HomeMy WebLinkAbout01. 17-93 MARCH 14, 2017 17-93 RESOLUTION
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
AS AMENDED
PURPOSE: APPROVE FINAL RESOLUTION FOR SPECIAL ASSESSMENTS
PAVING, SIDEWALK, DRIVEWAY AND UTILITIES / SECOND
LOCAL STREET CONCRETE PAVING PROGRAM NORTH AND
WEST SIDES— CONTRACT 17-05
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the Common Council of the City of Oshkosh held a public hearing on
the 141h day of March, 2017, at 6:00 p.m. for the purpose of hearing all interested persons
concerning the preliminary resolution and report of the City Manager (Board of Public
Works) on the proposed improvements as listed below, pursuant to the initial resolution
adopted January 10,2017,by the Oshkosh Common Council of the following named streets:
Concrete Pavement,Asphalt Pavement, Sidewalk,Driveway Aprons,Sanitary Sewer
Laterals (New and Relay), Storm Sewer Laterals (New and Relay), and Water
Laterals (New and Relay):
New York Avenue from Wisconsin Street to North Main Street
Jackson Street from 50' south of New York Avenue to 50' north of New York
Avenue
Kentucky Street from New York Avenue to 50' north of New York Avenue
Central Street from 50' south of New York Avenue to 50' north of New York
Avenue
Merrill Street from New York Avenue to 50' south of New York Avenue
East Murdock Avenue from Harrison Street to 50' east of Bowen Street
Bowen Street from 50' south of East Murdock Avenue to 50' north of East
Murdock Avenue
Maricopa Drive from 400' northwest of Dickinson Avenue to 50' west of
Covington Drive
Dickinson Avenue from Maricopa Drive to South Washburn Street
MARCH 14, 2017 17-93 RESOLUTION
CONT'D
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh as follows:
1. That the proposed street grade(s), from a datum plane established by the official
United States Coast and Geodetic Survey, as identified and on file in the Department
of Public Works is/are hereby permanently established.
2. The Common Council for the City of Oshkosh hereby orders that sidewalk be
constructed according to the established grade pursuant to Section 66.0907 of the
Wisconsin Statutes and the ordinances of the City of Oshkosh on the following
locations:
Dickinson Avenue south side from Maricopa Drive to South Washburn Street
3. That the report of the City Manager, acting as the Board of Public Works,pertaining
to the construction of the above described public improvements, including plans and
specifications therefor,is hereby adopted and approved with the following modifications:
a. 1444 Maricopa Drive (13-1768-0000) storm sewer lateral corrected from
$2,100.00 to $750.00.
b.
C.
4. That the action of the City Manager in advertising for bids and to carry out the
work of such improvements in accordance with the reports of the City Manager and in
accordance with the said resolution heretofore adopted, is hereby approved, ratified and
confirmed.
5. That payment for said improvements be made by assessing the cost to the
property benefited as indicated in said report, except as modified herein.
6. Assessments shown on the report represent an exercise of the police power and
have been determined on a reasonable basis and are hereby confirmed.
MARCH 14, 2017 17-93 RESOLUTION
CONT'D
7. That the assessments for all projects included in said report are hereby combined
as a single assessment but any interested property owners shall be entitled to object to each
assessment separately or all assessments jointly for any purpose or purposes.
8. That the assessments may be paid in cash, or in installments pursuant to Section
25-83 thru 25-89 of the Oshkosh Municipal Code, said deferred payments to bear interest at
the rate of six percent (6%) per annum on the unpaid balance. The City Clerk shall publish
an installment assessment notice in accordance with Section 66.0715(3)(e) of the Wisconsin
Statutes in the official newspaper of the City.
9. The City Clerk is directed to publish this resolution in the OSHKOSH DAILY
NORTHWESTERN, the official newspaper of the City.
10. The City Clerk is further directed to mail a copy of this resolution to every
property owner whose name appears on the assessment roll whose post office address is
known or can with reasonable diligence be ascertained.
City of Oshkosh
215 Church Avenue
P.O. Box 1130
Oshkosh, WI 54902-1130
L
Oshkosh
March 3, 2017
Dear Property Owner:
Please find enclosed the following documents for your information and review:
A letter of explanation from Public Works Assistant Director Steven Gohde.
1A. Information sheet on parking during construction.
1B. Information sheet on lead service line replacement program.
Pamela R. Ubrig
City Clerk
Angela J. Joeckel
Deputy City Clerk
Emily E. Karl
Election Aide
2. The Initial Resolution adopted by the Oshkosh Common Council, which began the process
for the improvement(s) adjacent to your property.
3. Notice of Public Hearing to be held by the Oshkosh Common Council on March 14, 2017
regarding assessments, which will be set with the adoption of the final resolution, also scheduled
for adoption on March 14, 2017.
4. Special assessment payment plan options explaining the payment choices after Contract No.
17-05 is certified as complete — payment choice or payment is not accepted at this time.
5. Assessment sheet indicating properties involved in the proposed project, the property
footage, price per foot and estimated total assessment to the property.
If you wish to appear before the Council before the final resolution is adopted to proceed with
the construction, please refer to the "Notice of Public Hearing" enclosed.
If you have any questions regarding the above listed documents, please contact the Public Works
Department (236-5065) or the City Clerk (236-5011), Monday through Friday, 8:00 a.m. until 4:30
p.m.
Sincerely,
-Cl- -- OF OSHKO
PAMELA R. UBRIG
City Clerk
CITY HALL
215 Church Avenue
P.O. Box 1130 {f
Oshkosh, Wisconsin
54903-1130 City of Oshkosh TT
0
n !HKn !H
March 3, 2017
Subject: Assessments for Concrete Paving, Asphalt Paving, Sanitary Sewer Laterals (New & Relay),
Water Laterals (New and Relay), Storm Sewer Laterals (New and Relay), Sidewalk Repair,
New Sidewalk, and Concrete Drive Approaches
Contract 17-05
To Property Owners on:
➢ NEW YORK AVENUE, from Wisconsin Street to North Main Street
➢ EAST MURDOCK AVENUE, from Railroad Tracks to Bowen Street
➢ MARICOPA DRIVE, from 300' northwest of Dickinson Avenue to Covington Drive
➢ DICKINSON AVENUE, from Maricopa Drive to South Washburn Street
A public hearing is scheduled for Tuesday, March 14, 2017, in the Common Council Chambers at City Hall to
consider improvements to your street. Staff will be available beginning at 4:30 p.m. in Room 310 of City Hall
to answer questions about the project and the estimated costs. Residents may also call the Department of
Public Works Engineering Division at (920)236-5065 to have questions answered.
The public hearing covers the proposed improvements, which include the following: paving, utilities,
sidewalks, and/or driveway approaches and the levy of special assessments that partially cover the cost of the
improvements. Assessments are not due until the project is certified as complete and these charges can be paid
by any one of the plans as outlined by the City Clerk's information on payment plan options. Based upon the
City of Oshkosh assessment policy, the assessable portions of the project have been identified and are outlined
on the attached assessment worksheet(s). The estimated distance for construction on side streets is estimated
high to allow adequate area for the new construction to be transitioned to the existing pavement. The
quantities and costs are estimates and will be adjusted to the actual quantity installed. Unit costs will be
adjusted according to the assessment policy based on bid prices. The estimated quantities for sidewalk
include up to six (6) additional squares of sidewalk to allow for private utility lateral construction. Only
squares actually removed and replaced to repair defective sidewalk or facilitate the private utility lateral
construction will be billed to the property owner. Additional sidewalk squares removed will not be billed to
the property owner if the Construction Access Agreement previously mailed to them was signed and returned by
the property owner.
Property owners who have not returned the Construction Access Agreement will only have partial sidewalk
squares removed and patched. These property owners will be sent orders to replace the patched sidewalk with
permanent concrete sidewalk in 2018. These property owners will be financially responsible for replacing
all patched concrete sidewalk, all defective sidewalk, and all sidewalk that does not meet the Americans
with Disabilities Act (ADA) standards. Sidewalk squares needing replacement only to meet ADA
standards will not be billed to the property owner if the property owner returns the Construction Access
Agreement before commencement of the street reconstruction project. If needed, please contact the
Department of Public Works Engineering Division at (920)236-5065 or attend the meeting listed above to get a
G I:\Engineering\2017 CONTRACTS\17-052nd Paving\Project_Information\Con:espondence\Letters\17-05 Page 1 of
Assessments Ltr 01_3-3-17.docc
P
copy of the agreement form. The enclosed assessment information assumes the Construction Access Agreement
was signed and returned by the property owner.
Enclosed with this letter is information about lead water services and a program to replace lead services on
private property. Please review this information in Attachment 1B, in addition to this letter. The enclosed
assessments do not include replacing the private water service line.
The final assessment cost will not increase above the estimated total without another public hearing. Questions
in regard to payment of Special Assessments can be answered by calling the City Clerk's office at (920)236-
5011. Questions in regard to the construction project in general can be answered by calling the Department of
Public Works Engineering Division at (920)236-5065.
The sequence of construction has not yet been scheduled with a contractor. Residents will be notified
approximately one (1) week before construction will begin on a particular street. Each street identified in this
year's paving program has been designated a specific time frame in which the contractor will need to complete
their work on that street. The construction time frames vary from 9 to 18 weeks depending upon the amount of
work and the complexity of the work associated with a specific street. All work within this contract is
scheduled to be completed by the end of November 2017. Wisconsin Public Service and other utility
companies will be relocating some of their facilities prior to the City contractor beginning work. This work is
not part of the above time frame.
