Loading...
HomeMy WebLinkAbout07. 17-50 FEBRUARY 14, 2017 17-50 RESOLUTION (CARRIED____5-0___ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 17-17 TO PTASCHINSKI CONSTRUCTION, INC. FOR HEMLOCK COURT & FRASER DRIVE CONCRETE PAVING ($169,180.99) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for various concrete paving & utility projects for Hemlock Court and Fraser Drive in the City of Oshkosh; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: PTASCHINSKI CONSTRUCTION, INC. W7352 STH 33 Beaver Dam, WI 53916 Total Bid: $169,180.99 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 315-0410-7480-00000 Street Improvement Fund Expenditures 317-0410-7480-03301 Special Assessments Fund – Streets 541-1810-1799-00000 Water Utility - Construction in Progress 311-0410-7480-00000 Sidewalk Construction Fund 317-0410-7480-03304 Special Assessments Fund – Sidewalks 317-0410-7480-03303 Special Assessments Fund – Water 551-1910-1799-00000 Sewer Utility - Construction in Progress 317-0410-7480-03302 Special Assessments Fund – Sewer FEBRUARY 14, 2017 17-50 RESOLUTION CONT’D 561-2010-1799-00000 Storm Utility - Construction in Progress 317-0410-7480-03305 Special Assessments Fund – Storm Water 541-1867-6401-08673 Water Utility – Maintenance of Mains 541-1867-6401-08675 Water Utility – Maintenance of Services 323-0801-7206-06303 Property Improvement Fund – Traffic 323-0740-7216-06134 Property Improvement Fund – Land Improvement Great Neighborhoods 323-0740-7216-06136 Property Improvement Fund – Land Improvement Traffic Signal Equipment Cityof `. Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works' DATE: February 9, 2017 RE: Award Bid for Public Works Contract No. 17-17 Hemlock Court & Fraser Drive Concrete Paving Ptaschinski Construction, Inc. / ($169,180.99) BACKGROUND The purpose of this project is to install concrete pavement on Fraser Drive and Hemlock Court. Sanitary sewer main and laterals, water main and laterals, and storm sewer main and laterals will be repaired prior to placing new concrete pavement. Concrete aprons and handicap ramps will be constructed to match the new pavement. This work will complete the requirements of the Edgewood Village plat and related development agreement. ANALYSIS Engineering staff reviewed three bids. The low bid was received from Ptaschinski Construction, Inc. of Beaver Dam, Wisconsin. The total bid is $169,180.99. FISCAL IMPACT Funding for the project is in the Streets section of the 2015 Capital Improvement Program (CIP) and shown as entirely assessable. Following is a summary of the available funds and the construction costs, including engineering fees. Assessments will be levied to adjoining property owners to cover all of the expenses. CIP Section CIP Funds Budgeted Construction Costs with Engr Street/Sidewalk $255,000 $189,483 Totals $255,000 $189,483 RECOMMENDATIONS I recommend award to the low bidder, Ptaschinski Construction, Inc. in the amount of $169,180.99. Approved: Mark A. Rohloff City Manager SMG/tlt L\ Engineering \ 2017 CONTRACTS \ 17-17 Hemlock Ct-Fraser Dr \ Project_Information\ Correspondence \ Memo \ 17-17 Memo for Bid Award_2-9-17.docx Contract 17-17 - Hemlock Court & Fraser Drive Concrete Paving (#4779813) Owner. Oshkosh, City of Solicitor. Oshkosh, City of Bid Opening 01/311201710.V0 AM CST Page 1 of 4 2=17 Ptaschinski Const, Inc Vinton Construction Company W7352 STH 33 Beaver Dam, Wl 53916 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1: Concrete