HomeMy WebLinkAbout09. 16-04JANUARY 12, 2016 16-04 RESOLUTION
(CARRIED__7-0____LOST________LAID OVER_______WITHDRAWN_______)
PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS
CONTRACT NO. 15-06 WITH AL DIX CONRETE, INC. FOR PAVING
AND STORM SEWER WORK (+$137,554.26)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
AL DIX CONCRETE, INC.
500 Draper Street
Kaukauna, WI 54130
Net Increase to contract: $137,554.26
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. No. 311-0410-7480-00000 Sidewalk Construction Fund
315-0410-7480-00000 Street Improvement Fund Expenditures
317-0410-7480-03301 Special Assessments Fund – Streets
317-0410-7480-03302 Special Assessments Fund – Sewer
317-0410-7480-03303 Special Assessments Fund – Water
317-0410-7480-03304 Special Assessment Fund – Sidewalks
317-0410-7480-03305 Special Assessments Fund - Storm Water
541-1810-1799-00000 Water Utility - Construction in Progress
551-1910-1799-00000 Sewer Utility - Construction in Progress
561-2010-1799-00000 Storm Utility - Construction in Progress
323-0801-7206-06303 Property Improvement Fund - Traffic
Equipment
323-0740-7216-06316 Property Improvement Fund - Land
Improvement
325-0610-7214-07508 Park Improvement Fund - Buildings
.1110)
OlH<Ol-
ON THE WATER
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works 4=0:?j
DATE: January 7, 2016
RE: Change Order No. 1 for Public Works Contract No. 15-06
Concrete Sidewalk
Al Dix Concrete, Inc. (+$137,554.26)
BACKGROUND
Change Order No. 1 for Contract 15-06 is scheduled for consideration by the Common Council at the January
12, 2016 meeting. The contract was originally awarded to Al Dix Concrete, Inc. in April of 2015. This change
order is for final quantities and additional services provided.
ANALYSIS
Following is a summary of the significant changes to each section of the CIP/Operating Budget:
• Sidewalk — Additional work for the University of Wisconsin-Oshkosh for the relocation of the Hawk
system at Sage Hall, additional ordered in sidewalk at West 20th Avenue and West South Park Avenue
to allow the Wisconsin Department of Transportation to perform signal work, and additional requested
sidewalk and driveway approaches throughout the City.
• Water Utility Operating —Additional work and materials required to match field conditions.
• Property Improvements —Additional work and materials were required to match field conditions at the
George Washington monument; work at Teichmiller Park was added to this contract.
• Park Improvements—Work at Algoma Park was added to this contract.
FISCAL IMPACT
Contract Section Change Order Amount New Contract Total CIP Budget Amount
CIP - Sidewalk $109,614.99 $796,406.99 $770,000.00
Water Utility Operating $5,286.76 $236,296.76 $236,296.76
Park Improvements $6,960.00 $6,960.00 $6,960.00
Property Improvements $15,692.51 $35,280.51, $35,280.51
Total $137,554.26 $1,074,944.26 $1,048,537.27
Funding for the sidewalk rehabilitation portion of the project is in the 2015 Capital Improvement Program (CIP)
Sidewalk Section and in the Water Utility Operating Budget. The overage in the Sidewalk section of the 2015
CIP is all work for which the City will be reimbursed. The University of Wisconsin-Oshkosh will be invoiced
$9,621.16 for their portion and property owners will be billed for work done abutting their property. Funding for
the George Washington Monument and Teichmiller Park portions of the project is available from the Great
Neighborhood Initiative project in the Property Improvements section of the CIP. Funding for Algoma Park is
available from the Park Improvements section of the 2015 CIP.
RECOMMENDATIONS
I recommend approval of Change Order No. 1 to Contact No. 15-06 in the amount of +$137,554.26 to Al Dix
Concrete, Inc.
