ...4..44.4 7 .._.. 15 08-038270000-....-. 2_4EVELINE ST., ... _.. RUSSEL T BEHNKE SINGLE FAM_______ _ .. .._._55:5_. ...--.._'K_.BIB.00 __..._.. CO NCREiE.__...._. .i1E0.7O ___... 598000_.._ _5.2.200.00. ....5750.00.__.____53_•855.70 _. EVELINE ST. .........._.... _ROBERT/DENA WAGONER .--- _ SINGLE FAM .._.._______ 58 0....... .. ...._...}5,080.80.. .. ...... SHARED, ASP 4444. 330130 .............. . .31 260:00.-. .......}-1,200.00 _ _ $750.00. ..}9.595.10 08-0374-0000..._.. 32EVELINEST_ ___..__..._.-ORIN K/MELISSASCHIMMELJR_,_,_ __.._-__ ..._SINGLE FAM,._._.._ ................. .._444:0_ ..._53:.g$/.g0 ..._. SHARED CONC,...__._3100.00 _ {1.120.00 _,_.}_1.2(10_00 .. .._575050.__._58_02db 08-0311-OWO __ 36EVELINEST.. ........4....-444_, TODONEKOLI.. ........ ....... ............ 4444 .._. SINGLEFAM ........... 4..4.4 ........ ..... 44.0 -.._-__CONCRETE.._-_.._..... .;126.95_... .384000._.-. _..51.250.00_....._-__.5750.00__x,77135 08-0361-0000 ..- 42EVELINEST___„_SYLVIASTANG .-....._ _...- ....-... .__ .__...-__. _SINGLE FAM._. __.._ ...--..._. ...___880_ ..58A09_60_ ASPHALT......_...........5324.24._..._ }980.00__ .. .. 2200 .._ --.�...._... $.750.00 ...._.x_66384 D8 -036770G00, 46 EVELINESTJOHNJOBRI,EN SINGLE FAM._. _....._. _.._. 48.0 54.204.80 ..___..CONCRETE...._.. ;10825 ... .. ..584000. 5'!,100.00_._. $750.00 08-0352-0000... 48 EVELINEST._.... SINGLEFAM ...4...44.4 48.0.. ....... N.-.40_.._ CONCRETE ;103.30 .. 398L100._. _._.. 52.200.00 ..... 93-0351-0000 52 EVELINESTRONALDD/LILLIAN G HANSCHE TRUST _._ ....SINGLEFAM ...... .. ...... __._,..CONCRETE___ 112.65 ..... _ ....... ... 5.2:200.00 $750.00, ..-..x,15865 OB -035P0000__ 56EVELINEST.____ $PENCERHROLPH SINGLE FAM 49.0 . ..._......_.29240 ............. -... 1000.._..__ 80.00_.... ...... ;Z200, .50$7.00... 50-....._. _182f0C __-- 08-0313 0000_.._ 62 EVELINE S .__ _. TIMMY J STRETCH 444.4 SINGLE FAM ...4..444__ ..83.3..__ _. 37.297.08 ..__... CONCRETE 3126.95 _5-1 260.00.-.., 5.2,200.00 ... $75000 __,....... _511_634.03 __._. 66EVELINE ST ..._.-_.FEDERAL NATIONAL_ MORTGAGE ASSOC 4,444, ... .SINGLE FAM.___ _ ,....... -._j5,001_96 .__ CONCRETE 522630 _.._ 980.00___.jY,2(10,00 ___..5750.00_.._.._,59,15846 OB -03350000 70EVEUNEST INGRID CORLEfT 4..4...4...4 ....... SINGLE FAM _............. 47.1 X4.125.96 _... CONCRETE._._.. 5-100.00......_- .. _SBd0.00_..,200.00__ 5750.00 ...... _ _.58.01596_ ._.. _0503.14-0000- 72EVELINES __DANIELILAMERE_ __ _......... ___SINGLE FAM 71 _5112.6 ..._EDCONS 0000.._ _......_____ _.__._..57.00. ....._.....5 08-0316-0000. ....... . 76_EVELINEST SUE ESTDN-...... __._ 68:0... ___.._.55.956.80....-... SHAREDCONC_.._.. 5136.85575000 ...510.44365 ..08-0318-0000 .... 80EVELINEST _.......... KAVLA ASCMOMACHER__..__ .-... SINGLE FAM ._.. 4..44....4. ..__.._855.._ _._._3.5,82540 _.CONCRETE.._._..._„100AD 98000 52,200:00_...575000__.__-59.5ss.ao 0893209000 84 EVELINE ST ____BREIT YUNK ..._-__..-._-_ __.._ _....._. _.. �N .. Fes. -.._-44.4.4_._._ 550 __.._._. SS78T60 _-......_ CONCRETE ._ gREtE ...-5102.75 ..___� 7,120.00 _ 52.200.00.. .. 5750:00 __59,95d.35 _1327 CEAPEAVE,__ PHIWP/GINGERHOREJS ___ ......................... EVELINE ONLY_ .......SINGLE TAM_ 1280/2' ___.81.0 55,606.40 CONCRETE.._._... 00 _.._.31.460.00. 32 �00:a0 5750AD _..59.916.40 _. $115,377.96 $3,336.04 523.380.00 $481400.00 $17,250.00 $215.43400 ' CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION AA INCLUDES 6 SIDEWALK SQUARES FOR UTILITY REPLACEMENT. SEE LETTER FOR MORE INFORMATION SHEET 4 OF 4 2017 ASSESSMENT RATES: CITY OF OSHKOSH CONCRETE PAVING, APRON, SIDEWALK AND WATER, ENGINEERING DIVISION SANITARY S STORM SEWER LATERAL ASSESSMENTS 30' CONCRETE PAVEMENT (SINGLE FAMILY RESIDENML) =557.60 PER LINEAR FOOT (EVELINE) CONTRACT R 17-N CONCRETE APRON=55.50 PER SQUARE FOOT LESS ANY CREDIT(ESTIMATE) DRAWN 03/09/2017 SIDEWALK REHABILITATION = $5.60 PER SQUARE FOOT (ESTIMATE) WARD STH EVELINE ST- BAY SHORE DR TO CEAPE AVE SANITARY SEWER LATERAL RELAY = $2.200.00 EACH (ESTIMATE) NEW STORM SEWER LATERAL FOR SUMP PUMP. $750.00 EACH BOWEN ST- 100.0 W OF EVELINE ST TO 100.0 E OF EVELINE ST REVISED CERTIFIED