Paving $169,180.99 $182,924.56 Removing curb and gutter; 1110 complete as specified Linear Feet 2010 $2.00 $4,020.00 $4.25 $8,542.50 Removing conaete and asphalt sidewalk and driveway; complete as 1120 specified Square Feet 1750 $0.50 $875.00 $0.30 $525.00 Unclassified excavation; 1200 complete as specified Cubic Yards 690 $12.00 $8,280.00 $11.65 $8,038.50 7" concrete pavement; base in place and grading 1300 complete as specified Square Yards 3045 $37.22 $113,334.90 $39.50 $120,277.50 Crushed aggregate base 1340 course; complete as specified Tons 10 $10.00 $100.00 $15.00 $150.00 Adjust manholes and inlets; 1360 complete as specified Each 20 $300.00 $6,000.00 $285.00 $5,700.00 Turf restoration on Fraser 1370A Drive; complete as specified Square Yards 5115 $6.91 $3,53.1.47 $6.85 $3,503.78 Turf restoration on Hemlock 1370B Court; complete as specified Square Yards 738.5 $6.91 $5,103.04 $6.85 $5,058.73 12" radius curb with 6" CABC and grading; 1410 complete as specified Linear Feet 142 $10.00 $1,420.00 $5.00 $710.00 30" curb and gutter, 7"; with 5" CABC and grading 1440 complete as specified Linear Feet 12 $25.00 $300.00 $25.00 $300.00 36" mountable curb and gutter; 8"; with 6' CABC and grading; complete as 1450 specified Linear Feet 90 $14.001 $1,260.00 $28.00 $2,520.00 4" concrete sidewalk with 3" CABC and grading; 1500 complete as specified Square Feet 525 $4.15 $2,178.75 $3.90 $2,047.50 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading 1510 complete as specified Square Feet 1625 $4.65 $7,55675 $450 $7,312.50 Curb ramp detectable warning field (natural/non- painted); complete as 1540 specified Square Feet 30 $25.00 $750.00 $26.00 $780.00 Drilled No. 4 sidewalk fie bars - deformed; epoxy - 15W coated; complete as specified Each 65 $6.00 $390.00 $5.00 $325.00 Sawing existing pavement; 1700 complete as specified Linear Feet 230 $1.50 $345.00 $2.00 $460.00 Tack coat; complete as 1900 specified Gallons 12 $10.10 $121.20 $10.00 $120.00 4" asphaltic pavement with 10" CABC and grading 1906 complete as specified Square Yards 9 $70.70 $636.30 $70.00 $630.00 4" asphaltic transition with 10" CABC and grading; 1911 complete as specified ISquareYards 167 $27.27 1$4,IS4.091 $35.68 1 $5,958.56 Page 1 of 4 2=17 Contract 17-17 - Hemlock Court & Fraser Drive Concrete Paving (:4779813) Owner. Oshkosh, City of Solicitor. Oshkosh, City of Bid Opening; 01/31/201710;00 AM CST Page 2 of 4 2(172017 Ptaschinski Const, Inc Vinton Construction Company W7352 S[H 33 Beaver Dam, WI 53916 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install 18" storm 2009 sewer, complete as specified Linear Feet 16 $112.00 $1,792.00 $120.00 $1,920.00 Furnish and install 24" storm 2015 sewer, complete as specified Linear Feet 10 $120.00 $1,200.00 $126.50 $1,265.00 Connect to existing storm sewer main; complete as 2850 specified Each 4 $250.00 $1,1100.00 $345.00 $1,380.00 Connect to existing storm sewer manhole; complete as 2856 specified Each 2 $200.00 $400.00 $420.00 $840.00 Furnish and install externa sanitary sewer manhole chimney seal; complete as 3114 specified Each 4 $600.00 $2..400.00 $300.00 $1,200.00 Furnish and install externa sanitary sewer manhole ddmney seal extension; 3116 complete as specified Each 11 $200.00 $200.00 $250.00 $250.00 Furnish and install 4"/6" sanitary sewer lateral (relay); 3234 complete as specified Linear Feet 20 $64.00 $1,280.00 $152.00 $3,040.00 Furnish and install sanitary, sewer lateral marker balls; 3236 complete as