HomeMy WebLinkAbout03. 16-508NOVEMBER 9, 2016 16-508 RESOLUTION (CARRIED 7-0 LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 16-16 WITH VINTON CONSTRUCTION CO. FOR SENIORS CENTER SOUTH PARKING LOT IMPROVEMENTS (+$70,435.88) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: VINTON CONSTRUCTION CO. PO Box 1987 Manitowoc, WI 54221 Net Increase to contract: $70,435.88 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 561-2010-1799-00000 Storm Utility – Construction in Progress 325-0610-7216-07502 Park Improvements – Land Improvement 231-0760-7216-00000 Senior Center – Land Improvement 323-1717-7216-06601 Equipment Fund – Land Improvement City of � Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works J' _ l V ` DATE: November 3, 2016 RE: Change Order No. 1 for Public Works Contract No. 16 -16 Seniors Center South Parking Lot Improvements Vinton Construction Company ( +$70,435.88) BACKGROUND Change Order No. 1 for Contract 16 -16 is scheduled for consideration by the Common Council at the November 9, 2016 meeting. The contract was originally awarded to Vinton Construction Company in February of 2016. This change order is for adjusting quantities to match field conditions and for additional services provided. ANALYSIS Following is a summary of the significant changes to each section of the CIP /Operating Budget: • Storm Sewer CIP — adjusted quantities to match field conditions. • Parks CIP — adjusted quantities to match field conditions. Property Improvements CIP — adjusted quantities to match field conditions. After bids were received, staff identified an additional pervious pavement material that would provide better functionality and reduced long -term maintenance. After evaluation, it was determined to utilize this material, rather than the porous asphalt that was bid. Additional over excavation was also required for the removal of contaminated soils. In addition, during the course of this project, representatives of the University of Wisconsin - Oshkosh (UWO) asked if the City would assist in the reconstruction of a section of the Riverwalk directly north across the Fox River from the project site. Any additional costs incurred due to this reconstruction would be reimbursed by UWO. • Seniors Center Operating Budget — adjusted quantities to match field conditions. 1A Engineering \2016 CONTRACTS \16 -16 Seniors Ctr S Parking Lot Page 1 of 2 Impr \Project_Information \Correspondence \Memo \16-16 Memo for CO #'1_11- 3- 16.dooc FISCAL IMPACT Contract Section Change Order Amount New Contract Total CIP /Operating Budget Amount Storm Sewer - $2,761.76 $127,065.24 $129,827.00 Bike Path - Parks - $1,489.38 $43,510.62 $45,000.00 Bike Path - Prop. Impr. - $12,642.00 $0.00 $12,642.00 Parking Lot - Prop. Impr. $88,237.20 $661,136.32 $760,000.00 Seniors Center Oper. Budget 1 -$908.181 $15,956.821 $16,865.00 Total 1 $70,435.881 $847,669.001 $964,334.00 Adequate funds are available in the Property Improvements section of the 2016 Capital Improvement Budget. The costs that will be reimbursed by UWO total $23,903.74. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 16 -16 in the amount of +$70,435.88 to Vinton Construction Company. Approved: Mark A. Rohloff City Manager SMG /tlt 1:\ Engineering \2016 CONTRACTS\ 16 -16 Seniors Ctr S Parking Lot Page 2 of 2 Impr\ Project_Wormation\ Correspondence \ Memo \ 16 -16 Memo for CO !!1_11$- 16.docx TO: VINTON CONSTRUCTION CO P.O. BOX 1987 MANITOWOC, WI 54221 CHANGE ORDER #1 (FINAL) DATE: OCTOBER 17, 2016 Your present contract with the City of Oshkosh, Contract No. 16 -16, awarded February 9, 2016, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - PARKING LOT IMPROVEMENTS $70,435.88 NET INCREASE TO CONTRACT $70,435.88 SECTION I TOTALS BID TOTAL $777,233.12 $777,233.12 CO #1 $70,435.88 $70,435.88 CONTRACT TOTAL $847,669.00 $847,669.00 CITY OF OSHKOSH BY: City Manager City Clerk Approved and accepted: i �C I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT 16 -16 CHANGE ORDER 41 (FINAL) SECTION I - PARKING LOT IMPROVEMENTS ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN CONTRACT DECREASEIN NUMBER QUANTITY Q QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Furnish and install sign 1023 osts; com lete asspecified Each 17.00 17.00 $260.00 Removing pavement; Square 1100 1 complete asspecified Yards 6,500.00 6,569.49 69.49 $1.00 $69.49 Removing concrete and asphalt sidewalk and driveway; complete as Square 1120 specified Feet 1,600.00 1,307.51 - 292.49 $0.50 ($146.25) Common excavation (includes removal of existing base materials and soils to proposed design elevations for all areas; except bio- filtration areas); complete as Cubic 1201 Ispecifted Yards 2,000.00 2,000.00 $14.90 Excavation below subgrade (unsuitable soils); complete Cubic 1203 asspecified Yards 1,000.00 0.00 - 1,000.00 $5.90 ($5,900.00) Excavation special (paving); 1220 complete as specified Tons 2,000.00 3,805.81 1,805.81 $13.35 $24,107.56 Heavy non -woven fabric (2 layers) (does not include overlap or waste); complete Square 1235 asspecified Feet 71,400.00 93,089.98 21,689.98 $0.12 $2,602.80 Biaxial geogrid (does not include overlap or waste); Square 1240 1 complete asspecified Feet 50,200.00 46,544.99 - 3,655.01 $0.21 ($767.55) Geomembrane liner for permeable pavement; Square 1245 complete asspecified Feet 10,600.00 10,600.00 $2.30 Furnish and install dumpster enclosure (includes foundation; concrete slab; walls; gates; and all associated materials and labor); complete as specified Lump 1250 Sum 1.00 1.00 $23,000.00 30" curb and gutter; with 12" curb head; 8 "; with 6" CABC and grading; complete as Linear 1445 specified Feet 1,710.00 1,785.50 75.50 $18.70 $1,411.85 Sidewalk curb; complete as Linear 1460 specified Feet 50.00 48.00 -2.00 $20.00 ($40.00) Tapered concrete 30" curb and gutter; with 6" CABC and grading; complete as Linear 1470 specified Feet 525.00 513.53 -11.47 $16.25 ($186.39) 4" concrete sidewalk with 3" CABC and grading; complete Square 1500 asspecified Feet 4,630.00 1 4,356.40 - 273.60 $4.17 ($1,140.91) Page 1 of 7 CONTRACT 16 -16 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN CONTRACT DECREASEIN NUMBER QUANTITY Q QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE 6" concrete sidewalk/ driveway/ ramp with 3" CABC and grading; complete Square 1510 asspecified Feet 500.00 1,225.96 725.96 $5.00 $3,629.80 Curb ramp detectable warning field (natural /non- painted); complete as Square 1540 specified Feet 184.00 196.00 12.00 $28.00 $336.00 Sawing existing pavement; Linear 1700 complete asspecified Feet 230.00 234.00 4.00 $3.00 $12.00 Base aggregate dense; 1-1/4"; 1801 complete asspecified Tons 1 6,030.00 6,126.11 96.11 $11.25 $1,081.24 3/4" open graded base; 1850 complete asspecified Tons 1,090.00 826.84 - 263.16 $18.33 ($4,823.72) Tack coat; complete as 1900 specified Gallons 230.00 365.00 135.00 $4.29 $579.15 HMA Pavement Type E -1.0; 