HomeMy WebLinkAbout11. 16-472SEPTEMBER 27, 2016 16-472 RESOLUTION (CARRIED___7-0___ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVE CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT NO. 14-10 WITH DORNER, INC. FOR GRADING / GRAVELING & UTILITY CONSTRUCTION IN THE SOUTHWEST INDUSTRIAL PARK EXPANSION (TID #23) (+ $16,124.71) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: DORNER, INC. E506 Luxemburg Road Luxemburg WI 54217 Net Increase to contract: $16,124.71 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 540-1040-7216-07416 TIF #23 Southwest Industrial Park – Land Improvements r,A City of Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Co on Council FROM: James Rabe, Director of Public Works DATE: September 22, 2016 RE: Change Order No. 2 for Public Works Contract No. 14 -10 Southwest Industrial Park Expansion (TID #23) Dorner, Inc. ( +$16,124.71) BACKGROUND Change Order No. 2 for Contract 14 -10 is scheduled for consideration by the Common Council at the September 27, 2016 meeting. The contract was originally awarded to Dorner, Inc. in October of 2014, and Change Order No. 1 was approved in February of 2016. This change order is for additional services provided. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • TIF #23 — Added rip rap and associated restoration in severely eroded areas of the banks of two drainage ponds. FISCAL IMPACT Private and public infrastructure projects in TID #23, which have been funded with a State Trust Fund Loan and General Obligation debt, have created a funding source for this Change Order. RECOMMENDATIONS I recommend approval of Change Order No. 2 to Contact No. 14 -10 in the amount of +$16,124.71 to Dorner, Inc. Approved: ,-I- r,vef--04— Mark A. Rohloff City Manager JER /tlt 1:\ Engineering \2014 CONTRACTS \ 1410 SW Ind Prk Exp (TID #23) Ph 3 & 4 Util \ Project _Information \ Correspondence \ Memo \ 14 -10 Memo for CO Ot2- 9- 22- 16.docx TO: DORNER, INC. PO BOX 129 LUXEMBURG, WI 54217 CHANGE ORDER #2 (FINAL) DATE: AUGUST 15, 2016 Your present contract with the City of Oshkosh, Contract No. 14 -10, awarded October 14, 2014, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - PAVING NET INCREASE TO: SECTION II - STORM SEWER NET INCREASE TO: SECTION III -SANITARY SEWER NET INCREASE TO: SECTION IV- WATER MAIN SECTION I (PAVING) BID TOTAL $170,955.70 CO #1 $10,949.11 CO #2 $0.00 NET INCREASE TO CONTRACT SECTION II (STORM) $2,709,645.76 $50,924.17 $16,124.71 CITY OF OSHKOSH BY: SECTION III SECTION IV (SANITARY) (WATER) $147,679.25 $378,864.00 ($1,116.33) ($2,770.00) $0.00 $0.00 City Manager City Clerk Ap r ved and a pted: Co ractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney Comptroller $0.00 $16,124.71 $0.00 $0.00 $16,124.71 TOTALS CONTRACT 14 -10 CHANGE ORDER #2 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Removing pavement, Square 1100 complete asspecified Yards 113.89 113.89 $5.00 36" mountable curb and Square 2002 gutter, 8 ", with 6" CABC and Yards 586,500.00 586,500.00 $0.25 grading, complete as Linear 1450 specified Feet 169,10 169.10 $60.10 Sawing existing pavement, Linear 1700 complete asspecified Feet 178.90 178.90 $2.00 Base aggregate dense, 1 % ", Lump 1801 complete asspecified Tons 13,782.23 13,782.23 $10.71 Tack coat, complete as Lump 1900 specified Gallons 1 20.00 20.00 1 1 $10.10 HMA Pavement Type E -3.0, Lump 190 1 complete asspecified Tons 1 168.72 1 168.72 1 $136.35 SECTION I - (BID ITEMS 4100 -1903) - SUBTOTAL $0.00 $0.00 NET INCREASE TO: SECTION 1 $0.00 SECTION II - STORM SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Mobilization, complete as Lump 2000 specified Sum 1.00 1.00 $183,315.00 Strip and stockpile topsoil, Square 2002 complete as specified Yards 586,500.00 586,500.00 $0.25 Clear trees, complete as Lump 2006 specified Sum 1.00 1.00 $6,565.00 Clear shrubs, complete as Lump 2008 specified Sum 1100 1.00 $2,525.00 Grub stumps, complete as Lump 2012 specified Sum 1.00 1.00 $13,635.00 General excavation, Lump 2020 complete asspecified Sum 1.00 1.00 $1,212,000.00 Construct: clay liner, complete Lump 2024 asspecified Sum 1.00 1.00 $121,200,00 Excavation below subgrade - Public Improvements, Cubic 2025A complete asspecified Yards 946.00 946.00 $4.04 Excavation below subgrade - Non - Public Improvements, Cubic 20256 complete asspecified Yards 0.00 1 0.00 $4.04 Furnish and install 15' RCP Class III storm sewer, Linear 2044 complete asspecified Feet 479.90 479.90 $26.00 Furnish and install 18" RCP Class III storm sewer, Linear 2050 complete asspecified Feet 94.80 94.80 $28.00 Furnish and Install 24" RCP Class III storm sewer, Linear 2062 complete asspecified Feet 2,449.90 2,449.90 $32,00 Furnish and install 30" RCP Class III storm sewer, Linear 2074 complete asspecified Feet 534.60 1 534.60 1 $43.00 Page t of 6 CONTRACT 14 -10 CHANGE ORDER #2 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install 36" RCP Class III storm sewer, Linear 2080 complete asspecified Feet 501.30 501.30 $52.00 Furnish and install 42" RCP Class III storm sewer, Linear 2086 1 complete asspecified Feet 588.40 588.40 $70.00 Furnish and install 48" RCP Class III storm sewer, Linear 2092 complete asspecified Feet 1,489.60 1,489.60 $82.00 Furnish and install 15" RCP Class 111 apron endwall with joint ties, complete as 2302 specified Each 2.00 2.00 1 $947.00 Furnish and install 18" RCP Class Ill apron endwall with joint ties, complete as 2304 specified Each 1.00 1.00 $1,014.00 Furnish and install 24" RCP Class III apron endwall with joint ties, complete as 2308 specified Each 4.00 4.00 $1,234.00 Furnish and install 48" RCP Class III apron endwall with joint ties, complete as 2318 specified Each 2.00 2.00 $2,328.00 Furnish and install standard storm sewer manhole (4' diameter), complete as Vertical 2532 specified Feet 31.14 31.14 $314.00 Furnish and install standard storm sewer manhole (5' diameter), complete as Vertical 2534 specified Feet 87.81 87.81 $387.00 Furnish and install standard storm sewer manhole (6' diameter), complete as Vertical 2536 specified Feet 18.56 18.56 $551.00 Furnish and install standard storm sewer manhole (7' diameter), complete as Vertical 2538 specified Feet 23.03 23.03 $683.00 Furnish and install standard storm sewer manhole (6'x 6' Vertical 2548 box), complete asspecified Feet 12.34 12.34 $863.00 Furnish and install standard storm sewer inlet manhole (4' diameter), complete as Vertical 2556 specified Feet 4.09 4.09 $354.00 Furnish and install standard storm sewer inlet manhole (7' diameter), complete as Vertical 2562 specified Feet 5.91 5.91 $774.00 Furnish and install standard storm sewer inlet manhole (6' x 6' box), complete as Vertical 2572 specified Feet 0.00 0.00 $842.00 Furnish and install storm sewer outlet structure, 2582A complete asspecified Each 1.00 1.00 $4,494.00 Page 2of6 CONTRACT 14 -10 CHANGE ORDER #2 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install