HomeMy WebLinkAboutPW CNT 15-05/CNG OR 1/Jossart BrothersDEPARTMENT OF PUB WC W ORKS
215 Church Avenue
P.O. Box 1130
Oshkosh,Wisconsin Sd903-1130
Ph. (9?A) 2365065
Fax (920)236-5068
December 1 S, 2015
Mr. Jason Hermsen
Jossart Brothers, Inc.
1682 Swan Drive
DePere, WI 54115
Re� Change Order No. 1(Final)
Contract 15-OS
Deaz Mr. Hermsen:
��
i i� ��
Enclosed is an executed copy of Change Order No. 1(Final) beh��een the City of Oshkosh and Jossart
Brothers, Inc. regaxding the abovementioned project.
If you have any questio�s, please call ou� of8ce at (920)236-5065.
Sincerely,
I es��,CPES��. � � /
Director of Public Works
iewa�
Enclosure: Change Order No. 1(Final)
cc: Pam Ubrig, City Cleik (w/originaL)
Tara Wendt, Assistaut Finance Di�ector (w/copy)
File (w/oiigi¢al)
t�.y�:Mp�ois mNnucrsusus coM e.d�a s uria��.� ��r<�m�romco�mu mm¢nN¢<om>.vsus Page I of 1
Earm�acox� ia-�e.ueoa
TO: Jossart Brothers,lnc.
1682 Swan Drive
DePere WI 54115
CHANGEORDER#'I (FINAL)
DATED: NOVEMBER 17, 2015
Your present contract with the City of Oshkosh, Contract No.15-O5, awarded March 24, 2015, is hereby
amended and changed as follows: �
NET INCREASE TO:
NET DECREASE TO:
NET DECREASE TO:
NET DECREASE TO:
SECTION I - PAVING 35,81976
SECTION II - STORM SEWER (17,075.09)
SECTION III - SANITARY SEWER (11,3'18.30)
SECTION IV - WATER MAIN (9,597.'14)
NET DECREASE TO CONTRACT
($2,170.77)
Sectian I Sec�ion II Sedian III Sedion IV
(Paving) (S�orm) (Sanitary) (Wa�er) Totals
Bid Total $880,477.35 $822,29426 $687,02075 $445,825.00 $2,835,617.36
C.O.#1 $35,81978 ($77,075.09) ($11,318.30) ($9,597.14) ($2,170.77)
ContrectTOtal $916,297.11 $805,219.17 $675,702A5 $436.227.86 $2,833,446.59
Recommended:
Director of Public Works
CITY OF OSHKOSH
BY: �l,��/?�
- --� ary Maz, r
I �;
City Clerk
Approved and accepted:
Contractor
I cehify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
.� lf. _J 11 �•
-Approved as U form:
Cit orney
CONTRACT: 15-OS CHANGE ORDER # 1(FINAL)
SECTION I - PAVING
ITEM DESCRIPTION INCREASEIN DECRFASE/N
NOMBEF BIO MSTALLEO NET NET UNIT LONTFALT LONTFALT
UNR QUANTITY QUANTITIES WCREASE DELREASE PRICE PRICE PRICE
CONTRACT: 15-05 CHANGE ORDER M i(FINAL)
SEGTIONI-(BIDITEM51000-191�f-S118-TOTALS 588,]39.85 (E40,565.U9)
ADDITIONAL WORK REOUIREO: L.O. p 7- SECTION I
ITEM �ESCftIPTION INCREASEIN �ELftEASEIN
NUMBEft BIO /NSTPLLED NET NET fINIT CONTRACT CONiFACT
UNIT QUANTIiY pUANTITIES INCREASE OECFEASE PR/CE PRICE GFICE
10000 Atltlitionalaquipment,
labor, and ma[enals to
remove existing street car �
rails on New Vork Avenue, Linear
completeasspeci(etl Feet 0 1700.00 7,700.00 $4.00 $680�.00
Page 2 of 10
CONTRACT: 15-OS CHANGE ORDER # 1(FINAL)
ADDITIONALWORK: C.O.Yt�(ITEM510ooa-laoox)-SIIB-TOTAL 5�,650.00 b0.00
NET WGREASE TO: SECTION I E35,819.]6
