HomeMy WebLinkAbout07. 17-50
FEBRUARY 14, 2017 17-50 RESOLUTION
(CARRIED____5-0___ LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 17-17 TO
PTASCHINSKI CONSTRUCTION, INC. FOR HEMLOCK COURT &
FRASER DRIVE CONCRETE PAVING ($169,180.99)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the City of Oshkosh has heretofore advertised for bids for various
concrete paving & utility projects for Hemlock Court and Fraser Drive in the City of
Oshkosh; and
WHEREAS, upon the opening and tabulation of bids, it appears that the following is
the most advantageous bid:
PTASCHINSKI CONSTRUCTION, INC.
W7352 STH 33
Beaver Dam, WI 53916
Total Bid: $169,180.99
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same, all
according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. No. 315-0410-7480-00000 Street Improvement Fund Expenditures
317-0410-7480-03301 Special Assessments Fund – Streets
541-1810-1799-00000 Water Utility - Construction in Progress
311-0410-7480-00000 Sidewalk Construction Fund
317-0410-7480-03304 Special Assessments Fund – Sidewalks
317-0410-7480-03303 Special Assessments Fund – Water
551-1910-1799-00000 Sewer Utility - Construction in Progress
317-0410-7480-03302 Special Assessments Fund – Sewer
FEBRUARY 14, 2017 17-50 RESOLUTION
CONT’D
561-2010-1799-00000 Storm Utility - Construction in Progress
317-0410-7480-03305 Special Assessments Fund – Storm Water
541-1867-6401-08673 Water Utility – Maintenance of Mains
541-1867-6401-08675 Water Utility – Maintenance of Services
323-0801-7206-06303 Property Improvement Fund – Traffic
323-0740-7216-06134 Property Improvement Fund – Land
Improvement Great Neighborhoods
323-0740-7216-06136 Property Improvement Fund – Land
Improvement Traffic Signal Equipment
Cityof `.
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works'
DATE: February 9, 2017
RE: Award Bid for Public Works Contract No. 17-17
Hemlock Court & Fraser Drive Concrete Paving
Ptaschinski Construction, Inc. / ($169,180.99)
BACKGROUND
The purpose of this project is to install concrete pavement on Fraser Drive and Hemlock Court. Sanitary sewer
main and laterals, water main and laterals, and storm sewer main and laterals will be repaired prior to placing
new concrete pavement. Concrete aprons and handicap ramps will be constructed to match the new pavement.
This work will complete the requirements of the Edgewood Village plat and related development agreement.
ANALYSIS
Engineering staff reviewed three bids. The low bid was received from Ptaschinski Construction, Inc. of Beaver
Dam, Wisconsin. The total bid is $169,180.99.
FISCAL IMPACT
Funding for the project is in the Streets section of the 2015 Capital Improvement Program (CIP) and shown as
entirely assessable. Following is a summary of the available funds and the construction costs, including
engineering fees. Assessments will be levied to adjoining property owners to cover all of the expenses.
CIP Section CIP Funds Budgeted Construction Costs with Engr
Street/Sidewalk $255,000 $189,483
Totals $255,000 $189,483
RECOMMENDATIONS
I recommend award to the low bidder, Ptaschinski Construction, Inc. in the amount of $169,180.99.
