HomeMy WebLinkAboutItem II-2017 Capital Improvement ProgramPrepared for Plan Commission: Preliminary Capital Improvement Program 2017 - 2021 August 26, 2016 2017 CIP Comprehensive Streets/Utility Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 Public Infrastructure Improvements - Other Streets . . . . . . . . . . . . . . . . . . . . . . . . . . . .7 Public Infrastructure Improvements - Storm Water Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10 Public Infrastructure Improvements - Water Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15 Public Infrastructure Improvements - Wastewater Utility . . . . . . . . . . . . . . . . . . . . . . . .18 Public Infrastructure Improvements - Sidewalks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21 Traffic Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23 Park Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26 Public Property Improvements - Non-Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29 Public Property Improvements - Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35 Major Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38 Major Equipment - Vehicles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40 Tax Increment Financing (TIF) Districts Improvements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42 2017 CIP Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44 2017 Borrowing Spreadsheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46 2017 - 1 Comprehensive Streets/Utility Improvements Project Descriptions New York Avenue Reconstruction 3,199,000$ Document/Study/Planning Document:2011 Pedestrian and Bicycle PASER Rating: 2 Circulation Plan CIP Project Score: 110/200 Asset Life Span: 30+ Years Full reconstruction of the street, including public utilities and laterals,from Wisconsin Street to Main Street. Proposed 32'-36' concrete pavement in 53'-60' right-of-way. Sidewalk sections will be repaired, as needed. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign and stripe facility. Age of Infrastructure: Sanitary - 1885, 1889, and 1981 Water - Pre-1920's Storm - 1968, 1980, 1981, and 1998 CIP Section Assessment Other City Total Street 307,600$-$538,400$846,000$ Storm 25,500$-$642,500$668,000$ Wastewater 81,100$-$644,400$725,500$ Water -$-$829,900$829,900$ Sidewalk 50,800$-$33,800$84,600$ Traffic -$-$45,000$45,000$ Total 465,000$-$2,734,000$3,199,000$ 2017 - 2 Comprehensive Streets/Utility Improvements Project Descriptions East Murdock Avenue Reconstruction 2,108,400$ Document/Study/Planning Document:N/A PASER Rating: 3 CIP Project Score: 90/200 Asset Life Span: 30+ Years Full reconstruction of the street, including public utilities and laterals, from railroad tracks to Bowen Street. Proposed 44' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1902 and 1972 Water - Pre-1920's Storm - 1931, 1958, and 1994 CIP Section Assessment Other City Total Street 374,700$-$230,300$605,000$ Storm 4,500$-$253,500$258,000$ Wastewater 15,800$-$606,600$622,400$ Water 26,900$-$456,600$483,500$ Sidewalk 29,700$-$19,800$49,500$ Traffic -$-$90,000$90,000$ Total 451,600$-$1,656,800$2,108,400$ Maricopa Drive Reconstruction 2,362,100$ Document/Study/Planning Document:N/A PASER Rating: 6 CIP Project Score: 95/200 Asset Life Span: 30+ Years Full reconstruction of the street, including public utilities and laterals,from 330' northwest of Dickinson Avenue to Covington Drive. Proposed 32' concrete pavement in 60' right-of-way. Sidewalk section will be repaired, as needed. Age of Infrastructure: Sanitary - 1968 Water - 1967, 1974 Storm - 1968, 1974, and 1976 NEED MAP CIP Section Assessment Other City Total Street 185,500$-$361,800$547,300$ Storm 16,500$-$713,500$730,000$ Wastewater 40,500$-$500,500$541,000$ Water -$-$498,600$498,600$ Sidewalk 27,100$-$18,100$45,200$ Total 269,600$-$2,092,500$2,362,100$ 2017 - 3 Comprehensive Streets/Utility Improvements Project Descriptions Dickinson Avenue Reconstruction 1,073,900$ Document/Study/Planning Document:N/A PASER Rating: 7 CIP Project Score: 95/200 Asset Life Span: 30+ Years Full reconstruction of the street including public utilities and laterals,from Maricopa Drive to South Washburn Street. Proposed 36' of concrete pavement in 66' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1967 Water - 1967 Storm - 1967 and 1991 CIP Section Assessment Other City Total Street 153,600$-$138,900$292,500$ Storm 4,500$-$120,500$125,000$ Wastewater 14,300$-$299,600$313,900$ Water -$-$312,800$312,800$ Sidewalk 17,800$-$11,900$29,700$ Total 190,200$-$883,700$1,073,900$ Lake Street Reconstruction 2,840,400$ Document/Study/Planning Document:N/A PASER Rating: 3 CIP Project Score: 90/200 Asset Life Span: 30+ Years Full reconstruction of the street, including public utilities and laterals,from Bay Shore Drive to Ceape Avenue. Proposed 32' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1936, 1938, and 1986 Water - Pre 1920's Storm - 1902 and 1978 CIP Section Assessment Other City Total Street 271,200$-$336,300$607,500$ Storm 33,000$-$466,000$499,000$ Wastewater 123,000$-$809,100$932,100$ Water 10,100$-$724,200$734,300$ Sidewalk 27,000$-$40,500$67,500$ Total 464,300$-$2,376,100$2,840,400$ 2017 - 4 Comprehensive Streets/Utility Improvements Project Descriptions 4,495,200$ Document/Study/Planning Document:2011 Pedestrian and Bicycle PASER Rating: 3, 4 Circulation Plan CIP Project Score: 90/200 Asset Life Span: 30+ Years Full reconstruction of the street, including public utilities and laterals,from Bowen Street to Lake Street. Proposed 32' concrete pavement in 54' right-of-way. Sidewalk sections will be repaired/installed as needed. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign and/or shareway facility. Age of Infrastructure: Sanitary - 1936, 1938, and 1986 Water - Pre-1920's Storm - 1905, 1909, 1915, and 1978 CIP Section Assessment Other City Total Street 447,000$-$573,600$1,020,600$ Storm 36,000$-$676,000$712,000$ Wastewater 174,900$-$1,266,100$1,441,000$ Water 20,200$-$1,187,400$1,207,600$ Sidewalk 68,400$-$45,600$114,000$ Total 746,500$-$3,748,700$4,495,200$ Bay Shore Drive Reconstruction 2017 - 5 Comprehensive Streets/Utility Improvements Section Summary CIP Section Assessment Other City Total Street 1,739,600$-$2,179,300$3,918,900$ Storm 120,000$-$2,872,000$2,992,000$ Wastewater 449,600$-$4,126,300$4,575,900$ Water 57,200$-$4,009,500$4,066,700$ Sidewalk 220,800$-$169,700$390,500$ Traffic -$-$135,000$135,000$ Total 2,587,200$-$13,491,800$16,079,000$ 2017 -$ -$ 4,444,400$Fund Amount -$Storm 2,992,000$ 11,634,600$Wastewater 4,575,900$ -$Water 4,066,700$ -$Total 11,634,600$ 16,079,000$ Project Project Total City Contribution Dickinson Avenue Reconstruction 1,073,900$883,700$ New York Avenue Reconstruction 3,199,000$2,734,000$ East Murdock Avenue Reconstruction 2,108,400$1,656,800$ Maricopa Drive Reconstruction 2,362,100$2,092,500$ State DOT Contributions Federal Grant Total Developer Contribution Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Total 16,079,000$13,491,800$ Sources of Funds General Fund (City Contribution) Lake Street Reconstruction 2,840,400$2,376,100$ 4,495,200$3,748,700$Bay Shore Drive Reconstruction 2017 - 6 Public Infrastructure