Loading...
HomeMy WebLinkAboutPlumbing f2-11-0301-PO City of Oshkosh � Inspection Services 21 5 Church Ave., PO Box 1130 Oshkosh, WI 54902-1130 OIHKQIH Fqx1236-5049 1920) 236-5706 ON THE WATER Gartman Mechanical Services 520 W. South Park Ave. Oshkosh, WI 54902 Ref: Plumbing Plan Approval: Dear Sirs, Banner Packaging Addition 3550 Moser S[., Oshkosh, WI Plan ID# F2-1 1-0301-P March 27, 2001 Examina[ion of the plumbing plans and specifications for this project has been completed. In accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin Administrative Code, the plumbing plans a�id specifications a�e approved contingent upon compliance with the stipulation(s) noted below. 1. Cleanout access for the building sanitary sewer shall not exceed 100 feet developed length between cleanouts. COMM 8235 2. Circui[ vent connection for the lavatory vent system shall connect to the eircuit vented drain as required by COMM 8231 3. Full size cleanout access and minimum size building drain is req�ired . COMM 8235 4. Floor drains in the Men's and Womeds locker rooms shall be vented. COMM 8231 5. All horizonta] building drain shall be accessable by cleanout. COMM 82.35 6. No morc than two water closets shall be vented on ] Yz" vent pipe. COMM 8231 In the event installation of this plumbing system has not commenced within two years from this date, this approva] shall become void. A new application accompanied by full examination fees shall be filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh or its represen[ative does not hold itself liable for any defects in plans or specifications, plan omissions, examination oversight, construction or any damage that may result in or after installation. The City of Oshkosh reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or uny of its parts. Respectfully, Richazd Wood, Plumbing Inspector Mar—g9—01 10:36A ;� f�l�l��Jl�J �1ti �::i�'��'�.�;�. 1 � �y l � - � � �� � � � EAST CENTRAL WISCONSIN RBGIONAL PLANNING COMMISSION iii „, I" 131 Main Sucet A1enazha. Nisconsin 5495231fq (920)751-49]D FAX (920)]51-4911 March 29, 2001 Thomas Riederer Riederer Engineering, LLC 2626 E. Wisconsin Avenue Appleton, W[ 54911 Dear Mr. Riederer: East Central Review No. 2001-065 Subject; East Central Comments — Sanitary Sewer Lateral Proposal The East Central Wisconsin Regional Planning Commission, in accordance with Wisconsin Administrative Code COMM. 82, 5.62.20(4)(c), has reviewed the proposed sanitary sewer lateral for the Banner Packaging Warehouse project located on 3550 Moser Street, City of Oshkosh, Winnebago County. East Central has determined the proposed development is within the Oshkosh Sewer Service Area. This project is also consistent with the Sewer Service Areawide Water Quality Management Plan elemen[s. A copy of this letter should be enclosed with the project plans sent to the Wsconsin Departmen[ of Commerce and other appropriate review agencies for their review. If you have any questions, please contact East Central. Sincerely, �ae.L— -� Harlan P. Kieso� Executive Director HPK/jwh MemberCOUnties: fnlumel MarqueLLC Mcnomintt OmaSamic Shawano WauW�v 0.4ushara Winnebago P.02