HomeMy WebLinkAboutPWC CNT 15-06/CHR OR 1/ Al Dix ConcreteDEPART'.YIENT OF PUBLIC WORKS
215 Church Avenue
P.O. Boz 1130
Oshkash, N'iscoosin 54903-1130
PM1.(920)236-5065
Rax (92U)236-5068
January 19, 2016
Mr. A1 Dix
A1 Dix Concrete, I�c.
500 D�aper Street
Kaukauna, WI 54130
Subject: ChangeOrderNo.l
Contract 15-06
Deaz Mr. Dix:
►�
/�JI �l/11 I
Endosed is an executed copy of Change Order No. 1 between the City of Oshkosh and A1 Dix Concrete,
Inc. regazding the abovementioned project.
If you have any questions, please call our o�ce a[ (920)236-5065.
Sincerely,
es Rabe, P.E., CPE� � I" 1
irector of Public Works
iewm
Enclosure: Change Order No. 1
cc: Pam Ubrig, Ciry Clerk (w/original)
Taza Wendt, Assistant Finance D'uector (w/copy)
File (w/original)
��0���e�ois coxrn.�crsis.osce�� s�e....uM�. s x.h,e)a,o�M wom..�m�KO��.� um�cn..e= Page 1 of I
om<�nsme.���mcoai�� �.is.ieeoa
TO: AL DIX CONCRETE, INC.
500DRAPERSTREET
KAUKAUNA, WI 54130
CHANGE�ORCDER i�i �� a01 S
DATE: eMJac/ �
Yaur present conirad wilh the City of Oshkosh, Conlract No. 1SOfi, awarded April 28, 2015, is hereby
amentled antl changed as follows:
NETINCREASETO: SECTIONI-PAVING
NETINCREASETO: SECTIONII-STORM SEWER
NET INCREASE TO CONTRACT
$125.154.26
$12,400.00
5137,564.26
SECTION I SECTION II
(PAVIN�) (STORM) TOTALS
BID TOTAL . 5927,390.00 $10,000.00 �: ' � �..'� 3937,390.00 ��
CA@i $125,15426 $'12,40000 ..:: 5137.fib426!
CONTRACTTOThL�.'��-� 1,064,6A6.28 "f22.400.00 J�;1,074,844:26�;
CI7V OF OSHKOSH
BY:
City Manager
� _
�� ��Gity Clerk
r ed and acceptetl:
c4 :(�-
Contractor
I certify ihat provision has been made to pay ihe liability that will accrue to ihe City of Oshkosh, Wisconsin,
under the withln Change Order.
�. .. `�� (e�L} A �1M
CompUOlier
Approved as t 1ortn: S� ;,
I � �/ �
Clly Atto
CONTRACT 15-06 CHANGE ORDER Mi
SECTION I - PAVING
ITEM OESLFIPTION UNIT �ONTRALT INSTALLEO NET NET UNIT INCFFASEIN OECREFSEIN
NUMBER QUANTITY QUTNTITIES INCREASE OWFFASE PRICE CONTRpCTPFICE CONTRACTPRICE
Removing curb and gutter, Linear
1110 wm lete as s ecifietl Feet 200.00 335.50 735.50 E0.50 8609]5
Removing concrete antl
asphalt sitlewalk and
tlriveway, mmplete as Spuare
140 s ecifed Fee� 98,120.00 136,869.86 38,I49.86 $1.10 $42,624B5
Removing concrete and
asphalt sitlewalk antl
tlriveway, Washington
Monument, complete as Squa�e
1120B s ecified Feet 1,880.00 1,880.00 81.10
7" wncrete pavemenl
removal antl replacement,
inclutling sawing, pavement
ties, integral curb and
grotling, excavafing, 6"
CABq terracing, antl trzffc
contml, complete as Square
1308 5 ecifetl YaMS 1,200.00 165.18 -1,03d82 $50.00 E51,741.00
8" concrete pavement
removal antl replacement,
inclutling sawing, pavement
ties, integral cur� antl
grading, exwvating, 6"
CABC, �erracing, and �reHic
conlml, comple[e as Square
7318 specifetl VaMS 1]50.00 1,366.3] 38363 555.00 $21,09965
8" concrete pavement HES
removal and replacement,
inclutling sawing, pavement
lies, integrel cu�b and
grading, ezwvating, 6"
CABC, �erracing, and tra�c
wntrol, wmplele as SQUare
1319 s ecifiatl VarES 600.00 1,035.]] 435.]] E60.00 $2Q146.20
Atljust manholes and inlets.
