HomeMy WebLinkAbout12. 16-318JUNE 28, 2016 16-318 RESOLUTION
(CARRIED 7-0 LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: APPROVE CHANGE ORDER NO. 3 FOR PUBLIC WORKS
CONTRACT NO. 13-24 WITH AUGUST WINTER AND SONS, INC.
FOR WWTP CONTROL SYSTEM, INFLUENT PUMPING &
AERATION SYSTEM BLOWER UPGRADES ($106,393.00)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
AUGUST WINTER AND SONS, INC.
2323 N. Roemer Road
Appleton WI 54911
Net Increase to contract: $106,393.00
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. No. 551-1910-1799-00000 Sewer Utility - Construction in Progress
(0
770, -i
ON iNF wniFR
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Stephan M. Brand, Public Works Utility Bureau Managera� I(/�
DATE: June 23, 2016
RE: Approve Change Order No. 3 for Public Works Contract No. 13 -24
Wastewater Treatment Plant Control System, Influent Pumping, & Aeration Blowers Upgrades
August Winter and Sons, Inc. / $106,393
BACKGROUND
Change Order No. 3 for Contract 13 -24 is scheduled for consideration by the Common Council at the June 28,
2016 meeting. The contract was originally awarded to August Winter and Sons in January 2014 to replace
aging influent pumping equipment, control systems and aeration system blowers. When replacing and retro
fitting equipment in a production facility setting, we occasionally encounter conditions in the field that were
unanticipated and require modifications to the plans. We also encounter situations where improvements can be
made to add long -term value to the project. The project is substantially complete with a small number of punch
list items to be finished to close out the project.
ANALYSIS
The four major items in this change order include: influent pump seal water strainer to remove any solids in the
recycle seal water used for lubricating the pumps' mechanical seals; a new conduit and box for buried fiber optic
cable (existing conduit proved to be unusable); influent pump vent modifications to prevent the pumps from air
locking during the start-up cycle; and upgrades to the ferric chloride chemical feed control panel. All items
related to this change order was reviewed by CH2M HILL Engineers, Inc., our consultant on the project, and
were found to be reasonable and within expected costs for the work performed.
FISCAL IMPACT
The original contract amount was for $4,210,500. Change Order No. 1 decreased the budget by $50,000.
Change Order No. 2 increased the budget by $90,275. Change Order No. 3 is for $106,393. The revised
contract price with this change order is $4,357,168. This project is included in the 2014 Capital Improvements
Program under the Major Equipment (Sewer Utility Fund).
RECOMMENDATIONS
I recommend approval of Change Order No. 3 to Contact No. 13 -24 in the amount of $106,393 to August Winter
and Sons, Inc.
Approved:
uc�r.
Mark . ohloff
City Manager
SMB /tlt
I: \Engineering\2013 CONTRACTS \13 -24 WWIP Ctrl Syst, Influent Pump, & Aeration Blower Upgrade \Correspondence \Memo \13 -24 CO #3 Memo_6- 20- 16.docx
dam. CONTRACT MODIFICATION
CITY OF OSHKOSH - CONTRACT NO. 13 -24
❑x CHANGE ORDER ❑ WRITTEN AMENDMENT MODIFICATION NO: 003
TO August Winter & Sons, Inc.
PROJECT: Wastewater Treatment Plant Control System, Influent PROJECT NO: 482461
Pumping & Aeration Blowers Upgrade
OWNER: City of Oshkosh
ENGINEER: CH2MHILL
The following .. required):
Refer to Items 3a. through 3p. described on attached page 2 with supporting documentation following page 3.
Reason for Modification(s):
Actions taken to modify design or construction methods to adjust for site conditions.
Attachments (List Supporting Documents):
Contract Amount or Price Contract Times (Calculate Days)
Original
$ 4,210,500
Original Duration
760 Days
Previous Contract
By:
Previous Contract
Date
Modification(s)
(see page 3)
Modification(s)
(Add /Deduct)
$40,275 (add)
(Add /Deduct)
0 Days
This Contract Modification
This Contract
(Add /Deduct)
$106,393 (add)
Modification
120 Days
Revised Contract Amount
$4,357,168
Revised Contract Time
880 Days
The Revised
Contract Completion Date is:
August 15, 2016
Owner (City of Oshkosh)
Contractor (August Winter & Sons,
Inc)
Engineer (CH2M HILL)
By:
By:
By:
Date
Date
Date: Ulc/�2 -1 ab( (o
(see page 3)
Change Order No. 3 May 10, 2016
City of Oshkosh Contract No. 13 -24
Wastewater Treatment Plant Control System, Influent Pumping & Aeration Blower Upgrade
Contractor: August Winter & Sons, Inc.
This document shall become a supplement to City of Oshkosh Contract No. 13 -24 and all provisions will
apply hereto.
TABLE 1
Description of Requested Changes
Item
COR No.
Description
Action
Amount
3a.
014
AFD- 11 -2 -1 Wiring Credit
Deduct
($2,187)
3b.
015
RIO -1A, -61 Wiring and Terminations
Add
$6,866
3c.
019
RIO -1A, -61 Wiring and Terminations
Add
$894
3d.
-
Centrifuge Mounting Brackets
Add
$1,506
3e.
020
Level Element Mounting Bracket
Add
$2,621
3f.
RF1046
Refeed Battery Charger & Control Wiring
Add
$7,758
3g.
021
Pump Seal Water Strainer
Add
$16,625
3h.
022
P- 11 -2 -1 Vent Modification
Add
$7,885
3i.
-
Exit Signs
Add
$1,472
3j.
-
Flag Pole Lights Modification
Add
$1,743
3k.
024
Ferric Chloride Panel
Add
$8,281
31.
026
Ethernet Cable and Conduit
Add
$4,773
3m.
027
Buried Fiber Optic Cable
Add
$10,813
3n.
028
Influent Pump Vent Modifications
Add
$24,046
3o.
029
Miscellaneous Panel Modifications
Add
$12,430
3p.
033
Fix Uneven Floor
Add
$867
TOTAL VALUE OF THIS CHANGE ORDER
Add
$106,393
2
Signed for and in behalf of the City of Oshkosh
Mark A. Rohloff, City Manager
Pamela R. Ubrig, City Clerk
Lynn Lorenson, City Attorney
Trena Larson, Director of Finance
I hereby certify that the necessary provisions
have been made to pay the liability which will
accrue under this contract.