storm sewer outlet structure, 2582B complete asspecified Each 1.00 1.00 $4,549.00 Furnish and install storm sewer outlet structure, 25820 complete asspecified Each 1.00 1.00 $4,426.00 Furnish and install Type 3 inlet (with 18" sump), 2614 complete asspecified Each 33.00 33.00 $1,157.00 Furnish, install, maintain, and remove Type D modified inlet protection, complete as 2858 specified Each 36.00 36.00 $91.00 Sediment removal - Type D modified inlet protection, 2860 complete asspecified Each 1 36.00 36.00 $68.68 Furnish, install, maintain, and remove stone tracking pad, 2862 complete asspecified Each 1.00 1.00 $1,010.00 Furnish, install, maintain, and remove silt fence, complete Linear 2864 asspecified Feet 18,004.40 18,004.40 $1.44 Furnish, Install, maintain, and remove stone bag, complete 2866 asspecified Each 20.00 20.00 $7.58 Furnish, install, maintain, and remove ditch check, 2872 complete asspecified Each 62.00 62.00 $70.70 Install salvaged topsoil 6" Square 2902 depth, complete as specified ' Yards 551,667.95 551,667.95 $0.40 Install salvaged topsoil 12" Square 2906 depth, complete as specified Yards 4,700.00 4,700.00 $0.71 Furnish and install wetland Square 2908 pluns, complete asspecified Yards 4,665.51 ,4,665.51 $4.04 Furnish and install native seeding (Sideslope), Square 2910 complete asspecified Yards 42,294.60 42,508.80 214.20 $0.85 $182.07 Furnish and install native seeding (Shoreline), Square 2912 complete asspecified Yards 3,382.44 3,382.44 $0.76 Furnish and install WDOT Seed Mixture #10, complete Square 2921 asspecified Yards 501,485.95 501,616.25 130.30 $0.22 $28.67 Furnish and install no -mow fescue, complete as specified Square 2922 Yards 41,680.92 41,835.12 154.20 $0.26 $40.09 Furnish and install Class 1, Type A erosion control mat, Square 2930 complete asspecified Yards 90,839.42 91,338.12 498.70 $0.86 $428.88 Furnish and install turf reinforcement mat system, Square 2938 comp lete asspecified Yards 4,462.26 4,462.26 $7.88 Furnish and install medium rip -rap with filter fabric, Square 2946 complete asspecified Yards 190.28 190.28 $35.35 Page 3 of 6 CONTRACT 14 -10 CHANGE ORDER #2 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install heavy rip - rap with filter fabric, complete Square 2948 asspecified Yards 101.95 101.95 $35,35 SECTION Il - (BID ITEMS 2000 -2948) - SUBTOTAL $679.71 $0.00 SECTION ll - ADDITIONAL WORK REQUIRED: CO #1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install standard storm sewer inlet manhole (6' Linear 3034 diameter), complete as Vertical 3,026.30 3,026.30 $28.00 12560 specified Feet 8.84 8.84 $600.00 Excavation below subgrade and restoration swale; Square 20000 complete asspecified Yards 1,400.00 1,400.00 $2,00 Excavation below subgrade and restoration sump pits; Square 20001 complete asspecified Yards 278.00 278.00 $2.00 3114 Cover crop; complete as Square 8.00 8.00 $358.00 20002 specified Yards 160,018.00 160,018.00 $0.19 EBS soft areas, hauled off Cubic 20003 site; complete asspecified Yards 105.50 105.50 $14.35 Replace gravel in EBS areas; 20004 complete asspecified Tons 121.80 121.80 $17.25 3236 Filter fabric; complete as Square 1.00 1.00 $30.00 20005 specified Yards 1,456.50 1 1,456.50 $5.75 3332 Furnish and install heavy rip Each 0.00 0.00 $2,048.00 rap with fabric; complete as Square 20006 specified Yards 0.00 293.90 293.90 $50.00 $14,695.00 Mobilization; complete as 20007 Ispecified I Each 0.00 1.00 1 1.00 1 $750.00 $750.00 