SECTIONII-STORMSEWER
ITEM �ESCRIPTION INCREASEIN DECFEASEIN
NUMBER BID MSTALLEO NET NET UNIT CONiFACT CONTRACT
UNIT OUANTITY OUANTITIES MCREASE OECftEASE FRILE PRICE PRILE
20�4 Startn sewerutiliryline
opening (ULO)I tomple[e
as s ecifetl Each 5 200 3.00) E�50.00 52250.00)
203fi Furnis� antl inscalll2"
s�ortn sewer, comple[e as Linear
s ecifetl Feet 550 582.80 32.8� 549.00 51 6aL20
2038 Furnish antl inslall 12"
RCP Class III srofm sewer;
complete as specifetl Linear
Feet 145 139.10 (5.90 $52.00 8306.80)
2042 Furnish anC insta1115"
storm seweq complete as Linear
soecifed Feel 245 24420 (080) $53.00 E4240
2044 Fumish antl install 15" �
RCP Class III storm sewer,
complete az speci(etl Linear
Feet 350 34420 5.80 $54D0 $31320
2048 Furnis� antl instal118"
stortn sewer, complete as Linear
s eci(etl Feet 110 99.40 ry0.60 $8600 ($911.60
2060 Fumish and install24"
stortn sewer', complete as Linear
s ecifetl Feet 40 3920 0.80 $100.D0 ($80.00)
2012 Furnish antl insta1130"
smrtn sewer, wmple�e as Linear
s ecifetl Feet 380 370.10 9.90 $104.00 ($1.029.60
2102 Fumish antl insta1160"
slorm sewer, complele as Linear
s ecifetl Feet 995 992.90 2.10 $218.00 545].80
2108 Fumish and install66"
storm sewer, complete as Linear
s ecifetl Feet 550 %420 (5.8�) $242.00 E1 403.6�)
Page 3 of 10
CONTRACT: 75-05 CHANGE OR�ER # 1(FINAL)
REM OESCRIPTION INLREASEIN OECREASEIN
NUMBER BIO INSiALLEO NET NET UNIT CONTRALT CONTRACT
UNIT pUAN➢tt QUANTITIES MCFEASE DECREASE PRILE PFILE PFICE
2280 Fumish an0 ins[all fi" sto�m
sewer lateral; complete as Linear
s eci(ied Feet 2,000 1.9]9.00 21.00) 544.00 $92400
2282 Fumish and install 8" storm
sewer lateral', complete as Linear
s ecifed Feet 125 35.00 90.00 $47.00 54.230.00
2284 Fumis� antl insWll storm
sewer marker balls',
com lete as s ecifed Each 140 136.00 4.00) $30.00 $120.00
2286 Fumish antl install storm
sewer clay dams; complete
as s ecifetl Eacn �0 6L00 (3.00) $50.0� 5150.00
2288 WmishantlinsWllstorm
sewer lateral inlet;
com lete as s eci(ed Each 64 55.00 (9.40 8500.00 (84,500.00
2532 Fumish antl install
sWneara stortn sewer
manhole(4'tliame�er); Vertical
com IeteasspecifeE Feet 44 4922 54] $550.00 b3,00850
2534 Furnish antl install
standard stortn sewer
manhole(5'tliameter)�, vertical
mm le�e as s ecif�etl Feet 24 19.15 (4B5 E520.00 � ($2,522.00
2536 Furnish antl install
sWntlartl srorm sewer
manhole (6' diame�er); Vertiwl
com lete as sOeciled Feet ] 6.9a (� ob 5580.00 ($34.80
2540 Fumish antl install
stantlartl storm sewer
manhole (8' diame�er); VeRical
complete as s ecifed Feet �9 79.88 1.38 5650.00 $897.00
2550 Fumish antl install
stantlartl storm sewer
manhole (7' x 7' box); Vertical
com lete as s eciFletl Feet 9 9.45 0.35 $2,000.00 $'100.00
2610 Furnish antl install Type 1
inlet (with 18" sump);
