Loading...
HomeMy WebLinkAbout15. 16-376JULY 26, 2016 16 -376 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN PURPOSE: APPROVE CHANGE ORDER NO. 3 FOR PUBLIC WORKS CONTRACT NO. 15 -21 WITH JOS. SCHMITT & SON CONSTRUCTION CO., INC. FOR THE PUBLIC WORKS FIELD OPERATIONS FACILITY - PHASE III ( +$15,928.96) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: from: JOS. SCHMITT & SON CONSTRUCTION CO., INC. 2104 Union Avenue Sheboygan WI 53082 Net Increase to Contract: $15,928.96 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated Acct. No. 323 - 0450 - 7214 -06510 Property Improvement Fund - Buildings C& city W O Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Comm ouncil FROM: James E. Rabe, Director of Public Works DATE: July 21, 2016 RE: Change Order No. 3 for Public Works Contract No. 15 -21 Public Works Field Operations Facility - Phase III Jos. Schmitt & Sons Construction Co., Inc. ( +$15,928.96) BACKGROUND Change Order No. 3 for Contract 15 -21 is scheduled for consideration by the Common Council at the July 12, 2016 meeting. The contract was originally awarded to Jos. Schmitt & Sons Construction Co., Inc. in March of 2015, Change Order No. 1 was approved in September of 2015, and Change Order No. 2 was approved in November of 2015. This change order includes additional work that is necessary in order to complete the project. ANALYSIS The work associated with this change order includes hauling of additional impacted soils to the Waste Management Valley Trail Landfill in Berlin, additional installation of vinyl- coated chain link fence that was deleted from the contract for previous phases of construction, and other miscellaneous minor revisions to the plans and specifications. These revisions to the contract are necessary in order to complete the project. FISCAL IMPACT Contract Section Change Order Amount New Contract Total CIP Budget Amount Property Improvements $15,928.96 $2,295,932.29 $2,747,299 Total $15,928.96 $2,295,932.29 $2,747,299 RECOMMENDATIONS I recommend approval of Change Order No. 3 to Contract 15 -21 in the amount of +$15,928.96 to Jos. Schmitt & Sons Construction Co., Inc. Approved, Mark A. Rohloff City Manager L\ Engineering \ 2015 CONTRACTS \ 15 -21 P W Field Ops Facility-Ph III \ Project_Information \ Correspondence \ Memo \ 15 -21 Memo for CO A3_7- 21- 16.docx — I-IAIA Document G701TM -2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 003R OWNER: ❑ Public Works Field Operations Facility - DATE: 6/15/2016 ARCHITECT: ❑ Phase III 639 Witzel Avenue CONTRACTOR: ❑ Oshkosh, WI 54902 TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: FIELD: El Jos. Schmitt & Sons Construction CONTRACT DATE: 3/30/2015 OTHER: ❑ Company, Inc CONTRACT FOR: General Construction PO Box 1084 2014 Union Avenue Sheboygan, WI 53082 -1084 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) The original Contract Sum was $ 2,889,000.00 The net change by previously authorized Change Orders $ - 629,501.35 The Contract Sum prior to this Change Order was $ 2,259,498.65 The Contract Sum will be increased by this Change Order in the amount of $ 15,928.96 The new Contract Sum including this Change Order will be $ 2,275,427.61 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Kueny Architects, LLC Jos. Schmitt & Sons Construction City of Oshkosh Company Inc ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) 10505 Corporate Drive Suite 100 2104 Union Avenue 215 Church Avenue Pleasant Prairie, WI 53158 PO Box 1084 Oshkosh, WI 54903 -110 ShebovA, WI 5309-2- 84 RES ADDRES ADDRESS V BY ignature) BY (Si re) I BY (Signature) n Wallenkam Keith Isken James Rabe (Typed name) (Typed name) ('Typed name) June 15, 2016 DATE DATE DATE AIA Document G701--2001. Copyright O 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 12:08:23 on 06/15/2016 under Order No.5703201110_1 which expires on 06/09/2017, and is not for resale. User Notes: (1265002546) Oshkosh Phase 3 ( Jos. Schmitt) Change Order Request Date CO# Status Add Credit Approved Description 10/12/15 1011 Approved $1,075.00 $1,075.00 Install approx. 2300 sf of 3" clear stone, 6" deep in lieu of topsoil 10/12/15 1012 Approved $1,854.00 $1,854.00 Remove 1,440 SF of asphalt, Install warning fabric and 6" topsoil 11/3/15 1013 Approved $3,407.00 $3,407.00 Provide approx. 60' of additional black vinyl chain link fence 11/3/15 1014 Approved $620.00 $620.00 Provide and Install door closers at doors OBC1 and OBC2 per shop drawings 11/17/15 1015 Partial Approval $6,500.00 $4,500.00 Provide grade changes and steps per CB #8 and 08.1 - includes removal /replacement of concrete to make grades work 11/17/15 1016 Approved $1,315.00 $1,315.00 Install saddle at Salt Dorm building 11/17/15 1017R Rejected $1,543.00 Install Bollard at the salt dome at electrical conduit 11/17/15 1018 Rejected $1,448.00 Install switch, light and receptacle in conveyor pit near salt dome 2/29/16 Approved $1,203.04 - $1,203.04 WPS Utility Bill 6/15/16 1019 Approved $4,361.00 1$4,361.00 Change Order #3 $15,928.96 0