Loading...
HomeMy WebLinkAbout21. 15-536DECEMBER 8, 2015 15-536 RESOLUTION (CARRIED__7-0_____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: ESTABLISH 2016 STORM WATER UTILITY RATE TO $148.88/ERU INITIATED BY: DEPARTMENT OF PUBLIC WORKS STORM WATER UTILITY BOARD RECOMMENDATION: Reduce Capital Improvement Program Budget by $1,500.00 and establish rate at $148.88. WHEREAS, the City of Oshkosh has previously established a Storm Water Utility; and WHEREAS, Section 14-4 (B)(2) of the Oshkosh Municipal Code gives the Common Council authority to establish the Equivalent Runoff Unit (ERU) charge for the Utility. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the Equivalent Runoff Unit (ERU) charge for 2016 shall be $148.88/ERU. BE IT FURTHER RESOLVED that the appropriate City officials are authorized and directed to take those steps necessary to implement this charge to become effective for services provided on and after April 1, 2016. n HK H MEMORANDUM TO: Honorable Mayor and Members of the Co on Council FROM: James Rabe, Director of Public Work DATE: December3,2015 RE: Establish 2016 Storm Water Utili[y Rate to $148.88 / ERU BACKGROUND The City of Oshkosh implemented a Srorm Water Utility in 2003 ro fund improvements [o [he City's s[orm water management facili[ies. Based on Ihe initial Storm Water Utiliry study completed in Sep[ember of 2002, the Common Council implemented a phased introduction of the rates. The rete was initially se[ at $79.10 per Equivalent Runoff Unit (ERU) per year for one half of 2003. There were eight subsequent rate increases, the most recent being ro$136.60 per ERU per year in 2015. The Storm Water Utility has funded several projects to date including the Fair Acres Area Detention Basin, Anchorage Channel Constmction, the Baldwin Avenue Area Dry Detention Basiq the Tipler School Area Dry Detention Basin, the North High School Area Wet Detention Basin, the Oakwood Road Wet Detention Basin, the Melvin Avenue Storm Wa[er Pump Station, the Westhaven Clubhouse Area Wet Detention Basin, the James Roatl Area Detention Basiq the City Hall Underground Detention and parking lot projec[, the Armory Area Wet Detention Basin, and the 9'" & Washburn Area Wet Detention Basin. In addition to these projects, storm sewers are replaced/upgraded wi[h each street reconstmction project. The Ciry experienced significant flootling during rain s[orms in 1990, 1993, 1996, 1999, 2001, 2004, 2008, 2010, and 2072. Localized areas also flood during smaller storm events. In additioq the City is now under a permit (MS4) from the Wisconsin Department of Na[ural Resources (WDNR), as mandated by the federal Clean Water Act, for discharge of storm wa[er ro local water bodies. This permit requires the implementation of prectices to reduce the amount of pollutants entering lakes and rivers. 7he largest expense item in the permit is reducing the Total Suspended Solids (TSS) generated by the City as a whole by 20% in 2008 and previous requirements for a reduction of 40 % by 2013. We have met the 20% goal. The Sta[e legislature has since removetl the 40% requirement The Federel Environmen[al Protection Agency (EPA), in conjunction wi[h the WDNR, is wrrently tleveloping targe[ed performance standards that are anticipated to require TSS reduction of 40% or more. It is anticipated [hat these targeted performance standards will be implemented in ihe nex[ couple of years. AECOM was hired by the City to develop a City-wide plan for pollution reduction. The City has also completed several flood studies in the past and is currently studying several watersheds to develop plans to reduce flooding in combination with pollution control. City staff, based on information fmm all studies, developed a schedule of work needed to reduce flooding and implement polWtion control measures. The schedule calls for one to lwo major projects to be constructed per year with an emphasis on flood control. Wherever possible, pollution control measures will be implemented with Flood control measures. ANALYSIS The City worked with Brown and Caldwell and Ehlers (Financial Consultant) to pertorm a rate analysis to provide funding to implement the projects outlined in the schedule, to implement other Capital �aie ewW memo isa-u.eou Page 1 of 2 Improvement Projects, and to fund operational costs. In order ro support these activities, a rate of $148.88 per ERU per year is recommended. This rate will allow the City [o complete all of [he projects listed in the 2016 Capital Improvemen[ Program (CIP) — Storm Sewer Section, and also maintain daily operations. The rate is pmposed to be in effect on April 1, 2016. Finance Director Larson has reviewed the cash reserves and any available funds have been inwrporeted in order to minimize the ra[e increase. The Utility must retain adequate reserves to maintain favorable bond ratings and meet the opera[ing needs of [he Utility. The Storm Water Utility Committee recommended reducing the Capital Improvement Progrem scope to one major storm water project every other year, thereby reducing the budget by $1,500,000, which would reduce the 2016 rate to $146.84. During the 2016 budget workshops, the Common Council gave clear direction to staff to maintain the wrrent Capital Improvement Program scope of one major storm water project per year. In the event grants or other monies are secured at more favorable rates than anticipated in the study, the rate increases for fu[ure years can be offset. The intent is to review the rate annually to incorporate actual construc[ion costs from the previous year and incorporate other funds that become available to the Utiliry. FISCAL IMPACT The rate of $148.88 per ERU per year is required to implement all of the projects and operations in the 2016 budgets. Further reduction of the rate would result in the delay of other proposed projects within the CIP. Pushing projects to future years will result in iess reduction of flooding during siqnificant rein events prior to project completion and will delay implementation of water quality improvements. RECOMMENDATIONS The Department of Public Works and Finance Department staff recommends a rate increase to $148.88 per ERU per year to fund all activities in the approved 2016 budgets. It is recommended that the rate go into effect on April 1, 2016. The effect of the increase equates to a total cost of $145.81 per ERU for 2016. Approved: �<_ � /� M k A. Rohloff City Manager �ew�n i:�Ena���nnp�sia.� wmr imvmmon�oie re�e swe� ma� iz 3-+s eocx Page 2 of 2