Loading...
HomeMy WebLinkAboutAECOM/Revised Contract Amendment proj 60443604��� 558 NOorih Main Sireet 920.235.032�1 fax Oshkosh,Wl 54901 January 12, 2016 Ms. Darlene Brandt Community Development City ot Oshkosh 215 Church Avenue Oshkosh, WI 54903-1130 Subject: REVISED Contrect Amendment for Storm Water Management, Civil Site Plans, and Surveying Services (or the Proposed Redevelopment of the Vacant Lot Located East of Grove Street in Oshkosh, Wisconsin AECOM Project No. 60403604, City of Oshkosh Purchase Order 126144 Dear Ms. Brand[, AECOM Technical Services, Ina (AECOM) presents this REVISED amendment tor a storm water managemen[ plan, civil site plans, and surveying services for the above-noted prqect. This flEVISED amendment modifies AECOM's proposal dated November 30, 2015, and is based on recent discussions with staff irom ihe City ot Oshkosh (City), including Mc Steve Gohde of Engineering and Ms. Elizabeth Williams ot Planning. This amendment includes our understanding of the proposed project, our proposed scope of services, and estimated fees. UndersWndina We understand the Ctty ot Oshkosh is planning to redevelop the vacant parcel loca[ed east of Grove Street, benveen Cleveland Avenue and East Parkway Avenue. The entire parcel is approximately 1.2 acres in size, relatively level, and grass covered. The City in[ends to divide this parcel into two lots by Certified Survey Map (CSM). Proposed Lot 1 will be comprised of the southern portion ot the parcel, and is to be 0.33 acres (14,000 square teet). Proposed Lot 2 will he comprised of the middle and north portion of the parcel, and is to be approximately 0.91 acres. 8oth Lots are zoned R-5 PD. Sidewalk easements exist along Cleveland Avenue antl East Parkway Avenue; Ihese are to be dedicated as part of the City's righ�-of-way. Task 1 is to prepare a Certified Survey Map of ihe property which divides the lots as noted above and incorporates ihe easements. The proposed development plan for Lot 1 is the constmction of a Iwo-unit handicap accessible residen[ial stmcture with approxima�ely 2,600 square fee[ of living area (1,200 square feet for Unit 1 and 1,400 square feet for Unit 2). An anached garage will include 600 square feet for Unit 1 and 700 square feet for Unit 2. Green space will constitute 54 % of the site, while impervious surfaces (buildings, patios, and driveways) will cover 46 %. Tasks 2 and 3 are [o prepare ihe civil sRe design and storm water management plan for the Lot 1 development only. The storm water management plan is to include a rain garden to comply with the City's requirements for storm water treatment. AECOM has previously completed a Phase I ESA and Subsurface Geotechnical Evaluation for the site. W e propose [o amend Ihe Subsurface Geotechnical Evaluation agreement to add ihe survey, civil site design, and storm water management plan services to the geotechnical project budget. eaaaaeoa aeviseanmanamenu.aoc, ❑�xK.nci Scooe of Services Task i: Certified Survey Map and Topographic Survey Certified Survev Mao AECOM will prepare a iwo-lot Certified Survey Map (CSM) adhering to City of Oshkosh and S[ate of Wisconsin standards. The CSM will incorpora�e other requiremenis already established, induding: 1. The final CSM will include a note �hat both Lot 1 and Lot 2 are required to meet fhe City's "curren[ storm water management requirements at time of developmenC' Presently, the 2016 standard is 40 % reduction in total suspended solids (TSS) for a re-development area. This removal standard will be utilized in Task 3 to design Lot 1. However, because developmeN ot Lot 2 may occw well into the tuture, City s[aH requested Ihat the no�e reflect compliance with standards �hat may be in force at ihat time. 2 Sidewalk easements located along Cleveland Avenue and East Parkway Avenue will be dedicated as right-of-way. The easement along Cleveland Avenue extends beyond ihe proposed Lot 2 boundary. Theretore, [his will require preparation of an Easement Release document. AECOM will prepare this documen� with the understanding ihat the City will handle ihe release process. The easement along East Parkway Avenue is only on ihe proposed Lot 1 area; therefore, an Easement Release document is not required tor this easement The City will also handle Ihe release process for the East Parkway Avenue easement. 3. The tinal CSM will designate ihe boundaries of Lots 1 and Lot 2 per the planning commission recommendation. 