1902 complete asspecified Tons 1,020.00 1,091.37 71.37 $67.17 $4,793.92 4" asphaltic surface with 6" CABC and grading; complete Square 1916 asspecified Yards 300.00 299.03 -0.97 $29.54 ($28.65) Parking; handicap; and crosswalk epoxy striping; Lump 1921 complete asspecified Sum 1.00 1.00 $9,460.00 Furnish and install asphaltic material permeable pavement; complete as Square 1925 specified Yards 480.00 0.00 - 480.00 $32.32 ($15,513.60) Furnish and install 6" storm Linear 2000A sewer; complete asspecified Feet 190.00 204.00 14.00 $28.24 $395.36 Furnish and install 6" perforated storm sewer; Linear 2000B I complete asspecified Feet 174.00 1 171.00 -3.00 $6.12 1 ($18.36) Furnish and install 12" RCP Class III storm sewer; Linear 2004 complete asspecified Feet 86.00 82.00 -4.00 $56.20 ($224.80) Furnish and install 48" storm sewer; complete as specified Linear 2030 Feet 346.00 330.00 -16.00 $160.00 ($2,560.00) Furnish and install 48" RCP Class III storm sewer; Linear 2031 complete asspecified Feet 157.00 159.00 2.00 $163.00 $326.00 Furnish and install 48" RCP Class III apron endwall with joint ties; complete as 2149 Ispecified Each 1.00 1.00 $11,314.00 Furnish and install standard storm sewer manhole (T diameter); complete as Vertical 2204 specified Feet 28.00 24.17 -3.83 $575.00 ($2,202.25) Furnish and install Type 1 2236 inlet; complete asspecified Each 6.00 6.00 $1,511.00 Page 2 of 7 CONTRACT 16 -16 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE IN NUMBER Q UANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Furnish and install 6" storm sewer lateral; complete as Linear 2400 1 specified Feet 94.00 106.50 12.50 $28.24 $353.00 Furnish and install storm sewer marker balls; complete 2404 asspecified Each 13.00 6.00 -7.00 $32.00 ($224.00) Furnish; install; maintain; and remove Type D inlet protection; complete as 2506 Ispecified Each 10.00 12.00 2.00 $76.00 $152.00 Sediment removal - Type D modified inlet protection; 2510 complete asspecified Each 10.00 0.00 -10.00 $65.00 ($650.00) Furnish; install; maintain; and remove stone tracking 2512 ad; complete asspecified Each 2.00 0.00 -2.00 $0.01 ($0.02) Furnish; install; maintain; and remove silt fence; Linear 2514 complete asspecified Feet 1,400.00 991.00 - 409.00 $1.50 ($613.50) Furnish; install; maintain; and remove stone bag; 2516 complete asspecified Each 18.00 28.00 10.00 $12.00 $120.00 Furnish; install; maintain; and remove turbidity barrier; complete as specified 2526 Each 1.00 1.00 $3,600.00 Furnish and install topsoil 6" depth; complete as specified Square 2600 Yards 3,020.00 2,416.83 - 603.17 $4.40 ($2,653.95) Furnish and install turf grass; Square 2620 1 complete asspecified Yards 3,020.00 2,416.83 - 603.17 $0.18 ($108.57) Furnish and install annual cover crop; complete as Square 2624 specified Yards 3,020.00 0.00 - 3,020.00 $0.14 ($422,80) Furnish and install trees; 2626 complete asspecified Each 11.00 11.00 $390.00 Furnish and install Class I; Urban; Type A erosion control mat, complete as Square 2632 specified Yards 3,020.00 2,416.83 - 603.17 $1.05 ($633.33) Furnish and install heavy rip - rap with filter fabric; Square 2648 complete asspecified Yards 12.00 91.00 79.00 $58.00 $4,582.00 Abandon 8" - 12" storm Linear 2800 sewer; com lete asspecified Feet 24.00 24.00 $12.50 Remove 30" and smaller storm sewer; complete as Linear 2804 specified Feet 32.00 32.00 $8.60 Mobilization, complete as Lump 2900 specified Sum 2.00 2.00 $10,000.00 