HomeMy WebLinkAboutF6-585 (2)�
' * ` SCHMIDT OIL COMPANY
* t
DIV.OF LLS.OIL LO.,INC.
� • •
* * � 'Serving [he Poz Rivn Vnlley"
• Tires, Batteries & Accs.
• Oil Burner Service
• AirConditioning
• Plumbing
• Sheet Metal
• Oil & Gas Heating
PLUMBING DEPARTMENT
July l, 1985
City of Oshkosh
City Hall
215 Church Avenue
Oshkosh, Wisconsin
P 0 Box 1130
54902
At[en[ion: Marv Higley
MAIN OFFICE
425 5. Washing�on St.
Cambined Locks, WI 54113
Ph:414-739-6101
Subject: Plumbing plan apprwal for 137i Moreland Avenue, Plan I D li F6-585
This letter is to verify phone conversation wiih you regarding the above
mentioned plan approval. It has been verified that the laundry and floor
drains have been deleted from Chese plans and tha[ [hey will be accepted as
such, without redrawing and re=submitiing.
Thank you,
�Cm�u�(/� f�J .�/c�
James S. Schmid[
MP 5050
Narold L. Voig[
CONSERVE
� AMERICA'S
v ENEFOV
�
Save Energy and You Serve Americal
f.�
��,�oF
�� WISCONSIN
May 20, 1985
Schmidt Oil Co., Plumbing Division
425 S. Washington Ave.
Combined Locks, WI 54113
RE: Plumbing Plan Apprwal for 1375 Moreland Ave., Plan ID pF6-585
Gentlemen:
Examination of the plumbi�g pla�s and specifications for the above-
mentioned project has been completed.
In accord with Chapter 145, Wisconsin Statutes, and ILHR 81 throUgh 85
Wisconsi❑ Admi�istrative Code, the plumbing plans and specifications are
approved co�tingent upo� compliance with the stipulation noted below:
1. Floor pla❑ with plumbing building drain is not representative
of actual installation.
REDRAW AND SOBMIT PLAN AS INSTALLED HEFORE OCCUPANCY PERMIT WILL
AE ISSUED.
The architect, professional engineer, registered designer, owner or
plumbing contractor shall keep, at the construction site, one set of
plans bearing the stamp of approval.
In the event installation of this plumbing system has not commenced within
two years from this date, this approval shall become void. A new appli-
cation accompanied by full examination fee sha11 be filed and an updated
approval received before work may commence.
In granti�g this approval, the City of Oshkosh or its representative does
❑ot hold itself liable for any defects in plans or specification, plan
omissions, examintion oversight, construction or a�y damage that may result
in or after installation and reserves the right to order changes or add-
itions should co�ditions arise making this necessary.
It shall be ❑ecessary for i�stalling plumber to obtain a plumbing permit
from the City of Oshkosh before proceeding with actual installation of
this plumbing system or any of its parts.
NOTE: Subrtiit plan i❑ complete sets and identify sheets i❑ the future
and make sure plan is clear.
Sincerely,
.�' ���✓V(.�-.
'� /
MARVIN HIGLEY
Plumbi�g Supervisor
CITV HALL . 215 CHURCH AVENUE • P. O. BOX 1130 . OSHKOSH, WISCONSIN 54902