CHANGE ORDER - WASTEWATER TREATMENT PLANT
BE IT RESOLVED by the Common Council of the City of Oshkosh that
the following Change Order No. 12 to Contract "B" for the construction
o� the Wastewater Treatment Plant is hereby approved:
CHANGE ORDER NO. 12 - Adding the amount of $6,451.32
r ?rn -r,,T�
Purpose: Provide and install additiona]_ equipment as tabulated
below:
l. Furnish and install "Y" stainers on vacuum f�lters tc�
strain belt wash water and prevent plugging of spray
nozzl.es. Required ta keep vacuum filter belt clean
to achieve maximum filter performance. $3,724.00
2. Provide additional relays in electric machinery panel to
provide "Pump Required" signal to computer f_or sequencing
of raw sewage pumps. $66.32
3. Furnish and install line strainers on vacuum filte�
wash water lines, requ'ired to prevent filter cloth
blinding. $245.00
4. Relocate final effluent ceater line to ash conditioner
in Solids Building to facilitate accessa�ility by
operator. $176.00
rJ. Instal l fOt1I" ( 4 i 31T_' 1"?1 ��cL� 11I1p� nn rut.: ;;2:= n'-•L1T;?
_" J `-' i t�' �
to insure all pumps are primed at all times and available
to run when required_ $?58.00
6. Provide and install two (2) sump pumps, one in elevator
pit and one to replace inadequate sump pump in raw
sewage pump room. Required to keep operating areas and
equipment dry. $1;4$2.00
BE IT FURTHER RESOLVED by the Common Council that the above
change order is hereby approved and a copy of. which is herewith
attached to this resolution. Money for this purpose is hereby
appropriated from its respective construction fund.
- 24 -
AUG 7 197a
# 16 RESOLUTION
:;.�,
-- t;rt�ivc�� ORDER — WASTEWATER TREATMENT PLANT
BE IT RESOLVED by the Common Council of the City of Oshkosh that
the following Change Order No. 12 to Contract "B" for the construction
of the Wastewater Treatment Plant is herEby approved:
CHANGE ORDER NO. 12 - Adding the amount of $2,779,081.15
HGi.O, ING.
Purpose: Provide and install additional equipment as tabulated
below:
1. Furnish and install "Y" stainers on vacuum filters to
strain belt wash water and prevent plugging of spray
nozzles. Required to keep vacuum filter belt clean
ta achieve maximum filter performance. $3,724.00
2. Provide additional relays in electric machinery panel to
provide "Pump Required" signal to computer for sequencing
of raw sewage pumps. $66.3?_
3. Furnish and install line strainers on vacuum filter
wasn water lines, required �to prevent filter cloth
blinding. $245.0�3
4. Relocate final effluent water line to ash conditioner
in Solids Building to facilitate accessability by
operator. $176.00
� Irs±:ai 1�our ( �? �:ir rv�lease lines on ra�u se�frage pumps
to ins�ire �11 pumps are primed at all times and available
to run wh�n required. $758.�J0
6. Provide ancl install two (2? sump pumps, one in elevator
pit and one to replace inadec�uate sump pump in raw
sewaqe pump room. Required to keep aperating areas and
equipment dry. $1,482.00
BE IT FURTHER RES�LVED by the Comman Council that the above
change order is hereby approved and a copy of which is herewith
attached to this resolution. Money for this purpo
appropriated from its respective construction fund; �:�:�'''�-�-''-'=� ���
�
-- 2 4 - ; ,_,.,.,�..__.._..,.�-.�........__.,......_. .
�
+...... _. _
.. ._,.,� �
� �
�'' �
rt �
,� �
n �
F-1 �
ri �. �
x �
, �
�
�
�
--a=�..
• v�� Q�no�aa�
_ � -
�g a�,�sz�gns
0
ch
F-'•
0
�
c� ..
�
� y
'� o
�.
� �
� ¢
•• o
�
� �
�
N
�
�
�
►� � � � �' �,
� � � tA
(1' �y, n U
K � #�
� � N f.,.
Q, O
�- ro �r �
�4 �i' ° o
. � n �
ct p .�
' � �
�'' O �
n � �
�m
�� �
_ 'L N
� � ��
