HomeMy WebLinkAbout03. 16-508NOVEMBER 9, 2016 16-508 RESOLUTION
(CARRIED 7-0 LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS
CONTRACT NO. 16-16 WITH VINTON CONSTRUCTION CO. FOR
SENIORS CENTER SOUTH PARKING LOT IMPROVEMENTS
(+$70,435.88)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
VINTON CONSTRUCTION CO.
PO Box 1987
Manitowoc, WI 54221
Net Increase to contract: $70,435.88
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. No. 561-2010-1799-00000 Storm Utility – Construction in Progress
325-0610-7216-07502 Park Improvements – Land Improvement
231-0760-7216-00000 Senior Center – Land Improvement
323-1717-7216-06601 Equipment Fund – Land Improvement
City
of �
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works J' _ l V `
DATE: November 3, 2016
RE: Change Order No. 1 for Public Works Contract No. 16 -16
Seniors Center South Parking Lot Improvements
Vinton Construction Company ( +$70,435.88)
BACKGROUND
Change Order No. 1 for Contract 16 -16 is scheduled for consideration by the Common Council at the November 9,
2016 meeting. The contract was originally awarded to Vinton Construction Company in February of 2016. This
change order is for adjusting quantities to match field conditions and for additional services provided.
ANALYSIS
Following is a summary of the significant changes to each section of the CIP /Operating Budget:
• Storm Sewer CIP — adjusted quantities to match field conditions.
• Parks CIP — adjusted quantities to match field conditions.
Property Improvements CIP — adjusted quantities to match field conditions. After bids were received, staff
identified an additional pervious pavement material that would provide better functionality and reduced
long -term maintenance. After evaluation, it was determined to utilize this material, rather than the porous
asphalt that was bid. Additional over excavation was also required for the removal of contaminated soils. In
addition, during the course of this project, representatives of the University of Wisconsin - Oshkosh (UWO)
asked if the City would assist in the reconstruction of a section of the Riverwalk directly north across the Fox
River from the project site. Any additional costs incurred due to this reconstruction would be reimbursed by
UWO.
• Seniors Center Operating Budget — adjusted quantities to match field conditions.
1A Engineering \2016 CONTRACTS \16 -16 Seniors Ctr S Parking Lot Page 1 of 2
Impr \Project_Information \Correspondence \Memo \16-16 Memo for CO #'1_11- 3- 16.dooc
FISCAL IMPACT
Contract Section
Change Order Amount
New Contract Total
CIP /Operating
Budget Amount
Storm Sewer
- $2,761.76
$127,065.24
$129,827.00
Bike Path - Parks
- $1,489.38
$43,510.62
$45,000.00
Bike Path -
Prop. Impr.
- $12,642.00
$0.00
$12,642.00
Parking Lot -
Prop. Impr.
$88,237.20
$661,136.32
$760,000.00
Seniors Center
Oper. Budget
1 -$908.181
$15,956.821
$16,865.00
Total
1 $70,435.881
$847,669.001
$964,334.00
Adequate funds are available in the Property Improvements section of the 2016 Capital Improvement Budget. The
costs that will be reimbursed by UWO total $23,903.74.
RECOMMENDATIONS
I recommend approval of Change Order No. 1 to Contact No. 16 -16 in the amount of +$70,435.88 to Vinton
Construction Company.
