HomeMy WebLinkAbout06. 16-63FEBRUARY 23, 2016 16-63 RESOLUTION
(CARRIED__6-0_____LOST_______LAID OVER_______WITHDRAWN_______)
PURPOSE: APPROVE AMENDMENT TO INSPECTION SERVICES DIVISION
FEE SCHEDULE DELETING ELECTRICAL CONTRACTOR
LICENSE FEES AND CLARIFICATION ON CALCULATING
BUILDING PERMIT FEES
INITIATED BY: INSPECTIONS SERVICES DIVISION, COMMUNITY
DEVELOPMENT
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
following electrical contractor license fees are hereby deleted from the Inspection
Services Division Fee Schedule:
Electrical License Fees (Type C, M, S)
Original $100.00
Renewal $ 75.00
Electrical Credential Exam $ 25.00
Local Electrician Credential (3 Year Credential)
New $100.00
Renew $ 75.00
BE IT FURTHER RESOLVED that the Electrical Annual Permits is hereby
amended by deleting “(Type M Optional Arrangement)” and inserting “(Manufacturing
Only)”.
BE IT FURTHER RESOLVED that in order to assist contractors and
homeowners in better understanding fees associated with building projects, the
following statement of clarification is added to the Fee Schedule:
“To calculate fees for building projects, use the higher of the fees by valuation or square
footage.”
NOW THEREFORE BE IT FURTHER RESOLVED that the above noted
revisions are hereby adopted effective February 24, 2016. All other permit fees for
building, plumbing, electrical and HVAC remain unchanged.
O
IH H
TO:
FROM:
DATE:
RE:
Honorable Mayor and Members of the Common Council
John Zarate
Chief Building Official
February 16, 2016
Inspection Services Fee schedule clarification/ corrections
BACKGROUNDI ANALYSIS
Since building permit fees were approved to calculate some permit fees by square footage for
some building permits such as new buildings, interior commercial alterations or additions
there have been questions from applicants as to what fee schedule should be used valuation
or fee based. In order to address this confusion staff is recommending a statement of
clarification to read "To calculate fees for building projects, use the higher of the fees by
valuation or square footage."
For several years the City issued electrical licenses to certified electrical contractors, as well
as charged fees for eledrical credentials and electrical exam fees. In (2014) State Statutes
were revised that prohibit municipalities from issuing these electrical related contractor
licenses.
FISCAL IMPACT
The clarification will not have an impact as staff was responsible for charging the correct fees
prior to this clarification. The clarification will assist contractors and homeowners in better
understanding the fees associated with projects.
The annual electrical contractor licenses have not been issued for the last couple of years
and these fees were not included as part of the revenue estimates for 2016.
RECOMMENDATION
City Council approves amending the Inspection Services Division Fee Schedule deleting
electrical contractor license fees and adding a clarification on calculating building permit fees
to go into effect February 24, 2016.
Respectfully submitted,
/` �/��+ �viJ �
Allen Davis
Community Development Directar
Approved,
����
City Manager
INSPECTION SERVICES DIVISION FEE SCHEDULE
Ellective Jauuary 1, 2016
� ** To ealculate fees for building projects use ihe higM1er of tM1e.fees by valuatian or square�footage *•
BUILDING
The below fee breakdown is jor but not limited to.�
New Buildings, Additions & Alterations, Interior Remodeling/Alterations, Decks, Fences, Patios,
Steps, Porches, Driveways, Pools, Signs, Windows, RooTing, Siding, Demo/Ruing, Ramps�� Etc:
Valuation Fee
$ 0 to $ 1,000.00 ..........................................................................................$37.00
$ 1,000.01 to $ 2,000.00 ..........................................................................................$44.00
$ 2,000.01 [o $ 3,000.00 ..........................................................................................$51.00
$ 3,000.01 to $ 4,000.00 ..........................................................................................$58.00
$ 4,000.01 to $ 5,000.00 ..........................................................................................$65.00
$ 5,000.01 to $ 6,000.00 ..........................................................................................$72.00
$ 6,000.01 to $ 7,000.00 ..........................................................................................$79.00
$ 7,000.01 to $ 8,000.00 ..........................................................................................$86.00
$ 5,000.01 to $ 9,000.00 ..........................................................................................$93.00
$ 9,0OO.Olto$10,000.00 ........................................................................................$100.00
$10,000.01 to $20,000.00 .......................................$100.00 for the first $] 0,000.00
plus $6.00 for each [housand dollaz valuation or part Ihereof
Over $20,000.00 .................................................$160.00 for the first $20,000.00
plus $3.50 for each thousand dollaz valuation or part thereof
The below fee breakdown is far but not limited to:�
New Buildings, Additions & Alterations:
.......................................................$0.18 per squaze foot (Minimum of $30.00)
(square foomge includes all new areas including garages, basement/crawlspace and decks or porches)
Additionel FeeS:
New Construction: one or two-faznily structure
Earl y Start Pennit (optional) ............................................................... $100.00
Plan Examination ............................................................................$ 75.00
Wisconsin Unifonn Building Permit Seal (cost +$5.00) ..............................$ 30.00
Sidewalk Grade Stake .......................................................................$ 15.00
New Conshuction: multiple family (moxe than 2 units) or commercial/industeial structure
Plan Examination .................see WI Dept of Safety and Professional Scrvices schedule
Sidewalk Grade Stake (when applicable) .................................................$ 15.00
Additions or Alterations: one or two-faznily structure
Plan Examination — Deck, detached gazages .............................................$ 25.00
Plan Examination— 1-story building ......................................................$ 50.00
Plan Examination — 2-story building ......................................................$ 75.00
Moving Permit: Under 500 sq.ft ...................................................................$ 50.00
500 sq.fr. or more .................................................................$ 100.00
See the current Property Record Maintenance Fee Schedule (page 5)
See the wrreut Planning Services Division Fee Schedule (page 6)
Also see Miscellaneous Fees
� PROPOSED REVISION
MISCELLANEOUS
Commeacing Work Without Pennits ................................................................................Triple Fee
or $]00.00 plus the normal permit fee, whichever is greater
Reinspec[ion ............................................................................................... $100.00 per reinspection
CODE ENFORCEMENT SERVICE FEE
Initial Service Fee ................
