Loading...
HomeMy WebLinkAbout26. 17-88 FEBRUARY 28, 2017 17-88 RESOLUTION (CARRIED_______ LOST _______ LAID OVER _______ WITHDRAWN ___X____) BY STAFF PURPOSE: AWARD BID TO MACCOS COMMERCIAL INTERIORS INC. FOR CARPET REPLACEMENT, FAITH TECHNOLOGIES INC. FOR ELECTRICAL UPGRADES & OMNI GLASS & PAINT FOR PAINTING & WALLCOVERING IMPROVEMENTS FOR THE OSHKOSH CONVENTION CENTER ($342,767.00) INITIATED BY: PURCHASING DIVISION WHEREAS, the City of Oshkosh has heretofore advertised for bids for carpet replacement, electrical upgrades and painting and wallcovering improvements for the Oshkosh Convention Center; and WHEREAS, upon the opening and tabulation of bids, it appears that the following are the most advantageous bids: Flooring Replacement: MACCOS COMMERCIAL INTERIORS, INC. 680 S Westland Drive Appleton, WI 54303 Total Bid: $239,090.00 Electrical Upgrades: FAITH TECHNOLOGIES, INC. 201 Main Street Menasha, WI 54952 Total Bid: $37,800.00 FEBRUARY 28, 2017 17-88 RESOLUTION CONT’D Painting and Wallcovering Improvements: OMNI GLASS & PAINT 3530 Omni Drive Oshkosh, WI 54904 Total Bid: $65,877.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 503-1040-17XX Convention Center – Capital Improvements Oshkosh TO: Honorable Mayor and Members of the Common Council FROM: Jon G. Urben, General Services Manager DATE: February 22, 2017 RE: Award Bid to Maccos Commercial Interiors Inc. for Carpet Replacement, Faith Technologies Inc. for Electrical Upgrades and OMNI Glass and Paint for Painting and Wallcovering Improvements for the Oshkosh Convention Center ($342,767.00) BACKGROUND In 2015 assessments were conducted of the Oshkosh Convention Center to identify a 15 -year capital replacement program to ensure the facility continues to be operationally functional and competitive among convention/meeting facilities throughout the State. The assessments covered a wide variety of areas including HVAC, roofing, kitchen equipment, AN equipment/systems, interior design items, electrical systems, emergency generator, moveable walls and more. The assessments identified recommendations for approximately $1.5M in necessary capital improvements over a 15 -year schedule. Working with Facilities Maintenance staff and representatives from the Convention Center Operator (Oshkosh Investors, LLC), it was determined that the initial capital improvement priorities should include replacing/updating the Convention Center's carpet, paint/wallcovering and to upgrade various electrical elements. The City hired the Boldt Company to provide construction management/administration to coordinate the bid specifications for these initial projects. ANALYSIS Working with the Boldt Company, Facilities Staff and Convention Center Operator staff, Purchasing prepared bid specifications for these three renovation projects. All three projects were advertised in the local paper and posted on Onvia DemandStar. The mandatory pre-bid for the carpet replacement project was held on November 29, 2016. Bids were due December 20, 2016. The bid tab is attached. Based on the bid review, it was the consensus of Boldt and City staff that the low bid met all the minimum bid requirements. The mandatory pre-bid for the electrical upgrade project was held on December 14, 2016. Bids were due January 10, 2017. The bid tab is attached. Based on the bid review, it was the consensus of Boldt and City staff that the sole bid received was competitive and met all the minimum bid requirements. The mandatory pre-bid for the painting and wallcovering improvements bid was held on December 14, 2016. Bids were due January 10, 2017. The bid tab is attached. Based on the bid review, it was the consensus of Boldt and City staff that the low bid met all the minimum bid requirements. These renovation projects are expected to begin this spring and be completed by the summer. City Nall, 215 Church Avenue P.O. Box 1 130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us FISCAL IMPACT The total fiscal impact of all three projects is $342,767.00. The fiscal impact of the three bids is as follows: carpet replacement- $239,090.00, electrical upgrades- $37,800.00, painting/wallcovering improvements- $65,877.00. Funding for these three renovation projects will come from: State Trust Fund Load Program and charged to A/N#: 503-1040-7XXX-07415. RECOMMENDATION Purchasing recommends the Common Council award these bids as follows: the carpet replacement bid to Maccos Commercial Interiors Inc. for $239,090.00, the electrical upgrades bid to Faith Technologies Inc. for $37,800.00 and the painting/wallcovering improvements bid to Omni Paint and Glass for $65,877.00. Respectfully Submitted, Approved: Jon G. Urben, General Services Manager Mark A. Rohloff, City Manager BID TABULATION SHEET FLOORING REPLACEMENT CITY OF OSHKOSH CONVENTION CENTER BIDS OPENED DECEMBER 20, 2016 VENDOR INFORMATION BID BOND ADDENDUM PREQUAL HJ Martin and Son Inc 320 S Military Ave $361,675.00 X X X Green Bay WI 54307 Maccos Commercial Interiors Inc 680 S Westland Drive $239,090.00 X X X Appleton WI 54303 Schleis Floor Covering Inc 998 Glory Road $265,727.00 X X X Green Bay WI 54304 BID TABULATION SHEET PAINTING AND WALLCOVERING CITY OF OSHKOSH CONVENTION CENTER BIDS OPENED JANUARY 10, 2017 VENDOR INFORMATION BID PREQUAL BOND The Reese Group Avantti Environmental Group LLC 310 E Buffalo Street Stuie 106 $135,930.00 X X Milwaukee WI 53202 Omni Glass & Paint 3530 Omni Drive $65,877.00 X X Oshkosh WI 54904 BID TABULATION SHEET ELECTRICAL UPGRADES CITY OF OSHKOSH CONVENTION CENTER BIDS OPENED JANUARY 10, 2017 VENDOR INFORMATION BID PREQUAL BOND Faith Technologies Inc 201 Main Street $37,800.00 X X Menasha WI 54952