HomeMy WebLinkAbout09. 16-04JANUARY 12, 2016 16-04 RESOLUTION (CARRIED__7-0____LOST________LAID OVER_______WITHDRAWN_______) PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 15-06 WITH AL DIX CONRETE, INC. FOR PAVING AND STORM SEWER WORK (+$137,554.26) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: AL DIX CONCRETE, INC. 500 Draper Street Kaukauna, WI 54130 Net Increase to contract: $137,554.26 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 311-0410-7480-00000 Sidewalk Construction Fund 315-0410-7480-00000 Street Improvement Fund Expenditures 317-0410-7480-03301 Special Assessments Fund – Streets 317-0410-7480-03302 Special Assessments Fund – Sewer 317-0410-7480-03303 Special Assessments Fund – Water 317-0410-7480-03304 Special Assessment Fund – Sidewalks 317-0410-7480-03305 Special Assessments Fund - Storm Water 541-1810-1799-00000 Water Utility - Construction in Progress 551-1910-1799-00000 Sewer Utility - Construction in Progress 561-2010-1799-00000 Storm Utility - Construction in Progress 323-0801-7206-06303 Property Improvement Fund - Traffic Equipment 323-0740-7216-06316 Property Improvement Fund - Land Improvement 325-0610-7214-07508 Park Improvement Fund - Buildings .1110) OlH<Ol- ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works 4=0:?j DATE: January 7, 2016 RE: Change Order No. 1 for Public Works Contract No. 15-06 Concrete Sidewalk Al Dix Concrete, Inc. (+$137,554.26) BACKGROUND Change Order No. 1 for Contract 15-06 is scheduled for consideration by the Common Council at the January 12, 2016 meeting. The contract was originally awarded to Al Dix Concrete, Inc. in April of 2015. This change order is for final quantities and additional services provided. ANALYSIS Following is a summary of the significant changes to each section of the CIP/Operating Budget: • Sidewalk — Additional work for the University of Wisconsin-Oshkosh for the relocation of the Hawk system at Sage Hall, additional ordered in sidewalk at West 20th Avenue and West South Park Avenue to allow the Wisconsin Department of Transportation to perform signal work, and additional requested sidewalk and driveway approaches throughout the City. • Water Utility Operating —Additional work and materials required to match field conditions. • Property Improvements —Additional work and materials were required to match field conditions at the George Washington monument; work at Teichmiller Park was added to this contract. • Park Improvements—Work at Algoma Park was added to this contract. FISCAL IMPACT Contract Section Change Order Amount New Contract Total CIP Budget Amount CIP - Sidewalk $109,614.99 $796,406.99 $770,000.00 Water Utility Operating $5,286.76 $236,296.76 $236,296.76 Park Improvements $6,960.00 $6,960.00 $6,960.00 Property Improvements $15,692.51 $35,280.51, $35,280.51 Total $137,554.26 $1,074,944.26 $1,048,537.27 Funding for the sidewalk rehabilitation portion of the project is in the 2015 Capital Improvement Program (CIP) Sidewalk Section and in the Water Utility Operating Budget. The overage in the Sidewalk section of the 2015 CIP is all work for which the City will be reimbursed. The University of Wisconsin-Oshkosh will be invoiced $9,621.16 for their portion and property owners will be billed for work done abutting their property. Funding for the George Washington Monument and Teichmiller Park portions of the project is available from the Great Neighborhood Initiative project in the Property Improvements section of the CIP. Funding for Algoma Park is available from the Park Improvements section of the 2015 CIP. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 15-06 in the amount of +$137,554.26 to Al Dix Concrete, Inc. Approved: / M k A. Rohioff City Manager I:\Engineering\2015 CONTRACTS\15-06 Conc Sidewalk(New&Rehab)\Project_Information\Correspondence\Memo\15-06 CO#1 Memo_1-7-16.docx TO: AL DIX CONCRETE, INC. CHANGE ORDER#1 500 DRAPER STREET DATE: fyie°W.bei 1 61 0P-4015 KAUKAUNA,WI 54130 Your present contract with the City of Oshkosh, Contract No. 15-06, awarded April 28,2015, is hereby amended and changed as follows: NET INCREASE TO: SECTION I-PAVING $125,154.26 NET INCREASE TO: SECTION II-STORM SEWER $12,400.00 NET INCREASE TO CONTRACT $137,554.26 SECTION 1 SECTION II (PAVING) (STORM) TOTALS BID TOTAL $927,390.00 $10,000.00 :: :.:'.::;;`;$937,390.00. CO#1 $125,154.26 $12,400.00 $137,554.26? CONTRACT TOTAL:'``$1,052,544.26 $22,400.00` ` '' ' $1,074,944.26 CITY OF OSHKOSH BY: City Manager City Clerk proved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT 15-06 CHANGE ORDER#1 SECTION I-PAVING ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Removing curb and gutter, Linear 1110 complete as specified Feet 200.00 335.50 135.50 $4.50 $609.75 Removing concrete and asphalt sidewalk and driveway, complete as Square 1120 specified Feet 98,120.00 136,869.86 38,749.86 $1.10 $42,624.85 Removing concrete and asphalt sidewalk and driveway,Washington Monument, complete as Square 1120B specified Feet 1,880.00 1,880.00 $1.10 7"concrete pavement removal and replacement, including sawing, pavement ties, integral curb and grading,excavating, 6" CABC,terracing, and traffic control, complete as Square 1308 specified Yards 1,200.00 165.18 -1,034.82 $50.00 ($51,741.00) 8"concrete pavement removal and replacement, including sawing, pavement ties, integral curb and grading,excavating,6" CABC, terracing, and traffic control, complete as Square 1318 specified Yards 1,750.00 1,366.37 -383.63 $55.00 ($21,099.65) 8"concrete pavement HES removal and replacement, including sawing, pavement ties, integral curb and grading, excavating,6" CABC,terracing, and traffic control, complete as Square 1319 specified Yards 600.00 1,035.77 435.77 $60.00 $26,146.20 Adjust manholes and inlets, 1360 complete as specified Each 5.00 3.00 -2.00 $300.00 ($600.00) Turf restoration, complete as Square 1370 specified Yards 400.00 265.99 -134.01 $8.00 ($1,072.08) Turf restoration,Washington Monument,complete as Square 1370B specified Yards 1,000.00 0.00 -1,000.00 $10.00 ($10,000.00) 12"radius curb with 6"CABC and grading, complete as Linear 1410 specified Feet 250.00 0.00 -250.00 $8.00 ($2,000.00) 30"curb and gutter, 7"with 5" CABC and grading, complete Linear 1440 as specified Feet 500.00 509.80 9.80 $26.00 $254.80 Sidewalk curb, complete as Linear 1460 specified Feet 25.00 121.90 96.90 $25.00 $2,422.50 4"concrete sidewalk with 3" CABC and grading, complete Square 1500 as specified Feet 78,420.00 103,844.50 25,424.50 $3.50 $88,985.75 4"concrete sidewalk with 3" CABC and grading, Square 1500B Washington Monument, Feet 1,880.00 1,880.00 $4.00 4"concrete sidewalk with 3" CABC and grading,water department locations, Square 1502 complete as specified Feet 3,000.00 4,459.89 1,459.89 $6.25 $9,124.31 Page 1 of 3 CONTRACT 15-06 CHANGE ORDER#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 6"concrete sidewalk/ driveway/ramp with 3"CABC and grading, complete as Square 1510 specified Feet 45,000.00 48,238.27 3,238.27 $3.85 $12,467.34 6"concrete sidewalk/ driveway/ramp with 3"CABC and grading,water department locations, Square 1512 complete as specified Feet 2,500.00 2,010.65 -489.35 $7.00 ($3,425.45) 8"concrete sidewalk/ driveway/ramp,with 3"CABC and grading, complete as Square 1520 specified Feet 1,000.00 1,794.38 794.38 $6.00 $4,766.28 Curb ramp detectable warning field (natural/non- painted), complete as Square 1540 specified Feet 250.00 180.00 -70.00 $26.00 ($1,820.00) No. 4 reinforcing rods- deformed, epoxy-coated, Linear 1550 complete as specified Feet 2,000.00 1,944.00 -56.00 $1.10 ($61.60) Drilled No.4 sidewalk tie bars -deformed, epoxy-coated, complete as specified 1560 Each 6,000.00 12,108.00 6,108.00 $4.00 $24,432.00 Cold weather covering (sidewalk)-single visquine, Square 1580 complete as specified Feet 1,000.00 0.00 -1,000.00 $0.05 ($50.00) Cold weather covering (sidewalk)-double visquine, Square 1582 complete as specified Feet 1,000.00 0.00 -1,000.00 $0.05 ($50.00) Cold weather covering (sidewalk)-double visquine with 6"hay, complete as Square 1584 specified Feet 500.00 0.00 -500.00 $0.05 ($25.00) Up-charge for late season concrete sidewalk, driveway, or ramps, complete as Square 1590 specified Feet 500.00 0.00 -500.00 $1.00 ($500.00) Up-charge for late season concrete pavement, complete Square 1591 as specified Yards 200.00 470.08 270.08 $5.00 $1,350.40 Sawing existing pavement, Linear 1700 complete as specified Feet 8,000.00 3,935.00 -4,065.00 $2.50 ($10,162.50) Profile saw cut concrete curb, Linear 1720 complete as specified Feet 25.00 0.00 -25.00 $40.00 ($1,000.00) Base aggregate dense, 'A", 1800 complete as specified Tons 150.00 0.00 -150.00 $14.00 ($2,100.00) Re-grade existing gravel driveways, complete as 1820 specified Tons 75.00 0.00 -75.00 $20.00 ($1,500.00) 4"asphaltic pavement with 10"CABC and grading, Square 1906 _complete as specified Yards 500.00 235.62 -264.38 $65.00 ($17,184.70) Page 2 of 3 CONTRACT 15-06 CHANGE ORDER#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2"asphaltic pavement, Square 1920 complete as specified Yards 100.00 14.10 -85.90 $50.00 ($4,295.00) SECTION I-(BID ITEMS 1110-1920)-SUBTOTAL $213,184.18 ($128,686.98) SECTION I-ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Turf restoration,Washington Monument, complete as Lump 1370B specified Sum 0.00 1.00 1.00 $9,000.00 $9,000.00 Additional negotiated cost for 4"&6"sidewalk installation at Algoma Park(1,740 square feet @$0.50/square Lump 10000 foot); complete as specified Sum 0.00 1.00 1.00 $870.00 $870.00 Additional negotiated cost for 4"&6"sidewalk installation at Teichmiller Park(3,331.8 square feet @$0.50/square Lump 10001 foot); complete as specified Sum 0.00 1.00 1.00 $1,665.90 $1,665.90 Additional work on West 20th Avenue and West South Park Avenue, per Proposal dated July 10, 2015; complete as Lump 10002 specified Sum 0.00 1.00 1.00 $19,500.00 $19,500.00 Additional work for High Avenue Crossing at UW Oshkosh's Sage Hall(to be reimbursed by UW Oshkosh); Lump 10003 complete as specified Sum 0.00 1.00 1.00 $9,621.16 $9,621.16 SECTION I-(ADDITIONAL WORK REQUIRED: CO#1 ITEMS 1370B-10003)-SUBTOTAL $40,657.06 $0.00 NET INCREASE TO: SECTION I $125,154.26 SECTION II-STORM SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish, install, maintain, and remove Type D inlet protection, complete as 2856 specified Each 20.00 112.00 92.00 $200.00 $18,400.00 Furnish and install Class I, Square 2932 Urban, Type A erosion Yards 1,000.00 0.00 _-1,000.00 $6.00 ($6,000.00) SECTION II-(BID ITEMS 2856-2932)-SUBTOTAL $18,400.00 ($6,000.00) NET INCREASE TO: SECTION II $12,400.00 NET INCREASE TO SECTIONS I&II: $272,241.24 NET DECREASE TO SECTIONS I&II: ($134,686.98) NET INCREASE TO CONTRACT: $137,554.26 Page 3 of 3