� CIIANGB ORDF.IL NO. �
Ownes CitY of Oshkosh, Wisconsin p�i�� 10/9/7q
Project Wastewater Treatment Facilities
Conttact "u" Contractor Fluor Bros. Construction Co. , Inc.
OriginalContractAward $ 4,537,707.00
Change Ordered Herewith: - -
Extend Contract complet;on time from B00 consecutive calendar days
after written notice to proceed to 983 consecutive calendar days .
� after written notice to proceed.
Reason for Change Order:
To extend.contract time for causes outside of the control of Contractor
per his request. (See Attachment).
CONTRACCqMOUNT
Original g9,537,707.00 �
PreviousC.Os(ADD/� g 31.141.07
This C.O. (ADD/DEDUCT) $ -0-
REVISED � $4,568,848.07
� CONTRACT TIME (CAL. DAYS)
Original 800 Days
Revious C.O.s (ADD/DEDUCT) No Chanqe Days
77tis C.O: (qDD/�') 1$ 3 Days
REVISED 983 Days
THIS UOCUMF,NT SHALL SECOME AN AMENDMENT TO THF, CONTRACT AND ALL STIPULATIONS
AND COVENAN'PS OF 1'HE CONTRACT SHALL AI'PLY }�gRETO.
Donohue & Associates, Inc.
FLUOR BROS. CONSTRUCTION CO
CITY OP' OSHKOSH, WISCONSIN
BYr' i
BY:�_et \r F
)Q�
i�
E.
Wm. McEnroe, Exec. V.P.
16
Date
Donohue & Associates, Inc. Consulting and Design Engineers
2033 � 7
_,
cunNCeoKOeiiNO. � �a7�cl
Owner Citv of Oshkosh Wisconsin Datc 10/9/74 �
Roject Wastewater Treatment Facilities
Contract_ "a" ConVactor Fluor Bros. Construction Co. , Inc. �
Original Contract Award $ 9, 537, 707.00
Change Ordered Herewith:
Extend Contract completion time from 800 consecutive calendar days
after written notice to proceed to 983 consecutive calendar days
after written notice to proceed. �
Reason fot Change Order:
To extend contract time for causes outside of the control of Contractor
per his request. (See Attachment).
CONTRACT AMOiJN7'
CONTRACT TIME (CAL. DAYS)
Ori�nal $4,537,707.00 Original 800 Days
Revious C.Os (ADD/jy��j(g}j g 31. 141. 07 Previous C.O.s (ADD/DEDUCT) No Chanae Days
ThisC.O. (ADD/DEDUCT)S '�- ThisC.O: (ADD/�[') 183 Days
REVISED $4,568,896.07 REVISED 983 Days
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS
AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
Donohue & Associates, Inc.
FLUOR 9ROS'. CONSTRUCTION CO
CITY OF OSHKOSH, WISCONSIN
Donohue & Accociates, Inc.
By: . `l-LC' `� ��({� O Ff >�
ete F. Po/ te .E. a e
BY' I �`1 ° ( �7 i
Wm. Enroe, Exec. V.P. Date
By:
ate
' � o�.,� �
�[�„�ConsultingandDesignEngineerS�
��� - --. _. 2033 / 7
.._ Vm� N.. n � u_
CONTRACT "A"
City of Oshkosh, Wastewater Treatment Facilities
Attachment to C. O. #7
DELAYS AFFECTING CRITICAL PATH OF PROJECT FOR
WHICH EXTENSION OF TIME IS BEING GRANTED
1. Sewer Contractors delay under Contract "I"
was to have been completed March 19, 1973.
Actually completed June 14, 1973. . 87 days
2. Excess Rock Excavation Contract called for
Contractor to include 1000 Cubic Yds. in Bid.
Actually removed 1749 cubic yds. Required
additional work, 18 days
3. Shortage of reinforcing steel for structural
slabs. Records show severe drop i❑ delivery
during ,7anuary and February of 1974. General
Contractors agreement with his material sup-
plier called for an additional $3.00 per
cubic yard of concrete for concrete not
supplied from unheated portable ready mix
plant at site. Material supplier did not
charge General Contractor this premium be- �
cause he was unable to supply re-steel to
enable pouring of concrete before cold weather. 60 days
9. Delays caused by other Contractors, excess
rock excavation and delayed delivery of re-
inforcing steel caused work to be done in
severe winter weather thus reducing efficiency. 16 days
163 days
Delays not on critical yath,these delays tended to
compress the Mechanical and Electrical Contractors
work schedule into a tighter time frame necessitating
a larger crew and not being able to complete work as
originally planned.