2nd Service Fee ...................
3`" Service Fee ...................
Subsequent Service Fee.........
ROOMING HOUSE
.....................................................................$ 20.00
.....................................................................$ 50.00
.....................................................................$ 100.00
......................................................................$ 200.00
Rooming House License (Annual) ...............................................
plus $15.00 per bedroom
Rooming House — Penalty for Late License ................................
for late renewa] oc operating without a]icense
HEATING
Valuation
$0 to $1,000.00 ............................................................................
..........$ ] 00.00
.....Double Fee
Fee
...........................$30.00
$1,000.01 to $]0,000.00 ... ...................................................................... $30.00 for first $1,000.00
pl�s $16.00 pei each additiona] $1,000.00 valuation or part theteof
$10,000.01 to $25,000.00 .................................................................... $174.00 for first $10,000.00
plus $10.00 per cach additional $1,000.00 valuation or part thereof
Over $25,000.00 ........................._...................................................$324.00 for the first $25,000.00
pWs $5.00 per each addi[ional $1,000.00 valuation or part [hereof
Plan Examination .............
Also see Miscellaneous Fees
............see WI Dept of Safety and Professional Services schedule
2
STORAGE TANKS
Installation & Removal of Tanks.......see WI Dept of Safety and Professional Services schedule
ELECTRICAL
Valuation Fee
$0 to $500.00 .............................................................................................................$30.00
$500.01 to $I,000.00 .................................................................$30.00 for the first $500.00
plus $8.00 for each additiona] hundred dollaz valua[io� or parf thereof
$1,000.01 to $10,000.00 ...........................................$70.00 far the first $1,000.00
plus $17.00 for each additional thousand dollaz valuation or part thereof
$]0,000.01 to $20,000.00 ..........................................$223.00 for the first $10,000.00
plus $6.00 for each additional thousand dollar valuation or part thereof
Over $20,000.00 .................................................$283.00 for the first $20,000.00
plus $3.50 for each additional thousand dollaz valuation or part thereof
. .� �.
. .. . .... . . ... � �..
� Annual Permits �T°—° "" n...:.._..� .. __.._..,......_.�:
Assessed Valuation
$50,000.00 or ]ess ............................................
$50,000.01 to $100,000.00 inclusive ...............
$1OQ000.01 ta $SOQ000.00 inclusive .............
$SOQ000.01 ro $1,000,000.00 inclusive..........
$1,000,000.01 and over ....................................
Also see Miscellaneous Fees
� PROPOSED REVISION
.. �
Fce
.............................$100.00
.............................$200.00
.............................$300.00
.............................$400.00
.............................$ 500.00
PLUMBING
Fee
MinimumPermit Fee .............................................................................................................$30.00
Eachfixture: New ..................................................................................................................$9.00
Relocated..........................................................................................................$9.00
Replaced or roughed in for future use ..............................................................$9.00
Disconnect, abandon, or capping off of lateral (each lateral) ..................................................$9.00
Sanitary or Stomi Sewer connections at main in street or wrb .............................................$50.00
Sanitary or Stonn Sewers re-laid from main or curb to building or main to curb .................$50.00
Water Service connections at main in street or curb ..............................................................$50.00
Water Service re-laid from main or curb to building or main to curb ...................................$50.00
Water Service and Sewer repair .............................................................................................$50.00
PrivateWells .............................................................................................$50.00
Plan Examination ......................................see City of Oshkosh Plan Review Fee schedule
Also see Miscellaueous Fees
Copies: 8 1!2 x 11 25¢ / page + tax
8 1/2 x 14 25¢ / page + tax
11 x 17 25¢ / page + tax
FBxi�g: $1.00 / page + tax
J