Approved:
Mark A. Rohloff
City Manager
SMG /tlt
1:\ Engineering \2016 CONTRACTS\ 16 -16 Seniors Ctr S Parking Lot Page 2 of 2
Impr\ Project_Wormation\ Correspondence \ Memo \ 16 -16 Memo for CO !!1_11$- 16.docx
TO: VINTON CONSTRUCTION CO
P.O. BOX 1987
MANITOWOC, WI 54221
CHANGE ORDER #1 (FINAL)
DATE: OCTOBER 17, 2016
Your present contract with the City of Oshkosh, Contract No. 16 -16, awarded February 9, 2016, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION I - PARKING LOT IMPROVEMENTS $70,435.88
NET INCREASE TO CONTRACT $70,435.88
SECTION I
TOTALS
BID TOTAL $777,233.12 $777,233.12
CO #1 $70,435.88 $70,435.88
CONTRACT TOTAL $847,669.00 $847,669.00
CITY OF OSHKOSH
BY:
City Manager
City Clerk
Approved and accepted:
i �C
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT 16 -16 CHANGE ORDER 41 (FINAL)
SECTION I - PARKING LOT IMPROVEMENTS
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
CONTRACT
DECREASEIN
NUMBER
QUANTITY
Q
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
PRICE
Furnish and install sign
1023
osts; com lete asspecified
Each
17.00
17.00
$260.00
Removing pavement;
Square
1100
1 complete asspecified
Yards
6,500.00
6,569.49
69.49
$1.00
$69.49
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
1120
specified
Feet
1,600.00
1,307.51
- 292.49
$0.50
($146.25)
Common excavation
(includes removal of existing
base materials and soils to
proposed design elevations
for all areas; except bio-
filtration areas); complete as
Cubic
1201
Ispecifted
Yards
2,000.00
2,000.00
$14.90
Excavation below subgrade
(unsuitable soils); complete
Cubic
1203
asspecified
Yards
1,000.00
0.00
- 1,000.00
$5.90
($5,900.00)
Excavation special (paving);
1220
complete as specified
Tons
2,000.00
3,805.81
1,805.81
$13.35
$24,107.56
Heavy non -woven fabric (2
layers) (does not include
overlap or waste); complete
Square
1235
asspecified
Feet
71,400.00
93,089.98
21,689.98
$0.12
$2,602.80
Biaxial geogrid (does not
include overlap or waste);
Square
1240
1 complete asspecified
Feet
50,200.00
46,544.99
- 3,655.01
$0.21
($767.55)
Geomembrane liner for
permeable pavement;
Square
1245
complete asspecified
Feet
10,600.00
10,600.00
$2.30
Furnish and install dumpster
enclosure (includes
foundation; concrete slab;
walls; gates; and all
associated materials and
labor); complete as specified
Lump
1250
Sum
1.00
1.00
$23,000.00
30" curb and gutter; with 12"
curb head; 8 "; with 6" CABC
and grading; complete as
Linear
1445
specified
Feet
1,710.00
1,785.50
75.50
$18.70
$1,411.85
Sidewalk curb; complete as
Linear
1460
specified
Feet
50.00
48.00
-2.00
$20.00
($40.00)
Tapered concrete 30" curb
and gutter; with 6" CABC
and grading; complete as
Linear
1470
specified
Feet
525.00
513.53
-11.47
$16.25
($186.39)
4" concrete sidewalk with 3"
CABC and grading; complete
Square
1500
asspecified
Feet
4,630.00 1
4,356.40
- 273.60
$4.17
($1,140.91)
Page 1 of 7
CONTRACT 16 -16 CHANGE ORDER #1 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
CONTRACT
DECREASEIN
NUMBER
QUANTITY
Q
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
PRICE
6" concrete sidewalk/
driveway/ ramp with 3"
CABC and grading; complete
Square
1510
asspecified
Feet
500.00
1,225.96
725.96
$5.00
$3,629.80
Curb ramp detectable
warning field (natural /non-
painted); complete as
Square
1540
specified
Feet
184.00
196.00
12.00
$28.00
$336.00
Sawing existing pavement;
Linear
1700
complete asspecified
Feet
230.00
234.00
4.00
$3.00
$12.00
Base aggregate dense; 1-1/4";
1801
complete asspecified
Tons
1 6,030.00
6,126.11
96.11
$11.25
$1,081.24
3/4" open graded base;
1850
complete asspecified
Tons
1,090.00
