Loading...
HomeMy WebLinkAbout10. 16-67 FEBRUARY 23, 2016 16-67 RESOLUTION (CARRIED___6-0_____LOST________LAID OVER________WITHDRAWN________) PURPOSE: APPROVE ENGINEERING SERVICES AGREEMENT WITH AECOM TECHNICAL SERVICES, INC. FOR CONSTRUCTION RELATED ENGINEERING SERVICES FOR PUBLIC WORKS CONTRACT NO. 16-03 ($801,280.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate professional services agreement with AECOM Technical Services, Inc. for construction related engineering services pertaining to Public Works Contract No. 16-03, the construction of the Snell Road West Lift Station and interceptor Sewer, in the amount of Eight-Hundred-One-Thousand-Two-Hundred-Eighty and 00/100 ($801,280.00). Acct. Nos. 315-0410-7480-00000 Street Improvement Fund Expenditures 551-1910-1799-00000 Sewer Utility – Construction in Progress 561-2010-1799-00000 Storm Water Utility – Construction in Progress � �-K�� H MEMORANDUM TO: Honorable Mayor antl Members of the Common Council /1-� FROM: Steven M. Gohtle, Assistant Director of Public Works'S1� �GI I � � DATE: February 18, 2016 RE: Engineering Services Agreement for Construction-Related Engineerinq Services for Public Works Contract No. 16-03 / AECOM Technical Services, Inc. (AECOM) ($801,820) BACKGROUND In February 2014, Department of Public Works staff selected AECOM to prepare the design and the bid documents for the new Snell Road lift station prqect. AECOM was selectetl based on several factors. AECOM's proposal tlemonstrated a significant understanding of the project and the challenges associated wi[h designing a sanitary sewer lik station to integrate it in[o the existing system. In addi[ion, AECOM has demonstrated a thorough understanding of the City of Oshkosh's sanitary sewer collection system and how the proposed projects will impact the entire system. The high groundwater at the project location also required a very challenging groundwater management program to be developed. Oue to the knowledge AECOM has related to this prqect, AECOM was requested to provide a proposal to provide construction- related engineering services for this project. ANALYSIS AECOM has provided a proposal to pertorm project management, onsite construction engineering senices, and onsite construction inspection for the lik station and sanitary sewer interceptor installation. The pmposal is for approximately 11 % of the construction costs. While high compared to street construction projects, the technical aspects of the lik station construction and integretion into the City's system will require substantially more staff time and technical expertise. The proposal includes the option to allow City staff [o pertorm the sewer inspection to reduce costs, if staff is available. FISCAL IMPACT The cost of the proposal is $801,820. Funds for this pmject are indudetl in the Streets, Storm Water, and Wastewater section of the 2016 Capital Improvement Progrem. This cost is included in the Fiscal Impact Analysis of the Bitl Award memo for Contract i 6-03 Snell Road West Lift Station & Interceptor Sewer. RECOMMENDATIONS Chapter 12 of the Municipal Code o/fhe CiryofOshkosh provides that professional services of a specialized nature, including engineering services, may be procured without the use of formal, sealed quotes. I have reviewed the proposal and in accordance with Section 12-16 of the Code, I am hereby recommending that the Common Council approve this agreement. Approved, `rO���.i�� MaTk A. Rohloff City Manager SMG/tlt 1�.1E�IpiMBfi�qW016 CONRiPCT$Vfi-0] $nell RE Wesl Lm $�atim 61n1e��'eplw $xTVmjacl_InlameliCMCOmqvntlenmVAdnollfi-03 En8 COOfI-ReISIeO $erv Memo- PECOM_218-06Ear