A specific description of the-project-construction consists of the following elements: concrete pavement with
curb and gutter; relay or installation of specific segments of water and sanitary sewer mains and their
associated laterals at various locations along the project; relay or installation of storm sewer and storm sewer
laterals, as needed, along the project to accommodate the drainage needs for the street and the adjacent
properties; new concrete driveway aprons will be constructed; and the existing concrete sidewalk will be
repaired, as needed. Gaps in the sidewalk system will be completed with construction of new sidewalk. It is
recommended that no salt or harsh chemicals be put on the new sidewalk for one (1) year. If you know of any
underground wires and/or piping (examples: invisible electric fence, conduit for exterior lighting, irrigation
system, etc.) on your property which are located near the sidewalk, right-of-way, or driveways, please contact
the Engineering Division as soon as possible. Any private improvements within the right-of-way, brick pavers,
shrubs, lights, etc. will be removed by the contractor during construction and will not be replaced. In the event
you wish to replace certain items, a permit must be obtained from the Department of Public Works prior to
your beginning the work. Prior to the completion of the project, all disturbed areas will be topsoiled, seeded,
and covered with erosion mat. The property owner is responsible for watering the newly vegetated areas.
The matting placed over the seed is biodegradable. Please do not remove the mat because it serves as mulch
for the new grass. Please set your lawn mower to the highest setting when mowing the new grass areas until
the new grass areas are well established.
As part of the construction, a storm lateral is proposed to be installed for each residential lot on the project. An
eight-inch (8") diameter surface drain with a slotted drain cover will be placed into your yard. The storm
sewer lateral and drain will allow you to direct drainage and/or sump pump hoses to this location. This drain
is connected to the storm sewer system and drains directly to local streams and lakes. The lateral is to be used
for "dear water" only. "Clear water" is typically groundwater discharged by a sump pump or runoff from
precipitation (i.e. rainfall or snow melt). Do not place pet waste, yard waste, or other waste material into the
storm sewer system. In the event conditions on the property prevent the installation of the drain (example: a
substantial retaining wall), a drain will not be installed, but the storm sewer lateral will be installed
underground to the property line. You will be receiving additional information about the storm sewer lateral
and drain, including a telephone number for contact to coordinate the lateral's and drain's final location. The
drain is part of your private lateral and it will be yours to maintain. The drain will have a fabric filter installed
I: \ Engineering\2017 CONTRACTS \ 17-05 2nd Paving\Project_Infonnation\Correspondence \Letters \ 17-05 Page 2 Of 4
Assessments Ltr ill 3-3-17.docz
as a part of the construction. Please leave the filter in place until the grass surrounding the drain is well
established. The fabric will prevent dirt and debris from filling the pipe until the -grass - is established.
Commercial properties will receive a larger diameter storm sewer lateral installed onto the property. The
previous two paragraphs assume the Construction Access Agreement was signed and returned by the property
owner.
Commercial parcels and parcels with parking lots will have a storm sewer lateral stubbed onto the property.
This lateral can be used to meet City code when construction work is done on the parcel.
During construction, there will be periods of time when access to residential properties will be restricted.
There will only be a few instances when this situation will occur. Typically, short access restrictions occur
during the underground utility installation and longer restrictions occur during the placement of concrete
pavement and driveways. To minimize the inconvenience, the contractor will provide a one-week notice prior
to the access being restricted for concrete work. Per the Police Department, a Construction Parking Permit is
not required to park on a street overnight, if you park within two (2) blocks of the street under construction
(see enclosed information). All "No Parking" areas and/or posted time zones must be obeyed. Vehicles
parking overnight must be parked on the house address side of the street that corresponds to the current
date before midnight. On odd calendar dates, the vehicles should be parked on the odd address side of the
street. On even calendar dates, vehicles should be parked on the even address side of the street. Provisions
will be made with the Fire Department and the Sanitation Division so fire protection and City
garbage/recycling collection will continue at all times. Please ensure your garbage/recyclables are at the
curbside by 7:00 a.m. on your regular collection day. Crews schedule collection of garbage/recyclables in
construction areas at the start of each day. If rural -type mailboxes exist on your street, the contractor will
remove them during construction. This removal will make it necessary for you to pick up your mail at the Post
Office. The contractor will be responsible so as not to damage the mailboxes. Upon completion of the paving
work, the contractor will reset the mailboxes.
For commercial properties, the contractor is required to maintain access. Business owners are encouraged to
provide the City's Engineering Division with contact information, which will be shared with the contractor.
Communication between you, the City, the City's contractor, and your customers and delivery personnel will
help the project proceed as quickly as possible.
Although terrace trees may need to be removed at specific locations, they will be preserved as much as
possible. Property owners at locations where a tree needs to be removed will receive advance notice of the
removal and replacement options. Roots and branches may be cut to allow for paving operations. Cutting and
pruning will either be done by, or under the direction of, the City Forester.
The City has implemented a way for you to receive project updates via e-mail. The updates will provide
information about access and construction progress. To receive these updates, please send a blank e-mail to
contractl705-subscribe@lists.ci.oshkosh.wi.us- You will receive an e-mail stating your subscription request has
been received. You must reply to the message within five (5) days to complete the subscription. The City will
stop sending updates upon completion of the project. If at any time you wish to unsubscribe, please send an e-
mail to this address, contractl705-unsubscribe@lists.ci.oshkosh.M.us.
I:\Engineering\2017 CONTRACTS\17-052nd Paving\Project_Information\Correspondence\Letters\17-05 Page 3 of 4
Assessments Ltr #1 3-3-17.doa
Please feel free to contact the Public Works Engineering Division at (929)236-5065 prior to the scheduled public
hearing if you have any questions on the proposed assessments or the project construction.
Sincerely,
Steven M. Gohde, P.E.
Assistant Director of Public Works
SMG/tlt
Enclosures
L• \Engineering\2017 CONTRACTS\17-05 2nd Paving\ProjecL_Information\Correspondence\Letters\17-05 Page 4 of 4
Assessments Ltr #1 3-3-17.docx
420 Jackson Street
ex Oshkosh, WI 54901
City of Oshkosh Tel: 920-236-5720
Fax: 920-236-5087
Police Department dsmith@ci.oshkosh.wi.us
PROFESSIONALISM • PRIDE a INTEGRITY • TEAMWORK Dean Smith
Chief of Police
As per Sections 27-27, 27-28, and 27-29 of the Municipal Code of the City of Oshkosh, there is no parking on
City streets, 2 AM to 5 AM, unless the owner of vehicle was granted permission or has purchased a City
parking permit.
If your street or sidewalk is under construction, it is NOT necessary to obtain a parking permit if you
park your car within two blocks of the street under construction. All City ordinances and parking
rules/guidelines must be followed, and all posted parking restrictions, including time zones and no
parking areas, must be obeyed.
You will need to follow the odd -even rules. On odd days of the week, the vehicle should be parked on
the side of the street with odd -numbered houses. On even days of the week, the permit holder should
park on the side of the street with even -numbered houses. Each night, the car should be parked on the
opposite side of the street as the night before. NOTE: Odd and even dates are figured before midnight.
If parking is only allowed on one side of the street, the Odd -Even rule DOES apply. Vehicles can only
park on the side of the street that does not have restricted parking and are only allowed to park overnight
on the appropriate Odd -Even days.
In the case of a declared Snow Emergency, parking on City streets is restricted to one side of the street
using the Odd -Even rule with dates figured from noon on the calendar date to noon on the following
calendar date. It is the responsibility of the vehicle owner/operator to find appropriate parking in the
event of a snow emergency. Vehicles in violation of snow emergency parking will be towed at the
owner's expense.
Disabled vehicles are not allowed to park overnight at anytime and should be moved within 24 hours.
Motor busses, truck tractors, semi -trailers and motor trucks designed, used, or maintained primarily for
the transportation of property as defined in Municipal Code 27-26(3) are not permitted to park overnight
on City streets.
All street parking is subject to the following guidelines:
• May not park in signed / designated "No Parking" areas.
• Vehicles may not stop or park in a designated "Fire Lane".
• No parking within 10 feet of a fire hydrant (an official traffic sign may indicate a greater distance
is required).
• No parking in loading zones.
• No parking within 4 feet of an alley or private roadway or driveway.
• No parking within 15 feet to the near limits of a crosswalk.
Failure to follow the above rules could result in parking citations being issued. Individuals wishing to
appeal a parking citation may do so by completing a Request to Review Parking Citation form which is
available at the Oshkosh Police Department Telecommunications Desk, on the Police Department website
(oshkoshpd.com) or on the City of Oshkosh website.
The Mission ofthe Oshkosh Po/ice Depaa`ment is to promote pub/ic safety and to enhance the
quality of/ife in our community through innovative poticingand communitypadnerships
City
�
Oshkosh
Lead Service Line Replacement Information
The purpose of this document is to inform property owners of the potential existence of a lead water
service line at your property and a City program to replace it. Lead service lines and home plumbing
are potential sources of lead in drinking water. Lead is harmful to human health, particularly the
health of small children. For this reason, the City of Oshkosh (City) uses corrosion control treatment
at the water filtration plant to minimize the potential for lead in the City's drinking water.
As part of the construction project adjacent to your property, the City will replace the water main
and the City -owned portion of the water service line to your home. The City owns and is responsible
for maintaining the water service line up to the curb stop (the first valve) off the water main. For a
vast majority of residential properties, the curb stop is typically located in the terrace or in the
sidewalk adjacent to the street. The water service line from inside your building out to the curb stop
is owned and maintained by the property owner.
Sidewalk Strft
City Water Main-,.,,,,
Curb Stop.y- (no lead)
Private Service Lin Public Service Line
(may be lead) (may be lead)
o 4-- City Responsibility —i►
Homeowner's Responsibility
1:\ Engineering\ Tracy Taylor\ Public Works Contracts\ Miscellaneous\ Lead Water Lateral Program_2-3- Page 1 of 3
17.docx
Recent studies have shown that replacing only a portion of a lead service line can increase the risk
of lead exposure from drinking water to the occupants. As a result, the City is implementing new
policies and procedures to reduce the risk of lead exposure to its residents. The City's proposed new
ordinance will require full Lead Service Line Replacement (LSLR), replacement of both the public
and privately -owned lead service lines, within six (6) months of work on a lead water service line.
