HomeMy WebLinkAbout11. 16-472SEPTEMBER 27, 2016 16-472 RESOLUTION
(CARRIED___7-0___ LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: APPROVE CHANGE ORDER NO. 2 FOR PUBLIC WORKS
CONTRACT NO. 14-10 WITH DORNER, INC. FOR GRADING /
GRAVELING & UTILITY CONSTRUCTION IN THE SOUTHWEST
INDUSTRIAL PARK EXPANSION (TID #23) (+ $16,124.71)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
DORNER, INC.
E506 Luxemburg Road
Luxemburg WI 54217
Net Increase to contract: $16,124.71
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. No. 540-1040-7216-07416 TIF #23 Southwest Industrial Park –
Land Improvements
r,A
City
of
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Co on Council
FROM: James Rabe, Director of Public Works
DATE: September 22, 2016
RE: Change Order No. 2 for Public Works Contract No. 14 -10
Southwest Industrial Park Expansion (TID #23)
Dorner, Inc. ( +$16,124.71)
BACKGROUND
Change Order No. 2 for Contract 14 -10 is scheduled for consideration by the Common Council at the September
27, 2016 meeting. The contract was originally awarded to Dorner, Inc. in October of 2014, and Change Order
No. 1 was approved in February of 2016. This change order is for additional services provided.
ANALYSIS
Following is a summary of the significant changes to each section of the CIP:
• TIF #23 — Added rip rap and associated restoration in severely eroded areas of the banks of two
drainage ponds.
FISCAL IMPACT
Private and public infrastructure projects in TID #23, which have been funded with a State Trust Fund Loan and
General Obligation debt, have created a funding source for this Change Order.
RECOMMENDATIONS
I recommend approval of Change Order No. 2 to Contact No. 14 -10 in the amount of +$16,124.71 to Dorner, Inc.
Approved:
,-I- r,vef--04—
Mark A. Rohloff
City Manager
JER /tlt
1:\ Engineering \2014 CONTRACTS \ 1410 SW Ind Prk Exp (TID #23) Ph 3 & 4 Util \ Project _Information \ Correspondence \ Memo \ 14 -10 Memo for CO Ot2- 9- 22- 16.docx
TO: DORNER, INC.
PO BOX 129
LUXEMBURG, WI 54217
CHANGE ORDER #2 (FINAL)
DATE: AUGUST 15, 2016
Your present contract with the City of Oshkosh, Contract No. 14 -10, awarded October 14, 2014, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION I - PAVING
NET INCREASE TO: SECTION II - STORM SEWER
NET INCREASE TO: SECTION III -SANITARY SEWER
NET INCREASE TO: SECTION IV- WATER MAIN
SECTION I
(PAVING)
BID TOTAL $170,955.70
CO #1 $10,949.11
CO #2 $0.00
NET INCREASE TO CONTRACT
SECTION II
(STORM)
$2,709,645.76
$50,924.17
$16,124.71
CITY OF OSHKOSH
BY:
SECTION III SECTION IV
(SANITARY) (WATER)
$147,679.25 $378,864.00
($1,116.33) ($2,770.00)
$0.00 $0.00
City Manager
City Clerk
Ap r ved and a pted:
Co ractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Approved as to form:
City Attorney
Comptroller
$0.00
$16,124.71
$0.00
$0.00
$16,124.71
TOTALS
CONTRACT 14 -10 CHANGE ORDER #2 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Removing pavement,
Square
1100
complete asspecified
Yards
113.89
113.89
$5.00
36" mountable curb and
Square
2002
gutter, 8 ", with 6" CABC and
Yards
586,500.00
586,500.00
$0.25
grading, complete as
Linear
1450
specified
Feet
169,10
169.10
$60.10
Sawing existing pavement,
Linear
1700
complete asspecified
Feet
178.90
178.90
$2.00
Base aggregate dense, 1 % ",
Lump
1801
complete asspecified
Tons
13,782.23
13,782.23
$10.71
Tack coat, complete as
Lump
1900
specified
Gallons 1
20.00
20.00
1 1
$10.10
HMA Pavement Type E -3.0,
Lump
190 1
complete asspecified
Tons 1
168.72 1
168.72 1