com lete as s ecifietl Each 2 2.00 E1]00.00
261Y Furnish antl ins�all Type 3
inlet (with 18" svmp);
rom lete as s ecifed Each 35 34.D0 7.00 E1,8��.00 $1,870.00
2800 Connec� to exisling storm
sewer main; complete as
s ecifetl � Each 8 ].00 (1.00 $1,000.00 (51.000.00
2602 Connect to existing storm
sewer lateral; comple�e as
s eciTetl Each 4 3.00 (1.00 5200.Oa ($200.00
2806 Cannect to existing stortn
sewer manhole; complete
as s ecified Eac� 3 3.00 $i,50Q00
2820 Abandon8"-12"storm
sewer, complete as Linear
s ecifetl Feel 305 307.00 (4.00 85.00 520.00
2624 Remove 30" antl smaller
storm sewer; complele as Linear
s eci(etl Feet 405 484.00 1.00 $15.00 $15.�0
2830 Abantlon storm sewer
manholes and inlets;
wm lete as s eci(etl Eacn 3 2.00 1.00 $400.00 $400A�
Page 4 of 10
CONTRAGT: 15-05 CHANGE OROER p 1(FINAL)
SECTIONII-(BIDITEM5Y014-2960)-51J8-TOTALS E6,212.70 (bZd,08].56)
ADDITIONAL WORK REQUIRED: C.O. # i- SECTION II
ITEM DESCFIPTION INLREASEIN DELREASEIN
NUMBER 9/O INSTALLED NET NET UNIT CONTFALT CONTRACT
UNIT QUANTITY pUANTITIES INCFERSE OECftEASE PRICE PRICE GRILE
20000 Atlditonal equipment, labor,
and materials to repair
existlng storm sewer an
Moroe S[reet �hat was
boretl Ihrough byWPS. per
Invoice tlatetl ]/24/15.
complete as speci(etl Lump
Sum 0 1.40 1.00 579977 $799.77
ADDITIONALWORK:C.O.%1-QTEMt0000�-SUB-TOTAL L]99.]] 50.00
NETDECREASETO: SECTIONII (517,075.09)
SECTION ill -SANITARV SEWER
ITEM OESCRIPTION INCREASEIN �ELREASEIN
NUM9Eft BIO INSTqLLEO NET NET UNIT CONTRACT CONTRALT
UNIT OUANTITY QUANTITIES INCFEASE OECftEASE PFICE PFICE PFICE
GONTRACT: 15-OS CHANGE ORDER # 1(FINAL)
ItEM OESCRIPTION INCREASEIN �ECREASEIN
NUMBER BIO INSTALLED NET NET I/NI� CONTRALT CONTFACT
UNR QUANTITY OUANTITIES INCREASE �ECREASE GRICE PFICE GRICE
3002 Fumish anE install 10"
sanitary sevrer (relay); Linear
com lete as s ecified Fee� 15 10.00 (5.00 $140.00 $]00.00
3004 Furnish antl install 12"
Sdfll�d!}'S2WE!(!¢�dY); �IOEdf
com le[e as s eci(eC Feet 10 6.00 4.00 E150.00 Sfi00.00
3060 Fumis� antl install B"
sanitary sewer tlrop; Vertical
com lete as s ecifetl Feet 8 8.00 5390 00
3062 Fumish and install 10"
sankarysewartlrop; Vertical
com leleass ecifetl Fee� 18 17.40 045 84�000 5180.0o
3064 Fumish an0 ins[all 12"
sanitarysewertlrop', Vertical
com leteass ecifietl Feet 9 7.95 0.80 5450.�0 b364.�0
3100 Furnis� antl install
s�antlartl sanitary sewer
manhole(4'tliamete�); Vertical
com le�eass ecified Fee� 1]1 169.67 1.33 $19004 5252]0
3114 Fumish antl install ezternal
sanitary sewer manhole
chimney seal', camplete as
s ecifietl Each 12 11.00 (1.00) E52500 E525.00
3716 Pumish antl install external
saniW ry sewer maMOle
chimney seal extension�,
complete as specifietl
Each 2 0.00 (2.00 $4]5.�0 $950.00
3118 Fumish and ins�all intemal
