Loading...
HomeMy WebLinkAbout0062046-Plumbing (interior) CITY OF OSHKOSH 62046 No OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address315 W MURDOCK AVEOwnerWAYNE ERICKSONCreate Date01/14/1998 ContractorJIM'S PLUMBING & HEATING INCCategoryPlan 440 - Industrial-Interior Inspector Clothes Wshr Bathtub00Classrm Sink0Surgeons Sink0Roof Drain0Deduct Meters0 Shower0Lndry Tray0Exam Sink3Sterilizer0Soda Disp0Wtr Sewer Mtrs0 Whirlpool 0Sump Pump0F Prep Sink0RPZ Valve0Coffee Maker0Wtr Usage Mtrs0 Misc. Flr/Wst Sink Lavatory2San Sump/Pump00Bidet0Site Drain00 Fixtures ToiletWater Softner 30Hand Sink0Urinal1Wait. St.0 Kit Sink0Standp Rec0 Ice Chest Lab Sink0Beer Tap00 Disposal0Gar Drain0Plaster Sink0Dip Well0Comm Ice Maker0 DishwasherDrink Ftn 0Local Waste0Sculry Sink01Int Grease Trap0 Floor DrainBar SinkServ SinkWash Ftn 5010Ext Grease Trap0 Hose Bibb0Breakrm Sink0Shamp Sink0Catch Basin0Eye Wash Statn0 Water Heater2 Use/Nature NEW WALGREEN'S PHARMACY of Work SizeMaterialType#Conn. Type Sanitary Sewer0 0 0 0 0 Storm Sewer0 0 0 0 0 Water Service0 0 0 0 Parcel Id # 0 1501840000 $0.00Permit Voided Valuation$27,000.00Plan ApprovalPermit Fees$72.00 Issued ByDate01/19/1998 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner AddressW-6166 GREENVILLE DRIVEGREENVILLEWI54942-0000Telephone Number757-5258 OR 757-6468 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.