Improvements - Other Streets Project Descriptions Asphalt Mill and Overlay Program (Annual)964,100$ Document/Study/Planning Document:N/A PASER Rating: Varies CIP Project Score: 85/200 Asset Life Span: 10 Years Project restores the asphalt surface of existing streets to a very good condition. Work can include curb and gutter repair; stone base course; and spot repairs to sanitary sewer, storm sewer, and water main systems. CIP Section Assessment Other City Total Street 243,500$-$325,600$569,100$ Storm -$-$320,000$320,000$ Wastewater -$-$50,000$50,000$ Water -$-$25,000$25,000$ Sidewalk -$-$-$-$ Total 243,500$-$720,600$964,100$ Concrete Pavement Repairs (Annual)335,000$ Document/Study/Planning Document:N/A PASER Rating: Varies CIP Project Score: 85/200 Asset Life Span: 10 Years Spot repairs to deteriorated panels of concrete pavement will be made on various arterial, collector, and local streets. Some work will be done in coordination with sanitary manhole rehabilitation project. CIP Section Assessment Other City Total Street -$-$275,000$275,000$ Storm -$-$30,000$30,000$ Wastewater -$-$15,000$15,000$ Water -$-$15,000$15,000$ Sidewalk -$-$-$-$ Total -$-$335,000$335,000$ 2017 - 7 Public Infrastructure Improvements - Other Streets Project Descriptions 492,500$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 45/200 Asset Life Span: 1 Year Up-front engineering services to help in the design of 2018 CIP projects. CIP Section Assessment Other City Total Street -$-$20,000$20,000$ Storm -$-$275,000$275,000$ Wastewater -$-$185,000$185,000$ Water -$-$12,500$12,500$ Sidewalk -$-$-$-$ Total -$-$492,500$492,500$ Environmental Assessments, Subsurface Explorations, and Storm and Sanitary Sewer Televising for 2018 Construction Projects 2017 - 8 Public Infrastructure Improvements - Other Streets Section Summary CIP Section Assessment Other City Total Street 243,500$-$620,600$864,100$ Storm -$-$625,000$625,000$ Wastewater -$-$250,000$250,000$ Water -$-$52,500$52,500$ Sidewalk -$-$-$-$ Total 243,500$-$1,548,100$1,791,600$ 2017 -$ -$ -$ -$ -$ 864,100$Fund Amount -$Storm 625,000$ 927,500$Wastewater 250,000$ -$Water 52,500$ -$Total 927,500$ Previously Borrowed -$ 1,791,600$ Project Project Total City Contribution Asphalt Mill and Overlay Program (Annual)964,100$720,600$ Concrete Pavement Repairs (Annual)335,000$335,000$ Environmental Assessments, Subsurface Explorations, and Storm and Sanitary Sewer Televising for 2018 492,500$492,500$ Total 1,791,600$1,548,100$ State DOT Contributions Sources of Funds General Fund (City Contribution) Storm Water Utility Fund Contribution Wastewater Utility Fund Contribution Water Utility Fund Contribution Federal Grant Total Developer Contribution Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds 2017 - 9 Public Infrastructure Improvements - Storm Water Utility Project Descriptions South Park Area Basin Retrofit 4,930,000$ Document/Study/Planning Document:Stringham Watershed Storm PASER Rating: N/A Water Plan, South Park Master Plan CIP Project Score: 120/200 Asset Life Span: 40 Years This project includes dredging and reconfiguration of the lagoons in South Park. Project also includes numerous improvements to the landscaping in and around the lagoons and the replacement/upgrade of walkways and handicap access around the lagoons. The historic stone bridge will be protected and preserved throughout the construction. Multiple storm sewers crisscrossing the park are structurally in bad condition and will be consolidated into new storm sewers. Storm and other utility improvements will be made in Georgia Street and in South Park Avenue to accommodate the new storm sewers. In conjunction with this work, the Parks Department has been involved with the design of this project to incorporate components of the South Park Master Plan. Fountains/aerators will be installed in lagoons and an observation/fishing deck will be constructed. Shoreline stabilization is also incorporated into the plan.The cost for the lagoon improvements and the park amenities is included in the Park Improvements section of the 2017 CIP. CIP Section Assessment Other City/Utility Total Street -$-$-$-$ Storm -$-$4,930,000$4,930,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$4,930,000$4,930,000$ 2017 - 10 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Wetland Mitigation Bank Development Land Acquisition 2,000,000$ Document/Study/Planning Document:Wetland Bank Feasibility PASER Rating: N/A Study (2016) Stantec CIP Project Score: 90/200 Asset Life Span: 40 Years The goal of this project is to establish a wetland bank for City projects and for development within the City. The project will convert 40 acres or more of land back to wetlands. This will allow the City to purchase wetland credits at or below current market rates and allow development in the City of Oshkosh to fill on-site wetlands to make maximum economic use of their property. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$600,000$1,400,000$2,000,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$600,000$1,400,000$2,000,000$ Sawyer Creek Watershed Study 300,000$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 85/200 Asset Life Span: 5 years Updated Sawyer Creek Watershed storm water study to identify additional flood mitigation strategies. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$300,000$300,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$300,000$300,000$ 2017 - 11 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Storm Sewer in Easement 245,000$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 60/200 Asset Life Span: 75-100 Years A storm sewer is proposed from Eichstadt Road to Logan Drive. This storm sewer is needed to provide service to a proposed residential subdivision. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$245,000$245,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$245,000$245,000$ Mini Storm Sewers/Storm Laterals (Annual)400,000$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 60/200 Asset Life Span: 75-100 Years Provide mini storm sewers and laterals to property owners that have requested them. The laterals allow property owners to connect to the storm sewer system without discharging water over the sidewalk. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$400,000$400,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$400,000$400,000$ 2017 - 12 Public Infrastructure Improvements - Storm Water Utility Previously Funded but Not Constructed Washburn Water Quality Basin Construction 400,000$ Document/Study/Planning Document:N/A PASER Rating: N/A Construction/expansion of detention basin to provide increased water quality benefits. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$400,000$400,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Parks -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$400,000$400,000$ 2017 - 13 Public Infrastructure Improvements - Storm Water Utility Section Summary CIP Section Assessment Other City/Utility Total Street -$-$-$-$ Storm -$600,000$7,275,000$7,875,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$600,000$7,275,000$7,875,000$ 2017 -$ -$ -$ -$Fund Amount -$Storm 7,275,000$ 7,275,000$Wastewater -$ -$Water -$ -$Total 7,275,000$ -$ 600,000$ 7,875,000$ Storm Sewer in Easement 245,000$245,000$ Project Project Total City/Utility Contribution South Park Area Basin Retrofit 4,930,000$4,930,000$ Wetland Mitigation Bank Development Land Acquisition 2,000,000$1,400,000$ Sawyer Creek Watershed Study 300,000$300,000$ General Obligation Notes Revenue Bonds Sources of Funds General Fund (City Contribution) Storm Water Utility Fund Contribution Developer Contribution Debt Financing: General Obligation Bonds Total State DOT Contributions Federal Grant State Grant City of Neenah Match Mini Storm Sewers/Storm Laterals (Annual)400,000$400,000$ Total 7,875,000$7,275,000$ 2017 - 14 Public Infrastructure Improvements - Water Utility Project Descriptions West Murdock Avenue Water Main Relays 1,533,000$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 95/200 Asset Life Span: 75-100 Years Replace existing 6" water main with 8" water main,from Algoma Boulevard to Vinland Street. The existing water main has had a large amount of breaks and its replacement was requested by the Water Distribution Division. Age of Infrastructure: Water - Pre-1920's, 1954, and 1962 CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$1,533,000$1,533,000$ Sidewalk -$-$-$-$ Total -$-$1,533,000$1,533,000$ Clairville Road Water Main Loop 1,406,800$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 90/200 Asset Life Span: 75-100 Years Loop water main from Southwest Industrial Park to West 20th Avenue for increased fire flows. Age of Infrastructure: Water - None Present CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$1,406,800$1,406,800$ Sidewalk -$-$-$-$ Total -$-$1,406,800$1,406,800$ 2017 - 15 Public Infrastructure Improvements - Water Utility Project Descriptions West 6th Avenue Water Main Relays 446,800$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 100/200 Asset Life Span: 75-100 Years Replace existing 6" water main with 8" water main,from Reichow Street to Eagle Street. The existing water main has had a large amount of breaks and its replacement was requested by the Water Distribution Division. Age of Infrastructure: Water - Pre-1920's and 1959 CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$446,800$446,800$ Sidewalk -$-$-$-$ Total -$-$446,800$446,800$ Miscellaneous Lead Service Replacements 100,000$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 95/200 Asset Life Span: 75-100 Years As sanitary sewer laterals are relayed, if lead water services are discovered, these services will be replaced under the Lead Abatement Program. Age of Infrastructure: Water - Varies CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$100,000$100,000$ Sidewalk -$-$-$-$ Total -$-$100,000$100,000$ 2017 - 16 Public Infrastructure Improvements - Water Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$3,486,600$3,486,600$ Sidewalk -$-$-$-$ Total -$-$3,486,600$3,486,600$ 2017 -$ -$ -$ -$Fund Amount -$Storm -$ 3,486,600$Wastewater -$ -$Water 3,486,600$ -$Total 3,486,600$ -$ 3,486,600$ 3,486,600$ West 6th Avenue Water Main Relays Project Project Total Utility Contribution West Murdock Avenue Water Main Relays 1,533,000$1,533,000$ 446,800$446,800$ Miscellaneous Lead Service Replacements 100,000$100,000$ Clairville Road Water Main Loop 1,406,800$1,406,800$ Total 3,486,600$ Total Sources of Funds General Fund (City Contribution) Water Utility Fund Contribution Developer Contribution Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Special Assessments State DOT Contributions Federal Grant 2017 - 17 Public Infrastructure Improvements - Wastewater Utility Project Descriptions Oregon Street Interceptor Sewer 4,352,800$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 120/200 Asset Life Span: 75-100 Years Construction of new interceptor sewer, from West 8th Avenue to West 16th Avenue, for future southside development. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 151,700$-$4,201,100$4,352,800$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 151,700$-$4,201,100$4,352,800$ Oshkosh Avenue Area Sanitary Sewer Re-Route 3,873,100$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 90/200 Asset Life Span: 75-100 Years Re-route sanitary sewer along Oshkosh Avenue, from North Westfield Street to Eagle Street for new lift station. Recently updated components from the Punhoqua area lift station will be reused in the new location. Sanitary: 1894 CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 18,500$-$3,854,600$3,873,100$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 18,500$-$3,854,600$3,873,100$ Age of Infrastructure: 2017 - 18 Public Infrastructure Improvements - Wastewater Utility Project Descriptions 1,000,000$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 110/200 Asset Life Span: 75-100 Years Work includes identification and elimination of clear water entering the sanitary sewer system and implementation of CMOM/SECAP recommendations. Work can include manhole inspections and repairs, flow monitoring, and/or sewer lining or replacement. Sanitary sewer lining and grouting of laterals and mainline will be performed in areas that have newer concrete streets with aging sanitary sewer infrastructure. Televising inspections will be used to determine the areas of work. This helps to remove clear water from the sanitary sewer system. Clear water entering the sanitary system is a significant problem. The sanitary sewer system is not designed to handle these flows. The result of the excess flow is sanitary sewer backups into residents' homes. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 62,500$-$937,500$1,000,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 62,500$-$937,500$1,000,000$ Inflow/Infiltration Removal, Sanitary Sewer Rehabilitation, and Emergency Sanitary Sewer Repairs 2017 - 19 Public Infrastructure Improvements - Wastewater Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 232,700$-$8,993,200$9,225,900$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 232,700$-$8,993,200$9,225,900$ 2017 -$ 3,873,100$ -$ -$Fund Amount -$Storm -$ 5,352,800$Wastewater 9,225,900$ -$Water -$ -$Total 9,225,900$ -$ 9,225,900$ Inflow/Infiltration Removal, Sanitary Sewer Rehabilitation, and Emergency Sanitary Sewer Repairs 1,000,000$937,500$ 8,993,200$ Project Project Total Utility Contribution Oshkosh Avenue Area Sanitary Sewer Re-Route 3,873,100$3,854,600$ Oregon Street Interceptor Sewer 4,352,800$4,201,100$ Total 9,225,900$ Federal Grant Previously Borrowed Total General Obligation Bonds General Obligation Notes Revenue Bonds State DOT Contributions Sources of Funds General Fund (City Contribution) Wastewater Utility Fund Contribution Developer Contribution Debt Financing: 2017 - 20 Public Infrastructure Improvements - Sidewalks Project Descriptions Sidewalk Rehabilitation and Reconstruction Program 750,000$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 95/200 Asset Life Span: 10 Years Program rotates through the City on a 10-year cycle to repair defective sidewalk squares. Program also includes citizen complaint locations. Handicap ramps are installed at intersections currently without ramps. Program will also fix deteriorated driveway aprons. