HomeMy WebLinkAbout27283 / 74-07� � .. _ ._
,�. - - -
REVISED
# 7 RESOLi7TION
FINAL RESOLUTION - Sanitary sewer, water main & grading
and graveling portions of Vinland, Knapp, North Main,
Medalist Drive and West 33rd Avenue
WfiEREAS, the Board of Yublic Werks (City Manager) of the City
of Oshkosh held a public hearing on the 15th day of October, 1974 at
4:00 p.m. for the purpose of hearing all interested persons concerning
the preliminary resolutions and reports of the Board of Public Works
(City Manager) on the proposed improvements consisting of sanitary sewer,
water main and grading and graveling, pursuant to resolutions of June 6,
1974, September 19, 1979 and October 3, 1974 of the Oshkosh Common
Council:
SEWER ONLY
KNAPP STREET - From Florida Avenue to 600 feet south of
Florida Avenue
SF.WER AND S9ATER
VINLAND STREET - West Smith Avenue to 350 feet north of
Smith Avenue
GRADING AND GRAVELING
NORTf] MAIN STREET - From 657 feet north of Chicago and North-
western Railroad right of way to County Trunk Highway "J"
S°WER lu'VD S4ATER,
GRF�DIFG AND GRAVELING
MEDALIST DRIVE - From 233 feet south of 44est 33rd Avenue to
500 feet south of West 33rd Avenue
WEST 33RD AVLNUE - From tAedalist Drive to 735 feet east of
Medalist Drive �
NOW, THER�FORE, BE IT RESOLVED by the Common Council of the City
of Oshkosh as follows:
1. That the report of the City Manager, acting as thc Board of
Public Works, pertaining to the const,-uctior. of thc above descri_bed
public improvements, including planc and specifications therefor, is
hereby adopted and approved with the following modifications:
a.
b.
c.
2. That the action of the City Manager in advertisiny for bids
and to carry out the woxk of such improvements in accor.dance with the
report of the City Manager and in accordance with the said resolutions
heretofore adopted, is hereby approved, ratified and confirmed.
3. That payment for said improvements be made by assessing the
cost o£ the property benefited as indicate3 in said report, except as
modified herein.
4. That the benefits and damayes shoem on the report as modif.ied I
are true and correct and are hereby confirmed. �
�" . ___ . _�..._. ... __ _ . _ _._..,_�
£INAL RESOLUTION cont'd.
5. That the assessments for all projects included in said
report are hereby combined as a single assessment but any interested
property owner shall be entitled to object to each assessment
separately or both assessments jointly for any purpose or purposes.
6. That the assessments may be paid in cash, or in installments
pursuant to Section 25-83 thru 25-89 of the Oshkosh Municipal Code.
Said deferred payments to bear interest at the rate of eight percent
(8°s) per annum on the unpaid balanee. The City Clerk shall publish
an installment assessment notice in accordance with Section 66.54 (7)
(e) o£ thz r:i�ccn�in Statutes for 19G9 in tha official newspaper of
the City.
7. The City Clerk is directed to publish this resolution in
the official newspaper of the city, the OSHKOSH DAILY NORTHWESTERN.
6. The City Clerk is further directed to mail a copy of this
resolution to every property owner whose name appears on the assess-
ment roll whose post office address is known or can with reasonable
diligence be ascertained.
r ='L..�+.---�+."'_
i
{ .ln'i1fI^1T�
j �
�
AP?R�l'ED
�
October 2, 1975
REPOflT OF CONSTRUCTION
��7.�8�
Pursue.nt to an ordinance duLy adopted by the Common Council
cn Occo6ei 3, 1974 and October 17, 1974 ordering and directing
�he follooring described work ta be done by the City without
suS�itting same for bids and requiring a report of the cost of
such zvork as provided by Section 62.15(14), the foLlowing report
includ=s grsding, laying of base material and eust preventative
ior the following streets:
Wes[ 33rd Avenue - Medalist Drive to 735' e. of Medalist Drive
Medalist Drive - 233' sou[h of Wes[ 33rd [0 500' s. of West 33rd Avenue
107 hours grader w/o @ $14.00
43 hours loader w/o @ $14.00
63 hours truck w/o @$ 8.50
64 hours roller w/o @ $12.00
-- �� hours flusher w/o
-- hours water pump
62 hours labor � @ $ 5.00
950.15 tons 2 in. stone @$ 2.30
2091.55 tons cxusher run @$ 2.29
4500 ga1s. road oi1 @ $ .40
220 tons 3/8" stone @$ 2.30
Sub-Tota1
Engineering & Inspection 10�
Tota1
$ 1�498.00
$ 602.00
$ 535.50
$ 768.00
$ 310.00
$ 2,185.35
$ 4�789.65
$ 1,800.00
$ 506.00
$12�994.50
+ $ 1,299.45
$14�293.95
Board of Pub11c 41orKs
� .�
.'���� ��.. �
. City Mana�er ,qt_.
Januarv 13, 1976
_ _ ����
BEPOAT OF CONSTRUCTION
Contract 74-17
Pursuant to an ordlnance duly adopted by the Common Council
ori Sep[ember 19,1974 arid October 17,1974, Ordering arid directLng
th= follc:ving described work to be done by the City without
subaitting same for bids and requiring a report of the cost of
such work as provided by Section 62.15i14), the following report
includes grading, laying of base material and dust preventative
:or the follo�ring streets:
NORTH hWIN STREET - from 657 Eeet north of C.N,W,A,R. right of way to
County Trunk Highway "J"
262 hours grader w/o @ $14.00
257 hours loader w/o @ $14.Oo
435 hours truck w/o @$ 8.50
5o hours roller w/o @ $i2.o0
hours flusher w/o
hours water pump
214 hours labor @ $ 5.00
5,767.7 tons 2 in. stone @$2.30
5,674.95 tons crusher run @ $2.29
5,388 ga1s. road oil @ $.40
180 tons 3/8" stone @ $2.30
32 houra Cruz Air w/o @$13.00
1,142.85 tons 3/4" stone @$2.50
SUB-TOTAL
Engineering & Inspection 10,�
Tota1
$ 3,668.00
$ 3�598.00
$ 3�697.50
$ 600.00
$ 1,070.00
$13�265.71
$12�995.64
$ 2�155.20
$ 414.00
$ 576.00
$ 2,857.13
$44,897.18
�S 4,489J1
$49,386.89
Board of Public Works
y -i a
r
h �n
�
�
�
0
r
h
P
a
V
�
A
�
�
T•
0
�
y
0
a
a
0
�
o�m
� At-•
T. �
f� � A
m te
? A
hS.1
A Sl N
j.. P
s �n o
a te
a A F
�A�
io � o
m� S
a A d.
• Re>
[D A
� N
A F�o
R ?
f!�
�
� E
� A
h
�
?
�
�
�a
x' x
40.% v