Because water utility rates cannot be used to fund private lead service line replacement, the City
obtained grant money to help reduce the cost to private property owners in 2017. While the City's
Lead Service Line Replacement Program is still being developed, program features will conform to
the proposed City ordinance revisions and a new City Lead Service Line Replacement Policy. The
ordinance will make replacement of lead water service lines mandatory and the policy will describe
how the ordinance will be implemented. Approval of the ordinance and policy are anticipated at
the February 28, 2017 Common Council meeting.
To utilize grant funding in 2017, the City will solicit bids from licensed contractors to complete
private lead service line replacements. The selected private LSLR contractor will be responsible for
coordinating with the contractor performing the construction work on the City's water main and
public water service line, and coordinating with the property owner. The City will provide property
owners with the name and contact information of the selected private LSLR contractor. Residential
property owners, who work with the City's private LSLR contractor to complete the lead service line
replacement as part of the project, will be eligible to receive a fifty percent (50%) reduction of the
lead service line replacement's total cost, up to $1,500 per parcel. The actual cost of private lead
service line replacement can vary significantly. Some of the factors include: length of service line,
method of service line replacement, and construction methods of the building. It is anticipated a
majority of the private lead service line replacements will cost between $1,000 and $2,500 each. The
City will send a separate bill to private property owners for the cost of the lead service line
replacement less the grant -funded cost share. By law, private lead service line replacement costs
are not eligible for assessments or a payment plan.
Disturbing and replacing lead water service lines may result in temporarily increased lead levels in
drinking water. To minimize exposure to this risk during construction, the City will be providing a
faucet filter and a replacement filter cartridge, certified for lead removal by NSF International, to
each living unit on a parcel with a lead water service line.
Based on available information, the City anticipates your water service line is likely made of lead.
To determine if your water service line is lead, you may contact a certified plumber, the City's Water
Utility at (920)232-5330, or perform a self -inspection. To perform the self -inspection, simply take a
metal tool, like a coin, and scratch the surface of the pipe protruding from the floor or wall prior to
the water meter. If the pipe is easy to scratch and the scratched area is a shiny grey color, the pipe is
made of lead. The figure on the next page provide basic guidance for performing a self -inspection:
I: \Engineering\Tracy Taylor\ Public Works Contracts\ Miscellaneous \ Lead Water Lateral Program -2-3- Page 2 Of 3
17.do«
Galvanized Steel Lead
Plastic Copper
Lead is dull, very soft, and will turn a shiny
silver color when scratched. �c
?. C
je
O'G
TO FROM fl
110MG S'11tEE l'
WAi'ER METER fl
t�fl
Magnets will ONLY stick to steel. )Oc
They will NOT stick to lead or copper.
If you choose to hire a plumber to perform the inspection, the City is developing a form that will be
required for all certified plumbers to use for inspections.
Additional information about lead in drinking water can be found on the City's web page at
hUs://www.ci.oshkosh.wi.us/Public Works/water utility.asp. Property owners may wish to
consider replacement of building's plumbing (pipe, valves, or fixtures) that contain lead-based
materials.
Please contact Pete Gulbronson at (920)232-5258 or the Department of Public Works at (920)236-5065
with any questions regarding lead in drinking water.
I:\Engineering\Tracy Taylor\Public Works Contracts\Miscellaneous\Lead Water Lateral Program_2-3- Page 3 of 3
17.docz
#2
JANUARY 10, 2017 17-07 RESOLUTION
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVAL OF INITIAL RESOLUTION FOR SPECIAL
ASSESSMENTS PAVING, SIDEWALK, DRIVEWAY AND
UTILITIES / SECOND LOCAL STREET CONCRETE PAVING
PROGRAM NORTH AND WEST SIDES — CONTRACT 17-05
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED BY the Common Council of the City of Oshkosh as follows:
1. The Common Council hereby declares its intention to exercise its police
power under Section 66.0703 and 66.0705 of the Wisconsin Statutes to levy special
assessments upon property within the following described areas for benefits conferred
upon such property by improving the following:
Concrete Pavement, Asphalt Pavement, Sidewalk, Driveway Aprons, Sanitary
Sewer Laterals (New and Relay), Storm Sewer Laterals (New and Relay), and
Water Laterals (New and Relay)
New York Avenue from Wisconsin Street to North Main Street
Jackson Street from 50' south of New York Avenue to 50' north of New York
Avenue
Kentucky Street from New York Avenue to 50' north of New York Avenue
Central Street from 50' south of New York Avenue to 50' north of New York
Avenue
Merrill Street from New York Avenue to 50' south of New York Avenue
East Murdock Avenue from Harrison Street to 50' east of Bowen Street
Bowen Street from 50' south of East Murdock Avenue to 50' north of East
Murdock Avenue
Maricopa Drive from 400' northwest of Dickinson Avenue to 50' west of
Covington Drive
Dickinson Avenue from Maricopa Drive to South Washburn Street
JANUARY 10, 2017 17-07 RESOLUTION
CONT'D
2. The total amount assessed against such district shall not exceed the total cost
of the improvements and the amount assessed against any parcel shall not be greater
than the benefits accrued thereto from said improvements.
3. The assessments against any parcel may be paid according to the provisions
of Section 25-83 through 25-89 of the Oshkosh Municipal Code.
4. The governing body determines that the improvements constitute an exercise
of the police power for the health, safety, and general welfare of the municipality and
its inhabitants.
5. The Board of Public Works is directed to prepare a report consisting of:
(a) Final plans and specifications for said improvements.
(b) An estimate of the entire cost of the proposed work or
improvements.
(c) An estimate as to each parcel of property within the assessment
district of:
(1) The assessment of benefits to be levied for each
improvement.
(2) The damages to be awarded for property taken or damages
by each improvement.
(3) The net amount of benefits over damages or the net amount
of damages over benefits for each improvement.
(4) The total assessment against each parcel
Upon completion of such report, the Board of Public Works is directed to file a copy
thereof in the City Clerk's Office for public inspection.
6. Upon receiving the report of the Board of Public Works, the City Clerk is
directed to give notice of a public hearing on such reports as specified in Section
66.0703(7)(a) of the Wisconsin Statutes. The hearing shall be held before the Common
Council at the Council Chambers, Room 406 in the City Hall at a time set by the Clerk in
accordance with the Wisconsin Statutes. The assessment against any parcel may be
paid in cash, paid with the first property tax installment, or in ten (10) installments if
JANUARY 10, 2017 17-07 RESOLUTION
CONT'D
the total amount of the assessment is greater than five hundred dollars ($500.00) or
fifteen (15) installments if the total amount of the assessment is greater than one
thousand dollars ($1000.00).
7. The installation of said street improvements shall be accomplished according
to the provisions of Section 25-3 through 25-11 of the Oshkosh Municipal Code.
#3
NOTICE OF PUBLIC HEARING
Office of the City Clerk, City of Oshkosh, Winnebago County, Wisconsin:
Please take notice that the City Council of the City of Oshkosh has declared its intention to
exercise its power under Section 66.0703(7)(a) of the Wisconsin Statutes, to levy
assessments upon property for benefits conferred upon such property by providing the
following improvements fronting upon the following described streets:
CONCRETE PAVEMENT, ASPHALT PAVEMENT, SIDEWALK, DRIVEWAY
APRONS, SANITARY SEWER LATERALS (NEW & RELAY), STORM SEWER
LATERALS (NEW & RELAY) & WATER LATERALS (NEW & RELAY)
New York Avenue from Wisconsin Street to North Main Street
Jackson Street from 50' south of New York Avenue to 50' north of New York
Avenue
Kentucky Street from New York Avenue to 50' north of New York Avenue
Central Street from 50' south of New York Avenue to 50' north of New York
Avenue
Merrill Street from New York Avenue to 50' south of New York Avenue
East Murdock Avenue from Harrison Street to 50' east of Bowen Street
Bowen Street from 50' south of East Murdock Avenue to 50' north of East
Murdock Avenue
Maricopa Drive from 400' northwest of Dickinson Avenue to 50' west of
Covington Drive
Dickinson Avenue from Maricopa Drive to South Washburn Street
The report of the Public Works Director and City Manager showing proposed plans and
specifications, estimated costs of improvements, proposed assessments and awards of
damages is on file in the Office of the City Clerk and can be inspected there on any business
day between the hours of 8:00 a.m. and 4:30 p.m.
Notification that the City Manager (Board of Public Works) and City Council will hear all
persons interested or their agents or attorneys concerning the matters in the preliminary
resolutions authorizing awards of damages at 6:00 p.m. in the Council Chambers in the
City Hall, Oshkosh, Wisconsin on MARCH 14, 2017.
All objections will be considered at said hearing and thereafter the amount of assessment
will be finally determined.
CITY OF OSHKOSH
PAMELA R. UBRIG
PUBLISH: 3/4/2017 CITY CLERK
MI
SPECIAL ASSESSMENT PAYMENT PLAN OPTIONS
AFTER
CONTRACT NO. 17-05 IS CERTIFIED AS COMPLETE
CONTRACT NO 17-05 WILL CONSIST OF
CONCRETE PAVEMENT, ASPHALT PAVEMENT, SIDEWALK, DRIVEWAY
APRONS, SANITARY SEWER LATERALS (NEW & RELAY), STORM SEWER
LATERALS (NEW & RELAY) & WATER LATERALS (NEW & RELAY)
New York Avenue from Wisconsin Street to North Main Street
Jackson Street from 50' south of New York Avenue to 50' north of New York
Avenue
Kentucky Street from New York Avenue to 50' north of New York Avenue
Central Street from 50' south of New York Avenue to 50' north of New York
Avenue
Merrill Street from New York Avenue to 50' south of New York Avenue
East Murdock Avenue from Harrison Street to 50' east of Bowen Street
Bowen Street from 50' south of East Murdock Avenue to 50' north of East
Murdock Avenue
Maricopa Drive from 400' northwest of Dickinson Avenue to 50' west of
Covington Drive
Dickinson Avenue from Maricopa Drive to South Washburn Street
Included in this mailing, is an estimated amount (quantities and costs) of the special
assessment (sheet #5) against your property or properties. A statement of the same is on
file in the office of the City Clerk. Once Contract No. 17-04 is certified as complete by the
Public Works Department, the final amount (quantities and costs) of the special assessment
against your property or properties will be mailed to you. At that time you will also
receive the paperwork to select a payment choice for the special assessments. PAYMENT
CHOICE OR PAYMENT IS NOT ACCEPTED AT THIS TIME.