1360 com lete as s ecifetl Each 5.00 3.04 -2.00 $300.00 $600.00
Tud restoration, complete as SQUare
13]0 s cifetl VarES 404.00 265.99 -139.01 E8.00 $1,W2.08
Tud restoretion, Was�ington
Monument, complete as Square
13�OB s ecifetl YarES 1,000.00 0.00 -1,000.00 510.00 $10,000.00
12" radlus wrb wit� 6" CABC
and gretling, wmplele as Linear
1410 s cifetl Feel 254.00 0.00 -250.00 $8.00 $2,000.00
30" curb antl guner, ]' wit� 5"
CABG antl gratling, complele Linear
1440 as s eci(etl Feel 504.00 509.80 9.80 $26.00 5254.80
Sitlewalk cur0, complete as Linear
1460 5 ecifetl Feet 25.�0 121.90 96.90 $25.OD $2,422.50
4" concrete sitlewalk with 3"
CABC antl gratling, complete Square
1500 ass eci(etl Feet �8,420.00 103,844.50 25,42a.50 $9.50 $88,985]5
4" concrete sidewalk with 3"
CABC antl gratling, Square
1500B Washin ron Manumen�, Feel 1,88�.�0 1 880.�0 $dA0
4" wncrete sitlewalk with 3"
CABC antl grading, water
department locations, Square
7502 com lete as s ecifetl Feet 3,000.00 4p59.89 1 459.89 $625 E9,124.31
Page 1 013
GONTRALTIS-06CXANGEORDERk1
REM DESCftIPTION UNIT CONTRACT /NSTRLLEO NET NET UNIi INCRFASEIN OECRFASEIN
NUM9EF QWNiIT' QWNTITIES INCREASE OECRETSE PRICE CONIFACTPRICE CONTRACTVRICE
6" concrete sitlewalk/
tlriveway/ramp with 3" CABC
and grading, complete as Square
1510 s ecifetl Fee� 45,000.00 68,23827 3R382] $3.85 512,66].34
6" wncrete sitlewalW
driveway/ramp with 3" CABC
and gratling,water
tlepatlment localions, Square
7512 com lete as s cifietl Fee� 2,500.00 2,010.65 -089.35 $�.00 $3p25.45
8" concrete sidewalW
tlriveway/ramp, with 3" CABC
antl greding, complete as Square
1520 s ecifetl Feet 1,000.00 1,]96.38 ]96.38 $6.00 $6,�6628
Curb ramp tletectable
warning feltl (na�uroUnon-
paintetl), wmplete as Square
1560 5 cifeG Fee� 250.00 180.00 -10.00 $2fi.00 $1,820.00
No. 4 reinforcing mES -
tlefortneq epory-coated, Linear
1550 com lete as s ecifetl Feet 2,000.00 1,946.00 -56.00 51.10 $61.60
Drilletl No. 4 sitlewalk tie bars
- tletormetl, epozy-coateq
complete as specifed
1560 Each 6,000.00 12,108.04 6,108.00 54.00 $26,632.00
Cold weather covering
(siEewalk)-singlevisquine, Square
1580 wm lete as 5 eciTed Feet 1,000.00 0.00 4,000.00 $0.05 $50.00
Coltl weather covering
(sitlewalk)-GOUClavisquine, Square
7582 com leteass ecifetl Feet 1,000.00 0.00 4,000.00 50.05 $50.00
Coltl weather covering
(sidewalk) - tlouble visquine
wit� 6' hay, wmplete aa Square
1584 s ecifetl Feet 50�.00 0.00 -500.00 $OAS $25.00
Up-charge (or late season
