Loading...
HomeMy WebLinkAboutPWC CNT 15-06/CHR OR 1/ Al Dix ConcreteDEPART'.YIENT OF PUBLIC WORKS 215 Church Avenue P.O. Boz 1130 Oshkash, N'iscoosin 54903-1130 PM1.(920)236-5065 Rax (92U)236-5068 January 19, 2016 Mr. A1 Dix A1 Dix Concrete, I�c. 500 D�aper Street Kaukauna, WI 54130 Subject: ChangeOrderNo.l Contract 15-06 Deaz Mr. Dix: ►� /�JI �l/11 I Endosed is an executed copy of Change Order No. 1 between the City of Oshkosh and A1 Dix Concrete, Inc. regazding the abovementioned project. If you have any questions, please call our o�ce a[ (920)236-5065. Sincerely, es Rabe, P.E., CPE� � I" 1 irector of Public Works iewm Enclosure: Change Order No. 1 cc: Pam Ubrig, Ciry Clerk (w/original) Taza Wendt, Assistant Finance D'uector (w/copy) File (w/original) ��0���e�ois coxrn.�crsis.osce�� s�e....uM�. s x.h,e)a,o�M wom..�m�KO��.� um�cn..e= Page 1 of I om<�nsme.���mcoai�� �.is.ieeoa TO: AL DIX CONCRETE, INC. 500DRAPERSTREET KAUKAUNA, WI 54130 CHANGE�ORCDER i�i �� a01 S DATE: eMJac/ � Yaur present conirad wilh the City of Oshkosh, Conlract No. 1SOfi, awarded April 28, 2015, is hereby amentled antl changed as follows: NETINCREASETO: SECTIONI-PAVING NETINCREASETO: SECTIONII-STORM SEWER NET INCREASE TO CONTRACT $125.154.26 $12,400.00 5137,564.26 SECTION I SECTION II (PAVIN�) (STORM) TOTALS BID TOTAL . 5927,390.00 $10,000.00 �: ' � �..'� 3937,390.00 �� CA@i $125,15426 $'12,40000 ..:: 5137.fib426! CONTRACTTOThL�.'��-� 1,064,6A6.28 "f22.400.00 J�;1,074,844:26�; CI7V OF OSHKOSH BY: City Manager � _ �� ��Gity Clerk r ed and acceptetl: c4 :(�- Contractor I certify ihat provision has been made to pay ihe liability that will accrue to ihe City of Oshkosh, Wisconsin, under the withln Change Order. �. .. `�� (e�L} A �1M CompUOlier Approved as t 1ortn: S� ;, I � �/ � Clly Atto CONTRACT 15-06 CHANGE ORDER Mi SECTION I - PAVING ITEM OESLFIPTION UNIT �ONTRALT INSTALLEO NET NET UNIT INCFFASEIN OECREFSEIN NUMBER QUANTITY QUTNTITIES INCREASE OWFFASE PRICE CONTRpCTPFICE CONTRACTPRICE Removing curb and gutter, Linear 1110 wm lete as s ecifietl Feet 200.00 335.50 735.50 E0.50 8609]5 Removing concrete antl asphalt sitlewalk and tlriveway, mmplete as Spuare 140 s ecifed Fee� 98,120.00 136,869.86 38,I49.86 $1.10 $42,624B5 Removing concrete and asphalt sitlewalk antl tlriveway, Washington Monument, complete as Squa�e 1120B s ecified Feet 1,880.00 1,880.00 81.10 7" wncrete pavemenl removal antl replacement, inclutling sawing, pavement ties, integral curb and grotling, excavafing, 6" CABq terracing, antl trzffc contml, complete as Square 1308 5 ecifetl YaMS 1,200.00 165.18 -1,03d82 $50.00 E51,741.00 8" concrete pavement removal antl replacement, inclutling sawing, pavement ties, integral cur� antl grading, exwvating, 6" CABC, �erracing, and �reHic conlml, comple[e as Square 7318 specifetl VaMS 1]50.00 1,366.3] 38363 555.00 $21,09965 8" concrete pavement HES removal and replacement, inclutling sawing, pavement lies, integrel cu�b and grading, ezwvating, 6" CABC, �erracing, and tra�c wntrol, wmplele as SQUare 1319 s ecifiatl VarES 600.00 1,035.]] 