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 550,000$-$200,000$750,000$ Total 550,000$-$200,000$750,000$ Sidewalk: New Walk Ordered In 100,000$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 55/200 Asset Life Span: 10 Years Install new sidewalk along street segments without sidewalk. Selection to be coordinated through Pedestrian/Bicycle committee. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 92,500$-$7,500$100,000$ Total 92,500$-$7,500$100,000$ Sidewalk: Subdivision Agreements 55,000$ Document/Study/Planning Document:N/A PASER Rating: N/A CIP Project Score: 60/200 Asset Life Span: 10 Years Install sidewalks at various locations within newer subdivisions. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 50,000$-$5,000$55,000$ Total 50,000$-$5,000$55,000$ 2017 - 21 Public Infrastructure Improvements - Sidewalks Section Summary CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 692,500$-$212,500$905,000$ Total 692,500$-$212,500$905,000$ 2017 -$ -$ -$Fund Amount 905,000$Storm -$ -$Wastewater -$ -$Water -$ -$Total -$ 905,000$ Project Project Total City Contribution Sidewalk Rehabilitation and Reconstruction Program 750,000$200,000$ Sidewalk: New Walk Ordered In 100,000$ Total 905,000$ 7,500$ Sidewalk: Subdivision Agreements 55,000$5,000$ Federal Grant Total General Obligation Notes 212,500$ Sources of Funds General Fund (City Contribution) Revenue Bonds State DOT Contributions Developer Contribution Debt Financing: General Obligation Bonds 2017 - 22 Traffic Improvements Project Descriptions Bicycle and Pedestrian Infrastructure 50,000$ Document/Study/Planning Document:2011 Pedestrian and Bicycle Circulation Plan CIP Project Score: 60/200 Asset Life Span: 10 Years Provide designated funds for bicycle and pedestrian infrastructure improvements. Primary improvements will be bicycle lane striping and symbols, bike facility signage for existing and future routes, improving sidewalks and curb cuts, shared lane markings, and constructing bike paths. Traffic Signals 45,000$ Document/Study/Planning Document:N/A CIP Project Score: 110/200 Asset Life Span: 20 Years This item pays for traffic signal equipment to be installed at various intersections as needed, in order to repair knockdowns and/or replace obsolete equipment. Typical purchases include poles, cabinets, controllers, and vehicle detection equipment. Knapp Street and West 20th Avenue Traffic Signals 40,000$ Document/Study/Planning Document: N/A CIP Project Score: 65/200 Asset Life Span: 20 Years Reconstruct traffic signals at Knapp Street, south of West 20th Avenue. The current infrastructure is over 25 years old. The fiber is currently on WPS poles. The southside of Knapp Street is being reconstructed in conjunction with an FAA airport project. Storm sewer work is also being done. As part of this reconstruction, we will need to relocate the fiber running to the airport fire station and reconstruct traffic signals on the south side of West 20th Avenue. The project will require us to temporarily relocate the service and control cabinet to the north side of West 20th Avenue during the construction. We will be replacing all underground conduits, signal bases, and aboveground signal equipment, as it is outdated. All work will be done with in-house staff, as the project was already bid in 2016. We will also be actuating the traffic signals as part of this project. Pedestrian Countdown Signal Heads 15,000$ Document/Study/Planning Document:2011 Bicycle and Pedestrian Circulation Plan CIP Project Score: 95/200 Asset Life Span: 10 Years This project facilitates a system-wide replacement of the City's pedestrian signal heads with number countdown heads. There are 55 intersections in the City with pedestrian crossings (there are 62 intersections in the City, 7 do not have pedestrian crossings). The City's existing pedestrian signal heads are experiencing LED failure, which is reducing their effectiveness. The 2009 MUTCD requires new signal heads must incorporate a countdown time. This project will upgrade the signal heads at other locations where pedestrian volume warrants improved signal infrastructure. 2017 - 23 Traffic Improvements Project Descriptions LED Signal Head Replacement 10,000$ Document/Study/Planning Document:N/A CIP Project Score: 85/200 Asset Life Span: 10 Years This item will involve replacement of LED signal heads at City-maintained traffic signals. 2017 - 24 Traffic Improvements Section Summary 2017 105,000$ -$ 55,000$ -$ -$ 160,000$ 15,000$ Project Project Total City Contribution Bicycle and Pedestrian Infrastructure 50,000$50,000$ Knapp Street and West 20th Avenue Traffic Signals 40,000$40,000$ Traffic Signals 45,000$45,000$ Pedestrian Countdown Signal Heads 15,000$ Total Sources of Funds General Fund (City Contribution) Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Federal Grant Total 160,000$160,000$ LED Signal Head Replacement 10,000$10,000$ 2017 - 25 Park Improvements Project Descriptions South Park Lagoon Improvements and Park Amenities 200,000$ Document/Study/Planning Document:Stringham Watershed Storm Water Plan, South Park Master Plan CIP Project Score: 115/200 Asset Life Span: 50 Years This project includes dredging and reconfiguration of the lagoons in South Park. Project also includes numerous improvements to the landscaping in and around the lagoons and the replacement/upgrade of walkways and handicap access around the lagoons. The historic stone bridge will be protected and preserved throughout the construction. Multiple storm sewers crisscrossing the park are structurally in bad condition and will be consolidated into new storm sewers. Storm and other utility improvements will be made in Georgia Street and in South Park Avenue to accommodate the new storm sewers. In conjunction with this work, the Parks Department has been involved with the design of this project to incorporate components of the South Park Master Plan. Fountains/aerators will be installed in lagoons and an observation/fishing deck will be constructed. Shoreline stabilization is also incorporated into the plan.The cost for the South Park area basin retrofit is included in the Public Infrastructure Improvements - Storm Water utility section of the 2017 CIP. Mary Jewell Park Restroom/Shelter Building 200,000$ Document/Study/Planning Document:Comprehensive Outdoor Donations:25,000$ Recreation Plan CIP Project Score: 70/200 Asset Life Span: 50 Years The Comprehensive Outdoor Recreation Plan recommends a restroom facility for Mary Jewell Park. A wastewater facility/pump house is being considered for construction in Mary Jewell Park. In discussions with Engineering staff, Lakeshore Municipal Golf Course staff, and the Advisory Park Board, the construction of a restroom/shelter facility attached to the pump house is being recommended. $ 130,300 Document/Study/Planning Document:Park and Open Space Plan and Comprehensive Outdoor Recreation Plan CIP Project Score: 85/200 Asset Life Span: 15 Years The Park and Open Space Plan for the City recommends, as a high priority, an ADA-accessible route to the play structure; an accessible perimeter walk around the play structure; and the replacement of the play equipment at Fugleberg Park. The equipment