INTERGOVERNMENTAL AGREEMENT BETWEEN WINNEBAGO COUNTY
FOR WITTMAN REGIONAL AIRPORT AND CITY OF OSHKOSH
This INTERGOVERNMENTAL AGREEMENT is made and entered into by and
between Winnebago County as Owner of Wittman Regional Airport ("Airport"), and the City
of Oshkosh ("City").
RECITALS
WHEREAS, the Winnebago County is the owner of Wittman Regional Airport, located
partially within the City of Oshkosh; and
WHEREAS, the Airport desires to permit the City to construct and maintain a storm
sewer pipeline upon and beneath a portion of the northeast quadrant of the Airport, including
manholes, surface grates, inlets or similar features at a location described on Exhibit A
attached hereto and incorporated herein; and
WHEREAS, the installation of the City's storm sewer pipeline is identified in the City's
Glatz Creek Stormwater Management Plan as a city-funded project designed to reduce
flooding potential of 20th Avenue and businesses, hangars, and aircraft operational areas on
the Airport contiguous to 20th Avenue; and
WHEREAS, it is in the best interest of the City and the Airport to prevent potential
flooding events so as to protect Airport-owned, City-owned, and privately-owned property
from damage and destruction; and
WHEREAS, the City and Airport concurrently with this Agreement will enter into a
easement allowing the installation, maintenance and operation of the storm sewer upon the
Airport property; and
WHEREAS, the installation and maintenance of a storm sewer pipeline on and under
Airport property, and further integrating the Airport's Taxiway B reconstruction project and
the City's storm pipeline with combined construction management will produce financial
benefits to both City and Airport, and
WHEREAS, Airport currently pays significant Storm Water fees associated with the
impervious surfaces on the Airport property; and
WHEREAS, the installation and maintenance by the City of a storm sewer pipeline
on and under Airpo�t property does not prohibit the Airport from applying for storm water
credits from the City; and
WHEREAS, City and Airport recognize that storm water needs and the structure of
storm water fees may change over the term of this Agreement which may necessitate review
of the Agreement from time to time.
AGREEMENT
NOW THEREFORE, in consideration of the foregoing, and subject to any conditions
contained herein, Airport and City agree as follows:
In consideration of Winnebago County as owner of Wittman Regional Airport granting to the
City of Oshkosh a Conditional Limited Easement, the City of Oshkosh shall pay to
Winnebago County a lump sum payment within 30 days upon the execution of this
Agreement of Fifty Thousand Dollars ($50,000.00). In addition to this lump sum payment,
each year for the next 50 years the City shall make an annual payment in the amount of
$0.25 per square foot of the total square footage of the storm sewer pipeline easement
(154,754 square feet). At each five-year anniversary of the commencement of this
agreement, this fee shall increase five percent (5%). Payment shall be made on or before
�«e�ti�� Isr each year. Each entity shall have the option to request
renegotiation of the payment amount and/or terms of payment at E;ach five (5) year
anniversary of this Agreement. Requests shall be made in writing directed to the Director of
the Airport or the City of Oshkosh Director of Public Works. The annual payment shall cease
if Airport no longer pays storm water fees for airport runways or if the stormwater fee for the
airport property is less than the annual payment as provided in this paragraph. The parties
shall meet and renegotiate this payment if any portion of the airport property becomes
exempt from storm water fees or the method of calculation of fees for the airport property is
materially altered.
The easement shall provide that the City of Oshkosh will be responsible for all maintenance
on the storm water pipeline, except as damage may be caused by Airport, its employees,
contractors, agents or assigns. The easement shall provide that City will provide reasonable
notice to the Airport if it needs to access the Airport for maintenance of the pipeline, and will
further coordinate with the Airport if it needs to work within runway or taxiway safety areas.
If future airport development dictates the relocation of the storm sewer pipeline, the City will
be responsible for the costs and work to relocate the pipeline to a location agreeable to both
the City and the Airport. If such relocation is required, Airport and City will reopen this
Agreement for the purpose of renegotiating the agreed upon payments to take into
consideration these additional costs.