THE PAYMENT OPTIONS SHEET YOU WILL RECEIVE AFTER THE CONTRACT IS
CERTIFIED AS COMPLETE WILL HAVE THE FOLLOWING OPTIONS:
INVOICE - PAYMENT WITHIN 30 DAYS
If you choose this option, the City of Oshkosh will then send you a special assessment
invoice and you must make payment within thirty days of that notice.
read other side
If the payment is not made within thirty days after receiving the special assessment invoice,
6% interest accrues from the date of notification.
If after making this selection, the property owner fails to make payment to the City
Treasurer; the entire amount including interest will be placed on the next property tax bill.
TOTAL ASSESSMENT ON NEXT TAX BILL IN FULL
Property owners may elect to pay 100% of the assessment on the next designated real estate
property tax bill, without interest. The total amount of the assessment will be included on
and payable in conjunction with the next designated property tax bill.
TEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL (ASSESSMENT
MUST BE IN EXCESS OF $500.00)
The amount of the assessment will be placed on the property tax bill with interest at 6% on
the unpaid balance per year over the ten- (10) year period. The annual assessment payment
and interest will be included in each year's tax bill payment. The assessment balance may
be paid in full at any time during the ten-year period, with interest pro -rated to the month
of payment. (Applies to assessments in excess of $500.00.)
FIFTEEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL
(ASSESSMENT MUST BE IN EXCESS OF $1,000.00)
The amount of the assessment will be placed on the property tax bill with interest at 6% on
the unpaid balance per year over the fifteen- (15) year period. The annual assessment
payment and interest will be included in each year's tax bill payment. The assessment
balance may be paid in full at any time during the fifteen -year period, with interest pro-
rated to the month of payment. (Applies to assessments in excess of $1,000.00.)
CITY OF OSHKOSH
PAMELA R. UBRIG
CITY CLERK
read other side
. . .. ........
BLOQK 128
H
4j, 19
BLOC 127
U)
LEACHS MAP
N
_7ACS 3 MAP
LEACH MAP
z
17
LEACHS' VAJ-_
Z
0
W
14
V)
z
SR -9 ZONING
0
0
7)
506A
0
6
c;
524 518 512
506 426 422
416 404
67.0' 63.5' 60.0'
90.0, 66.0, 65.0'
46.0' 135.0'
NEW YORK
AVE.
TAT
595.0'
?F
0
Z
1130 WISCONSIN ST
z
PARCEL # 05-0174-0000
0
SR -5 Z NING
0
BLOCK 134
LEACHS MAP
0
IPD ZONING
5 10; 1 12
PAGE 1 OF 5
filename: New York05.dwg
CITY OF OSHKOSH
CONCRETE PAVING. APRON. SIDEWALK AND WATER.
ENGINEERING DIVISION
SANITARY & STORM LATERAL ASSESSMENTS
REVISION DATE:
CERTIFICATION DATE:
WEST NEW YORK AVE WISCONSIN ST. M
CONTRACT NO. DRAWN
N. MAN ST.
17-05 11-03-2016
JACKSON STREET 50.0' S. OF W. NEW YORK AVE. TO
50.0' N. OF W. NEW YORK AVE.
RArIC 0 25 50
P,
im
SCA, (IN FEET)
STREET NAME FOR
PARCEL I.D. ADDRESS OWNER CORNER LOT
RATE
FRONTAGE
CALCULATION
ASSESSABLE LINEAR CONCRETE PAVING
FEET ASSESSMENT
EXISTING APRON CONCRETE APRON SIDEWALK AA
SANITARY
LATERAL RELAY
STORM SEWER
LATERAL
ADDRESS ASSESSMENT
TOTAL
SEE NOT
12-0307-0D00 524 W, NEW YORK AVE GOLD STAR INVESTMENTS LLC NEW YORK ONLY
SINGLE FAM
67.0 _ $6,257.80_�tf
_OFf WUCONSIN $980.00
$2.200.00
750.00
, 10.1.87.83
12-0306-0000 518WNEW YORK AVE GOLD STAR INVESTMENTS LLC
SINGLE FAM
635
$5,930.90 _SHARED
CONC $263.35 $1,12D.00
$2,200.00
$750.00
$10,264.25
...I?-0-0302-0000.___.. _.512 W.NEW YORK __.CARTER) HENDRICKSEN
SMGLE FAM
_._..._...._....._....__...._.,60.0
_
}5,601.00
SHARED CONC _...._..245.20 {1,680;00
$2,2W.g0
_{750.00
I0A79_71__
12-0301-0000_-�.506.W NEW YORK AVEMICHAEL 5/DANIEL L SCHNEIDER ,____
_SINGLE FAM
90.0
$8.406.00
CONCRETE _ {243.00 52,100.00
{22011.00
$750.00
313.699.00
12-0300-0000 426 W NEW YORK AVE SARAH L CLARK
SINGLE FAM
_66.0
{6.164.40
CONCRETE b28DA0 $1,680.00
$2.200.00
$750100
11.071.80
, 17-0286-0000,__,_,422W.t! YORK AVE _.A CCU,PROPERTIESLLC
.SINGLE FAM___
65.0
*.CI _ _
CONCRETE____$441.00 $1.1211.00
$2200.011
_SAO
10.582_00
72112&5-0000_„„_.._116W NEW YORKAVE__..._WATER CRVPROPERTIES ILC ...._SN4GLE
FAM_
46.0
{4_296.d0_CONCRETE05.15
$1.120.00
)_2_2110.00
_.._{750_00
,67155
12-0284-0000 IW W NEW YORK AVE MARY L GREEN LIFE ESTATE NEW YORK
SINGLE FAM
1352 2--
675
$6.304.50 06)
CONCRETE $275A5 $1,820.00
$2.200.00
{750.00
JACKSON ,-SINGLE
FAM
_
50.0
$41670.00 DL)
$16.019.95
05-0174-0000 1130 WISCONSIN ST BOARD OF REGENTS UNIV OF WLS SYS NEW YORK
INSTITUTIONAL
59510
$55573.10 It %)
NONE $2940.00
JACKSON
INSTITUTIONAL
50.0'/2•=25.0
.. ... �2,335.00_U_._-.__._
__.0�
$111,613.00
$2.053.55 $14,840.00
$17.600.00
$6.000.00
$152.106.55
• CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION
$1521 D6.55
AA INCLUDES 6 SIDEWALK SQUARES FOR UTILITY REPLACEMENT, SEE LETTER FOR MORE INFORMATION
R REDUCED FRONTAGE OR CREDIT FOR 23/25 OF 2015 NEW YORK AVE CONCRETE PAVING ASSESSMENT TO BE APPLIED
x REDUCED FRONTAGE. OR CREDIT FOR 9/25 OF 2001 JACKSON ST CONCRETE PAVING ASSESSMENT TO BE APPLIED
2017 ASSESSMENT RATES:
SHEET 2 OF 5
CITY OF
OSHKOSH
CONCRETE PAVING,
APRON, SIDEWALK AND WATER,
36' CONCREIEPAVEMENT :SINGLE FAMILY RESIDENTIAL B INSTRUTIONAL PLANNED DEVELOPMENT) _ {93100 PER LINEAR FOOT (NEW YORK)
ENGINEERING DIVISION
SANITARY i STORM SEWER LATERAL
ASSESSMENTS
45' CONCRETE PAVEMENT :SINGLE FAMILY RESIDENTIAL$ INSTITUTIONAL PLANNED DEVELOPMENT) $93.C3 PER LINEAR FOOT (JACKSON)
CONTRACT#
17-05
CONCRETE APRON =$5.50 PER SQUARE FOOT LESS ANY CREDIT(ESTIMATE)
DRAWN
10/28/2016
SIDEWALK REHABILITATION = $5.60 PER SQUARE FOOT (ESTIMATE)
WARD
STH 6 12M
W NEW YORK AVENUE- WISCONSIN ST TO N MAIN ST
SANITARY SEWER LATERAL RELAY = $2,200.00 EACH (ESTIMATE)
NEW STORM SEWER LATERAL FOR SUMP PUMP = $750.00 EACH
JACKSON STREET- 50.0'S OF W NEW YORK AVETO SOON OF W NEW YORK AVE
REVISED
(WEST SIDE)
CERTIFIED
W
U
filename: New York03.dwa
PAGE 3 OF 5
F/71 , TO BE ASSESSED NON-RESIDENTIAL RATE
59.5'
90.5'
50.0'
40.0'
60.0'
N
1
N
121
113
I
103
SR. 9
-I
Z
.a -
121A
OCK B. GHME
3_EI
FCI K M,
LEACH_;
. AF'
'READ & KENNEDY'Sl
i
& K IN [Y"',
N
N_`�'if�C(Gmg
Y
,4
SUED
a
I3 CCK;2
I ZONING
LI_ CI
N
SUL
I—
ADDN
UN_ _N
6
24
N
t8 3
,:
J
—
Z
2
Q
o N
1
p
r
No
N
'120.0'
324
318
314
33006A
302
108
32 26 16 --. 14 /
56.0'
49.5'
49.5'
67.0'
50.33'
376.5'
75.0' 78.0' 45.35' 45.0' 40.0' 180.0'1200
rfNN
T
W
U
filename: New York03.dwa
PAGE 3 OF 5
F/71 , TO BE ASSESSED NON-RESIDENTIAL RATE
59.5'
90.5'
50.0'
40.0'
60.0'
120.0' 720.0'
1
121
113
109
103
21 Z
121A
o
TRw
4 t
7
N
N_`�'if�C(Gmg
UMU ZONING
I3 CCK;2
LI_ CI
N
SUL
I—
ADDN
UN_ _N
J
6
24
N
t8 3
i
J
Z
2
1
W
U
filename: New York03.dwa
PAGE 3 OF 5
F/71 , TO BE ASSESSED NON-RESIDENTIAL RATE
MtCfll0. ADDlti OWNlR
AtFfi XAMF FOR
RATE
FRONTAGE CALCULATION
ASSF SABLE LINEAR CONCRETE PAVING J' WIDENNGSPAVED EXISTING APRON
CONCRETE
SIDEWALK AA
SANWApY
S TONA SEWER
ADDRESS ASSESSMENT
CORNER IOi
FfA
SMEXF
LFRRACF ASSESSMFXi
SFF NO
LARMIRELAT
IATFMI
TOTAL
150"6-00" I MJACKSON Si OSHKOSH MANAGEMENT LLC
NEW YORK
SINGLE FAM
120.0/7•
60.0
35,6".801X)
SHARED CONIC
$IDD.DD
5980.00
$22M.DD
$150.00
JACKSON
SINGLE FAM
50.0
$6670.w IFL
Off NEW YORK
$1,30,00
150 ACKKI 326 W NEW YORK AVE STEPNENE L EICNAUNH
SINGLE FAM
56.0
15,230.60
SHAREDCONC
31011.00
$1,120.00
322W.00
3)50.00
39.IOO.b
)$-0028-00" 318WNEWYORKAVE STEPHEN A/CARLYNiAMRRANO
SINGLE FAM
69.5
",62330
SHAR®GONG
3133,60
3980.00
S2.2K1.M
$)50.00
3&736.90
15002900" 311WNEWYORKAVE TIMOTHY L/K MFAHLEY
SINGLE FAM
69.5
31,62330
SHAREDCONC
SI3030
$1.24XI10
$2,-...