was installed in 1999. The project will also include installation of poured-in-place rubberized surfacing that is safer, more accessible, more durable, and requires less maintenance than the existing wood fiber used in the playgrounds. Fugleberg Park Play Equipment, Surfacing Accessible Route, and Perimeter Walk 2017 - 26 Park Improvements Project Descriptions Teichmiller Park Restrooms Update 120,000$ Document/Study/Planning Document:Comprehensive Outdoor Recreation Plan CIP Project Score: 110/200 Asset Life Span: 50 Years The restrooms at Teichmiller Park are in very poor condition, as noted in the updated Comprehensive Outdoor Recreation Plan, as well as in citizen surveys for the Plan update. The project will include updating the entire restroom building, including new plumbing, lighting, fixtures, ceiling, walls, partitions, etc., to be ADA-compliant. Abe Rochlin Park Lighting 50,000$ Document/Study/Planning Document:Comprehensive Outdoor Recreation Plan CIP Project Score: 65/200 Asset Life Span: 25 Years The lights in Abe Rochlin Park are some of the oldest in the park system. The replacement of site lighting at Abe Rochlin Park is ranked as a high priority in the CORP. 2017 - 27 Park Improvements Section Summary 2017 50,000$ 625,300$ -$ -$ 25,000$ 700,300$ Teichmiller Park Restrooms Update 120,000$120,000$ City Contribution 130,300$ 175,000$ 200,000$ Fugleberg Park Play Equipment, Surfacing Accessible Route, and Perimeter Walk Project Project Total Mary Jewell Park Restroom/Shelter Building 200,000$ South Park Lagoon Improvements and Park Amenities 200,000$ 130,300$ 50,000$Abe Rochlin Park Lighting 50,000$ Total General Obligation Bonds General Obligation Notes Revenue Bonds 675,300$ General Fund (City Contribution) Debt Financing: Total 700,300$ Donations Sources of Funds 2017 - 28 Public Property Improvements - Non-Utility Project Descriptions Community Development: Blight Removal for Neighborhood Redevelopment 300,000$ Document/Study/Planning Document:Strategic Plan/Comprehensive Plan CIP Project Score: 50/200 Asset Life Span: 10 Years Acquisition, demolition, and remediation of various sites with WDNR permitting/site closure, if required. Great Neighborhoods Initiative 175,000$ Document/Study/Planning Document:Healthy Neighborhood Initiative/ Strategic Plan/Comprehensive Plan CIP Project Score: 100/200 Asset Life Span: 20 Years Construct neighborhood improvements that support the Healthy Neighborhood Initiative in concert with Neighborhood Associations and neighborhood improvement partners. Projects are located in the right-of-way or on public property, and include streetscape improvements and signage, pedestrian and bicycle safety improvements, park improvements, safe routes to school improvements, and others identified and approved by the City Council. Riverwalk Signage 25,000$ Document/Study/Planning Document:Riverwalk Corridor Design Guidelines CIP Project Score: 60/200 Asset Life Span: 10-20 Years Purchase and installation of riverwalk signage and banners, way-finding signage, kiosks, and park regulations. Fire Department: Fire Station 17, 18, and 19 Floor Replacement 51,000$ Document/Study/Planning Document:N/A CIP Project Score: 70/200 Asset Life Span: 30+ Years Fire Stations 17, 18, and 19 were built in 1997, 1998, and 1999 respectively. The floors in the hallways, offices, and kitchens in these stations were done in vinyl floor tile. This tile is beginning to wear and peel up, and requires a great deal of maintenance to retain an acceptable appearance. General Services: Roofing/HVAC Improvements 500,000$ Document/Study/Planning Document:2009 McKinstry Assessment and 2010 SEG Roofing Assessment CIP Project Score: 70/200 Asset Life Span: 20-30 Years Ongoing program to address improvements for roofing and HVAC projects, based on McKinstry/Summit Designs HVAC Inventory Assessment and Specialty Engineering Group Roofing Inventory Assessment. Projects are prioritized annually based on condition. 2017 - 29 Public Property Improvements - Non-Utility Project Descriptions 260,000$ Document/Study/Planning Document:2015 DesignWise OCC Room Tax Line of Credit:260,000$ Master Plan CIP Project Score: 65/200 Asset Life Span: 10-15 Years The 2015 Design Wise OCC Master Plan was the output of several months of planning between City staff and the Best Western Premier Hotel owners to identify short and long-term replacement planning priority recommendations. The plan's first recommendation is to replace the frayed, torn, and worn carpet throughout the OCC facility and to upgrade the dated, interior-design elements, including the paint, wallpaper, sconces, and lobby furnishings. While these items were installed in 2008-2009, they are already tired and dated compared to hospitality/conference industry standards (interior makeovers are recommended every 7 years). Oshkosh Convention Center Parking Ramp Improvements 60,000$ Document/Study/Planning Document:N/A CIP Project Score: 85/200 Asset Life Span: 15-20 Years The downtown ramp, connected to the downtown hotel, was constructed in 1985 and is owned by the City. As part of the City's obligations for the ramp, the City contracted with Carl Walker Engineering to determine the long-term maintenance/improvements for the ramp. In 2016, Carl Walker will be contracted to provide bid specifications for the following ramp improvements: silane sealer work, grade-level asphalt maintenance, and drain piping repairs/upgrades. Grand Opera Building Envelope Improvements 30,000$ Document/Study/Planning Document:N/A CIP Project Score: 60/200 Asset Life Span: 15 Years Library: Library Building Envelope Project - Stone Replacement 330,000$ Document/Study/Planning Document:Facility Engineering, Inc. Study dated June 15, 2012 by Tom Gernetzke of Madison, WI. Updated with building inspection and memo dated 4/10/2015. CIP Project Score: 95/200 Asset Life Span: 40 Years Replace and repair failing stone elements on 2 architectural bands on the exterior of the library building. This is the second phase of a two-phase project. The first phase was completed in 2014, which included removing and replacing 9,000 linear feet of sealants for all exterior stone panels. The Grand Opera House is in need of various building envelope improvments around the building exterior Oshkosh Convention Center (OCC) Carpet Replacement and Design Elements Upgrade 2017 - 30 Public Property Improvements - Non-Utility Project Descriptions Replacement of Vinyl Flooring 38,000$ Document/Study/Planning Document:N/A CIP Project Score: 65/200 Asset Life Span: 20 Years The current flooring was installed in 1994 when the library addition was constructed. Vinyl tiles are cracked and/or peeling due to building movement and traffic. Museum: Implement People of the Waters Exhibit 200,000$ Document/Study/Planning Document:1999-2013 Assessments and Donations:200,000$ Strategic Plan CIP Project Score: 90/200 Asset Life Span: 15+ Years Replace the current 2,000 square foot Wetlands and Waterways exhibit, opened in 1998, with People of the Waters. This is an interactive and immersive exhibit that ties to the interpretve themes of the Fox Wisconsin Heritage Parkway and connects to school curriculum. The current exhibit is outdated and has lost its audience appeal. The gallery does not have the infrastructure necessary to sustain new exhibit technologies and it would be extraordinarily difficult to retrofit the gallery with an existing exhibit in place. New interactive exhibits are key to a reinvigorated museum designed to serve new generations. This project began with conceptual design (2014), design development (2015) and start of construction (2017). 