HomeMy WebLinkAbout10. 16-471SEPTEMBER 27, 2016 16-471 RESOLUTION
(CARRIED___7-0___ LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: APPROVE CHANGE ORDER NO. 2 FOR PUBLIC WORKS
CONTRACT NO. 15-01 WITH JAMES PETERSON SONS, INC. FOR
9 & WASHBURN AREA DETENTION BASIN (+ $44,630.49)
TH
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
JAMES PETERSON SONS, INC.
N2251 Gibson Dr.
Medford WI 54451
Net Increase to contract: $44,630.49
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. No. 561-2010-1799-00000 Storm Utility - Construction in Progress
City
�
of
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the C on Council
FROM: James Rabe, Director of Public Works
DATE: September 22, 2016
RE: Change Order No. 2 for Public Works Contract No. 15 -01
91h & Washburn Avenue Detention Basin
James Peterson Sons, Inc. ( +$44,630.49)
BACKGROUND
Change Order No. 2 for Contract 15 -01 is scheduled for consideration by the Common Council at the
September 27, 2016 meeting. The contract was originally awarded to James Peterson Sons, Inc. in July
of 2015, and Change Order No. 1 was signed in April of 2016 (contract decrease of - $2,592.88). This
change order is for final quantities and for additional services provided.
ANALYSIS
Following is a summary of the significant changes to each section of the CIP:
• Paving - 8" doweled pavement was not included in the original bid, but was found in South
Washburn Street in some areas and required removal and replacement for utility construction.
Additional pavement removal and replacement was necessary to complete the work in
Maricopa Drive.
• Storm - A topsoil stockpile was added to the project at another location. Additional erosion
control measures were required to protect the site. At the request of some private property
owners, storm laterals were installed to these properties. These property owners will be
assessed for the storm laterals in accordance with the City's Special Assessment Policy.
• Sanitary - Two (2) additional sanitary manholes were exposed during construction, and
chimney seals were added to these manholes to reduce infiltration into the sanitary system.
1: \Engineering \2015 CONTRACTS \15-01 9th & Washburn Area Det Basin Page 1 of 2
Const \ Project_Information \ Correspondence \ Memo \ 15 -01 Memo for CO #2_9- 22- 16.docx
• Water - In order to allow for more efficient system operation, the hydrant at Maricopa Drive
and Cumberland Trail was relocated. Additional valves were also installed to facilitate system
operation.
FISCAL IMPACT
Contract Section
Change Order Amount
New Contract Total
CIP Budget Amount
Storm Sewer
$30,247.49
$2,556,446.61
$4,000,000.00
Sanitary Sewer
$953.00
$953.00
$953.00
Water Main
$13,430.00
$13,430.00
$13,430.00
Total
$44,630.491
$2,570,829.61
$4,014,383.00
Funding for the storm sewer portion of the project is in the Storm Water Utility section of the 2015
Capital Improvement Program. Funding for the sanitary sewer portion of the project is from the
Sanitary Sewer Rehabilitation project in the 2016 CIP. The funding for the water main portion of the
project is available from the West 5th Avenue Water Main Relay project (Contract 16 -09) in the 2016
CIP coming in under budget.
RECOMMENDATIONS
I recommend approval of Change Order No. 2 to Contact No. 15 -01 in the amount of +$44,630.49 to
James Peterson Sons, Inc.
Approved:
Mark A. Rohloff
City Manager
JER /tlt
1: \ Engineering \ 2015 CONTRACM \ 15 -019th & Washburn Area Det Basin Page 2 of 2
Const \ Project_Information\ Correspondence \ Memo \ 15-01 Memo for CO k2_9- 22- 16.docx
TO: JAMES PETERSON SONS, INC.