4. AECOM will provide a Survey Plat for the North Grove S[reet Two Unit Residential development. T0000raohic Survev AECOM will prepare a bpographic survey of the project site (Lots 1 and 2) and will extend the survey to adjoining sireet centedines and 20 feet beyond other property lines. Sufficiem data will be gathered to prepare a sudace model and onedoot contours of the surveyed areas. In addition to surveying the physical features unique to ihe site, existing concrete joints, if any, will be located along with visible overhead, surface, and sub-surface utilities based on observations and/or markings provided by contacting Diggers Hotline. Other than features visible and encountered during normal surveying operetions, subsudace and/or obswred at-grede utilities or improvements will not be loca�ed other than those marked by utility tlags or paint marks. The CAD deliverable will be prepared to �he standard required for an in-house AECOM design. NOTE: All horizon[al si[e contml and project deliverables will be surveyed in �he Wisconsin Coordinate Reference Systems (W ISCRS) W innebago County Datum (NA2011). The vertical datum will be NAVD88. Deliverables: AECOM will furnish one (1) drak CSM and Easemem Release document for City staH review. Upon receiving City staff review comments, we will (urnish appropriate signed originals and an electronic file. K9Pmjecls\fi066360d_Grove5VeelGeotecM1nicalU00-CONTRACAI05 ConVadMOtliOCalion_Survey-Civil$tomnWa�eA60C136� Re�isetl Amentlmen� 1.tlocx raxK•��i Task 2: Civil Site Plan AECOM will prepare civil site plans for ihe Lot 1 development area only. These civil site plans will be iransmitted by ihe City to Habitat for Humanity, to be used as part oi their overall bidding and constmction plans for the project The civil site plans will be based upon the architectural drawings prepared by Chet Wesenberg Architect LLC and the following conditions recommended by Ihe November 17, 2015 Plan Commission Site RepoR: 1. Driveway widih will be reduced to a minimum of 18 feet at the property line. 2. Base standard modification to allow a minimum iront yard setback ot 15.5 feet on Grove Street and Eas[ Parkway Avenue. 3. Base standard modification [o allow a minimum yard setback of 7 feet. 4. Base standard modification to allow 63 % rear yard impervious coverage. 5. Landscape buffer or solid fence to be installed along rear property line to create a buffer from ihe adjacent parking lot to ihe eas�. fi. Garege access doors to be relocated irom the east faqade to the north and south fagade of the attached garage. Based on AECOM's January 7, 2016 meeting with Mr. S�eve Gohde, the plan set will consist of ihe following drawings: • Project Intormation (Tmck Haul Route and Contact Intormation) • Existing Conditions and Survey Control Plan • Site LayouVGrading & Paving/Utilities Plan • Civil Details . Rain Garden Plan and Details Specifications will not be prepared. Deliverebles: AECOM will prepare one (1) draN set of civil plans for review and comment by City Engineering statt (not Site Plan Review). Upon receiving City Engineering statt comments, one final se� will be furnished in electronic format. Task 3: Storm Water Management Plan AECOM will prepare a storm water management plan (SWMP) intended to achieve a 40% reduction in TSS for Lot 1 only. The plan will include a pmjec� description narrative, a hydrologic boundary map, and W inSLAMM modeling for storm water quality improvement. This SW MP will include ihe civil plan sat and reference Rain Garden plan and details. Since ihis is a re-development site, runoff rate conirol is not required and will ihus no[ be included in Ihe SW MP. We understand this residential development falls under City building codes. Therefore, a W DNR Notice of Intent (NOI) for a Conshuction Site S[orm Wa[er Discharge permit is not needed. Deliverables: AECOM will prepare one (1) dratt SW MP for review and comment by City Engineering staN. Upon receiving City Engineering staH comments, one final SW MP will be furnished in elecironic format. K\Pmlec�s\6pC436� GroveSVeelGaotecM1nicalU00-WNTRACTU05_CanVadMOtliOCation_SUrvey-C'rvil5�armWa�ef50443fi� Revisetl Rmendmen� t.tlocx AECOM Task 4: Project Coordination / Meetings AECOM will attend two review mee�ings with City statf and provide coordination efforis dunng preparation of Tasks 1, 2, and 3. Fee Estimate The original Subsurface Geotechnical Evaluation tor the project site was authorized with a budget ot $6,000 for services outlined in our proposal dated September 15, 2015. We propose to complete Ihe additional work described in �his proposal on a[ime and materials basis tor an estimated fee ot $19,800. The time and materials �ee will be effective if this pmposal is accepted by the City ot Oshkosh within 60 days of the date ot ihis pmposal. The breakdown ot our fee is as follows: Task Fee Task 1: CSM & Topographic Survey $6,100 Task 2: Civil Site Plan $B,100 Task 3: S[orm Water Management Plan $3,200 Task 4: Project Coordination / Meetings 2 400 Total $19,800 Original Contract Amoun� E6 000 TOTAL