60,000$ Document/Study/Planning Document:Museum's strategic plan (2013); various planning studies and assessments 2007-2013 CIP Project Score: 70/200 Asset Life Span: 30+ Years This is the first phase of work associated with new exhibitions in the renovated Steiger Wing entrance and the second floor Memories & Dreams exhibition gallery. Conceptualization of new exhibitions must be done at the same time as the architect's work on the entrance revision to ensure the two designs (exhibition and building) work together and include the necessary infrastructure and functional design. The Memories & Dreams gallery will be impacted by the Steiger Wing changes and thus it is cost effective to do the exhibition planning for both projects simultaneously. Creating the next-generation Memories & Dreams exhibition is scheduled for 2019 and 2020. Steiger Wing Entrance and Memories & Dreams Gallery Exhibition Design 2017 - 31 Public Property Improvements - Non-Utility Project Descriptions 20,000$ Document/Study/Planning Document:Museum's strategic plan (2013); various planning studies and assessments 2007-2013 CIP Project Score: 65/200 Asset Life Span: 30+ Years Conceptual planning to enlarge and renovate the 1982 Steiger Wing entrance. This is the first step and will determine the project's size, scope, and cost. Renovation is plannned for 2018. Included will be larger lobby, visitor restrooms and amenities, and a freight or loading elevator to the second floor gallery. The entrance must be designed to have minimum impact on the archives, which is directly below the entrance. Parks: Cemetery Roads Repaving 25,000$ Document/Study/Planning Document:N/A CIP Project Score: 60/200 Asset Life Span: 15 Years Re-pave deteriorating access roads in Riverside Cemetery. In 2009, 2013, and 2015, funds were allocated. The roads continue to be in very poor condition. Police: Public Safety Building Parking Lot Fence 175,000$ Document/Study/Planning Document:N/A CIP Project Score: 95/200 Asset Life Span: 30 Years Fencing and secure gate access around the emergency vehicles located between the Safety Building and City Hall. When the parking lot was reconfigured for the Safety Building, this fence was cut from the initial parking lot project. Most of the infrastructure was put in place at that time, but cost would now be incurred for the fence, openers, installation, and wiring. Safety Building Locker Room Renovations 120,000$ Document/Study/Planning Document:N/A CIP Project Score: 90/200 Asset Life Span: 20 Years The men's and women's locker rooms have received no major updates since the Safety Building was opened in approximately 1980. This project will add new and larger lockers in each room to accommodate staff needs that include updated equipment and technology that modern police officers carry that were not used 35 years ago when these lockers were installed. It will update toilets, sinks, and showers in each room. It will also add square footage to the women's locker room, which is considerably smaller in size than the men's room, allowing us to accommodate our female officers. Steiger Wing Entrance Renovation Architect's Conceptual Planning 2017 - 32 Public Property Improvements - Non-Utility Project Descriptions Public Works: Landfill Gas Remediation 500,000$ Document/Study/Planning Document:N/A CIP Project Score: 70/200 Asset Life Span: 10 Years Complete investigation of methane generation, design of remediation system, and/or land acquisition at 2 former quarries filled with refuse from City, south of 17th Avenue, between Knapp Street and Sanders Street. Transportation: Parking Lot Improvements 600,000$ Document/Study/Planning Document:2014 Jewell Assessment of Previously Borrowed 100,000$ Municipal Parking Lots but not Constructed: CIP Project Score: 90/200 Asset Life Span: 20 Years This is an annual amount budgeted to fund the reconstruction of municipal parking lots. Projects are prioritized based on PASER rating and usage. The plan is to reconstruct the Washburn Fire Station lot in 2017. Other possible parking lots include the reconstruction of Otter East, Quarry Park, 10th Avenue, and South Park Lot 1 (shelter lot). Purchase of Streetlighting Poles 25,000$ Document/Study/Planning Document:N/A CIP Project Score: 80/200 Asset Life Span: 20 Years The City owns over 1,000 streetlighting poles. While these poles are expected to have a long, serviceable life, we do lose poles through damage from car accidents (about half of which unrecoverable). In addition, we are trying to expand the number of City-owned poles. This project would help to increase our inventory for both replacement of varying types of lighting poles we have and to allow for future expansion. LED Streetlighting Upgrades 10,000$ Document/Study/Planning Document:N/A CIP Project Score: 100/200 Asset Life Span: 20 Years This project would replace high-pressure sodium (HPS) lights at various locations with LED lighting. HPS lights have a 3-5 year life span and are not typically replaced within a CIP. LED lamps, conversely, are expected to last 10-20 years and therefore qualify as a capital improvement. 2017 - 33 Public Property Improvements - Non-Utility Section Summary 2017 260,000$ -$ -$ -$ 2,684,000$ -$ -$ -$ -$ 200,000$ 260,000$ 100,000$ 3,504,000$ 500,000$ Landfill Gas Remediation 500,000$500,000$ Purchase of Streetlighting Poles 25,000$25,000$ 25,000$ 120,000$ Cemetery Roads Repaving Safety Building Locker Room Renovations 25,000$ 120,000$ 38,000$ Steiger Wing Entrance Renovation Architect's Conceptual Planning 20,000$20,000$ Library Building Envelope Project - Stone Replacement Replacement of Vinyl Flooring 330,000$330,000$ 38,000$ Steiger Wing Entrance and Memories & Dreams Gallery Exhibition Design 60,000$60,000$ Implement People of the Waters Exhibit $ 200,000 -$ 300,000$300,000$ Project Project Total City Contribution 175,000$175,000$ Room Tax Line of Credit Riverwalk Signage 25,000$25,000$ Fire Station 17, 18, and 19 Floor Replacement 51,000$51,000$ Public Safety Building Parking Lot Fence 175,000$175,000$ Parking Lot Improvements 600,000$ Blight Removal for Neighborhood Redevelopment 500,000$500,000$ Grand Opera Building Envelope Improvements 30,000$30,000$ Oshkosh Convention Center (OCC) Carpet Replacement and Design Elements Upgrade 260,000$-$ Oshkosh Convention Center Parking Ramp Improvements 60,000$60,000$ 10,000$10,000$ Perpetual Care Fund Contribution Transit Fund Contribution Total 3,504,000$2,944,000$ Sources of Funds General Fund (City Contribution) Donations Total Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds State Trust Fund Loan Federal Grant Previously Borrowed State Grant LED Streetlighting Upgrades Roofing/HVAC Improvements Great