SECTION II - (ADDITIONAL WORK REQUIRED; CO #1 - (ITEMS 12560- 20007) - SUBTOTAL $15,445.00 $0.00 NET INCREASE TO. SECTION Il $16,124,71 SECTION III - SANITARY SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install 12" sanitary sewer (new), Linear 3034 complete asspecified Feet 3,026.30 3,026.30 $28.00 Furnish and install standard sanitary sewer manhole (4' diameter), complete as Vertical 3100 specified Feet 177.14 177.14 $227.00 Furnish and install external sanitary sewer manhole chimney seal, complete as 3114 specified Each 8.00 8.00 $358.00 Reconstruct sanitary sewer manhole (4' diameter), Vertical 3122 complete asspecified Feet 27.19 1 27.19 $502.00 Furnish and install sanitary sewer lateral marker balls, 3236 complete asspecified Each 1.00 1.00 $30.00 Core into existing manhole, 3332 complete asspecified Each 0.00 0.00 $2,048.00 Pago 4 of 6 CONTRACT 14 -10 CHANGE ORDER #2 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACT PRICE Closed circuit televising, Linear 3700 complete asspecified Feet 3,026.30 3,026.30 $0.85 SECTION III - (BID ITEMS 3034 -3700) - SUBTOTAL $0.00 $0.00 SECTION III - ADDITIONAL WORK REQUIRED: CO #1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install 20" sanitary sewer open cut casing pipes, complete as Linear 13411 ispecifled 1 Feet 1 20.00 1 20.00 $125.00 SECTION III - (ADDITIONAL WORK REQUIRED: CO #1 - ITEM 13411) - SUBTOTAL $0.00 $0.00 NET DECREASE TO: SECTION III $0.00 SECTION IV - WATER MAIN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install new 6" ductile iron water main with polywrap, complete as Linear 4020 specified Feet 1 235.50 235.50 $34.00 Furnish and install new 10" ductile iron water main with polywrap, complete as Linear 4024 specified Feet 5,177.50 5,177.50 $40.00 Furnish and install connections to existing 10" water main, complete as 4062 specified Each 1.00 1.00 $1,210.00 Furnish and install 10" x 6" water main tee, complete as 4119 specified Each 13.00 13.00 $536.00 Furnish and install 10" 11 %° water main bend, complete 4220 ass ecified Each 17.00 17.00 $351.00 Furnish and install 10" 22/.' water main bend, complete 4229 asspecified Each 7.00 1 7.00 $343.00 Furnish and Install 6 "45° water main bend, complete 4236 asspecified Each 22.00 22.00 $174.00 Furnish and install 10" 45° water main bend, complete 4238 asspecified Each 8.00 8.00 $348.00 Furnish and install 10" x 6" water main reducer, complete 4266 1 ass ecif+ed Each 1.00 1.00 $236.00 Furnish and install 6" water main gate valve, complete as 4401 specified Each 14.00 14.00 1 $1,082,00 Furnish and Install 10" water main gate valve, complete as 4403 specified Each 13.00 13.00 1 2,157.00 Furnish and install hydrant, 4500 complete asspecified Each 13.00 13.00 $3,067.00 Page 5 of 6 CONTRACT 14 -10 CHANGE ORDER #2 (FINAL.) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT 1NCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Relocate existing hydrant, 4501 complete asspecified Each 1.00 1100 $833.00 Jack and bore 24" steel water main casing pipe, complete Linear 4702 asspecified Feet 111.00 111.00 $340.00 Furnish and install 24" steel water main casing pipe, t Linear 4730 complete asspecified Feet 1 133.00 133.00 1 1 $120.00 SECTION IV - (BID ITEMS 4020 -4730) - SUBTOTAL $0.00 $0.00 NET DECREASE TO: SECTION IV $0.00 NET INCREASE TO SECTIONS I, II, ill, & IV $16,124.71 NET DECREASE TO SECTIONS t, II, III, & IV $0.00 NET INCREASE TO CONTRACT: $16,124.71 Page 6of6