sanitary sewer manhole
chimney seal; complete as
specifeE Each 2 0.00 2.00) $315.00 $6300a)
32'10 Fumish antl install 8" x 6"
sanifary sewer tacrory wyes
or �ees; tomplete as
specifed Each 65 62.00 3.00 $125.00 $375.00
3232 Furnish antl install6"
sanitary sewer �aterals
(new); complete as Linear
specifetl . Feet 35 29A0 6.00 569.00 $414A0
3233 F�mish antl install6"
sanitary sewer riser (new);
complete as specife0 Linear
Fee� 4 4.00 E�500
323d Furnish and install4"I6"
sanitary sewer lateral
(relay); complete as Linear
s ecifetl Feet 1,8�5 1,91]20 4220 $69.00 E2.911.80
3235 Furnis� antlinstall4"/6"
sanitary sewer riser (relay);
complete as specifetl Linear
Feet 350 299.00 51,00 $]5.00 $3,625.00
3236 Fumish antl install sanitary
sewer lateral marker balls;
complete as specifetl
Each 135 131.00 4.00) $30.00 ($120D0
3238 Furnish anE install clay
dams; complete as
s ecifed Each 65 62.00 3.00) $50.00 5150.00
Page 6 0� 10
CONTRACT: 15-OS CHANGE OR�ER N 1(FINAL)
ITEM OESCRIPTION MLREASEIN DECftEASEIN
NUMBEF BIO /NSTALLEO NET NET UNIT CONTR4CT CONTRACT
UNIT OUANTIN pl/ANTITIES MLREASE OECREASE PRILE PFICE PRICE
3300 Furnish antlinstall
connection to exisling 8"
mains; complete as
s ecified Each 78 18.00 $50�.00
3302 Furnish antl install
connection ta existing 10"
mains; tomplete as
s ecifed Each 2 2.00 $1,000.00
3304 Furnish an0 install
connectlon ro existing 72"
mains; complete as
s ecifetl Each 1 1.00 $1,000.00
3330 Furnish anG install sani�ary
sewer concrete collars;
complete as speci�etl
Each 2 0.00 2.00 $1,000.00� $2,000.0�
3406 Furnish anC install 10"
sanitary sewer open at
casing pipes; complete as Linear
s ecifetl Fee� 415 4a8.00 ].00 $60D0 $420.00)
3600 Rock excavation; complete Cu�ic
as s ecifred Vartls ]5 OAO ]5.00) 50.01 (8075
3]00 Clasetl circuit televising; Linear
[om leteass ecifetl Fee� 2.225 2,155.00 70.00 57.50 $105.00
3854 Remove sanitary sewer', Linear
com leteass ecifetl Feet 50 50.00 $75.00
389� Sanitary sewer utilily line
opening (ULO); camplete
as s ecifetl Each 4 2.00 2.00 $]50.00 ($1,500.00
3894 Bentoniteslurtytlam
(sanitary); complete as
s ecifed Each 2 0.00 2.00 $500.00 $1,000.0o
SECTIONIIL(BIDITEMS3000J894�-SUB-TOTAIS E2,911.80 (522�z30.45)
AD�ITIONAL WORK REQUIREO: C.O. # 1- SECTION III
INCREASEIN OECFEASEIN
?EM BIO INSTALLED NET NET UNIT CONTFACT LONTRACT
NUMdER DESCRIPTION IINP OUANII�Y QUANTITIES /NCREASE OECREASE PftICE Pft/CE Pft6E
3�000 CreOitforvsingPVCinlieu
of sleel Por sanitary sewer
open cut casing pipes as
speci(etl in Bitl I�em
#340<, complete as �inear
specifed Feet 0 (408.00 4�8.00 $2�.00 $8,160.00
30001 Additional equipmen(
labor, anC matenalsto
reset antl antl core larger
holein MH N-9, perinvoice
tlatetl S121/75, compelte as Lump
s ecifed Sum 0 1.00 1.00 $4,697.96 $4,69Z96