Approved: /
M k A. Rohioff
City Manager
I:\Engineering\2015 CONTRACTS\15-06 Conc Sidewalk(New&Rehab)\Project_Information\Correspondence\Memo\15-06 CO#1 Memo_1-7-16.docx
TO: AL DIX CONCRETE, INC. CHANGE ORDER#1
500 DRAPER STREET DATE: fyie°W.bei 1 61 0P-4015
KAUKAUNA,WI 54130
Your present contract with the City of Oshkosh, Contract No. 15-06, awarded April 28,2015, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION I-PAVING $125,154.26
NET INCREASE TO: SECTION II-STORM SEWER $12,400.00
NET INCREASE TO CONTRACT $137,554.26
SECTION 1 SECTION II
(PAVING) (STORM) TOTALS
BID TOTAL $927,390.00 $10,000.00 :: :.:'.::;;`;$937,390.00.
CO#1 $125,154.26 $12,400.00 $137,554.26?
CONTRACT TOTAL:'``$1,052,544.26 $22,400.00` ` '' ' $1,074,944.26
CITY OF OSHKOSH
BY:
City Manager
City Clerk
proved and accepted:
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin,
under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT 15-06 CHANGE ORDER#1
SECTION I-PAVING
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Removing curb and gutter, Linear
1110 complete as specified Feet 200.00 335.50 135.50 $4.50 $609.75
Removing concrete and
asphalt sidewalk and
driveway, complete as Square
1120 specified Feet 98,120.00 136,869.86 38,749.86 $1.10 $42,624.85
Removing concrete and
asphalt sidewalk and
driveway,Washington
Monument, complete as Square
1120B specified Feet 1,880.00 1,880.00 $1.10
7"concrete pavement
removal and replacement,
including sawing, pavement
ties, integral curb and
grading,excavating, 6"
CABC,terracing, and traffic
control, complete as Square
1308 specified Yards 1,200.00 165.18 -1,034.82 $50.00 ($51,741.00)
8"concrete pavement
removal and replacement,
including sawing, pavement
ties, integral curb and
grading,excavating,6"
CABC, terracing, and traffic
control, complete as Square
1318 specified Yards 1,750.00 1,366.37 -383.63 $55.00 ($21,099.65)
8"concrete pavement HES
removal and replacement,
including sawing, pavement
ties, integral curb and
grading, excavating,6"
CABC,terracing, and traffic
control, complete as Square
1319 specified Yards 600.00 1,035.77 435.77 $60.00 $26,146.20
Adjust manholes and inlets,
1360 complete as specified Each 5.00 3.00 -2.00 $300.00 ($600.00)
Turf restoration, complete as Square
1370 specified Yards 400.00 265.99 -134.01 $8.00 ($1,072.08)
Turf restoration,Washington
Monument,complete as Square
1370B specified Yards 1,000.00 0.00 -1,000.00 $10.00 ($10,000.00)
12"radius curb with 6"CABC
and grading, complete as Linear
1410 specified Feet 250.00 0.00 -250.00 $8.00 ($2,000.00)
30"curb and gutter, 7"with 5"
CABC and grading, complete Linear
1440 as specified Feet 500.00 509.80 9.80 $26.00 $254.80
Sidewalk curb, complete as Linear
1460 specified Feet 25.00 121.90 96.90 $25.00 $2,422.50
4"concrete sidewalk with 3"
CABC and grading, complete Square
1500 as specified Feet 78,420.00 103,844.50 25,424.50 $3.50 $88,985.75
4"concrete sidewalk with 3"
CABC and grading, Square
1500B Washington Monument, Feet 1,880.00 1,880.00 $4.00
4"concrete sidewalk with 3"
CABC and grading,water
department locations, Square
1502 complete as specified Feet 3,000.00 4,459.89 1,459.89 $6.25 $9,124.31
Page 1 of 3
CONTRACT 15-06 CHANGE ORDER#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
6"concrete sidewalk/
driveway/ramp with 3"CABC
and grading, complete as Square
1510 specified Feet 45,000.00 48,238.27 3,238.27 $3.85 $12,467.34
6"concrete sidewalk/
driveway/ramp with 3"CABC
and grading,water
department locations, Square
1512 complete as specified Feet 2,500.00 2,010.65 -489.35 $7.00 ($3,425.45)
8"concrete sidewalk/