Approved:
Mark A. Rohloff
City Manager
SMG/tlt
L\ Engineering \ 2017 CONTRACTS \ 17-17 Hemlock Ct-Fraser Dr \ Project_Information\ Correspondence \ Memo \ 17-17 Memo for Bid Award_2-9-17.docx
Contract 17-17 - Hemlock Court & Fraser Drive Concrete Paving (#4779813)
Owner. Oshkosh, City of
Solicitor. Oshkosh, City of
Bid Opening 01/311201710.V0 AM CST
Page 1 of 4 2=17
Ptaschinski Const, Inc
Vinton Construction Company
W7352 STH 33
Beaver Dam, Wl 53916
Section Title
Item Code
Item Description
UofM
Quantity
Unit Price
Extension
Unit Price
Extension
Section 1: Concrete
Paving
$169,180.99
$182,924.56
Removing curb and gutter;
1110
complete as specified
Linear Feet
2010
$2.00
$4,020.00
$4.25
$8,542.50
Removing conaete and
asphalt sidewalk and
driveway; complete as
1120
specified
Square Feet
1750
$0.50
$875.00
$0.30
$525.00
Unclassified excavation;
1200
complete as specified
Cubic Yards
690
$12.00
$8,280.00
$11.65
$8,038.50
7" concrete pavement; base
in place and grading
1300
complete as specified
Square Yards
3045
$37.22
$113,334.90
$39.50
$120,277.50
Crushed aggregate base
1340
course; complete as specified
Tons
10
$10.00
$100.00
$15.00
$150.00
Adjust manholes and inlets;
1360
complete as specified
Each
20
$300.00
$6,000.00
$285.00
$5,700.00
Turf restoration on Fraser
1370A
Drive; complete as specified
Square Yards
5115
$6.91
$3,53.1.47
$6.85
$3,503.78
Turf restoration on Hemlock
1370B
Court; complete as specified
Square Yards
738.5
$6.91
$5,103.04
$6.85
$5,058.73
12" radius curb with 6"
CABC and grading;
1410
complete as specified
Linear Feet
142
$10.00
$1,420.00
$5.00
$710.00
30" curb and gutter, 7"; with
5" CABC and grading
1440
complete as specified
Linear Feet
12
$25.00
$300.00
$25.00
$300.00
36" mountable curb and
gutter; 8"; with 6' CABC and
grading; complete as
1450
specified
Linear Feet
90
$14.001
$1,260.00
$28.00
$2,520.00
4" concrete sidewalk with 3"
CABC and grading;
1500
complete as specified
Square Feet
525
$4.15
$2,178.75
$3.90
$2,047.50
6" concrete sidewalk/
driveway/ramp with 3"
CABC and grading
1510
complete as specified
Square Feet
1625
$4.65
$7,55675
$450
$7,312.50
Curb ramp detectable
warning field (natural/non-
painted); complete as
1540
specified
Square Feet
30
$25.00
$750.00
$26.00
$780.00
Drilled No. 4 sidewalk fie
bars - deformed; epoxy -
15W
coated; complete as specified
Each
65
$6.00
$390.00
$5.00
$325.00
Sawing existing pavement;
1700
complete as specified
Linear Feet
230
$1.50
$345.00
$2.00
$460.00
Tack coat; complete as
1900
specified
Gallons
12
$10.10
$121.20
$10.00
$120.00
4" asphaltic pavement with
10" CABC and grading
1906
complete as specified
Square Yards
9
$70.70
$636.30
$70.00
$630.00
4" asphaltic transition with
10" CABC and grading;
1911
complete as specified
ISquareYards
167
$27.27
1$4,IS4.091
$35.68
1 $5,958.56
Page 1 of 4 2=17
Contract 17-17 - Hemlock Court & Fraser Drive Concrete Paving (:4779813)
Owner. Oshkosh, City of
Solicitor. Oshkosh, City of
Bid Opening; 01/31/201710;00 AM CST
Page 2 of 4 2(172017
Ptaschinski Const, Inc
Vinton Construction Company
W7352 S[H 33
Beaver Dam, WI 53916
Section Title
Item Code
Item Description
UofM
Quantity
Unit Price
Extension
Unit Price
Extension
Furnish and install 18" storm
2009
sewer, complete as specified
Linear Feet
16
$112.00
$1,792.00
$120.00
$1,920.00
Furnish and install 24" storm
2015
sewer, complete as specified
Linear Feet
10
$120.00
$1,200.00
$126.50
$1,265.00
Connect to existing storm
sewer main; complete as
2850
specified
Each
4
$250.00
$1,1100.00
$345.00
$1,380.00
Connect to existing storm
sewer manhole; complete as
2856
specified
Each
2
$200.00
$400.00
$420.00
$840.00
Furnish and install externa
sanitary sewer manhole
chimney seal; complete as
3114
specified
Each
4
$600.00
$2..400.00
$300.00
$1,200.00
Furnish and install externa
sanitary sewer manhole
ddmney seal extension;
3116
complete as specified
Each
11
$200.00
$200.00
$250.00
$250.00
Furnish and install 4"/6"
sanitary sewer lateral (relay);
3234
complete as specified
Linear Feet
20
$64.00
$1,280.00
$152.00
$3,040.00
Furnish and install sanitary,
sewer lateral marker balls;
3236
complete as specified
Each
2
$75.00
$150.00
$35.00
$70.00
Base Bid Total:
$169,180.99
$182,924.56
Page 2 of 4 2(172017
Contract 17-17 - Hemlock Court & Fraser Drive Concrete Paving (94779813)
Owner. Oshkosh, City of
Solicitor. Oshkosh, City of
Bid Opening: 01/31/201710:00 AM CST
Page 3 of 4 7/1(1017
Sommers Construction Co., Inc.