wncre�e sidewalk, tlriveway,
or ramps, complete as Square
1590 s ecifetl Feet 500.00 0.00 -500.00 $1.00 $500.00
Up-charge for late seasan
concrete pavemen�, rqmplete SQUare
1591 ass ecifetl Vartls 200.00 4]0.08 2]0.08 $5.00 E1.35060
Sawing existing pavement, Linear
1]00 com leteass cifetl Feet 8,000.00 3,935.00 <,065.00 82.50 810,162.50
Pmfile saw cut <oncrete curE, Linear
1]20 com leteass cified Feet 25.�0 0.00 -25.00 540.00 $1,000.00
Base aggregate tlense,'/.",
1800 com leteass cifetl Tons 150.00 0.00 -150.00 E14.00 $2,100.00
Re-gratle existing gravel
tlrrveways, complete as
1820 s ecifetl Tons ]5.00 0.00 -]5.00 $20.00 $1,500.00
4' asphattic pavement with
10" CABC antl gratling, Square
1906 com leteass cifetl Yartls 500.00 235.62 -2fi4.38 $65�0 $1],184]0
Page 2 W 3
CONTRACTIS-06CHANGEOROERtl1
SECTIONI-�BIOITEM51110�19]0�-SUBTOTAL f�13,186.18 �f1Y8,686.98)
SECTIONI-ADDITIONALWORKREQUIRED: COtl1
ITEM OESCRIPTION UNIT COMFACT INSTALLED NET NET UNIT INCRFASEIN OECRfASEIN
NUMBER QUTNIITY QUAMITIES MCREASE DELFFASE PRICE CONTRACTPFICE COATRACTVRICE
Tud resroretion, Was�ington
Monumenl, complele as Lump
13]OB s cifietl Sum 0.00 1.00 1.00 59,000.00 E9000.00
Atlditional negotialetl wst for
4" 8 fi" sitlewalk installation
at Algoma Park (1 ]d0
squarefeel�$�.SOlsquare Lump
10000 (ool �, com lete as s ecifietl Sum 0.00 1.00 1.0� $B]0.00 88]0.00
Atlditional negotia�etl cos� fo�
4" & 6" sitlewalk inslallation
al Teic�miller Park (3,331.8
squarefeel@$0.50/square Wmp
10001 foot ; wm lete as s ecifetl Sum 0.00 1.00 1.00 81,fi65.90 57,665.90
Addi�ional woM on Wes[ 20Ih
Avenue antl West South Pa�k
Avenue, per Proposal tlatetl
July 10, 2015;complete as Lump
10002 s eciFletl Sum 0.00 1.0� 1.00 519,500.00 819,500A0
Atltlitional work for High
Avenue Cmssing a� UW
Oshkosh's Sage Mall (to be
�eimbureetl by UW Oshkosh); Wmp
10003 com lete as s ecifad Sum 0.00 1.00 1.00 59,621.76 89b21.16
SECTIONI-�ADDITIONALWORKREOUIRED: COp11TEM513lOB-10003)-SUBTOTAL f40,65'l.O6 50.00
NET INCREASE TO: SECTION I 5125,150.38
SECTION II - STORM SEWER
��M OESCRIPTION UNIT CONTRACT MSiALLEO NET NET UNIT INCREASEIN OECFE45EIN
NUMBER QUrINTITY QUANTITIES MCREASE DELRE45E PFICE CON�RACTPRICE CONTRALTPRICf
Type 0 inlet
m, complete as
SECTION II -(BIO ITEMS 2856-1831) - SUBTOTAL
NET INCREASE TO: SECTION II
NET INCREASE TO SECTION51 811:
NET �ECREASE TO SECTIONS I 8 II:
NET INCREASE TO CONTRACT:
Fage]M3
$200.00
$6.00
E18,/00.00 (§6,000.00)
§12,400.00
57]2,Id1.Zd
15�31,68fi.98)
513�,556.26