Loading...
HomeMy WebLinkAbout08. 16-65FEBRUARY 23, 2016 16-65 RESOLUTION (CARRIED___6-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 16-19 TO H & H INDUSTRIES, INC. FOR WATER FILTRATION PLANT EQUIPMENT REPLACEMENT ($523,424.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for the Water Filtration Plant equipment replacement; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: H & H Industries, Inc. 2801 Syene Road Madison WI 53713 (Base Bid + Project Contingency) Total Bid: $523,424.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 541-1810-1732-00000 Water Utility Fund – Treatment Equipment /`'� � MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Stephan M. Brantl, Public Works Utility Bureau Manager DATE: February 18, 2016 RE: Award Bid for Public Works Contract No. 16-19 Q Water Filtretion Plant Equipment Replacement �ct H8H Industries, Inc. / $523,424 BACKGROUND 7he Water Filtration Plant was put into service in December of 1999. As part of our ongoing maintenance program, equipment is evaluated and determinations are made as to the expected life and need for replacement. The central air conditioning system and sodium hydmxide tanks and associated piping have been identified as equipmeM that needs to be replaced, along with an upgrade to the intake zebra mussel control system. These projects are induded in and have been approved as part of the Capital Improvement Program (CIP). ANALYSIS Staff and CH2M HILL Engineers, Inc., our project engineering consultant, reviewed lwo bids. The low bid was received from H&H Industries, Inc. of Madison, Wisconsin. The total bid is $523p24. FISCAL IMPACT This project is a combination of individual projects approved in the 2013, 2014 and 2015 CIP forthe Water Utility. The engineering agreements for this project were previously approved in the amount of $172,810. Thetotalprojectcost,includingthecontractorandengineeringcosts,isestimatedat$696,284. Theoriginal budgeted amount for this project was $650,500. Funds are available for reallocation from hvo previously approved CIP Water Utility studies totaling $55,000. The relocation of these funtls were reviewed and approved by the Finance Director. This reallocation will bring the available funding for this project to $705,500. I recommend award to the low bidder, H&H Industries, Inc. in the amount of $523,424. Approved: �...�: ��-r.-�- Mark A. Rohloff City Manager SMB/ik L1Eryireanrpp018 CONTpqCT5118-09 WFP EQUip ReplWml� InlormelimlLOme�pe�mVMmdtfi�l9 Mamo lor BIO AwerO ]-1616 Eon Q 0 Q 0 CD C! O C! 0 q C Q 0 Q 0 CD y (D 0 Q 0 CD Cr! 0 a — Q C Ln 40 Lr) X 40 W 0 0 0 0 0 0 a) cl� C� 0 .2 O m a. LO � D Q 0 Q C! 0 CD C! 0 Q 0 N N Q 0 C4 a "t lzz�C� C�It 0 C') Cl) Q 0 m 17 cli Ln 40 a -0 Cl) W co W 0 C) Lo O U) 0 — (n 0 a ad 00 Co 0 E E :3 U) U) Ln on C 4) E 0 co '4-- E O C E a) cr, 0 (n U) U- co w co CO C cu) E 0 co 0' 8 0%4 C, 1: pm a a 0 0 0 0 = G V .0 0 C a .2 0 0 0 0 C0 ca N 01 1 ca p�w w �p w w � < < aa�_ _ a� _ _ Z � F � ' S _F -� na aa a e d p e o p p a V U K K � w » w � w w w F . W . K K i9 x a� N v~i �s » • N E =' g � S E U @ V � E v °� � E � n p � a p U V yy�j a u � � b � `Vu Ea> y ry E c s�o�us Q c ¢ � m �' y�a' E K E Q� o w°A�yo� � ¢ 4 � ? ¢ �� 3" E y A 0 3 E � V p c N h � 24y�E� �' � � E y ., 3 »