$136.35
SECTION I - (BID ITEMS 4100 -1903) - SUBTOTAL $0.00 $0.00
NET INCREASE TO: SECTION 1 $0.00
SECTION II - STORM SEWER
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Mobilization, complete as
Lump
2000
specified
Sum
1.00
1.00
$183,315.00
Strip and stockpile topsoil,
Square
2002
complete as specified
Yards
586,500.00
586,500.00
$0.25
Clear trees, complete as
Lump
2006
specified
Sum
1.00
1.00
$6,565.00
Clear shrubs, complete as
Lump
2008
specified
Sum
1100
1.00
$2,525.00
Grub stumps, complete as
Lump
2012
specified
Sum
1.00
1.00
$13,635.00
General excavation,
Lump
2020
complete asspecified
Sum
1.00
1.00
$1,212,000.00
Construct: clay liner, complete
Lump
2024
asspecified
Sum
1.00
1.00
$121,200,00
Excavation below subgrade -
Public Improvements,
Cubic
2025A
complete asspecified
Yards
946.00
946.00
$4.04
Excavation below subgrade -
Non - Public Improvements,
Cubic
20256
complete asspecified
Yards
0.00
1 0.00
$4.04
Furnish and install 15' RCP
Class III storm sewer,
Linear
2044
complete asspecified
Feet
479.90
479.90
$26.00
Furnish and install 18" RCP
Class III storm sewer,
Linear
2050
complete asspecified
Feet
94.80
94.80
$28.00
Furnish and Install 24" RCP
Class III storm sewer,
Linear
2062
complete asspecified
Feet
2,449.90
2,449.90
$32,00
Furnish and install 30" RCP
Class III storm sewer,
Linear
2074
complete asspecified
Feet
534.60 1
534.60 1
$43.00
Page t of 6
CONTRACT 14 -10 CHANGE ORDER #2 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Furnish and install 36" RCP
Class III storm sewer,
Linear
2080
complete asspecified
Feet
501.30
501.30
$52.00
Furnish and install 42" RCP
Class III storm sewer,
Linear
2086
1 complete asspecified
Feet
588.40
588.40
$70.00
Furnish and install 48" RCP
Class III storm sewer,
Linear
2092
complete asspecified
Feet
1,489.60
1,489.60
$82.00
Furnish and install 15" RCP
Class 111 apron endwall with
joint ties, complete as
2302
specified
Each
2.00
2.00
1
$947.00
Furnish and install 18" RCP
Class Ill apron endwall with
joint ties, complete as
2304
specified
Each
1.00
1.00
$1,014.00
Furnish and install 24" RCP
Class III apron endwall with
joint ties, complete as
2308
specified
Each
4.00
4.00
$1,234.00
Furnish and install 48" RCP
Class III apron endwall with
joint ties, complete as
2318
specified
Each
2.00
2.00
$2,328.00
Furnish and install standard
storm sewer manhole (4'
diameter), complete as
Vertical
2532
specified
Feet
31.14
31.14
$314.00
Furnish and install standard
storm sewer manhole (5'
diameter), complete as
Vertical
2534
specified
Feet
87.81
87.81
$387.00
Furnish and install standard
storm sewer manhole (6'
diameter), complete as
Vertical
2536
specified
Feet
18.56
18.56
$551.00
Furnish and install standard
storm sewer manhole (7'
diameter), complete as
Vertical
2538
specified
Feet
23.03
23.03
$683.00
Furnish and install standard
storm sewer manhole (6'x 6'
Vertical
2548
box), complete asspecified
Feet
12.34
12.34
$863.00
Furnish and install standard
storm sewer inlet manhole (4'
diameter), complete as
Vertical
2556
specified
Feet
4.09
4.09
$354.00
Furnish and install standard
storm sewer inlet manhole (7'
diameter), complete as
Vertical
2562
specified
Feet
5.91
5.91
$774.00
Furnish and install standard
storm sewer inlet manhole (6'
x 6' box), complete as
Vertical
2572
specified
Feet
0.00
0.00
$842.00
Furnish and install storm
sewer outlet structure,
2582A
complete asspecified
Each
1.00
1.00
$4,494.00
Page 2of6
CONTRACT 14 -10 CHANGE ORDER #2 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Furnish and install storm
