Loading...
HomeMy WebLinkAboutDiscussion Item - Jackson Oregon BridgeTO:City of Oshkosh Redevelopment Authority FROM:Allen Davis, Community Development Director DATE:February 9, 2017 SUBJECT:February 14, 2017 RDA Agenda items Discussion Item: Make Recommendation to Council for Jackson and Oregon Street Bridge Project WisDOT is conducting a study on the Oregon/Jackson St Bridge. WisDOT narrowed the options for the Environmental document and the alternatives have been included in the packet.WisDOT has asked the City Council to recommend an alternative.The City Council has asked for any recommendations from other committees and commissions in the City by February 28, 2017. Oregon/Jackson Street Bridge Screening Alternatives Analysis Summary 38 | FINAL December 2016 Oregon/Jackson Street Bridge Screening Alternatives Analysis Summary FINAL December 2016 | 39 Oregon/Jackson Street Bridge Screening Alternatives Analysis Summary 40 | FINAL December 2016 Oregon/Jackson Street Bridge Screening Alternatives Analysis Summary FINAL December 2016 | 43 Oregon/Jackson Street Bridge Screening Alternatives Analysis Summary 44 | FINAL December 2016 Oregon/Jackson Street Bridge Screening Alternatives Analysis Summary 50 | FINAL December 2016 Oregon/Jackson Street Bridge Screening Alternatives Analysis Summary FINAL December 2016 | 51 Alternative A Alternative B Alternative C1 Alternative E Alternative F Alternative J1 Alternative J2 No Build Rehabilitation High Level Fixed (Division St realigned) On-Alignment (raised clearance) On-Alignment (both riverwalks separated) Off-Alignment (both riverwalks separated - Division St realigned) Off-Alignment (both riverwalks separated - Division St cul-de-sac) Addresses structural deficiencies no yes yes yes yes yes yes Improves multi-modal access across river no no yes (5' bicycle lanes, 6' sidewalks) yes (5' bicycle lanes, 6' sidewalks) yes (5' bicycle lanes, 6' sidewalks) yes (5' bicycle lanes, 6' sidewalks) yes (5' bicycle lanes, 6' sidewalks) Addresses boating clearance deficiency no no yes (no bridge openings)yes (improved clearance - fewer openings) yes (improved clearance - fewer openings) yes (improved clearance - fewer openings) yes (improved clearance - fewer openings) Accommodates city riverwalk plans no no yes no yes yes yes Magnitude of environmental impacts low low high medium high high high Closure timeframe for construction N/A 1 year 2 years 2 years 2 years 2 years construction - bridge closure limited to 1 year 2 years construction - bridge closure limited to 1 year Estimated construction cost in millions (1)$0 $9-11 $14-16 $33-35 $34-36 $34-36 $34-36 Estimated real estate cost in millions (2)$0 $0 $1.2-1.4 < $0.1 < $0.1 $0.9-1.1 $1.1-1.3 Life expectancy (years)???25 75 75 75 75 75 Future ownership State State City City City City City (1) - Costs are very preliminary and only reflect construction costs expressed in 2016 dollars. Estimates do not include any associated design/construction engineering or utility costs. Costs are currently 100% Federal/State funded. However, local cost share may be added at a later stage depending on aesthetic or design elements that the city wants to incorporate within the project. Local cost share may also be added if local utilities are upgraded or replaced. (2) - Costs are very preliminary and are expressed in 2016 dollars. Annual operating costs for the Wisconsin Street lift bridge in City of Oshkosh (opened in 2008) have averaged roughly $120,000/year from 2010-2014. Operating costs include bridge tender labor, utility costs, and miscellaneous minor repairs. Oregon/Jackson Street Bridge Alternative Summary O-J Alternative Comparison.xlsx 12/15/2016