1750.00
39.013.60
15-00060000 306W NEWYORK AVE ROBERT/BROOKEKNON
SINGLE FAM
61.0
36.25).30
CONCRETE
$228.7D
$810.00
S22D.O0
5750.00
SIQT76.50
1500090000 3M W NEW YORK AVE SYDNEY M GRAY
NEW YORK
SINGLE FAM
50.3
$1.]00.32
OR KENTUCKY
31,120.00
$220.80
$)50.00
KENTUCKY
SINGLE FAM
130.0/7•
65.0
$5,696].8 MI
OUTSIDE IIIJBS
316.661.82
15011680000 -W NEW YORK AVE OSHKOSHAREAMHOOLDDTRK:i
NEW YORK
NSTITLTIIONAL
050.0/7)•(150.0/7I'm.5•
123.5
$21.311.90
315000.80 NONE
$130110.00
322".00
KENTUCKY
NSTITLWDNAL
50.0
31,380.00 DSI
5280.00
CENTRAL
RISTITUIDNAL
50.0
31.38D.00
y60531.90
15610560000 32 W NEW YORK AVE GREGORY C/MARY BETH BOSSEA
NEW YORK
SINGLE FAM
75.0
17..500
OR CENTRAL
SM0.00
$22D00
$750.03
CENTRAL
SINGLE FAM
SOR/7•
25,0
$2190.00
OUTSIDE LIMITS
312"Ii:W
IS-00550000 26WNEWYORKAVE KEIIHR/JANET G RECHENBERGER
SINGLE FAM
78.0
37,28521
CONCRETE
33".90
sgmw
$2200.00
$750."
11.600.10
ISdO"0000 16WNEWYORKAVE JERENUH K/JENNIFER M JOHNSON
SINGLE FAM
15.35
$6,235,69
CONCRETE
"96.35
31,121.0032200.80
S7GD.00
18,-,q!
1500530000 11WNEWYORKAVE RUBYJRHOMASJEWER-WARD
SINGLEFAM
150
III.=0
CONCRETE
$297.85
111.1mm
$2210.00
3150."
38.5711.65
150DE90WD 1109N MAN ST RAMMIR--RIO.
NEWYORKONLY
URBAN MIXED
60.0
3510000
SHARED ASP
1505.56 r•j
3110.00
OFF ARAN
SI.30D.M
57."356
150D51-0000 1211NMANST PHLIPH3A.
NEWYORKONLY
URBAN MXED
80.0/7•
10.0
35,103.00(7)
SHARED ASP
3820.881•i
570100
32200.80
SI.MW
$10.628."
31066/0./1
SIS.DM.M
$5295]1
$24.760.00
$26.600.00
$11,100.00
3187,19615
' CALCULATION INCLUDING LONG SDE CORNER LOT DEDUCTION
1187196.15
AA INCLUDES 6 SIDEWALK SQUARES FOR UROY REPLACEMENT. SEE LETTER FOR MORE NMRMAIDN
R REDUCED FRONTAGE OR CREDIT FOR 9/25 OF MI JACKSON ST CONCRETE PAVING ASSESSMENT TO BE APPLIED
R REDUCED FRONTAGE OR CREDIT FOR 6/25 OF 1998 KENTUCKY ST CONCRETE PAVING ASSESS-0 BE APPLIED
A REDUCED FRONTAGE OR CREDIT FOR 21/25 OF W16MAN ST CONCRETE PAVING ASSESSMENTTO REAPPLED
"APRONS BASED ON 2115 AREA OWNERS WLL NOT BE ASSESSED FOR DRIAMAY APRON WORK DONE AS PART
OF THE 2116 MAN ST PROJECT
31) AAFSSMENI MRS
SDCONCRETE PAVEMENT (SNGLE FAMILY RESIDENHAL 3 NSIITUTDNAL) - 381.60 PER LINEAR MOT (KENNCKY 3
CENTRAL)
CDY OF OSHKOSH
SHEET
1 OF 5
36' CONCRETE PAVEMENT ISNGLE FAMILY RESDENTIL L INSTITUIIONALI • $93.60 PER LINEAR FOOT (NEW YORKI
FXGINFFNNG DIWSDN
CONCRETE PAVING.
APRON, SIDEWALK AN D WATER
ME
36' CONCRETE PAVENT IURMN MIXED USE? = $121.24 PER LINEAR FOOT (NEW YORKI
CONTRACT9
17.1
-ITABY E STOMA
SEWER LATERAL
ASSESSMENTS
65' CONCRETEPAVEMENT(SNGLEFAMILYRESIDENML3INSTITUTIONALPLANNMDEVEIOPMENT)=593.QPERLNEARFOOT(JACKSONI
CONCRETE APRON =35.50 PER SQUARE FOOL LESS ANY CREDO IESTISATEI
DRAWN
WAND
10/28/111
IAN313TN
W NW YORK AVENUE- YMCONSN ST M N FMN Si
SIDEWALK REHAI LITATDN = 35.60 PER SQUARE FOOT (ESTIMATE)
JACKON ALEFT (EAA NDE)- W NEW YORK AVE TO 50.0' N OF W NEW YORK AVE
SAN WARY SEWER LATERAL RELAY=12.2DA0 EACH (EAISATE)
KFNTVCKY AREIY- W NEW YORK AVE TO 50.0
N OF W NEW YORK AVE
N EW STORM SEWER LATERAL FOR SUMP PUMP =57W."EACH
IFF-ED
CEmF1ED
ClNTM AREA- W N EW YORK AVE TO SDV N OF W NPM YORK AVE
STREET NAME FOR
PARCEl1.D. ADDRESS OWNER STREET
RATE
PIIONTAGE
ASSESSABLE UNEAR CONCRETE PAVING SANITARY
EXISTING APRON CONCRETE APRON
STORMSEWER ADDRESS ASSESSMENT
CORNER LOT
CALCULATION
FEET
ASSESSMENT
SIDEWALK AA LATERAL
SEE NOT
LATERAL
TOTAL
91008420000 1156 JACKSON ST JUDY RAE BURTON NEW YORK
SINGLE FAM
120.4 / Y =
60.0
$5.604.00 I#)
CONCRETE
$325.50 3840.OD $2100.00
$750.00
_ _______ _ _..--- _ _...... ....... JACLKSON.__..
SINGLEFAM __
.... ..... _.... . _ ...... _.....
.._ --Sm -
L..........
OFFNEW YORK ..._....
.51 /.3B9S0
91008410000 325 W NEW YORK AVE MICHAEL L}ENZA/SHERRY L PRYER
SINGLE TAM_
_
S2.S
$4,903.50
CONCRETE
$119.80 _8,4020_52_200_00
3750.00..;0813.30___
91008070000 321 W NEW YORK AVE AMY 1 JAANER ..., -�_ _._____......_.-.......-
SINGLE FAM,,._,._...
..
6I5...___
35.83750
SHARED.CONC
5_205„A5 1.540:00
.._......._
$750.00 __,._kD_532.55._.
....... ...
91008060000 31304 NEW YORKAVE,.___„KEJNEHA/AMRLOMOSMOND
_.SINGLE fAM
500
.670.00
SHAREDCONC,_._b188;55
�:00 x.210.00.5150_00
8.788.55
91008050000 309 W NEW YORKAVE , JOSHUA/JACQUEUNEN LONG
FAM
87.5
$8.172.50
CONCRETE
3367.85 $1.68D.00 $2200.00
$750.00
313,170.35
^_SINGLE
91008040000 219WNML(?RKAVE HARVEYK/DIANEAHARTMAN
..___...__._. _
SINGLE FAM_
76.0
$7,098.40
CONCRETE
._
3135.75 $1400.00 2,200.00
��.�....-.�._
750.00
11,584.15
.__E_._..._
._9100803( N8..__..._713W NEW YORKAVE.... _.......... JASON M/ERIKALLOYD _.. ._..._..._SINGLE
FAM.._...
_.... _._._50.04.670.00
CONC,RETE.__.