826.84
- 263.16
$18.33
($4,823.72)
Tack coat; complete as
1900
specified
Gallons
230.00
365.00
135.00
$4.29
$579.15
HMA Pavement Type E -1.0;
1902
complete asspecified
Tons
1,020.00
1,091.37
71.37
$67.17
$4,793.92
4" asphaltic surface with 6"
CABC and grading; complete
Square
1916
asspecified
Yards
300.00
299.03
-0.97
$29.54
($28.65)
Parking; handicap; and
crosswalk epoxy striping;
Lump
1921
complete asspecified
Sum
1.00
1.00
$9,460.00
Furnish and install asphaltic
material permeable
pavement; complete as
Square
1925
specified
Yards
480.00
0.00
- 480.00
$32.32
($15,513.60)
Furnish and install 6" storm
Linear
2000A
sewer; complete asspecified
Feet
190.00
204.00
14.00
$28.24
$395.36
Furnish and install 6"
perforated storm sewer;
Linear
2000B I
complete asspecified
Feet
174.00
1 171.00
-3.00
$6.12 1
($18.36)
Furnish and install 12" RCP
Class III storm sewer;
Linear
2004
complete asspecified
Feet
86.00
82.00
-4.00
$56.20
($224.80)
Furnish and install 48" storm
sewer; complete as specified
Linear
2030
Feet
346.00
330.00
-16.00
$160.00
($2,560.00)
Furnish and install 48" RCP
Class III storm sewer;
Linear
2031
complete asspecified
Feet
157.00
159.00
2.00
$163.00
$326.00
Furnish and install 48" RCP
Class III apron endwall with
joint ties; complete as
2149 Ispecified
Each
1.00
1.00
$11,314.00
Furnish and install standard
storm sewer manhole (T
diameter); complete as
Vertical
2204
specified
Feet
28.00
24.17
-3.83
$575.00
($2,202.25)
Furnish and install Type 1
2236
inlet; complete asspecified
Each
6.00
6.00
$1,511.00
Page 2 of 7
CONTRACT 16 -16 CHANGE ORDER #1 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
CONTRACT
DECREASE IN
NUMBER
Q UANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
PRICE
Furnish and install 6" storm
sewer lateral; complete as
Linear
2400
1 specified
Feet
94.00
106.50
12.50
$28.24
$353.00
Furnish and install storm
sewer marker balls; complete
2404
asspecified
Each
13.00
6.00
-7.00
$32.00
($224.00)
Furnish; install; maintain;
and remove Type D inlet
protection; complete as
2506
Ispecified
Each
10.00
12.00
2.00
$76.00
$152.00
Sediment removal - Type D
modified inlet protection;
2510
complete asspecified
Each
10.00
0.00
-10.00
$65.00
($650.00)
Furnish; install; maintain;
and remove stone tracking
2512
ad; complete asspecified
Each
2.00
0.00
-2.00
$0.01
($0.02)
Furnish; install; maintain;
and remove silt fence;
Linear
2514
complete asspecified
Feet
1,400.00
991.00
- 409.00
$1.50
($613.50)
Furnish; install; maintain;
and remove stone bag;
2516
complete asspecified
Each
18.00
28.00
10.00
$12.00
$120.00
Furnish; install; maintain;
and remove turbidity barrier;
complete as specified
2526
Each
1.00
1.00
$3,600.00
Furnish and install topsoil 6"
depth; complete as specified
Square
2600
Yards
3,020.00
2,416.83
- 603.17
$4.40
($2,653.95)
Furnish and install turf grass;
Square
2620 1
complete asspecified
Yards
3,020.00
2,416.83
- 603.17
$0.18
($108.57)
Furnish and install annual
cover crop; complete as
Square
2624
specified
Yards
3,020.00
0.00
- 3,020.00
$0.14
($422,80)
Furnish and install trees;
2626
complete asspecified
Each
11.00
11.00
$390.00
Furnish and install Class I;
Urban; Type A erosion
control mat, complete as
Square
2632
specified
Yards
3,020.00
2,416.83
- 603.17
$1.05
($633.33)
Furnish and install heavy rip -
rap with filter fabric;
Square
2648
complete asspecified
Yards
12.00
91.00
79.00
$58.00
$4,582.00
Abandon 8" - 12" storm
Linear
2800
sewer; com lete asspecified
Feet
24.00
24.00
$12.50
Remove 30" and smaller
storm sewer; complete as
Linear
2804
specified
Feet
32.00
32.00
$8.60
Mobilization, complete as