sewer outlet structure,
2582B
complete asspecified
Each
1.00
1.00
$4,549.00
Furnish and install storm
sewer outlet structure,
25820
complete asspecified
Each
1.00
1.00
$4,426.00
Furnish and install Type 3
inlet (with 18" sump),
2614
complete asspecified
Each
33.00
33.00
$1,157.00
Furnish, install, maintain, and
remove Type D modified inlet
protection, complete as
2858
specified
Each
36.00
36.00
$91.00
Sediment removal - Type D
modified inlet protection,
2860
complete asspecified
Each
1 36.00
36.00
$68.68
Furnish, install, maintain, and
remove stone tracking pad,
2862
complete asspecified
Each
1.00
1.00
$1,010.00
Furnish, install, maintain, and
remove silt fence, complete
Linear
2864
asspecified
Feet
18,004.40
18,004.40
$1.44
Furnish, Install, maintain, and
remove stone bag, complete
2866
asspecified
Each
20.00
20.00
$7.58
Furnish, install, maintain, and
remove ditch check,
2872
complete asspecified
Each
62.00
62.00
$70.70
Install salvaged topsoil 6"
Square
2902
depth, complete as specified
' Yards
551,667.95
551,667.95
$0.40
Install salvaged topsoil 12"
Square
2906
depth, complete as specified
Yards
4,700.00
4,700.00
$0.71
Furnish and install wetland
Square
2908
pluns, complete asspecified
Yards
4,665.51
,4,665.51
$4.04
Furnish and install native
seeding (Sideslope),
Square
2910
complete asspecified
Yards
42,294.60
42,508.80
214.20
$0.85
$182.07
Furnish and install native
seeding (Shoreline),
Square
2912
complete asspecified
Yards
3,382.44
3,382.44
$0.76
Furnish and install WDOT
Seed Mixture #10, complete
Square
2921
asspecified
Yards
501,485.95
501,616.25
130.30
$0.22
$28.67
Furnish and install no -mow
fescue, complete as specified
Square
2922
Yards
41,680.92
41,835.12
154.20
$0.26
$40.09
Furnish and install Class 1,
Type A erosion control mat,
Square
2930
complete asspecified
Yards
90,839.42
91,338.12
498.70
$0.86
$428.88
Furnish and install turf
reinforcement mat system,
Square
2938
comp lete asspecified
Yards
4,462.26
4,462.26
$7.88
Furnish and install medium
rip -rap with filter fabric,
Square
2946
complete asspecified
Yards
190.28
190.28
$35.35
Page 3 of 6
CONTRACT 14 -10 CHANGE ORDER #2 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Furnish and install heavy rip -
rap with filter fabric, complete
Square
2948
asspecified
Yards
101.95
101.95
$35,35
SECTION Il - (BID ITEMS 2000 -2948) - SUBTOTAL $679.71 $0.00
SECTION ll - ADDITIONAL WORK REQUIRED: CO #1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Furnish and install standard
storm sewer inlet manhole (6'
Linear
3034
diameter), complete as
Vertical
3,026.30
3,026.30
$28.00
12560
specified
Feet
8.84
8.84
$600.00
Excavation below subgrade
and restoration swale;
Square
20000
complete asspecified
Yards
1,400.00
1,400.00
$2,00
Excavation below subgrade
and restoration sump pits;
Square
20001
complete asspecified
Yards
278.00
278.00
$2.00
3114
Cover crop; complete as
Square
8.00
8.00
$358.00
20002
specified
Yards
160,018.00
160,018.00
$0.19
EBS soft areas, hauled off
Cubic
20003
site; complete asspecified
Yards
105.50
105.50
$14.35
Replace gravel in EBS areas;
20004
complete asspecified
Tons
121.80
121.80
$17.25
3236
Filter fabric; complete as
Square
1.00
1.00
$30.00
20005
specified
Yards
1,456.50 1
1,456.50
$5.75
3332
Furnish and install heavy rip
Each
0.00
0.00
$2,048.00
rap with fabric; complete as
Square
20006
specified
Yards
0.00
293.90
293.90
$50.00
$14,695.00
Mobilization; complete as
20007 Ispecified
I
Each
0.00
1.00 1
1.00 1
$750.00