30002 Atlditionalequipmen[,
labor, and materials ro
remsn�mct 12" tlrop antl
atljust 12" pipe lo Me notlh
on MH N-], perinvaice
tlated 5/26/15, compelte as Lump
specifeE Sum 0 1.00 1.00 52,87B.6fi 82,818.66
Page 7 of 10
CONTRACT: 15-OS CHANGE ORDER # 1(FINAL)
ITEM OESCftIP�ION IryCftEASEM DECRFASEIN
Nf/MBEF . 810 /NSTALLED NET NET UNIT CONTFACT CONTFALT
UNIT QUANTITY OUANTITIES INGftEAS£ OECRFASE PFILE PRILE GRICE
30003 Adtlitonal equipment, labor,
antl materials to excavate
and fill in hole for sanitary
laterel at 220 Graceland
Driva. Televising was of(
by 13 fee�, per Invoice �
tlatetl ]/23/15, complete as
specifetl Lump
Sum 0 1.W t00 $4,132.30 $4,132.30
30004 Atltlitionalequipment, �
labor, antl ma�erial to
connect sanitary lateral at
1206 Ontario $Vee� Ihat .
was inativeNently missed, �
per Imoice tla�etl B/"//15. Lump
complete as specifeC Sum 0 1.00 1.00 $4,501.43 54,501.43
ADDITIONALWORK: C.O.AI��1TEMSJa000-300o6)-SUB-TOiAL f16,150.35 (58,160.00)
NET DECREASE T0: SECTION III ($11,318.30)
SECTION IV - WATER MAIN
/NCREASEM DECREASEIN
I]EM BID INSTALLEO NET NET UNIT CONTRACT CONTRACT
NUMBER DESCRIPTION UNIT QUANTITY pl/ANTITIES MCftEASE DECftEASE PkICE PFICE PF6E
4000 Furnish antl install4"
ductile iron water main
(relay) with polywrap; � Linear
com lete as speci0etl Fee[ 30 2850 L50 $]0.00 � (8105.00
4002 Furnish antlinstall6"
tluctile imn water main
(relay)witn polywrap; Linear
com0lete as s eci(etl Feet 2]5 296.50 21.50 $�0.0� E1505.00
4004 Furnish antl install B"
ductile imn warer main
(relay)withpolywrap; Linear
com lete as specifetl Feet 2,325 2,335.50 10.50 $]4.00 E�]7.00
4036 Fumish antl ins�all 1"water
service (relay); complete Linear
as s ecifetl Feet 2.025 2,035.5� 10.50 $46.00 5483.00
4042 Fumish and installl"wa�er
service (new); comple�e as Linear
s ecifetl Feet 25 2�.00 5.00 E<6.00 ($230.�0
4648 Furnish and inslalll"
corpora[ion and slop box;
com lete as s ecifietl Each 65 60.00 5.00 $300.00 $1,500.00)
4055 Fumishantlinstallwater
service clay dams',
com lele as s ecifetl Each 65 60.00 (5.00) $50.00 $250.00
4056 Furnish antl install
connections to existing 4"
water maiq complele as
s ec�ed Each 1 1.00 y1200.00
4058 Fumish antl install
connections to existing fi"
water main; complete as
s ecifetl Each 10 10.00 $1,500.00
Page 8 of 10
CONTR4CT: 15-05 CHANGE ORDER # i(FINAL)
REM OESCRIPTION INCREASEIN OECftEASEIN
NUMBEF BID INSTALLEO NET NET 1/NIT CONTRACT CONTFACT
UNIT pl/ANTITY pl/ANT/TIES /NCFEASE OECREASE PRICE PRICE PR/LE
40fi0 Furnish antl install
cannectians to existing B"
water main; complele as
s ecifietl Each 2 2.00 51,750.00
4107 Pomishandins�all6"z6"
waler main �ee; comple�e
as s ecifetl Each 1 1.00 5300.00
4110 Furnish antl ins[all 8"x fi"
water main tee; comple[e
as s ecifed Each 6 6.00 $385.00