Contract Amount $25,800 Schedule AECOM will schedule the tield survey work previously described upon authorization of ihis work. A draft CSM will be submitled for review within 15 working days after completion of Ihe tield work. The stortn water management plan draft and ihe civil site plan dratt will be submitted three weeks afler completion ot Ihe CSM and Topographic Survey. The final plans will be submitted within 10 days of receipt ot the City's commenis, barring delays due �o circumstances beyond AECOM's reasonable conirol. Assumotions Several assumptions have been made in developing ihis estimate and, if not valid, will constitute a change in scope requiring an adjustment in the project cost. These assump[ions are: • The final deliverables will be provided to the City of Oshkosh as an elec[ronic (PDF) document, unless otherwise requested. • AECOM will have unrestricted access to the site during normal business hours. Terms and Conditions Services described in this proposal wiil be performed on a time-and-ezpense/unit-cost basis. The project services will be performed in accordance with the 2016 Negotiated Fee Schedule and the April 2009 Negotiated Terms and Conditions between AECOM and the City ot Oshkosh, which are expressly incorporated into, and are an integral patl ot, our contract for professional services. K\PmjecS\6�CC36� Gmve SVeel GeotecM1nicalU00-CONTRACTIDS_COnlract Modiflcalion_SUrvey-CWiI�Slorm WateV�fi0CC36� ReviseG Rmentlment t.tlocx AECOM Please indicate your acceptance of this proposal by having an authorized individual of Ihe City execute ihe attached Authorization Form and reWm it to our Oshkosh office. If you have any ques�ions regarding the proposed scope of services and corresponding costs, please contact us at yourconvenience. We appreciate Ihe opportunity to provide engineering services to the City of Oshkosh. If you have any questions regarding the proposed project approach or corresponding costs, please contact us at your convenience. Sincerety yours, AECOM Technical Services, Inc. i��y//1V,��'I'Q�,y�'' L._2../' �f'wV / k, P.E. �/��ry Kevin Brehm, P.E. �G�.✓J Project Manager Wti'� Associate Vice President Attachments: Amendment to Agreement Amendment to Agreement Authorization Form K:\Pmjecis\WCC36� Gmve Sireet GeolecM1nicelV 00-0ONTRACT�IDS_ConVad Modificalion_SUrvey-CivilStortn WateNOJd3fiO4_Ravised Amentlment 1 Cacr A=COM AECOM 558 North Main S�reet OShkosh,Wl 54901 T920.2%.6]1B F920.235.0321 Amendment to Agreement Amendment No. 7 Redevelopment ot the Vawnt Lot Located East of Grove Street in Oshkosh, Wisconsin AECOM Project No. 60443604 City of Oshkosh Purchase Order No. 126744 RETURN TO: AECOM Date: January 12, 2016 558 North Main Stree[ Oshkosh, WI 54901 A�tention: Cliff Shierk SUMMARY: Original Coniract Amount: $6,000 Total Previous Change Orders: $0 Amount this Change Order: $19,800 Revised Contract Amount $25,800 Amendment# DESCRIP710N AMOUNT Storm water managemen[ plan, civil site plans, and surveying services for [he � Redevelopment of the Vacant Lot located $�9�800 East of Grove Sireet in Oshkosh, Wisconsin. K\Prol�s\6054360a GroveSireetGeotecM1nica�10000NTRRCTU05_COntraciMotlllica�ion SurveµCiviLStoimWaleM0443604 Ravisetl Amentlment I.tlocx /_l��L�Z iJ AECOM 558 North Main Streeq Oshkosh, WI 54901 T 920.236.6]18 F 920.235.0321 Amendment to Agreement Authorization Form January 12, 2016 I hereby certify that the necessary provisions have been made to pay the liabili�y which will accrue under ihis con[ract. I hereby authorize AECOM to proceed with the scope of work outlined Contrect Amendment to add Sbrm Water Management, Civil Site Planning, and Surveying Services for the Proposed Redevelopment of ihe Vacant Lot located East ot Grove Sireet in Oshkosh, W isconsin, AECOM Project No. 60443604, City of Oshkosh Purchase Order 126144, with a 6udget authorization increase of $19,800, for a total authorized amount ot $25,800 under the general te�ms and conditions specified in the proposal. �'��i�� Signadure Mark A Rohlotf Print Name Ciry Manager Title/Organization , � ,f1129 QD,�� �� Signature Pamela R. Ubrig Print Name :� . . p •. �1 I .�� l r,�l�\�.1/1�l .i- - Lynn A.Lorenson Print Name City Attomey Title/Organization .�Y'Q�r�nArm Signature Trena Larson Print Name Director of Finance Title/Organization Date � -�S �3F��% Date u FC—�I �o Date �li�li� Date K1Pml�s\fi044360a GroveSlree�Geo�x�mcaN00-0ONTRACTID5 ConlraclMOtlilicetion_SUrvay-Crvi451ormWater�fi0G436�0 fleNSetlRmentlmen�l.tlocx Return to: Name: Cliff Shierk Address: 558 North Main Sireet Oshkosh, WI54901 Email: cliff.sheirk�aecom.com Phone: 920236.6711 K Wrolec6\60943fiO4_Gmve S�ree� Geo�echnica�l0p-CONTRpCT�WS_COnVad Modi4ca�ion_Survey-Civil-Slortn W elaf�e0CC3fi� Fevisetl Amentlment 1 Loca