176.45__ 31.400.OD ...2.2111..00 ..._.._.j]50Ap
9.196:45._.... ..... ___
918M823000 ..._._ 21904 NEW YORK AVE PAUI,ENICKOLAI
SINGLE FAM... _...._
500x,670.00
CONCRETE
i192A0 5980.00 _�21Eq.00.,_.._SOAO
__...8,79240
___
91008010000 23W NEW YORK AVE STACY A DEATON NEW YORK
SINGLE FAM
50.0
$4.670.00
OFF MERRILL
$840.00
OFF MERRILL
INSTALLED VIA
MERRILL
SINGLE FAM
50A'/2-
25.0
32.190_00 IRI
OUTSIDE UMRS
X2200,00
1007
9,900.00
91007790000 1156 MERRRLST NICHOLAS L TRAVIS NEW YORK
SINGLE FAM
59.5
$5.557.30
OFF MERRILL
$1 AOO.00
OFF MERRILL
INSTALLED VIA
..__.-...--._.._..__....._..._ MERRILL .........
_SINGLE FAM..___.._50:0(7''
........
._250 ..._...
32190.00 (slj„
._OUTSIDE LIMBS...__._._
.-._-_...._._...52,204.00 ..._
1007._...._.
91DD778000D 121WNEWYORK AVE STEVEN G/DIANE LEACHSINGLE
FAM
__
90.5
__38.452.70
CONCRETE
$196.80 SIb80.00 2104.00
3750.00313.279.50
_91007770000._. 113W NEWYORK AVE...._.._.JASONR MENTZEL ._.___._-...___.__...._...... _...... _..... _... .
..... SINGLE FAM_„,__._._.._...._......._.�A
..._-..__....34.670.00
..__.CONCRETE_._X227_OS__....31,f.20_00.__.}21W.00
..._.750.00
_._....___i9..967_p5
_
91007760000 109 W NEW,YORKAVE ...._,%NE APARTMENISNLLC
SINGLE FAM.
.. b;0 ..._...x,736.110
CONCRETE
£1)8;10 _GOAD._.._ _ $2,210.00
3750_00 _^__(1:964.10_.__
91007750000 103 W NEW YORK AVE ULTIMATE PROPERTIES LLC NEW YORK
SINGLE FAM
60A
$5,604.00
OFF CENTRAL
$1,400.00
OFF CENTRAL
INSTALLED VM
CENTRAL
-.-...__..._.... .. ..._....
SINGLE FAM
50.0'/Y=
25.0
2335.00 A
OLITSIDEUMITS
32200.00
10-07
11.539.00
91007740000 21 WNEW YORK AVE TERRY J LAB NEW YORK
URBAN MIXED
12(1.6/7=
60.0
$7,662.00
CONCRETE
$1,540.00
OFF CENTRAL
INSTALLED VM
___._...__._......_.__....__-..._.._._._._ .. _._.._._C@RRAL ..._
URBAN MIXED ..
50......._
... ..... _ __._..52200:00 .._
7G07__
91007530000 _ 7WNEWYORKAVE 7WESTNEW YORKAVENUELLC NEWVORK.ONLY
_URBAN MI%ED
120.0'/7=
60A__.._...
f7.662.00 fl
CONCRETE
_]57.25L^j1000_00__}2.200.00_.._32.000.00£4:19.25_..___,_
3110,609.90
$3,070.55 $2).721J70 $35,200.00
$10,250.00
$179,850A5
' CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION
$179,BSOAS
AA INCLUDES 6 SIDEWALK SQUARES FOR UTILITY REPLACEMENT, SEE LETTER FOR MORE INFORMATION
x REDUCED FRONTAGE, OR CREDO FOR 9/25 OF 2001 JACKSON ST CONCRETE PAVING ASSESSMENT i0 BE APPLIED
R REDUCED FRONTAGE, OR CREDIT FOR 18/25 OF 2010 MERRILL ST CONCRETE PAVING ASSESSMENT i0 BE APPLIED
A REDUCED FRONTAGE OR CREDIT FOR 18/25 OF 2010 CEMRAL ST CONCRETE PAVING ASSESSMENT TO BE APPLIED
- REDUCED FRONTAGE, OR CREDIT FOR 24/25 OF 2016 MAIN ST CONCRETE PAVING ASSESSMENT TO BE APPLIED
**APRONS BASED ON 2015 AREA. OW NERSWILL NOT BE ASSESSED FOR DRIVEWAY APRON WORK DONE AS PART OF THE 2016 MAIN ST
PROJECT
2017 ASSESSMENT RATES:
30CONCRETE PAVEMENT (SINGLE FAMILY RESIDENTIAL & INSTITUTIONAL) = $87.60 PER UNEAR FOOT (MERRILL)
32' CONCRETE PAVEMENT (SINGLE FAMILY RESIDENTIAL L INSTITUTIONAL) = $93.40 PER LINEAR FOOT ICENTRAL)
SHEET 5O 5
32' CONCRETE PAVEMENT (NON RESIDEMLAQ = $111.70 PER LINEAR FOOT (CENTRAL
36' CONCRETEPAVEMENT (SINGLE FAMILY RESIDENTIAL & INSTITUTIONAL) = $93.40 PER UNEAR FOOT (NEW YORK)
CIIT OF OSHKOSH
36' CONCRETE PAVEMENT )URBAN MIXED USE) =3127.70 PER UNEAR FOOT (NEW YORK)
ENGINEERING DIVISION
CONCRETE PAVING, APRON, 31DEWALK
AND WATER.
45' CONCRETE PAVEMENT (SINGLE FAMILY RESIDENTIAL)= $93.40 PER UNEAR FOOT IJACKSON)
CONTRACT#
1745
SANITARY L STORM SEWER LATERAL ASSESSMENTS
CONCRETE APRON= $5.50 PER SQUARE FOOT LESS ANY CREDO (ESTIMATE)
DRAWN
10/28/2016
SIDEWALK REHABILITATION= 35.60 PER SQUARE FOOT (ESTIMATE)
WARD
15TH L10TH
WNEW YORK AVENUE-
WISCONSIN STTO N MAIN ST
SANITARY SEWER LATERAL RELAY = $2100.00 EACH (ESTIMATE)
JACKSON STREET (EAST SIDE)- 50.01 S OF W NEW YORK AVE TO W NEW YORK AVE
NEW STORM SEWER LATERAL FOR SUMP PUMP = 3750.DO EACH
MERRILL STREET- 50.0' S OF W NEW YORK AVE TO W NEW YORK AVE
REVISED
CENTRAL STREET- 50A' S OF W NEW YORK AVE TO W NEW YORK AVE
CERTIFIED
0
UI ZONING w
UI ZONING/
I ZONING
#15- $31-0000
410 416
17.0 40.69' 221. 66.0, 6.5'/ ,294.02
VACANT LOT
D0.0, 015-0485 12.0'
E. MUR 9 e 8 AYE. 100.0,
289.8' 66.0' 48.0'/ /4 8 215.83' 49.0,
225.0 175.0' 199.81'
/41i / Z/ --- 811
7 A/ j
=J jz(3 CANT lAl
<
/r5-0483-09
Z.%
10 IL
7,9
AVE
f15- /u U -PD ZONING
UI ZONING
//moi/��/�� � � ////_ _ _ _ __ ._ /
filename: Murdock04.dwg PAGE 1 OF 2
CITY OF OSHKOSH CONCRETE PAVING, APRON. SIDEWALK AND WATER.
ENGINEERING DIVISION SANITARY & STORM LATERAL ASSESSMENTS
REVISION DATE:
TO BE ASSESSED NON-RESIDENTIAL RATE CERTIFICATION DATE: E. MURDOCK AVENUE 50.0- W OF HARRISON ST. TO
F7 I 100.0* E OF BOWEN ST.
CONTRACT NO. DRAWN
17-05 10-20-2016 HARRISON STREET 50.0' S. OF E. MURDOCK AVE.
50.0' N. OF E. MURDOCK AVE.
r.RA 1C 0 25 50 100 BOWEN STREET 50.0 S. OF E. MURDOCK AVE.
SCALE (IN FEET) � 50.0' N. OF E. MURDOCK AVE.
PARCEL I.D. ADDRESS OWNER
STREET NAME MR
RATE
ASSESSABLE UNEAR CONCRETE PAVING EXISTING CONCRETE
4 .10" WATER SANITARY
SIDEWALK AA
STOW SEWER ADDRESS ASSESSMENT
CORNERLOT
CALCULATION
FEET
ASSESSMENT APRON APRON
SERVICE RELAYS LATERAL RELAY
(ME NOTE)
LATERAL
TOTAL
80QHARRISONS WALTER SL�t�OVV JR
__
_ _��,t!E
CE.OK��
S
17JD ..... 12,24530 (#)
00
$0.00
$3,721,30
_tA_
I51I9W:W00 0 E MUIDOCIK AYE CITY OFOSHKOSHDIRECT
BILL TO CITY . .
. .. .
E TER" i LALB.
.. . . . .... . ... -'-..---
. .... . ..
NgIH RES
. ....
AL.
....
$7,767 ZLll. PORNE.
13.32 .52_20.00 ......521_00.00
......
113.207.04
15-192"200 416E.URDOCKAVE TER" J LAIB
NON RES
22IS2
.�_AS�P �T 35-2D
. � T
S42,M. 17 ._.__.-..._..._..._.-
$I -k40.00 $2.2DO.22
RECONNECT
96&37
. .... . ....
15-193X'0000 DEMURDOCKAVE FOX VALLEY & WESTERN LTIDNOT
I5.19300000
. . .......
. ....
ASSESSABLE____
AIW650E MURDOCK AVE BRUCE R BARTEL
NON RES
75.0
14,31750 SHARED ASP $497,32 . .
. . . . . . . . . 11,123.00 $12004�
$2jI00.00
Z123.12
IL193�
SHARED ASP
15.19314000 606 E MURDOCK AVE MUZA METAL PRODUCTS UC
MURDOCK
NON RES
396.5'+294.02'=
690.52
$131.82.27 3 ASPHALT $1,727.12
$21.750.00 $3-100,00 $8.800.00
RECONNECT
BOWEN
NON RES
50.0'/7=.