Neighborhoods Initiative 2017 - 34 Public Property Improvements - Utility Project Descriptions Seal Aeration Tank Side Gates (Wastewater)75,000$ Document/Study/Planning Document:N/A CIP Project Score: 85/200 Asset Life Span: 20 Years This is to seal the side effulent channels that are no longer in use to protect the integrity of the tank and the existing concrete from exposure and damage. Roof Repairs for WWTP Complex (Wastewater)30,000$ Document/Study/Planning Document:N/A CIP Project Score: 55/200 Asset Life Span: 20 Years Repair several areas of our membrane roof that are fatigued due to age and exposure in order to protect infrastructure and equipment from water damage. Marion Road Water Tower Construction (Water Filtration)750,000$ Document/Study/Planning Document: CIP Project Score: 120/200 Asset Life Span: 70 Years Existing tower was constructed in 1936 and has reached the end of its usefule life expectancy. This is the completion of the construction that was started in 2016. Replace WFP Membrane Roof (Water Filtration)225,000$ Document/Study/Planning Document: CIP Project Score: 45/200 Asset Life Span: 20 Years Membrane roof was installed in 1999 and is in need of replacement. Roof has been repaired, but continues to have leaking issues. 2017 - 35 Public Property Improvements - Utility Projects Funded in Prior Years but Not Constructed Clearwell Replacement (Water Filtration)900,000$ Document/Study/Planning Document:WDNR 2007 Sanitary Survey; 2014 CH2M HILL Study The Water Filtration Plant clearwells store treated water prior to pumping into the water distribution system. The north and middle clearwells were installed in 1916 and the south clearwell was installed in the 1950's. These structures have exceeded their useful life and no longer meet WDNR Code requirements for in-ground water storage structures and need to be replaced. 2017 - 36 Public Property Improvements - Utility Section Summary 2017 -$ 30,000$ -$ -$Fund Amount -$Storm -$ 1,050,000$Wastewater 105,000$ 1,080,000$Water 975,000$ Total 1,080,000$ Project Project Total Utility Contribution Seal Aeration Tank Side Gates (Wastewater)75,000$75,000$ Total 1,080,000$1,080,000$ Roof Repairs for WWTP Complex (Wastewater)30,000$30,000$ Marion Road Water Tower Construction (Water Filtration)750,000$750,000$ Replace WFP Membrane Roof (Water Filtration)225,000$225,000$ Total Sources of Funds General Fund (City Contribution) Wastewater Utility Fund Contribution Water Utility Fund Contribution Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds 2017 - 37 Major Equipment Amount City Contribution 175,000$175,000$ 175,000$175,000$ 120,000$120,000$ 105,000$105,000$ 85,000$85,000$ 80,000$-$ 10,000$10,000$ 29,000$29,000$ 18,000$17,000$ 377,000$377,000$ 750,000$750,000$ 300,000$300,000$ 250,000$90,000$ 65,000$65,000$ 30,000$30,000$ 25,000$25,000$ 2,594,000$2,353,000$ Major Equipment Self-Contained Breathing Apparatus Replacement Department General Services Fire Department General Services General Services General Services General Services General Services Wastewater Wastewater Wastewater Wastewater Wastewater Street Wastewater Water Filtration Street Total 2017 Major Equipment Anaerobic Digester Mixing Upgrade Bar Screen Rail Replacement Replace Centrate Pumps Replace Recycle Water System Pumps Replace Dissolved Aeration Flotation Thickner Drives Project Contingency (if no funds from SBA) Project Contingency (Major Vehicle Replcement) Project Contingency Safety Building Emergency Generator Replacement (Facilities) Government Meeting Coverage Equipment Replacement Office Furniture Road Saw (replaces #201, 1998) Router (replaces #261, 1991) Water Filtration Plant Heat Boiler Replacement Grit System Classifier Replacement Construction 2017 - 38 Major Equipment Section Summary 2017 585,000$ -$Fund Amount Storm -$ -$Wastewater 1,260,000$ 131,000$Water 377,000$ 1,637,000$Total 1,637,000$ -$ 160,000$ -$ 1,000$ 80,000$ 2,594,000$ Trade-In Total Sources of Funds General Fund (City Contribution) Wastewater Utility Fund Contribution Debt Financing: General Obligation Bonds Previously Borrowed Donations General Obligation Notes Revenue Bonds Federal Grant Winnebago County/OASD 2017 - 39 Major Equipment - Vehicles Project Total City Contribution 45,000$45,000$ 25,000$25,000$ 43,000$43,000$ 78,000$78,000$ $ 25,000 $ 25,000 20,000$20,000$ 300,000$-$ 51,000$-$ 235,000$235,000$ 200,000$ $ 200,000 20,000$20,000$ 50,000$50,000$ 10,000$ $ 10,000 140,000$140,000$ 45,000$45,000$ 235,000$235,000$ Transportation 60,000$60,000$ Transportation 100,000$100,000$ 50,000$50,000$ 1,500,000$300,000$ 40,000$8,000$ 190,000$190,000$ 52,000$52,000$ 45,000$45,000$ 39,000$39,000$ 40,000$40,000$ 95,000$95,000$ 3,733,000$2,150,000$ Street Transportation Street Street Street Street Street Museum Major Equipment - Vehicles Crew Cab Pickup Truck (replaces 1999 Suburban) Service Van (replaces 1992 GMC Vandura) (Oshkosh Media) Pickup Truck (replaces 1998 GMC Safari Van) Mower (replaces #424, 2002 Jacobsen HR9016) Water FiltrationLift Truck Lift Station Service Truck with Hoist (replaces #976, 2002) Transportation Fire Department Department Parks General Services Parks Street Transportation Police Recycling Sanitation Street Total 2017 Major Equipment - Vehicles Wastewater Water Distribution Water Distribution Water Distribution Water Distribution 3/4-Ton CNG Full-Size Van (replaces #818, 2005 Van) Leaf Picker (replaces P15 Jacobsen 720E, P16 Rodgers, and P17 Gravely Pro-Vac) Upgrade Tactical Van Peterbilt with 31-Yard Labrie Packer Unit, (replaces #211, 2009) 3500 H.D. Chevrolet (replaces #202, 2001) Tandem Dump Truck with Stainless Steel Box, with Slide- In V-Box and Pre-Wet, Plow and Wing (replaces #60, 1997 GMC) Tractor (replaces #169, 1994 Tiger) New 5-Ton Equipment Trailer 5-Ton Truck with Box and Crane (replaces #21, 2002 IHC) Tandem Dump Truck with Stainless Steel Box, with Slide- In V-Box and Pre-Wet, Plow and Wing (replaces #65, 2004 IH) 1/2-Ton Extended Cab Pickup Truck with CNG (replaces #30, 2005 GMC) Hot Box (replaces #263, 2005 Stepp) Finish Roller, (replaces #160, 2002 Wacker) Electric Service Van (replaces #505, 1995) (Electrical) Utility Truck with Hydraulic Pounder and Boom (replaces #508, 1998 (Signs) New Paint Removal Machine (Signs) 3 - 35' Diesel Buses (replaces 2003) (Transit) Staff Van (replaces 2002 Chevrolet Astrovan) (Transit) CNG Tandem-Axle Dump Truck with Stainless Steel Dump Body (replaces #833, 2006) 3/4 Ton CNG or Leaded 4x4 Pickup truck with Service Body (replaces #820, 2005) Ditch Witch/Vac-All (replaces #812, 2005) 2017 - 40 Major Equipment - Vehicles Section Summary 2017 -$Fund Amount -$Storm -$ -$Wastewater 95,000$ Water 366,000$ -$Total 461,000$ 1,689,000$ 461,000$ 1,232,000$ 34,000$ 317,000$ 3,733,000$ General Fund (City Contribution) Wastewater Utility Fund Contribution Sources of Funds Total Water Utility Fund Contribution Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Federal Grant Trade-In Operating Budget 2017 - 41 Tax Increment Financing (TIF) Districts Improvements Project Descriptions Morgan District Riverwalk - West of Oregon Street Construction 1,500,000$ Document/Study/Planning Document:Fox River Corridor-Riverwalk Plan