Loading...
HomeMy WebLinkAbout08. 16-189APRIL 26, 2016 16-189 RESOLUTION (CARRIED__7-0______LOST________LAID OVER________WITHDRAWN________) PURPOSE: APPROVE ENGINEERING SERVICES AGREEMENT WITH CH2M HILL ENGINEERS, INC. FOR SOUTHSIDE SANITARY SEWER STUDY ($209,640.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate professional services agreement with CH2M Hill Engineers, Inc. for a study of the sanitary sewers south of the Fox River, in the amount of Two-Hundred- Nine-Thousand-Six-Hundred-Forty and 00/100 ($209,640.00). Acct. No. 551-1910-1799-00000 Sewer Utility - Construction in Progress � OlHKOlH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the C on Council FROM: James Rabe, Director of Public Works DATE: April 21, 2016 RE: Engineering Services Agreement for Southside Sanitary Sewer Study / CH2M HILL Engineers, Inc. (CH2M HILL) ($209,640) BACKGROUND The Department of Public Works requested a proposal from CH2M Hill to perForm a study of the City's sanitary sewers south of the Fox River. The purpose of this study includes preparing updated wastewater flow projections through 2035 and through the estimated ultimate buildout condition for the entire City sewer service area. Using the existing hydraulic collection system model to simulate system perFormance with projected wastewater flows, CH2M Hill will identify existing and potential future capacity problems for the southside sanitary sewer system, identify improvement projects, leverage findings from the City's recent Sewer Evaluation Capacity Assurance Plan, provide information that supports the City's future comprehensive wastewater utility plan, and prepare a study that helps the City meet the State of Wisconsin Clean Water Fund Program Fiscal Sustainability Plan certification requirements. ANALYSIS The City last studied this area in 2002 and an update to that study is needed to provide recommended alternatives to service current development and future growth of the City. CH2M HILL was chosen to perform this study due their past experience with this type of work, and their significant experience with the modeling of the sanitary sewer system of the City of Oshkosh. FISCAL IMPACT The cost of these services is estimated not to exceed $209,640, and funding is available in Sanitary Sewer section of the 2015 Capital Improvements Program. RECOMMENDATION Chapter 12 of the Municipal Code of the City of Oshkosh provides that professional services of a specialized nature, including engineering services, may be procured without the use of formal, sealed quotes. I have reviewed this agreement and in accordance with Section 12-16 of the Code, I am hereby recommending the Common Council approve this agreement. Approved: ,����� ����� Mark A. Rohloff City Manager JER/tlt I:\Engineering\Tracy Taylor�Memos to Mayor & Common Counci1�2016\CH2M Hill-S Side San Swr Study_4-21-16.docx