1. Jurisdictional dispute May 6, 1973 through
June 8, 1973. May 6, 1973 through May 21,
1973 delay chargable to this dispute.
Balance ran con-current with 18" underdrain
line. Dispute arose between Plumbers and
Laborers as to jurisdiction on ground water
drainage system installation. 16 days
2. 1B" under drain line, draining floor drains,
etc. to wetwell. Delays by Contractor for
Contract "B" held up General Contractor in
area between Aeration Tanks irom May 22,
1973 thrugh June 25, 1973. Actually more
time was used by Contract "B" but it did
not hold up Contract "A". 34 days
18" sludge drawoff lines for Final ql and
#2. 7/22/73 and 7/23/73 Contractor "B"
scheduled 25 days, Osed 27 days. 2 days
Ground water problems on effluent lines
from 4 final clarifiers. Excavation for
installation of these lines unearthed
springs. In order to seal oPf these spzings
and preclude the necessity of the City of
Oshkosh to pump out this ground water for
the life of this project, additional work
was requixed to seal off same.
Finals #1 and #2 8/6/73 through 9/20/73 30 days
(5 days scheduled, 35 days used)
Final #3 and #4 11/1/73 through 12/18/73 32 days
(15 days scheduled, 97 days usedj
�� ��
Novea6er 5, 1974
T0: OSHKOSH COFIPION COUPdCIL
FROM: dOHN [d. PENCE
City Attarney
REF�RENCE TO: CkIANGE ORDER N0. 7 TO CONTRACT "A" ACID RESOLUTION
NO 6 OF TAE OSFiKOSH COhP10N CO[IPICIL AGENDA FOR
NOVEPffiER 7, 1974
The contractor, Fluor Bros., had submitted to our engineer a request for
an extension of time pursuant to paragraph nu¢ber 36 of the contract
between Fluor Bros. and [he Ci[y of Oshkosh. Paragraph No. 36 states in
part as follows:
36. EXTENSIONS OF TIME
A. Should the con[ractor be delayed in the iinal completion of the
work by any act or neglect of the owner or engineer� or of any employee
of either, or by any other con[ractor employed by the owner, or by
strike, fire, or other cause outside oi the control of tl�e cont.-ac[or
and which in the opinion of the engineer, could have been neither anticipated
nor avoided then an extension of time suf£icien[ to compensate fo[ [he
delay� as determined by the engineer� will be granted by the ownerg
provided that the contractoz gives the owner and the engineer prompt
mtice in writing of [he cause of delay in each case and demonstrates
that he has used all reasona6le means to minimize the delay. Such
notice nust be given by the coatractor to the owner within five (5)
days following the be�inning of such delay. The contractor, in this
instance� requested time ex[ensions from oux engineer. Our engineer
reviewed tlie request of [he contrac[or and de[ermined tha[ as follows:
�
a
�
a
��
l'�
�
�
�
��
r�
0 0
� �
M
�c+ti p
o S
1 �
r �
d�
T$ i M
� ��
o a� o�
?
d O
rnri �+
�da
U i�jV�
�
O {� O
w�— o0
z � � r
a oioo
� 3 e d
o+�.+.p�L+
d � � o
0.' 3 K1 cl
�
�
�
S�
OW
7
ri w
wwa
o m
z�
i ro
N F M
b %m
t. N rn
O -i
a o
W Y
h0 Y
C G m
t'i E. N Y .
o+�ro a
N O
i, d o ro ..
WEW 4
O
C S.E❑ E
o w o 0
+a a� t, .a
Y N W Y
7 3 N C
r 1 N. Nl o
o uma +i
m m o E a>
� 3 � o E
�_ � 1
Fi .,
a '.''
�I
x
�
rn
ri
L� x
S�
u v
� ti
� V
v
.1 Y
O �-I
2 U
v
n
P
� r
d
� �
�
O S
J �
o u