Lump
2900
specified
Sum
2.00
2.00
$10,000.00
Strip and stockpile topsoil;
Square
2902
complete asspecified
Yards
910.00
0.00
- 910.00
$2.50
($2,275.00)
Page 3 of 7
CONTRACT 16 -16 CHANGE ORDER #1 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
CONTRACT
DECREASEIN
NUMBER
QUANTITY
Q
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
PRICE
Clear trees; complete as
Lump
2906
specified
Sum
2.00
2.00
$50.00
Grub stumps; complete as
Lump
2912
1 specified
Sum
2.00
1 2.00
$5.00
Excavation special (storm);
2950
complete asspecified
Tons
1,400.00
2,591.13
1,191.13
$6.75
$8,040.13
Furnish and install bio -filter
plantings; complete as
Lump
2998
specified
Sum
1.00
1.00
$13,500.00
Furnish and install bio - filters
(includes excavation; all
materials; piping; manhole;
cleanout; and liner; complete
Lump
2999
asspecified
Sum
1.00
1.00
$45,000.00
Furnish and install 8" ductile
iron water main (relay) with
polywrap; complete as
Linear
4004
specified
Feet
35.00
60.50
25.50
$87.00
$2,218.50
Furnish and install 8" 45
degree water main bend;
4237
complete asspecified
Each
4.00
4.00
$956.00
Furnish and install 8" water
main gate valve; complete as
4402
specified
Each
2.00
1.00
-1.00
$1,684.00
($1,684.00)
Furnish and install 18" steel
water main casing pipe;
Linear
4726
complete asspecified
Feet
10.00
12.00
2.00
$168.00
$336.00
Furnish and install pull box
(steel); 24" x 48 "; complete as
5020
specified
Each
7.00
7.00
$650.00
Furnish and install
communication vault; 30" x
5032
48 "; complete asspecified
Each
3.00
3.00
$1,500.00
Furnish and install control
cabinet; complete as specified
5050
Each
1.00
1.00
$11,000.00
Furnish and install 1"
Schedule 40 PVC; complete
Linear
5100
asspecified
Feet
400.00
478.61
78.61
$4.00
$314.44
Furnish and install 2"
Schedule 40 PVC; complete
Linear
5120
asspecified
Feet
290.00
122.00
- 168.00
$5.00
($840.00)
Furnish and install 3"
Schedule 40 PVC; complete
Linear
5130
asspecified
Feet
1,340.00
1,157.27
- 182.73
$7.00
($1,279.11)
Install single head fixture,
"City Supplied," complete as
5400
specified
Each
6.00
7.00
1.00
$450.00
$450.00
Furnish and install Type 2
Modified Base; complete as
5508
specified
Each
7.00
7.00
$2,750.00
Page 4 of 7
CONTRACT 16 -16 CHANGE ORDER 91 (FINAL)
ITEM
CONTRACT
INSTALLED
NET
NEI'
UNIT
fNCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACT PRICE
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
CONTRACT PRICE
Common Excavation
(includes removal of existing
Lump
1 -1250
pavement; base materials;
Sum
0.00
1.00
1.00
$5,150.00
$5,150.00
and soils to proposed design
1 -1360
elevations for all areas);
Each
0.00
6.00
6.00
$450.00
$2,700.00
complete as specified
Cubic
A2 -1201
bars- deformed, epoxy coated
Yards
410.00
295.70
- 114.30
$17.95
($2,051.69)
1 -1560
4" asphaltic surface with 6"
Each
0.00
11.00
1 11.00
$11.00
$121.00
CABC and grading; complete
Square
A2 -1916
asspecified
Yards
1,250.00
1,120.50
- 129.50
$27.59
($3,572.91)
1 -2910
Furnish; install; maintain;
Diameter
0.00
144.00
144.00
$6.50
$936.00
and remove Type D inlet
protection; complete as
A2 -2506
s ecified
Each
4.00
0.00
-4.00
$80.00
($320.00)
Furnish; install; maintain;
and remove stone tracking
A2 -2512
ad; complete asspecified
Each
1.00
0.00
-1.00
$0.01
($0.01)
Furnish; install; maintain;
and remove silt fence;
Linear
A2 -2514
complete asspecified
Feet
700.00
412.00
- 288.00
$1.50
1
($432.00)
Furnish and install topsoil 6"
depth; complete as specified
Square
A2 -2600
Yards
2,500.00
865.05
- 1,634.95
$4.40
($7,193.78)
Furnish and install turf grass;
uare
A2 -2620
complete ifi
Yards
2,500.00
865.05
1,634.95
$0.18