UTILITY DIVISION
N2251 GIBSON DRIVE
MEDFORD, WI 54451
CHANGE ORDER #2 (FINAL)
DATE: AUGUST 30, 2016
Your present contract with the City of Oshkosh, Contract No. 15 -01, awarded July 14, 2015, is hereby amended and
changed as follows:
NET INCREASE TO:
SECTION I - PAVING
$0.00
NET INCREASE TO:
SECTION II - STORM SEWER
$44,630.49
NET INCREASE TO:
SECTION III - SANITARY SEWER
$0.00
NET INCREASE TO:
SECTION IV - WATER MAIN
$0.00
NET INCREASE TO CONTRACT
$44,630.49
SECTION I
SECTION II SECTION III
SECTION IV
(PAVING)
(STORM) (SANITARY)
(WATER)
TOTALS
BID TOTAL $292,765.50
$2,142,702.50 $5,000.00
$88,324.00
$2,528,792.00
CO #1 $33,318.43
($74,391.91) $553.00
$37,927.60:
($2,592.88)
CO #2 $0.00
$44,630.49 $0.00
$0.00
$44,630.49
CONTRACT TOTAL $326,083.93
$2,112,941.08 $5,553.00
$126,251.60
$2,570,829.61
CITY OF OSHKOSH
BY:
City Manager
City Clerk
AP r an >
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the
within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT 15 -01 CHANGE ORDER 1'2 (FINAL)
SECTION I - PAVING
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Removing pavement;
Square
1100
complete asspecified
Yards
3,339.50
3,339.50
$3.45
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
1120
specified
Feet
1,613.30
1,613.30
$5.00
7" concrete pavement; with 5"
CABC and grading; complete
Square
1301
asspecified
Yards
1,297.00
1,297.00
$68.00
8" concrete pavement; with 6"
CABC and grading; complete
Square
1311
asspecified
Yards
951.00
951.00
$71.75
Pavement ties; complete as
1350
specified
Each
339.00
339.00
$8.00
Adjust manholes and inlets;
1360
complete asspecified
Each
11.00
1 11.00
$519.00
Turf restoration; complete as
Square
1370
specified
Yards
2,699.90
2,699.90
$1.10
18" curb and gutter; 7 "; with
5" CABC and grading;
Linear
1420
complete asspecified
Feet
548.80
548.80
$26.50
30" curb and gutter; 8 "; with
6" CABC and grading;
Linear
1442
complete asspecified
Feet
570.50
570.50
$28.75
4" concrete sidewalk with 3"
CABC and grading; complete
Square
1500
asspecified
Feet
872.70
872.70
$5.90
6" concrete sidewalk/
driveway /ramp with 3"
CABC and grading; complete
Square
1510
asspecified
Feet
534.49
534.49
$7.90
Curb ramp detectable
warning field (natural /non-
painted); complete as
Square
1540
specified
Feet
32.00
32.00
$30.00
No. 4 reinforcing rods -
deformed; epoxy- coated;
Linear
1550
complete asspecified
Feet
351.00
351.00
$1.10
Drilled No. 4 sidewalk tie
bars - deformed; epoxy -
1560
coated; complete asspecified
Each
28.00
28.00
$5.00
Sawing existing pavement;
Linear
1700
complete asspecified
Feet
1,547.00
1,547.00
$2.25
4" asphaltic pavement with
10" CABC and grading;
Square
1906
complete asspecified
Yards
806.60
806.60
$46.75
Page 1 of B
CONTRACT 15 -01 CHANGE ORDER #2 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY Q
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Pavement markings;
Lump
1921
complete asspecified
Sum
0.00
0.00
$2,500.00
SECTION I - (BID ITEMS 1100 -1921) - SUBTOTAL $0.00 $0.00
SECTION I - ADDITIONAL WORK REQUIRED: CO #1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
7" concrete pavement; base in
Lump
2000
place and grading; complete
Square
1.00
1.00
$105,500.00
11300
asspecified
Yards
455.06
455.06
$39.17
2002
8" concrete pavement
Yards
1 47,372.00
47,372.00
$0.45
doweled; with 6" CABC and
Lump
2006
grading; complete as
Square
1.00