specified Each 2 $75.00 $150.00 $35.00 $70.00 Base Bid Total: $169,180.99 $182,924.56 Page 2 of 4 2(172017 Contract 17-17 - Hemlock Court & Fraser Drive Concrete Paving (94779813) Owner. Oshkosh, City of Solicitor. Oshkosh, City of Bid Opening: 01/31/201710:00 AM CST Page 3 of 4 7/1(1017 Sommers Construction Co., Inc. Section Title Item Cade Item Description UofM Quantity Unit Price Extension Section 1: Concrete Paving $186,474.15 Removing curb and gutter; 1110 complete as specified Linear Feet 2010 $2.25 $4,522.50 Removing concrete and asphalt sidewalk and driveway; complete as 1120 specified Square Feet 17501 $0.55 $962.50 Unclassified excavation; 1200 complete as specified Cubic Yards 690 $10.60 $7,314.00 7" concrete pavement; base in place and grading; 1300 complete as specified Square Yards 3045 $40.15 $122,256 J5 Crushed aggregate base 1340 course; complete as specified Tons 10 $19.00 $19(1.00 Adjust manholes and inlets; 1360 complete as specified Each 20 $290.00 $5,800.00 Turf restoration on Fraser 1370A Drive; complete as specified Square Yards 5115 $6.85 $3,503.78 Turf restoration on Hemlock 13706 Court; complete as specified Square Yards 738.5 $6.85 $5,058.73 12" radius curb with 6" CABC and grading; 1410 complete as specified Linear Feet 142 $14.00 $1,988.00 30" curb and gutter; 7"; with 5" CABC and grading 1440 complete as specified Linear Feet 12 $24.00 $288.00 36" mountable curb an gutter; 8"; with 6" CABC and grading complete as 1450 specified Linear Feet 90 $17.95 $1,61550 4" concrete sidewalk with 3" CABC and grading; 1500 complete as specified Square Feet 525 $4.85 $2,546.25 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading 1510 complete as specified Square Feet 1625 $5.35 $8,693.75 Curb ramp detectable warning field (natural/non- painted); complete as 1540 spedfied Square Feet 30 $30.00 $900.00 Drilled No. 4 sidewalk tie bars - deformed; epoxy - 1560 coated; complete as specified Each 65 $3.50 $22750 Sawing existing pavement; 1700 complete as specified Linear Feet 230 $2.001 $460.00 Tack coat; complete as 1900 specified Gallons 12 $10.00 $120.00 4" asphaltic pavement with 10" CABC and grading; 1906 complete as specified ISquare Yards 9 $70.00 $630.00 4" asphaltic transition with 10" CABG and grading 1911 complete as specified Square Yards 1671$37.00 $6,179.00 Page 3 of 4 7/1(1017 Contract 17-17 - Hemlock Court & Fraser Drive Concrete Paving (44779813) Owner. Oshkosh, City of Solicitor. Oshkosh, City of Bid Opening: 01/31/201710.00 AM CST Page 4 of 4 ZWW17 Sommers Construction Co., Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Furnish and install 18" storm 2009 sewer, complete as specified Linear Feet 16 $63.65 $1,018.40 Furnish and install 24" storm 2015 sewer, complete as specified Linear Feet 10 $69.95 $69950 Connect to existing storm sewer main; complete as 2850 specified Each 4 $850.00 $3,400.00 Connect to existing storm sewer manhole; complete as 2856 specified Eads 2 $1,350.00 $2,700.00 Furnish and install external sanitary sewer manhole chimney seal; complete as 3114 specified Each 4 $525.00 $2,100.00 Furnish and install external sanitary sewer manhole chimney seal extension; 3116 complete as specified Each 1 $450.00 $450.00 Furnishand insta114"/6" sanitary sewer lateral (relay); 3234 complete as specified Linear Feet 20 $135.00 $2,700.00 Furnish and install sanitary wer lateral marker balls; 3236 complete as specified Each 2 $75.00 $150.00 Base Bid Total; $186,474.15 Page 4 of 4 ZWW17