Strip and stockpile topsoil; Square 2902 complete asspecified Yards 910.00 0.00 - 910.00 $2.50 ($2,275.00) Page 3 of 7 CONTRACT 16 -16 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN CONTRACT DECREASEIN NUMBER QUANTITY Q QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Clear trees; complete as Lump 2906 specified Sum 2.00 2.00 $50.00 Grub stumps; complete as Lump 2912 1 specified Sum 2.00 1 2.00 $5.00 Excavation special (storm); 2950 complete asspecified Tons 1,400.00 2,591.13 1,191.13 $6.75 $8,040.13 Furnish and install bio -filter plantings; complete as Lump 2998 specified Sum 1.00 1.00 $13,500.00 Furnish and install bio - filters (includes excavation; all materials; piping; manhole; cleanout; and liner; complete Lump 2999 asspecified Sum 1.00 1.00 $45,000.00 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as Linear 4004 specified Feet 35.00 60.50 25.50 $87.00 $2,218.50 Furnish and install 8" 45 degree water main bend; 4237 complete asspecified Each 4.00 4.00 $956.00 Furnish and install 8" water main gate valve; complete as 4402 specified Each 2.00 1.00 -1.00 $1,684.00 ($1,684.00) Furnish and install 18" steel water main casing pipe; Linear 4726 complete asspecified Feet 10.00 12.00 2.00 $168.00 $336.00 Furnish and install pull box (steel); 24" x 48 "; complete as 5020 specified Each 7.00 7.00 $650.00 Furnish and install communication vault; 30" x 5032 48 "; complete asspecified Each 3.00 3.00 $1,500.00 Furnish and install control cabinet; complete as specified 5050 Each 1.00 1.00 $11,000.00 Furnish and install 1" Schedule 40 PVC; complete Linear 5100 asspecified Feet 400.00 478.61 78.61 $4.00 $314.44 Furnish and install 2" Schedule 40 PVC; complete Linear 5120 asspecified Feet 290.00 122.00 - 168.00 $5.00 ($840.00) Furnish and install 3" Schedule 40 PVC; complete Linear 5130 asspecified Feet 1,340.00 1,157.27 - 182.73 $7.00 ($1,279.11) Install single head fixture, "City Supplied," complete as 5400 specified Each 6.00 7.00 1.00 $450.00 $450.00 Furnish and install Type 2 Modified Base; complete as 5508 specified Each 7.00 7.00 $2,750.00 Page 4 of 7 CONTRACT 16 -16 CHANGE ORDER 91 (FINAL) ITEM CONTRACT INSTALLED NET NEI' UNIT fNCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACT PRICE Common Excavation (includes removal of existing Lump 1 -1250 pavement; base materials; Sum 0.00 1.00 1.00 $5,150.00 $5,150.00 and soils to proposed design 1 -1360 elevations for all areas); Each 0.00 6.00 6.00 $450.00 $2,700.00 complete as specified Cubic A2 -1201 bars- deformed, epoxy coated Yards 410.00 295.70 - 114.30 $17.95 ($2,051.69) 1 -1560 4" asphaltic surface with 6" Each 0.00 11.00 1 11.00 $11.00 $121.00 CABC and grading; complete Square A2 -1916 asspecified Yards 1,250.00 1,120.50 - 129.50 $27.59 ($3,572.91) 1 -2910 Furnish; install; maintain; Diameter 0.00 144.00 144.00 $6.50 $936.00 and remove Type D inlet protection; complete as A2 -2506 s ecified Each 4.00 0.00 -4.00 $80.00 ($320.00) Furnish; install; maintain; and remove stone tracking A2 -2512 ad; complete asspecified Each 1.00 0.00 -1.00 $0.01 ($0.01) Furnish; install; maintain; and remove silt fence; Linear A2 -2514 complete asspecified Feet 700.00 412.00 - 288.00 $1.50 1 ($432.00) Furnish and install topsoil 6" depth; complete as specified Square A2 -2600 Yards 2,500.00 865.05 - 1,634.95 $4.40 ($7,193.78) Furnish and install turf grass; uare A2 -2620 complete ifi Yards 2,500.00 865.05 1,634.95 $0.18 ($294.29) Furnish and