25.0OUTSIDE
LIMITS
. .... . .
17 942. 39
IS -19384000 IBM BOWEN ST CRYOFOSHKOSH
. ... . .... .
MURDOCK
BOWENDIRECT
BILL TO CITY
I ASP 1
Is:q 411 E MUPD2C.K AVE G&PAClFICCORRUGAtEOU.0
MURDOCKONLY
NON RES
5.3U 8?, OC..200.00
-C_ __._ L_
t4
,RRL
I� E�LR��n FOX VALLEY & WESTERN LTD
.21L
NOT
. .... . .. . ......
EMUURP2C±nVLE CRY OF OSHKOSH
DIRECT BILL TO CITY
0lcLwp1 ST
-.68001--
$0.00
$10.84120
..... . . ....$1
15 -0483 -OM 525EIVURD CKAVE BRISTOL SQUARE DEVELOPMENT CO
49.8'+49.0'=
98.8
$18.860.92 2 CONCRETE 200M
$1.680.00 $2,200.00
RECONNECT
$22....940.92
1544830600 DEMUR OCKAVE GABERT RUSCH & LANG LLC
NON RES
215.83
$41,21.95 NONE
$3,360.00
52100.00
$16,661.95
1504830300 5115 E MURDOCK AVE LOM�INE A.NqtFKEjLE%UR
. .... . .....-AAAA- . ..
Ohl'!� . .....
.
. ..... M.0 .
. ...
Do
15-04840100 1735 BOWEN 9 GABERT RUSCH & LANG LLC
MURDOCK
NON RES
1150'/7)+25.0'=
I00.0
$19.090.00 CONCRETE $Ioom
$I.510.00 $2200.00
RECONNECT
BOWEN
50.0
$10,§n.E OUTSIDELPAITS
00
I5.I09040000 811 E MURDOCK AVE CITY OF OSHKOSH
MURDOCK
BOWEN
. . . ...... .. .
... . .... . ... . .... -.DIRECT BILL TO CITY
$402,065.35 $3,659.64
$42250.00 $21.63532 $29,600.0D
$10.500.00
$508,710.31
• CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION
",710.31
AA INCLUDES 6 SIDEWALK SQUARES MR UTILITY REPLACEMENT, SEE LETTER FOR MORE INFORMATION
# REDUCED FRONTAGE. OR CREM MR 14/25 Of 206 MURDOCK AVE CONCRETE PA -0 ASSESSMENT
TO BE APPLIED
2017 ASSESSMENT RATES,
43' CONCRETE PAVEMENT (NON RESIDENTIAL) $190.90 PER LINEAR MOT (MURDOCK)
SHEET 2 OF 2
Q' CONCRETE PAVEMENT (NON RESIDENTIAL) $213.80 PER LINEAR FOOT (BOW EI,
r WATE:SRVICE RELAY $4.750.00ESMATE�
CITY OF OSHKOSH
6 -WATER SERVICE RELAY $4250.00 (ESTIMATE)
ENGINEERINGDIVISMN
CONCRETE PAVING, APRON, SIDEWALK AND
WATER.
T WATERSERVICE RELAYIf $4.000.00 ESTIMATE)
E
CONTRACT
17.0
SANITARY L STOW SEWER LATERAL ASSESSMENTS10'WATM
R SERVICE RELAY = $5,0DO.0D (ESTIMATE)
DRAWN
0/28/2011
O'CONCRETE APRON = $5.5D PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE)
WARD
15TH E MURDOCK AVENUE- HARRISON 9
TO IW EAST Of BOWEN ST
SIDEWALK REHABILITATION = $5.60 PER SQUARE FOOT (ESTIMATE)
4 -8" SANITARY SEWER LATERAL REI.AY = $2.200.00 EACH (ESTIMATE)
BOWEN 9 REET- W S Of E MU RDOCK
AVE TO 50'N OF E MURDOCK AVE
NEW STORM SEWER LATERAL FOR SUMP PUMP = $750.00 EACH
REVISED
CERTIFIED
N
SMU ZONING
NE a NE
SEC 28
N
1245 S WASHBURN ST 2010 DICKINSON AVE.
ARCEL jf 13-1171-OOOC PARCEL / 13-1166-0000
N C0 Ca
_
2010 Z Z
6�
300.43' >
,ogo148.83'
,S5.32
DICKINSON AVE. c � �
�
J04-65 59.23' 149.0' 80.0' 115.3' z m
il
6i
2067 2025 2015 N
?
�
e
2p95
206 j
1ST
1n
_OT 1 LOT 2 in
kV Nil
o00
> :CSM 2898 CSM 28988
N+ES
Z
2
I )
G�
Z
N 7
N '
-' UNIT 1 OF
Z WASHBURN
Z v CONDOS
cow
k_....: .... 00
PAGE 1 OF 2
filename: Dickinson20.d.g
CITY OF OSHKOSH CONCRETE PAVING, APRON. SIDEWALK AND WATER.
ENGINEERING DIVISION SANITARY k STORM LATERAL ASSESSMENTS
REVISION DATE: DICKINSON AVENUE MARICOPA DR. TO
CERTIFICATION DATE: S. WASHBURN ST.
CONTRACT N0. I DRAWN
17-05 10-26-2016 MARICOPA DRIVE 100.0' W. OF COANGTON DR. TO
350.0 N. OF DICKINSON AVE.
GRAPHIC a 25 M '°° S. WASHBURN STREET 1DO.o' S. OF DICKINSON AVE. TO
SCALE: (IN FEET)
100.0 N. OF DICKINSON AVE.
PARCEL LD. ADDRESS OWNER
STREET NAME MR
CORI
RATE
FRONTAGE CALCULATION
ASSESSABLELINW CONCRETE PAVING
FEET ASSESSMENT EXISTING APRON
CONCRETE SANITARY S104MSMR
APRON SIDEWALK AA W WATER REALY SEWER LATERAL LATERAL
ADDRESS
ASS E&SMENTTOTAL
(SEE NOTE)
13-104-O000 2090 DICKINSON AVE 2090 DICKINSON AVENUE LLC
DICKINSON
IYIULTHFA.
1150.0/7)+33.32=
IW32
$11,373.60
ASPHALT
W.47 $1,260.00
50.00
L 1-6AM168.3
. .
....
19..q
FFDICKINSON
-D ZT00.00
'm_2P
131171-0000.__., 215 SWASHKLRq,n Ob L CORPORATION
-83
$2 S9
0 !?9.�20D.JI
EL LIASP.._£5,±23S:?I.W.04.000
. . ......... . ..........
. ___p0DD.00
t00
.309
13-1166-OWD ZD10DICMSONAVE WEINER INVESTMENTSU.0
DICKINSON
NON RES
300.43'+121,19'/2)=
31 IUM
$39.7170
2ASPHALT
$5.472.16 51.960,00
$6'600.00 $2100,00
�2—
250_OUfSR1Ea�
S
0
59-062_55
13101_0000 2095 DICKINSON AVE ERE W/NOELLE A SCHLICHTING
DICKINSON
NIULWA.
96,67
$10.150.35
OFF MARICOPA
$2658,13
$2.200.00
MARICOPA
MULWAM
120.01'/7•
60.005_85.600.t]
CONCRETE
M
$750,00
522426.45
13-1191-0100 2065 DICKINSON AVE SHERRYLHEffERNON
MUIiFFAM
100.65
10,988.25
.ASPHALT..........A1..002.
4_j____$2,200,00..___5750.001
82647
_.
131 1750000 145I..S47A_SS__Rn.n 1451 WASHBURN LLC
_�Z_-3.67_ASPHALT
9,q_jL
WASHBURN_.q_R_ECONNECT
0,236.95
13-117501W 2025 DICKINSON AVE WESNER ANDREW UJENNY R
NON RES
119.0.,
$19,027.30
ASPHALT61.29___3_9]1.5082.200,00.
$2,10D.00
527,560.09
._!?:I 2015,MKINSON AVE WILLIAM/LINDA LEMIEUX REV UVINIG TRUST
NON RES
10216a0)
_�2NCRae
0000 IIIto
$2,2000 $2,10D.00
$15,759.10
1J1168-0000 1405 S WASHBURN ST NJ PROPERTIES LLC
DICKINSON
NON RES
1153+ (21.25'/ 2) -
125.925
$16,080.62
ASPHALT
$736.67 $3,755.13
$2.200ID0 som
WASHBURN
NON RES
((21.25- / 2)
25.0
__33.19250 . ......__ouL
Sim
. ... .... C2��!�L,
5.9t., 2_
_.P— 1
$1]1,831.96
$15.054.30 $M.63757 $4.000.00
$24,200.00 $12.900.00
$250,623.83
CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION
$250.623.83
AA INCLUDES 6 SIDEWALK SQUARES FOR UTILITY REPLACEMENT, SEE LETTER FOR MORE INFORMATION
SHEET 2 OF 2
2011 ASSESSMENT RATES,
32 CONCRETE PAVEMENT (MULTI FAMILY RESIDENTIAL) $93.40 PER UMEAR FOOT JMARICOPI
U CONCRETE PAVEMENT (MULTI FAMILY RESIDENTIAL) $ 105M PER UNEAR FOOT (DICKINSON)
CRY OF OSHKOSH
CONCRETE PAVING, APRON, SIDEWALK AND WATER.