435.]] E60.00 $2Q146.20 Atljust manholes and inlets. 1360 com lete as s ecifetl Each 5.00 3.04 -2.00 $300.00 $600.00 Tud restoration, complete as SQUare 13]0 s cifetl VarES 404.00 265.99 -139.01 E8.00 $1,W2.08 Tud restoretion, Was�ington Monument, complete as Square 13�OB s ecifetl YarES 1,000.00 0.00 -1,000.00 510.00 $10,000.00 12" radlus wrb wit� 6" CABC and gretling, wmplele as Linear 1410 s cifetl Feel 254.00 0.00 -250.00 $8.00 $2,000.00 30" curb antl guner, ]' wit� 5" CABG antl gratling, complele Linear 1440 as s eci(etl Feel 504.00 509.80 9.80 $26.00 5254.80 Sitlewalk cur0, complete as Linear 1460 5 ecifetl Feet 25.�0 121.90 96.90 $25.OD $2,422.50 4" concrete sitlewalk with 3" CABC antl gratling, complete Square 1500 ass eci(etl Feet �8,420.00 103,844.50 25,42a.50 $9.50 $88,985]5 4" concrete sidewalk with 3" CABC antl gratling, Square 1500B Washin ron Manumen�, Feel 1,88�.�0 1 880.�0 $dA0 4" wncrete sitlewalk with 3" CABC antl grading, water department locations, Square 7502 com lete as s ecifetl Feet 3,000.00 4p59.89 1 459.89 $625 E9,124.31 Page 1 013 GONTRALTIS-06CXANGEORDERk1 REM DESCftIPTION UNIT CONTRACT /NSTRLLEO NET NET UNIi INCRFASEIN OECRFASEIN NUM9EF QWNiIT' QWNTITIES INCREASE OECRETSE PRICE CONIFACTPRICE CONTRACTVRICE 6" concrete sitlewalk/ tlriveway/ramp with 3" CABC and grading, complete as Square 1510 s ecifetl Fee� 45,000.00 68,23827 3R382] $3.85 512,66].34 6" wncrete sitlewalW driveway/ramp with 3" CABC and gratling,water tlepatlment localions, Square 7512 com lete as s cifietl Fee� 2,500.00 2,010.65 -089.35 $�.00 $3p25.45 8" concrete sidewalW tlriveway/ramp, with 3" CABC antl greding, complete as Square 1520 s ecifetl Feet 1,000.00 1,]96.38 ]96.38 $6.00 $6,�6628 Curb ramp tletectable warning feltl (na�uroUnon- paintetl), wmplete as Square 1560 5 cifeG Fee� 250.00 180.00 -10.00 $2fi.00 $1,820.00 No. 4 reinforcing mES - tlefortneq epory-coated, Linear 1550 com lete as s ecifetl Feet 2,000.00 1,946.00 -56.00 51.10 $61.60 Drilletl No. 4 sitlewalk tie bars - tletormetl, epozy-coateq complete as specifed 1560 Each 6,000.00 12,108.04 6,108.00 54.00 $26,632.00 Cold weather covering (siEewalk)-singlevisquine, Square 1580 wm lete as 5 eciTed Feet 1,000.00 0.00 4,000.00 $0.05 $50.00 Coltl weather covering (sitlewalk)-GOUClavisquine, Square 7582 com leteass