install annual cover crop; complete as Square A2 -2624 specified Yards 2,500.00 0.00 - 2,500.00 $0.14 ($350.00) Furnish and install Class 1; Urban; Type A erosion control mat; complete as Square A2 -2632 specified Yards 2,500.00 865.05 - 1,634.95 $1.05 ($1,716.70) SECTION I - (BID ITEMS 1023 -A2 -2632) - SUBTOTAL $55,911.24 ($60,868.14) SECTION I - ADDITIONAL WORK REQUIRED: CO #1 ITEM CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN DESCRIPTION UNIT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACT PRICE Furnish and install dumpster enclosure; complete as Lump 1 -1250 specified Sum 0.00 1.00 1.00 $5,150.00 $5,150.00 Adjust manholes and inlets 1 -1360 (CB -3); complete as specified Each 0.00 6.00 6.00 $450.00 $2,700.00 Drilled No. 4 sidewalk lie - bars- deformed, epoxy coated 1 -1560 (CB -8); complete as specified Each 0.00 11.00 1 11.00 $11.00 $121.00 Grubbing (CB -4); complete as Inch 1 -2910 specified Diameter 0.00 144.00 144.00 $6.50 $936.00 Page 5 of 7 CONTRACT 16 -16 CHANGE ORDER 91 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACT PRICE Furnish and install sanitary sewer external manhole chimney seal (CB -3); 1 -3114 Icomplete asspecified Each 0.00 1 1.00 1.00 $550.00 $550.00 Furnish and install sanitary sewer external chimney extension seal (CB -3); 1 -3116 complete as specified Each 0.00 1.00 1.00 $450.00 $450.00 Furnish/install PAVEDRAIN Permeable Pavement System (includes 24" width reinforced concrete perimeter beam and pavement base geogrid) - Construction Bulletin #1 (CB -1); complete Lump 1 -10000 as specified Sum 0.00 1.00 1.00 $40,746.24 $40,746.24 Furnish and install sanitary manhole cleanout casting (CB Lump 1 -10001 3); complete as specified Sum 0.00 0.84 0.84 $995.00 $835.80 Common dxcavation (includes removal of existing pavement; base materials; and soils to proposed design elevations for all areas) (CB- Cubic 1 -A3 -1201 2); complete as specified Yards 0.00 157.80 157.80 $17.95 $2,832.51 4" asphaltic surface with 6" CABC and grading (CB -2); Square 1 -A3 -1916 complete asspecified Yards 0.00 473.30 473.30 $27.59 $13,058.35 Furnish; install; maintain; and remove Type D inlet protection (CB -2); complete 1 -A3 -2506 asspecified Each 0.00 0.00 $80.00 Furnish; install; maintain; and remove stone tracking pad (CB -2); complete as 1 -A3 -2512 specified Each 0.00 0.00 $0.01 Furnish; install; maintain; and remove 20" diameter sediment logs (CB -2); Linear 1 -A3 -2520 complete asspecified Feet 0.00 192.00 192.00 $13.31 $2,555.52 Furnish and install topsoil 6" depth (CB -2); complete as Square 1 -A3 -2600 specified Yards 0.00 472.00 472.00 $4.40 $2,076.80 Furnish and install turf grass Square 1 -A3 -2620 (CB -2); complete as specified Yards 0.00 472.00 472.00 $0.18 $84.96 Furnish and install annual cover crop (CB -2); complete Square 1 -A3 -2624 asspecified Yards 0.00 0.00 $0.14 Page 6 of 7 CONTRACT 16 -16 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACTPRICE Furnish and install Class I; Urban; Type A erosion control mat (CB -2); complete Square 1 -A3 -2632 asspecified Yards 0.00 472.00 472.00 $1.05 $495.60 Mobilization (CB -2); Lump 1 -A3 -2900 complete ass ecified Sum 0.00 1.00 1.00 $2,800.00 $2,800.00 SECTION I - (ADDITIONAL WORK REQUIRED: CO #1 ITEMS 1250 -A3 -2900) - SUBTOTAL $75,392.78 $0.00 NET INCREASE TO: SECTION I $70,435.88 NET INCREASE TO SECTION I NET DECREASE TO SECTION I NET INCREASE TO CONTRACT: Page 7 of 7 $131,304.02 ($60,868.14) $70,435.88