Loading...
HomeMy WebLinkAboutPlumbing (G6-13-0398-P) 3/24/1998 � � t � City of Oshkosh � Inspection Services 215 Church Ave., PO Box 1130 O�V� n � Oshkosh, WI 54902-1130 � ��W � � (920) 236-5049 (9201 236-5106 FAX ON THE WATEP March 24, 1998 � James R. Seigfreid 1740 S. Bell School Rd. Cherry Valley, Ill 61016 �Valgreen's Ref: Plumbing Plan Approval: 315 W. Murdock Ave., Oshkosh, WI G6-13-0398-P Dear Sirs, Examination of the plumbing plans and specifications for this project has been completed. In accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation(s)noted below: 1. Cleanout access for building drain must maintain maximum separation of 75 feet between cleanout openings. COMM 82.35 2. Cross-connection,backflow protection of potable water supply to fixtures must meet requirements of COMM 82.41 for both degree of hazard and applicable device. 3. Installation of an RPZ valve requires departxnent approval. COMM 82.20 In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompanied by full examination fees shall be ' filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specifications,plan omissions, examination oversight, construction or any damage that may result in or after installation and reserves the right to order changes or additions should � conditions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. ; Respec lly = "`-�-'�-���1�T� Richard Wood Plumbing Inspector �. � �