ecifetl Feet 1,000.00 0.00 4,000.00 50.05 $50.00 Coltl weather covering (sidewalk) - tlouble visquine wit� 6' hay, wmplete aa Square 1584 s ecifetl Feet 50�.00 0.00 -500.00 $OAS $25.00 Up-charge (or late season wncre�e sidewalk, tlriveway, or ramps, complete as Square 1590 s ecifetl Feet 500.00 0.00 -500.00 $1.00 $500.00 Up-charge for late seasan concrete pavemen�, rqmplete SQUare 1591 ass ecifetl Vartls 200.00 4]0.08 2]0.08 $5.00 E1.35060 Sawing existing pavement, Linear 1]00 com leteass cifetl Feet 8,000.00 3,935.00 <,065.00 82.50 810,162.50 Pmfile saw cut <oncrete curE, Linear 1]20 com leteass cified Feet 25.�0 0.00 -25.00 540.00 $1,000.00 Base aggregate tlense,'/.", 1800 com leteass cifetl Tons 150.00 0.00 -150.00 E14.00 $2,100.00 Re-gratle existing gravel tlrrveways, complete as 1820 s ecifetl Tons ]5.00 0.00 -]5.00 $20.00 $1,500.00 4' asphattic pavement with 10" CABC antl gratling, Square 1906 com leteass cifetl Yartls 500.00 235.62 -2fi4.38 $65�0 $1],184]0 Page 2 W 3 CONTRACTIS-06CHANGEOROERtl1 SECTIONI-�BIOITEM51110�19]0�-SUBTOTAL f�13,186.18 �f1Y8,686.98) SECTIONI-ADDITIONALWORKREQUIRED: COtl1 ITEM OESCRIPTION UNIT COMFACT INSTALLED NET NET UNIT INCRFASEIN OECRfASEIN NUMBER QUTNIITY QUAMITIES MCREASE DELFFASE PRICE CONTRACTPFICE COATRACTVRICE Tud resroretion, Was�ington Monumenl, complele as Lump 13]OB s cifietl Sum 0.00 1.00 1.00 59,000.00 E9000.00 Atlditional negotialetl wst for 4" 8 fi" sitlewalk installation at Algoma Park (1 ]d0 squarefeel�$�.SOlsquare Lump 10000 (ool �, com lete as s ecifietl Sum 0.00 1.00 1.0� $B]0.00 88]0.00 Atlditional negotia�etl cos� fo� 4" & 6" sitlewalk inslallation al Teic�miller Park (3,331.8 squarefeel@$0.50/square Wmp 10001 foot ; wm lete as s ecifetl Sum 0.00 1.00 1.00 81,fi65.90 57,665.90 Addi�ional woM on Wes[ 20Ih Avenue antl West South Pa�k Avenue, per Proposal tlatetl July 10, 2015;complete as Lump 10002 s eciFletl Sum 0.00 1.0� 1.00 519,500.00 819,500A0 Atltlitional work for High Avenue Cmssing a� UW Oshkosh's Sage Mall (to be �eimbureetl by UW Oshkosh); Wmp 10003 com lete as s ecifad Sum 0.00 1.00 1.00 59,621.76 89b21.16 SECTIONI-�ADDITIONALWORKREOUIRED: COp11TEM513lOB-10003)-SUBTOTAL f40,65'l.O6 50.00 NET INCREASE TO: SECTION I 5125,150.38 SECTION II - STORM SEWER ��M OESCRIPTION UNIT CONTRACT MSiALLEO NET NET UNIT INCREASEIN OECFE45EIN NUMBER QUrINTITY QUANTITIES MCREASE DELRE45E PFICE CON�RACTPRICE CONTRALTPRICf Type 0 inlet m, complete as SECTION II -(BIO ITEMS 2856-1831) - SUBTOTAL NET INCREASE TO: SECTION II NET INCREASE TO SECTION51 811: NET �ECREASE TO SECTIONS I 8 II: NET INCREASE TO CONTRACT: Fage]M3 $200.00 $6.00 E18,/00.00 (§6,000.00) §12,400.00 57]2,Id1.Zd 15�31,68fi.98) 513�,556.26