State Grant:750,000$ CIP Project Score: 100/200 Asset Life Span: 20 Years TID #7 Donation:750,000$ TIF: TID #20 and #21 Build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches, and signage. Land Acquisition - 43 East 7th Avenue 800,000$ Document/Study/Planning Document:South Shore Redevelopment TID #7 Donation:800,000$ Plan TIF: TID #20 CIP Project Score: 75/200 Asset Life Span: 20 Years Land acquisition of 43 East 7th Avenue, based on agreement with CHAMCO, for implementation of the Fox Riverwalk Plan, Downtown Action Plan, and South Shore Redevelopment Plan. Marion Road Redevelopment Area Remediation 620,000$ Document/Study/Planning Document:Marion Road TID #7 Donation:620,000$ Redevelopment Plan TIF: TID #21 CIP Project Score: 90/200 Asset Life Span: 20 Years In order to implement the redevelopment and revitalization of the Marion Road Redevelopment Area, environmental contamination at three sites within this area needs to be remediated. South Shore Redevelopment Sites 200,000$ Document/Study/Planned Document:Fox River Corridor-TID #7 Donation:200,000$ Riverwalk Plan TIF: TID #20 CIP Project Score: 105/200 Asset Life Span: 20 Years Land acquisition, demolition, and remediation of multiple sites in the South Shore Redevelopment Area including, but not limited to, blighted industrial, commercial, and residential sites. State Street Parking Lot Reconstruction 125,000$ Document/Study/Planned Document:N/A Developers' Agreement:125,000$ TIF: TID #30 CIP Project Score: 90/200 Asset Life Span: 30 Years This parking lot reconstruction is required as part of the Developers' Agreement with the developers of the Washington Building renovations/rehabilitation. 2017 - 42 Tax Increment Financing (TIF) Districts Improvements Section Summary 2017 -$ 125,000$ -$ -$ -$ 2,370,000$ -$ 750,000$ 3,245,000$ Project Project Total City Contribution Total Federal Grant Developer Contribution Total TID #7 Donations Revenue Bonds General Obligation Notes General Obligation Bonds Debt Financing: Sources of Funds General Fund (City Contribution) South Shore Redevelopment Sites 200,000$-$ -$ State Grant 3,245,000$-$ 1,500,000$Morgan District Riverwalk - West of Oregon Street 620,000$Marion Road Redevelopment Area Remediation -$800,000$Land Acquisition - 43 East 7th Avenue -$ State Street Parking Lot Reconstruction 125,000$-$ 2017 - 43 2017 CIP Summary CIP Section Assessment Other City/Utility Total Street 1,983,100$-$2,799,900$4,783,000$ Storm 120,000$600,000$10,772,000$11,492,000$ Wastewater 682,300$-$13,369,500$14,051,800$ Water 57,200$-$7,548,600$7,605,800$ Sidewalk 913,300$-$382,200$1,295,500$ Traffic -$-$135,000$135,000$ Total 3,755,900$600,000$35,007,200$39,363,100$ Public Infrastructure Improvements - Water Utility Public Infrastructure Improvements - Wastewater Utility Section Total City/Utility Contribution Comprehensive Streets/Utility Improvements 16,079,000$13,491,800$ Section 1,791,600$1,548,100$ Public Infrastructure Improvements - Storm Water Utility 7,875,000$7,275,000$ Public Infrastructure Improvements - Other Streets 675,300$ 9,225,900$8,993,200$ Public Infrastructure Improvements - Sidewalks 905,000$212,500$ 54,379,400$44,369,500$ Major Equipment - Vehicles 3,733,000$2,150,000$ Tax Increment Financing (TIF) Districts Improvements 3,245,000$-$ Total 3,486,600$3,486,600$ Major Equipment 2,594,000$2,353,000$ Public Property Improvements - Non-Utility 3,504,000$2,944,000$ Public Property Improvements - Utility 1,080,000$1,080,000$ Traffic Improvements 160,000$160,000$ Park Improvements 700,300$ 2017 - 44 2017 CIP Summary 2017 1,000,000$ 3,903,100$ -$ -$ 125,000$ 5,933,800$ 5,464,000$ 31,824,500$ -$ -$Fund Amount 1,232,000$Storm 10,892,000$ 750,000$Wastewater 15,511,800$ 2,370,000$Water 9,323,800$ 225,000$Total 35,727,600$ 260,000$ 600,000$ 35,000$ 317,000$ 260,000$ 80,000$ 54,379,400$ Donations City of Neenah Match Trade-In Operating Budget Perpetual Care Fund Contribution General Obligation Notes Room Tax Line of Credit Winnebago County/OASD Total State Grant Previously Borrowed Revenue Bonds Federal Grant TID #7 Donations State DOT Contributions State Trust Fund Loan Sources of Funds General Fund (City Contribution) Developer Contribution Debt Financing: General Obligation Bonds Utility Funds Contribution Transit Fund Contribution 2017 - 45 2017 Borrowing 2017 General Obligation Bonds TID Contribution General Obligation Notes State Trust Fund Loan General Fund Contribution Water Utility Sewer Utility Storm Utility Comprehensive Streets/Utility Improvements 4,444,400$-$-$-$-$-$-$-$-$ Public Infrastructure Improvements - Other Streets 864,100$-$-$-$-$-$-$-$-$ Public Infrastructure Improvements - Storm Water Utility -$-$-$-$-$-$-$-$-$ Public Infrastructure Improvements - Water Utility -$-$-$-$-$-$-$-$-$ Public Infrastructure Improvements - Wastewater Utility -$-$-$-$-$-$3,873,100$-$-$ Public Infrastructure Improvements - Sidewalks -$-$905,000$-$-$-$-$-$-$ Traffic Improvements -$-$55,000$-$105,000$-$-$-$-$ Park Improvements 625,300$-$-$-$50,000$-$-$-$-$ Public Property Improvements - Non-Utility -$-$2,684,000$-$260,000$-$-$-$-$ Public Property Improvements - Utility -$-$-$-$-$-$30,000$-$-$ Major Equipment -$-$131,000$-$585,000$-$-$-$-$ Major Equipment - Vehicles -$-$1,689,000$-$-$-$-$-$-$ Tax Increment Financing (TIF) District Improvements -$2,370,000$-$-$-$-$-$-$-$ Total 5,933,800$2,370,000$5,464,000$-$1,000,000$-$3,903,100$-$-$ General Obligation Bonds/Notes/State Fund Trust Loan Total:11,397,800$ General Obligation Bonds & TID Contribution Utility Funds Contribution Perpetual Care Fund Contribution 2017 - 46 2017 Borrowing 2017 Comprehensive Streets/Utility Improvements Public Infrastructure Improvements - Other Streets Public Infrastructure Improvements - Storm Water Utility Public Infrastructure Improvements - Water Utility Public Infrastructure Improvements - Wastewater Utility Public Infrastructure Improvements - Sidewalks Traffic Improvements Park Improvements Public Property Improvements - Non-Utility Public Property Improvements - Utility Major Equipment Major Equipment - Vehicles Tax Increment Financing (TIF) District Improvements Total General Obligation Bonds/Notes/State Fund Trust Loan Total: Water Bonds Sewer Bonds Storm Bonds Donations Grants Trade-In Total 4,066,700$4,575,900$2,992,000$-$-$-$-$-$-$-$-$-$16,079,000$ 52,500$250,000$625,000$-$-$-$-$-$-$-$-$-$1,791,600$ -$-$7,275,000$-$-$-$600,000$-$-$-$-$-$7,875,000$ 3,486,600$-$-$-$-$-$-$-$-$-$-$-$3,486,600$ -$5,352,800$-$-$-$-$-$-$-$-$-$-$9,225,900$ -$-$-$-$-$-$-$-$-$-$-$-$905,000$ -$-$-$-$-$-$-$-$-$-$-$-$160,000$ -$-$-$25,000$-$-$-$-$-$-$-$-$700,300$ -$-$-$200,000$-$100,000$-$-$-$260,000$-$-$3,504,000$ 975,000$75,000$-$-$-$-$-$-$-$-$-$-$1,080,000$ 377,000$1,260,000$-$-$-$160,000$-$1,000$-$-$80,000$-$2,594,000$ 366,000$95,000$-$-$1,232,000$-$-$34,000$317,000$-$-$-$3,733,000$ -$-$-$-$750,000$-$-$-$-$-$-$125,000$3,245,000$ 9,323,800$11,608,700$10,892,000$225,000$1,982,000$260,000$600,000$35,000$317,000$260,000$80,000$125,000$54,379,400$ Total Revenue Bonds:31,824,500$ Revenue Bonds Room Tax Line of Credit Developer Contribution Winnebago County/OASD Previously Borrowed City of Neenah Match Operating Budget 2017 - 47