4111 Fumis� and insta118" x 8"
water main tee', complete
as s ecifetl Eac� 7 7.00 $500.00
4182 Furnishantlinstall6"x8" �
water main cross', complere
ass ecifietl Each 1 0.00 (1.00 5560.00 (E5600�)
4189 Furnish and install 8" x 8"
water main cross', complete
ass eciFletl Each 1 1.00 $64000
422� Furnish an0 install6" 22-
1l2 tlegree water main
bentl; wmplete as
specifetl Each 1 100 $185.00
4235 Pumish and install 4" 45
de9ree wa[er main bend
com leteass ecifed Each 2 400 2.00 $135.00 $270.00
4236 Wmishantlinstall6"45
tlegree water main bentl; -
com lete as s eci0etl Each 30 30.00 $200.00
423] Fumish antl ins�all 8" 45
tlegree warer main bentl;
com lete as s ecitietl Each 14 10.00 (4.001 $2]5.00 $1,100 00
4263 Furnish antl install 8" x a"
wa[er main retlucer;
com leteass ecifetl Each 1 1.00 $21000
42fi4 Fumish and install 8" x 6"
water main retluceq
com lete as 5 ecifetl Eath 8 8 QO 5225.00
a352 Cut and cap existing 6"
wate� main', complete as
s eciFletl Each 2 � Q.00) $1,�00.00 $3,400.00)
4354 Cut and cap existing 8"
water maln; complere as
s ecifed Each 1 1.0�) $1,800.00 51,800.00
44�� Fpffll5h dfld IOSId�� fi" Wd�2f
main gate valve; complete
ass ecified Each 10 8.00 (2.00) E120000 (§2,a00.00
4402 FurnisM1 and install8" water
main gate valve; complete
ass ecifetl Each 20 19.00 1.00 $7,600.00 $1,600.00
4500 Fumish antl install hytlrant;
complete as specifed
Each l Z00 $3,000.�0
4]12 Furnish antl install2" steel
water main casing pipe;
tomplele as specifetl Linear
Feet 415 406.00 9.00 840.00 E360.00
4726 Fumish antl ins�all 18"
steel water main casing
pipe; complete as speafied linear
Feet 30 24.00 6.00 $125.�0 8750.00
Page 9 af 10
CONTR4CT: 15-�5 CHANGE ORDER M 1(FINAL)
SECTIONIV-(BIDITEM54000-0920)-SUB-TOTALS fJ,410.00 �514.055.00)
AOOITIONAL WORK REOUIRED: C.O. # 1-SECTION IV
INCREASEIN OECREASE/N
ITEM BID INSTALLED NET NET UNR CONTRACT CONTftAC1
NUMBEft OESCftIPTION UNIT OUANTIiY QI/ANTITIES INLftEASE DECftEASE FRICE GFILE GRICE
400a0 Cretlit for using PVC in lieu
of 2"steelwsing pipes as
specifetl in Bid Ilem
#4]12. complete as Linear
specifetl Feel D 36400 364.00) E10.00 $3,640.00
40007 Additionalequipmen(
labor, and materials to
repair water main break on
Monroe Street, per Invoice
tlatetl 7114/i5, complete as Lump
s ecifetl Sum 0 1.0a 1.00 $3,505.3] $3.505.37
40002 Atltlitionalequipmen�,
labor, antl materials �o
repair wa�er main break on
New York Avenue, per
Invoice tlatetl 7/14/15, Lump
com leteasspecifetl $um 0 1.00 1.00 $1,18249 $1,18249
AODITIONALWORK: C.O.N1 QTEM5t0000�10002)�SUB�TOTAL $4,68].B6 (E7,6d0.00)
NETDECREASETO: SECTIONIV (f9,59].t4)
NET INCREASE TO SECTIONS I, II, III, IV E110,551.33
NET OECREASE TO SECTIONS I, II, III, IV ($112,]28.10)
NET DECREASE TO CONTRACT: . ($3,'l)�.]])
Page 10 ot 10