1.00
$8,000.00
11314A
specified
Yards
465.20
465.20
$76.70
2008
Replace existing property
Sum
1.00
1.00
$5,900.00
monuments; complete as
Lump
11652
specified
Each
1.00
1.00
$1,500.00
1 1/4" drilled dowel bars;
Lump
11999
complete asspecified
Each
44.00
44.00
$15.40
SECTION I - (ADDITIONAL WORK REQUIRED: CO Al ITEMS 11300 - 11999) - SUBTOTAL $0.00 $0.00
NET INCREASE TO: SECTION I $0.00
SECTION II - STORM SEWER
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Mobilization; complete as
Lump
2000
specified
Sum
1.00
1.00
$105,500.00
Strip and stockpile topsoil;
Square
2002
complete asspecified
Yards
1 47,372.00
47,372.00
$0.45
Clear trees; complete as
Lump
2006
specified
Sum
1.00
1.00
$8,000.00
Clear shrubs; complete as
Lump
2008
specified
Sum
1.00
1.00
$5,900.00
Grub stumps; complete as
Lump
2012
specified
Sum
1.00
1.00
$5,000.00
General excavation; complete
Lump
2020
asspecified
Sum
1.00
1.00
$1,015,000.00
Import clay material;
Cubic
2022
com lete asspecified
Yards
0.00
0.00
$8.27
Construct clay liner; complete
Lump
2024
asspecified
Sum
1.00
1.00
$123,000.00
Excavation below subgrade -
Detention Basin; complete as
Cubic
2026
specified
Yards
96.30
96.30
$10.00
Furnish and install backflow
preventer; complete as
2035
specified
Each
5.00
5.00
$2,500.00
Page 2 of 8
CONTRACT 15 -01 CHANGE ORDER A2 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Fumish and install 12" storm
Linear
2036
sewer; complete asspecified
Feet
426.00
426.00
$95.60
Furnish and install 24" storm
Linear
2060
sewer; complete asspecified
Feet
730.50
730.50
$118.00
Fumish and install 48" storm
Linear
2090
sewer; complete asspecified
Feet
32.00
32.00
$208.00
Furnish and install 60" storm
Linear
2102
server; complete asspecified
Feet
392.00
392.00
$254.00
Furnish and install 5'x 8' box
culvert storm sewer;
Linear
2188
complete asspecified
Feet
260.00
260.00
$517.50
Furnish and install 12" RCP
Class III apron endwall with
joint ties; complete as
2300
specified
Each
5.00
5.00
$957.00
Furnish and install 24" RCP
Class Ill apron endwall with
joint ties; complete as
2308
specified
Each
1.00
1.00
$2,070.00
Fumish and install 5'x 8' box
culvert end section with joint
2376
ties; complete asspecified
Each
1.00
1.00
$40,000.00
Fumish and install standard
storm sewer manhole (4'
diameter); complete as
Vertical
2532
specified
Feet
19.42
19.42
$276.00
Furnish and install standard
storm sewer manhole (5'
diameter); complete as
Vertical
2534
specified
Feet
19.00
19.00
$428.00
Furnish and install standard
storm sewer manhole (7'
diameter); complete as
Vertical
2538
specified
Feet
6.75
6.75
$710.00
Furnish and install standard
storm sewer manhole (8'
diameter); complete as
Vertical
2540
specified
Feet
14.87
14.87
$886.40
Fumish and install standard
storm sewer manhole (9'
diameter); complete as
Vertical
2542
specified
Feet
6.67
6.67
$1,514.00
Fumish and install standard
storm sewer inlet manhole (4'
diameter); complete as
Vertical
2556
specified
Feet
10.10
10.10
$482.00
Furnish and install storm
sewer junction chamber;
2580
complete asspecified
Each
1.00
1.00
$34,265.00
Fumish and install storm
sewer outlet structure;
2582
complete as specified
Each
1.00
1.00
$17,700.00
Furnish and install Type l
2612
inlet; complete asspecified
Each
5.00
5.00
$1,493.00
Page 3 of 8
CONTRACT 15-01 CHANGE ORDER 02 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
OECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install Type 3
inlet (with 18" sump);
2614
complete asspecified
Each
6.00
6.00
$1,815.00
Connect to existing storm
sewer main; complete as
2800
specified
Each
4.00
4.00
$584.00
Abandon 15" and larger
storm sewer, complete as
Linear
2822
specified
Feet
435.00
435.00
$43.00
Remove 30" and smaller
storm sewer; complete as
Linear
2824
specified
Feet
23.00
23.00
$10.00
Remove storm sewer
manholes and inlets;
2832
complete asspecified
Each
2.00
2.00
$500.00
Furnish; install; maintain;
and remove Type D modified
inlet protection; complete as
2858
specified
Each
25.00
25.00
$150.00
Sediment removal - Type D
modified inlet protection;
2860
complete asspecified
Each
0.00
0.00
$25.00
Furnish; install; maintain;
and remove stone tracking
2862
ad; complete asspecified
Each
3.00
3.00
$3,500.00
Furnish; install; maintain;
and remove silt fence;
Linear
2864
complete asspecified
Feet
3,763.00
3,763.00
$2.00
Furnish; install; maintain;
and remove ditch check;
2872
complete asspecified
Each
7.00
7.00
$250.00
Install salvaged topsoil 6"
Square
2902
depth; complete asspecified
Yards
35,275.31
35,275.31
$0.50
Install salvaged topsoil 12"
Square
2906
depth; complete asspecified
Yards
2,513.40
2,513.40
$150
Furnish and install wetland
Square
2908
lu s; corn lete asspecified
Yards
0.00
3,257.70
3,257.70
$13.70
$44,630.49
Furnish and install native
seeding; complete as
Square
2910
specified
Yards
13,994.50
13,994.50
$1.25
Furnish and install native
seeding; complete as
Square
2912
specified
Yards
11,980.75
11,980.75
$1.25
Furnish and install no -mow
Square
2922
fescue; complete asspecified
Yards
8,555.76
8,555.76
$0.60
Furnish and install trees;
2926
complete asspecified
Each
8.00
8.00
$595.00
Furnish and install shrubs;
2928
complete asspecified
Each
65.00
65.00
$250.00
Furnish and install Class I;
Type A erosion control mat;
Square
2930
complete asspecified
Yards
34,530.99
34,530.99
$1.00
Page 4 of 8
CONTRACT 15 -01 CHANGE ORDER 82 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY Q
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install turf
reinforcement mat system;
Square
2938
complete asspecified
Yards
0.00
0.00
$17.00
Furnish and install medium
rip -rap with filter fabric;
Square
2946
complete asspecified
Yards
218.50
218.50
$33.50
Furnish and install heavy rip -
rap with filter fabric;
Square
2948
complete asspecified
Yards
239.50
239.50
$37.50
Haul and stockpile clay at
Aviation Business Park,
Lump
A -2025
complete asspecified
Sum
1.00 1
1.00
$35,000.00
SECTION II - (BID ITEMS 2000 -A -2025) - SUBTOTAL $44,630.49 $0.00
SECTION II - ADDITIONAL WORK REQUIRED: CO 91
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install 6 storm
sewer lateral; complete as
Linear
12280
specified
Feet
86.00
86.00
$94.40
Furnish and install storm
sewer marker balls; complete
12284
asspecified
Each
5.00
5.00
$50.00
Furnish and install storm
sewer clay dams; complete as
12286
specified
Each
2.00
2.00
$750.00
Connect to existing storm
sewer main; complete as
12800
specified
Each
2.00
2.00
$700.00
Connect to existing storm
sewer lateral; complete as
12802
specified
Each
1.00
1.00
$276.00
Furnish and install annual
cover crop; complete as
Square
12924
specified
Yards
48,328.32
48,328.32
$0.13
Furnish and install box of
biodegradable stakes (C.D.