36 CONCRETE PAVEMENT (NON RESIDENTIAL) = 5127.70 PER UNEAR FOOT IDICKIMON)
ENGINEERING
DIVISION
SANITARY & VOW SEWER LATERAL ASSESSMENTS
CONCRETE APRON = $5,50 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE)
CONTRACT #
17-W
SIDEWALK REHABILITATION = $5.60 PER SQUARE FOOT (ESTIMATE)
DRAWN
10/28/2014
NEW SIDEWALK= $5.50 PER SQUARE FOOT (ESTIMATE)
-RD
13TH
DICKINSON AVENUE MARICORA DR TO S WASHBURN Si
SANITARY SEWER LATERAL RELAY = $2,200.00 EACH (ESTIMATE)
NEW STORM SEWER LATERAL FOR SUMP PUMP = $750.00 EACH
MANCOPA DRIVIE, 100.0'W OF COVINGTON
DR TO 350.0'N OF DICKINSON AVE
T WATER SERVICE RELAY = $4.000.00 (ESTIMATE)
REVISED
CERTIFIED
3 WASHBURN ST. 100.0' S Of DICKINSON AVE TO 100.0'N OF DICKINSON AVE
SR45 ZONING �
X47
♦� z
143.76
120.0'
120.0'
DR -6
ZONING
297
1437
14338
1431
1427
1423
1417
1435
1433A
1429
1425
1421
1415
120.0'
115.0'
115.0'
115.0'
120.0'
133.01'
143.76
120.0'
120.0'
119.58'
144.1' 96. /6
1438
1432
1430
1424
1416 1410
1420 1414
\'
,f
MR
12 ZON
NG
1VF S 'IVF:',
x
2a8
X39 0,
,33
filename: Maricooal4.dwa
SMU ZONING
PAGE 1 OF 2
,n
IDo
4mUo
oNNNN
2a3
o MMODOO
295
1s T -DIDN
1VF S 'IVF:',
x
2a8
X39 0,
,33
284
\
a
�
O°; a o Oi
w�oiG
s �
SMU ZONING
PAGE 1 OF 2
STRER R
FRONTAGE
ASSESSABLE
CONCRETE
CONCRETE
SANITARY SEWER STORM SEWED
ADDRESS
PARCEl1.0.
ADDRESS
OWNER
COMER
CORNER LOT
RATE
CALCULATION
LINEAR FEET
PAVING
EXISTING APRON
AA
At "(SEE
LATERAL
LATERAL
ASSESSMENT TOTAL
ASSESSMENT
NO
SEE NOTE)
731]61-0100
1141 MARICOPA DR
GERRIR 1/DONNA KLEINHUIEEN REV TRUST
DUPLE%RES
150.81
$1,1085.65
CONCRETE
$MB.40
61,820.00 OUTSDE LN1RS 750_00 _....
17,024.05
1315100000_1135
MARICOPA
GLENNW/WENDY OREHA
,.....__
DUPLEX RES ,,,,
_,_.____120,9
611,208.00
1CONCRETE
_3531.5061,90000
_^{2210,90 _..__30.Do
.,_.._If
5.3/2.`'0...
131501-0000
1433 MA,KIC 'ADR
JEFFREY/CHR6fM1E JANSEN REV TRUST
DUPLE%RES
_._...._„
_._.,..115,9-__._....
0,741,90__,,.._
A6PMAL7
{1.31713_ _6,120.00_____{22..00_,_._30,00...........315408.23,.,..,_
131508-0000
1429 MARICOPA DR
RICARDO L TREWYN
DUPLEX RES
__-
115.0
$10.741.00
2CONCREIE
$532.85
6840.00
{2210.00
60.00
$14.313.85
50% COMMON
131507-0100
_1127 MARICOPA DR
SHEIIRA LECHER ETAL
INTEREST .__,.
DUPLEX RESIISA"507i-„
575,.
55.370$0
1CONCRETE_.IB_,__6421.00
{7.100;00
5,90_
$7,SO1bB ..
5095 COMMON
1315074X100
1425MARKCOPADR
SHERRA L ELMER ETAL
INTEREST
DUPLEX RES
115.0"50%
575
$5370.50
2CONCRETE
236.18
$120.0
$1,10000
$37500
7,501 b8
131506-0000
1421 MARICOPA DR
HARRY/LORRANE HARTMANN
DUPLEX RES
120,9
$11,21800
CONCRETE
$364.55
80.00
$2290.00
5750.00
65.502.55
133,91
$12.42313
CONCRETE
U399.75..
68gA0 ....
__.... _{2IDDA0
{,750.00_
16.612.58.__.._..
1315060000
14O3MARK;OPADR
ROBERT J/SUSAN KHAN
DUPLEX RES
_118101
13 637.W.,
NCRETC,_.._...,_£SB„0_.Z
__.,j1,120.00.{y270_00
.{750A0__�18,2R8.03
131503-0000
1397 MARICOPA DR
PAUL L,HAMMEN
DUPLEX
132.01
62,42313
2CONCRETE
$533.10
584000
22D.OD
$750,90
16.74653
131502-00D0_..,._.139J
MARICOPA DR
LEEK SHEFCHIK
_ _.__......_.._.____._
DUPLEX RES .,.__
1.01
{15_411.93 ..._CONCRETE
..__
358.50_. _....{980.00_...__{22..00..._
.._._
5]5._00,__
19.700.43
131501-0000
1383 MARK:OPA DR
NANCY 1 HOISWORTH
DUPLEXP ZES
18821
_614,96361
_OIRSDE LN/RS
._...._....__._
810 00
{2210.00. _._...750.00.
_.._8.753.61
13176&0000
1414 MARICOFA DR
ADAM /HOLLY M HACKBARTH
MARICOPA
SINGLE FAM
106.19/2--
53.08
$4,958.61
CONCRETE
$100.0
$98.00
52100.00
COVINGTON
SINGLE FAM
.._
_
_ 75.0
6-....-...
OUTSIDE L
LIMITS
-
-
_...
_._.-...._6019
0 ...._.
5.161
643
131721L
1500 COVINGTON DR
OSHKOSH HOUSING AUTHORITY
MARICOPA
MULTFFAM
107.7
$10,059.18
CONCRETE
$436.40
$1,100.00
$2.100.00
COVNGTON
MULTFFAM
S0A'/2'=
25.0 52,335.00
OFF MARICOPA
60.00
$16.3558
I}110.5-0000
Id3B MARICOPA DR
14%MARICOPA DRNE LLC
_.
MUIiFFAM
14378...__...._
13.427.18._...._...
ASPHALT _
11.030.60 _._.
00_.__....3221D.00
._._._62100190
__19,73].78_,_..
I}11860000
..._ 132 MARICOPA DR
,__... JEMAZA PROPERTIES LLC..____..._....._...._...._._.._..._._..._____MULTfFAM____...
-._--.__120.9.__._._.,,,311208_00._.__ASPHALT
66w.W
_..�81.OA0 _._.....622X100
32.100_00.16,986.58
131187-0000
,1430MARICOPA DR_
BLUE MOON HOLDINGS LLC
MULTI-FAM
120.0
$11,208.00
ASPHALT
$939.92
.,."0.00
{2.200.0.
$2100.00
fl7^287.92
13-11880000
- _-...
1124 MARICOPA DR
_ _..__.
_MICHAEL W/CHRISTINE"WRHARM
_ ._ ....__..____..._...._.___....__
.MULTFFAM _.._._.
i 19.58
511,168.17
SHARED CpJC..._._
5203.40
__00.._...._...._2.210_UO
6 _-.,..
100.00
_...._.__
16,512.1]
..___..__
.131689-0000._.1120
MARICOPA �R_,_MI1;."LL/SANDRA
LSTRATZ.
MULTFFAM
IMLI
513458.94
SHA RED CONC..__126.95
___.{80:00..._...._....
,400_OO.j1L_....
$210..00
_ ,925,99,,,__,,,,_
131490.0000 ___
I410MARICOPADR
PONE INVESTMENTS OF OSHKOSH LLP
_MULTI-FAM
96.78
9,037.38
CONCRETE
$716.50
51.260.00
4 IM00 121
_£2100.00 31],023.88
131191-0000
2095 DICKINSON AVE
ERIC W/NORLE A SCHLICNTING
DICKINSON
SNEETS FOR ASSESSMm TOTALS
131494-0000
2NODICKINSON AVE
2090 DICKINSON AVENUE LLC
.__
..,SEE.
SHEETS FOR AE$FSSMENT TOTALS
___._____.
1}1192-0000
1390MARICOPA OR
1390 MARICOPA DRIVE LLC
MULTFFAM__
._....
_._.
168.83
.SEEDICIONSON
___615,768.72_
CONCRETE
_3251_25
_31_960.00a_{6,g0.90_�__$yl0D.W
521,479.97
131495-0000
1382 MARICOPA pRWAUKAU
CREEK LLC
MULTFfAM
110.0
610.2]/.OD
ASPHALT _-_
_£687.96 _ _
_980.0 _
OUTSIDE LNIRS
32100.00
_..14,011.96
$257.492.56
$10,131M
$22.540.00
$44=00
$27.00DDO
$361,1".36
• CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION
$UI,164.36
AA INCLUDES 6 SIDEWALK SQUARES FOR
UTILITY REPLACEMENT. SEE LETTER FOR MORE INFORMATION
SHEET 2 OF 2
CRY OF OSHKOSH
CONCRETE PAVING, APRON,
SIDEWALK AND WATER
2017 ASSESSMENT
RATES,
ENGINEERING DIVISION
SANITARY 8 STORM SEWER
LATERAL ASSESSMENTS
CONTRACT R
17.05
37 CONCRETE PAVEMENT (SINGLE FAMILY,
DUPLEX, S MULTI FAMILY RESIDENTIAL) - $93.40 PER UNEAR FOOT (MARICOPA)
DRAWN
10/28/2016
MARICOPA DRIVE-
IMIT W OF COVINGTON DR TO 350.0'N Of DICKINSON AVE
CONCRETE APRON = $5.50 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE)
WARD
13TH
SIDEWALK REHASIUTATION=$5.W PER SQUARE FOOT (ESTIMATE)
COVINGTON DRIVE 100.0S OF MARICOPA DR TO MARICOPA DR
SANITARY SEWER LATERAL RELAY = $2210.00 EACH (ESTIMATE)
NEW STORM SEWER LATERAL FOR SUMP PUMP
-$7W.W EACH
REVISED
DICKINSON AVENUE- MAR"PA DR TO S
WASHBURN Si
CERTIFIED