$750.00
SECTION II - (ADDITIONAL WORK REQUIRED; CO #1 - (ITEMS 12560- 20007) - SUBTOTAL $15,445.00 $0.00
NET INCREASE TO. SECTION Il $16,124,71
SECTION III - SANITARY SEWER
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Furnish and install 12"
sanitary sewer (new),
Linear
3034
complete asspecified
Feet
3,026.30
3,026.30
$28.00
Furnish and install standard
sanitary sewer manhole (4'
diameter), complete as
Vertical
3100
specified
Feet
177.14
177.14
$227.00
Furnish and install external
sanitary sewer manhole
chimney seal, complete as
3114
specified
Each
8.00
8.00
$358.00
Reconstruct sanitary sewer
manhole (4' diameter),
Vertical
3122
complete asspecified
Feet
27.19 1
27.19
$502.00
Furnish and install sanitary
sewer lateral marker balls,
3236
complete asspecified
Each
1.00
1.00
$30.00
Core into existing manhole,
3332
complete asspecified
Each
0.00
0.00
$2,048.00
Pago 4 of 6
CONTRACT 14 -10 CHANGE ORDER #2 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACT PRICE
Closed circuit televising,
Linear
3700
complete asspecified
Feet
3,026.30
3,026.30
$0.85
SECTION III - (BID ITEMS 3034 -3700) - SUBTOTAL $0.00 $0.00
SECTION III - ADDITIONAL WORK REQUIRED: CO #1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Furnish and install 20"
sanitary sewer open cut
casing pipes, complete as
Linear
13411
ispecifled
1 Feet
1 20.00
1 20.00
$125.00
SECTION III - (ADDITIONAL WORK REQUIRED: CO #1 - ITEM 13411) - SUBTOTAL $0.00 $0.00
NET DECREASE TO: SECTION III $0.00
SECTION IV - WATER MAIN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Furnish and install new 6"
ductile iron water main with
polywrap, complete as
Linear
4020
specified
Feet
1 235.50
235.50
$34.00
Furnish and install new 10"
ductile iron water main with
polywrap, complete as
Linear
4024
specified
Feet
5,177.50
5,177.50
$40.00
Furnish and install
connections to existing 10"
water main, complete as
4062
specified
Each
1.00
1.00
$1,210.00
Furnish and install 10" x 6"
water main tee, complete as
4119
specified
Each
13.00
13.00
$536.00
Furnish and install 10" 11 %°
water main bend, complete
4220
ass ecified
Each
17.00
17.00
$351.00
Furnish and install 10" 22/.'
water main bend, complete
4229
asspecified
Each
7.00
1 7.00
$343.00
Furnish and Install 6 "45°
water main bend, complete
4236
asspecified
Each
22.00
22.00
$174.00
Furnish and install 10" 45°
water main bend, complete
4238
asspecified
Each
8.00
8.00
$348.00
Furnish and install 10" x 6"
water main reducer, complete
4266 1
ass ecif+ed
Each
1.00
1.00
$236.00
Furnish and install 6" water
main gate valve, complete as
4401
specified
Each
14.00
14.00 1
$1,082,00
Furnish and Install 10" water
main gate valve, complete as
4403
specified
Each
13.00
13.00
1
2,157.00
Furnish and install hydrant,
4500
complete asspecified
Each
13.00
13.00
$3,067.00
Page 5 of 6
CONTRACT 14 -10 CHANGE ORDER #2 (FINAL.)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
1NCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Relocate existing hydrant,
4501
complete asspecified
Each
1.00
1100
$833.00
Jack and bore 24" steel water
main casing pipe, complete
Linear
4702
asspecified
Feet
111.00
111.00
$340.00
Furnish and install 24" steel
water main casing pipe,
t
Linear
4730
complete asspecified
Feet 1
133.00
133.00
1
1
$120.00
SECTION IV - (BID ITEMS 4020 -4730) - SUBTOTAL $0.00 $0.00
NET DECREASE TO: SECTION IV $0.00
NET INCREASE TO SECTIONS I, II, ill, & IV $16,124.71
NET DECREASE TO SECTIONS t, II, III, & IV $0.00
NET INCREASE TO CONTRACT: $16,124.71
Page 6of6