12996
17); complete asspecified
Each
17.00
17.00
$114.35
Connect to inlet structure;
12997
complete asspecified
Each
1.00
1.00
$2,452.50
Furnish and install coconut
fiber - reinforced matting;
Square
12998
complete asspecified
Yards
824.10
824.10
$5.50
Page 5 of 8
CONTRACT 15-01 CHANGE ORDER 42 (FINAL)
1TE.14
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Concrete cap /water stop
outlet structure S-1; complete
Linear
12999
asspecified
Each
1.00
1.00
$1,419.48
SECTION fI - (ADDITIONAL WORK REQUIRED: CO 41 - (ITEMS 12280- 12999) - SUBTOTAL $0.00 $0.00
NET INCREASE TO: SECTION II $44,630.49
SECTION III - SANITARY SEWER
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install 4 "/6'
sanitary sewer lateral (relay);
Linear
3234
complete asspecified
Feet
27.50
27.50
$60.00
13114
Furnish and install sanitary
Each
2.00
2.00
1
$476.50
sewer lateral marker balls;
3236
complete asspecified
Each
4.00
4.00
$50.00
Furnish and install clay
3238
dams; complete asspecified
Each
1.00
1.00
$750.00
Furnish and install
connection to existing 10"
3302
mains; complete asspecified
Each
0.00
0.00
$750.00
Furnish and install 10"
sanitary sewer open nit
casing pipes; complete as
Linear
3404
specified
Feet
20.00
20.00
$100.00
SECTION III - (BID ITEMS 3234 -3404) - SUBTOTAL $0.00 $0.00
SECTION III - ADDITIONAL WORK REQUIRED: CO 41
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install external
sanitary sewer manhole
chimney seal: complete as
Linear
13114
specified
Each
2.00
2.00
1
$476.50
SECTION III - (ADDITIONAL WORK REQUIRED: CO 41- ITEMS 30000- 30003) - SUBTOTAL $0.00 $0.00
NET INCREASE TO: SECTION 1II $0.00
SECTION IV - WATER MAIN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install 8" ductile
iron water main (relay) with
polywrap; complete as
Linear
4004
specified
Feet
1 67.00
67.00 1
1
$124.00
Page 6 of 8
CONTRACT 15 -01 CHANGE ORDER 92 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PR /CE
CONTRACTPRICE
CONTRACTPRICE
Furnish and install 16"
ductile iron water main
14050
(relay) with polywrap;
Linear
4.00
4.00
$680.00
4010
complete as specified
Feet
1 30.00
30.00
$243.00
Furnish and install 2" water
14110
service (relay); complete as
Linear
1.00
1.00
$605.00
4040
specified
Feet
153.00
153.00
$123.00
14354
Furnish and install water
Each
1.00
1.00
$630.00
service clay dams; complete
4055
asspecified
Each
3.00
3.00
$750.00
Furnish and install
connections to existing 8"
14402
water main; complete as
Each
1.00
1.00
$2,530.00
4060
specified
Each
2.00
2.00
$1,983.00
Furnish and install
connections to existing 10"
water main; complete as
4062
specified
Each
0.00
0.00
$2,089.00
Furnish and install
connections to existing 16"
water main; complete as
4066
specified
Each
2.00
2.00
$3,247.00
Furnish and install 8" 45
degree water main bend;
4237
complete asspecified
Each
5.00
5.00
$290.00
Furnish and install 16" 45
degree water main bend;
4240
complete as specified
Each
4.00
4.00
$1,320.00
Furnish and install 16" open
right ductile line stops;
4499
complete asspecified I
Each
2.00
2.00
$19,358.00
SECTION IV - (BID ITEMS 4004 -4499) - SUBTOTAL $0.00 $0.00
SECTION IV - ADDITIONAL WORK REQUIRED: CO #1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
Furnish and install 1 -1/4"
corporation and stop box;
14050
complete asspecified
Each
4.00
4.00
$680.00
Furnish and install 8"x 6"
water main tee; complete as
14110
specified
Each
1.00
1.00
$605.00
Cut and cap existing 8" water
14354
main; complete asspecified
Each
1.00
1.00
$630.00
Furnish and install 6" water
14401
main; complete asspecified
Each
1.00
1.00
$1,953.00
Furnish and install 8" water
main gate valve; complete as
14402
specified
Each
1.00
1.00
$2,530.00
Page 7 of 8
CONTRACT 15 -01 CHANGE ORDER A2 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install 16 water
main gate valve; complete as
14405
s cified
Each
2.00
2.00
$8,764.30
Furnish and install hydrant;
I
---[-
14500
tom lets ass ecifie
Each
1.00
1.00
$7,712.00
SECTION IV - (ADDITIONAL WORK REQUIRED: CO 91 ITEMS 14050-14500). SUBTOTAL $0.00 $0.00
NET INCREASE TO: SECTION IV $0.00
NET INCREASE TO SECTIONS I, II, III, & IV $44,630.49
NET DECREASE TO SECTIONS I, I1, III, & IV $0.00
NET INCREASE TO CONTRACT: $44,630.49