($294.29)
Furnish and install annual
cover crop; complete as
Square
A2 -2624
specified
Yards
2,500.00
0.00
- 2,500.00
$0.14
($350.00)
Furnish and install Class 1;
Urban; Type A erosion
control mat; complete as
Square
A2 -2632
specified
Yards
2,500.00
865.05
- 1,634.95
$1.05
($1,716.70)
SECTION I - (BID ITEMS 1023 -A2 -2632) - SUBTOTAL $55,911.24 ($60,868.14)
SECTION I - ADDITIONAL WORK REQUIRED: CO #1
ITEM
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
DESCRIPTION
UNIT
CONTRACT
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
CONTRACT PRICE
Furnish and install dumpster
enclosure; complete as
Lump
1 -1250
specified
Sum
0.00
1.00
1.00
$5,150.00
$5,150.00
Adjust manholes and inlets
1 -1360
(CB -3); complete as specified
Each
0.00
6.00
6.00
$450.00
$2,700.00
Drilled No. 4 sidewalk lie -
bars- deformed, epoxy coated
1 -1560
(CB -8); complete as specified
Each
0.00
11.00
1 11.00
$11.00
$121.00
Grubbing (CB -4); complete as
Inch
1 -2910
specified
Diameter
0.00
144.00
144.00
$6.50
$936.00
Page 5 of 7
CONTRACT 16 -16 CHANGE ORDER 91 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
CONTRACT
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
CONTRACT PRICE
Furnish and install sanitary
sewer external manhole
chimney seal (CB -3);
1 -3114
Icomplete asspecified
Each
0.00
1 1.00
1.00
$550.00
$550.00
Furnish and install sanitary
sewer external chimney
extension seal (CB -3);
1 -3116
complete as specified
Each
0.00
1.00
1.00
$450.00
$450.00
Furnish/install PAVEDRAIN
Permeable Pavement System
(includes 24" width
reinforced concrete perimeter
beam and pavement base
geogrid) - Construction
Bulletin #1 (CB -1); complete
Lump
1 -10000
as specified
Sum
0.00
1.00
1.00
$40,746.24
$40,746.24
Furnish and install sanitary
manhole cleanout casting (CB
Lump
1 -10001
3); complete as specified
Sum
0.00
0.84
0.84
$995.00
$835.80
Common dxcavation
(includes removal of existing
pavement; base materials;
and soils to proposed design
elevations for all areas) (CB-
Cubic
1 -A3 -1201
2); complete as specified
Yards
0.00
157.80
157.80
$17.95
$2,832.51
4" asphaltic surface with 6"
CABC and grading (CB -2);
Square
1 -A3 -1916
complete asspecified
Yards
0.00
473.30
473.30
$27.59
$13,058.35
Furnish; install; maintain;
and remove Type D inlet
protection (CB -2); complete
1 -A3 -2506
asspecified
Each
0.00
0.00
$80.00
Furnish; install; maintain;
and remove stone tracking
pad (CB -2); complete as
1 -A3 -2512
specified
Each
0.00
0.00
$0.01
Furnish; install; maintain;
and remove 20" diameter
sediment logs (CB -2);
Linear
1 -A3 -2520
complete asspecified
Feet
0.00
192.00
192.00
$13.31
$2,555.52
Furnish and install topsoil 6"
depth (CB -2); complete as
Square
1 -A3 -2600
specified
Yards
0.00
472.00
472.00
$4.40
$2,076.80
Furnish and install turf grass
Square
1 -A3 -2620
(CB -2); complete as specified
Yards
0.00
472.00
472.00
$0.18
$84.96
Furnish and install annual
cover crop (CB -2); complete
Square
1 -A3 -2624
asspecified
Yards
0.00
0.00
$0.14
Page 6 of 7
CONTRACT 16 -16 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT
PRICE
DECREASE IN
CONTRACTPRICE
Furnish and install Class I;
Urban; Type A erosion
control mat (CB -2); complete
Square
1 -A3 -2632
asspecified
Yards
0.00
472.00
472.00
$1.05
$495.60
Mobilization (CB -2);
Lump
1 -A3 -2900
complete ass ecified
Sum
0.00
1.00
1.00
$2,800.00
$2,800.00
SECTION I - (ADDITIONAL WORK REQUIRED: CO #1 ITEMS 1250 -A3 -2900) - SUBTOTAL $75,392.78 $0.00
NET INCREASE TO: SECTION I $70,435.88
NET INCREASE TO SECTION I
NET DECREASE TO SECTION I
NET INCREASE TO CONTRACT:
Page 7 of 7
$131,304.02
($60,868.14)
$70,435.88