Section Title
Item Cade
Item Description
UofM
Quantity
Unit Price
Extension
Section 1: Concrete
Paving
$186,474.15
Removing curb and gutter;
1110
complete as specified
Linear Feet
2010
$2.25
$4,522.50
Removing concrete and
asphalt sidewalk and
driveway; complete as
1120
specified
Square Feet
17501
$0.55
$962.50
Unclassified excavation;
1200
complete as specified
Cubic Yards
690
$10.60
$7,314.00
7" concrete pavement; base
in place and grading;
1300
complete as specified
Square Yards
3045
$40.15
$122,256 J5
Crushed aggregate base
1340
course; complete as specified
Tons
10
$19.00
$19(1.00
Adjust manholes and inlets;
1360
complete as specified
Each
20
$290.00
$5,800.00
Turf restoration on Fraser
1370A
Drive; complete as specified
Square Yards
5115
$6.85
$3,503.78
Turf restoration on Hemlock
13706
Court; complete as specified
Square Yards
738.5
$6.85
$5,058.73
12" radius curb with 6"
CABC and grading;
1410
complete as specified
Linear Feet
142
$14.00
$1,988.00
30" curb and gutter; 7"; with
5" CABC and grading
1440
complete as specified
Linear Feet
12
$24.00
$288.00
36" mountable curb an
gutter; 8"; with 6" CABC and
grading complete as
1450
specified
Linear Feet
90
$17.95
$1,61550
4" concrete sidewalk with 3"
CABC and grading;
1500
complete as specified
Square Feet
525
$4.85
$2,546.25
6" concrete sidewalk/
driveway/ramp with 3"
CABC and grading
1510
complete as specified
Square Feet
1625
$5.35
$8,693.75
Curb ramp detectable
warning field (natural/non-
painted); complete as
1540
spedfied
Square Feet
30
$30.00
$900.00
Drilled No. 4 sidewalk tie
bars - deformed; epoxy -
1560
coated; complete as specified
Each
65
$3.50
$22750
Sawing existing pavement;
1700
complete as specified
Linear Feet
230
$2.001
$460.00
Tack coat; complete as
1900
specified
Gallons
12
$10.00
$120.00
4" asphaltic pavement with
10" CABC and grading;
1906
complete as specified
ISquare Yards
9
$70.00
$630.00
4" asphaltic transition with
10" CABG and grading
1911
complete as specified
Square Yards
1671$37.00
$6,179.00
Page 3 of 4 7/1(1017
Contract 17-17 - Hemlock Court & Fraser Drive Concrete Paving (44779813)
Owner. Oshkosh, City of
Solicitor. Oshkosh, City of
Bid Opening: 01/31/201710.00 AM CST
Page 4 of 4 ZWW17
Sommers Construction Co., Inc.
Section Title
Item Code
Item Description
UofM
Quantity
Unit Price
Extension
Furnish and install 18" storm
2009
sewer, complete as specified
Linear Feet
16
$63.65
$1,018.40
Furnish and install 24" storm
2015
sewer, complete as specified
Linear Feet
10
$69.95
$69950
Connect to existing storm
sewer main; complete as
2850
specified
Each
4
$850.00
$3,400.00
Connect to existing storm
sewer manhole; complete as
2856
specified
Eads
2
$1,350.00
$2,700.00
Furnish and install external
sanitary sewer manhole
chimney seal; complete as
3114
specified
Each
4
$525.00
$2,100.00
Furnish and install external
sanitary sewer manhole
chimney seal extension;
3116
complete as specified
Each
1
$450.00
$450.00
Furnishand insta114"/6"
sanitary sewer lateral (relay);
3234
complete as specified
Linear Feet
20
$135.00
$2,700.00
Furnish and install sanitary
wer lateral marker balls;
3236
complete as specified
Each
2
$75.00
$150.00
Base Bid Total;
$186,474.15
Page 4 of 4 ZWW17