driveway/ramp,with 3"CABC
and grading, complete as Square
1520 specified Feet 1,000.00 1,794.38 794.38 $6.00 $4,766.28
Curb ramp detectable
warning field (natural/non-
painted), complete as Square
1540 specified Feet 250.00 180.00 -70.00 $26.00 ($1,820.00)
No. 4 reinforcing rods-
deformed, epoxy-coated, Linear
1550 complete as specified Feet 2,000.00 1,944.00 -56.00 $1.10 ($61.60)
Drilled No.4 sidewalk tie bars
-deformed, epoxy-coated,
complete as specified
1560 Each 6,000.00 12,108.00 6,108.00 $4.00 $24,432.00
Cold weather covering
(sidewalk)-single visquine, Square
1580 complete as specified Feet 1,000.00 0.00 -1,000.00 $0.05 ($50.00)
Cold weather covering
(sidewalk)-double visquine, Square
1582 complete as specified Feet 1,000.00 0.00 -1,000.00 $0.05 ($50.00)
Cold weather covering
(sidewalk)-double visquine
with 6"hay, complete as Square
1584 specified Feet 500.00 0.00 -500.00 $0.05 ($25.00)
Up-charge for late season
concrete sidewalk, driveway,
or ramps, complete as Square
1590 specified Feet 500.00 0.00 -500.00 $1.00 ($500.00)
Up-charge for late season
concrete pavement, complete Square
1591 as specified Yards 200.00 470.08 270.08 $5.00 $1,350.40
Sawing existing pavement, Linear
1700 complete as specified Feet 8,000.00 3,935.00 -4,065.00 $2.50 ($10,162.50)
Profile saw cut concrete curb, Linear
1720 complete as specified Feet 25.00 0.00 -25.00 $40.00 ($1,000.00)
Base aggregate dense, 'A",
1800 complete as specified Tons 150.00 0.00 -150.00 $14.00 ($2,100.00)
Re-grade existing gravel
driveways, complete as
1820 specified Tons 75.00 0.00 -75.00 $20.00 ($1,500.00)
4"asphaltic pavement with
10"CABC and grading, Square
1906 _complete as specified Yards 500.00 235.62 -264.38 $65.00 ($17,184.70)
Page 2 of 3
CONTRACT 15-06 CHANGE ORDER#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
2"asphaltic pavement, Square
1920 complete as specified Yards 100.00 14.10 -85.90 $50.00 ($4,295.00)
SECTION I-(BID ITEMS 1110-1920)-SUBTOTAL $213,184.18 ($128,686.98)
SECTION I-ADDITIONAL WORK REQUIRED: CO#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Turf restoration,Washington
Monument, complete as Lump
1370B specified Sum 0.00 1.00 1.00 $9,000.00 $9,000.00
Additional negotiated cost for
4"&6"sidewalk installation
at Algoma Park(1,740
square feet @$0.50/square Lump
10000 foot); complete as specified Sum 0.00 1.00 1.00 $870.00 $870.00
Additional negotiated cost for
4"&6"sidewalk installation
at Teichmiller Park(3,331.8
square feet @$0.50/square Lump
10001 foot); complete as specified Sum 0.00 1.00 1.00 $1,665.90 $1,665.90
Additional work on West 20th
Avenue and West South Park
Avenue, per Proposal dated
July 10, 2015; complete as Lump
10002 specified Sum 0.00 1.00 1.00 $19,500.00 $19,500.00
Additional work for High
Avenue Crossing at UW
Oshkosh's Sage Hall(to be
reimbursed by UW Oshkosh); Lump
10003 complete as specified Sum 0.00 1.00 1.00 $9,621.16 $9,621.16
SECTION I-(ADDITIONAL WORK REQUIRED: CO#1 ITEMS 1370B-10003)-SUBTOTAL $40,657.06 $0.00
NET INCREASE TO: SECTION I $125,154.26
SECTION II-STORM SEWER
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish, install, maintain, and
remove Type D inlet
protection, complete as
2856 specified Each 20.00 112.00 92.00 $200.00 $18,400.00
Furnish and install Class I, Square
2932 Urban, Type A erosion Yards 1,000.00 0.00 _-1,000.00 $6.00 ($6,000.00)
SECTION II-(BID ITEMS 2856-2932)-SUBTOTAL $18,400.00 ($6,000.00)
NET INCREASE TO: SECTION II $12,400.00
NET INCREASE TO SECTIONS I&II: $272,241.24
NET DECREASE TO SECTIONS I&II: ($134,686.98)
NET INCREASE TO CONTRACT: $137,554.26