Initial construction of the storm sewer pipeline will be completed as a part of the
reconstruction and realignment of Taxiway B Project. OMNNI Associates has entered into
an agreement with the State of Wisconsin Department of Transportation Bureau of
Aeronautics to provide project management for both the City's storm sewer pipeline project
and the Airport's Taxiway B reconstruction project. Vinton Construction Company will
construct the project including the storm sewer pipe line. Winnebago County will enter into
an intergovernmental agreement with the State of Wisconsin for this project to be completed
in two phases. The City of Oshkosh will pay to Winnebago County one million seven
hundred ninety-eight thousand dollars ($1,798,000.00) for Phase 1 of the storm sewer
pipeline portion of this project within 30 days of the execution of this agreement. This
payment is an estimated amount and the City will be billed any difference for the actual
amount of the project costs if the projects costs are in excess of the $1,798,000.00.
Winnebago County will refund to the City any amount less than the $1,798,000.00 if the
actual project costs are less than this estimated amount. Any excess payment or refund
shall be paid within 60 days of the calculation of the final payment amount. No City funds
will be used for any portion of the Airport's Taxiway B reconstruction project, and no Airport,
FAA, or BOA funds wilf be used for any portion of the City's storm water pipeline project.
Notices: Any notices required by this Agreement shall be in writing and delivered via
certified mail, return receipt requssted, as follows. Changes to these addresses shall be
in writing. In additivn to formal notification, both parties agree to take reasonable
measures to keep the other party informed of issues or questions regarding the
Agreement.
For: Winnebago County
c/o Airport Director
P.O. Box 2808
Oshkosh, W I 54901-2808
For: City of Oshkosh
c/o Director of Pubtic Works
P.O. Box 1130
Oshkosh, WI 54903-1130
Termination: This Agreement may only be terminated by either or both party/parties
under the following circumstances:
By mutual agreement of the parties, at any time.
ii. At the sole discretion of the City, if the storm water pipeline is
abandoned, removed, or relocated to City right-of-way or other
property.
iii. At the sole discretion of the Airport, if the provisions of any existing or
future agreements between Winnebago County and the United States
or the State of Wisconsin relative to the operation of the airport require
removal or relocation of the storm sewer outside of the Airport property
or termination of this Agreement.
iv. At the sole discretion of the Airport, if the City fails to perform any of the
City's materia( obligations under the Agreement and such failure is not
cured within a reasonable time after receipt of a written notice from the
Airport.
AUTHORITY: Airport affirms that all necessary boards and elected officials have
approved the acceptance of this Agreement, and that the undersigned have the authority
to sign this agreement on behalf of the Airport. City affirms that all necessary boards
and elected officials have approved the acceptance of this Agreement, and that the
undersigned have the authority to sign this agreement on behalf of the City.
This agreement shall be subordinate to the provisions of any existing or future agreement
between Winnebago County and the United States or the State of Wisconsin relative to the
operation or maintenance of the airport, the execution of which has been or may be required
as a condition precedent to the expenditure of federal or state funds for the development of
the airport, Furthermore, this agreement may be amended to include provisions required by
those agreements with the United State of the State of Wisconsin.
SIGNATURE PAGE FOLLOWS:
IN WITNESS WHEREOF the parties have caused this agreement to be executed by
their proper officers thereunto duly authorized as of the day and year above written.
Dated this Z3 of I� o�-�, �, , 2015.
WINNEBAGO COUNTY
By: ��%��� � ����
Mark L. Harris, County Executive
,
r
By: � I-
:'Susan T. Ertmer, County Clerk
Approved as to Form:
By:
John odnar, Corporation Counsel
CITY OF OSHKOSH
BY: ���1'w---�a�./? '�---.
Mar A. Rohloff, City M�nager
I
(
BY: I
Pamela R. Ubrig, Cit Clerk
By: �Y'Q!�1C� �CA1�Dw1
Trena Larson, Finance Director
Approved as to Form:
By
�yn A. Lor City Attorney
�
�
. �,
(�
_ �+�
m ��
I# � ¢
�
��
I T■
�
I �
Iy
�
��
�
l�
} I
,! �
I !
I
�I ;
�
I `
N `
I�
m �
� �
Z
�
+,
�
�� ,
�
I �
♦♦
C
�
s��
�¢
.�..�.�.�.
=:�
� I�
i I� I=
i� Is� �
i� ��
i
i
, r�
r
i� ��.
I�
�
'� ���
Z
� � ���
a
� `� � I I
-�- E IJNE OF NE 1/4, �
SEC. 34 + �
� _ ,�. _ � .._ �
r- � - � $00'23 03�1�M�E,0.5P - �
. ' KNAPP �3T. _.._..-.� I
I '
,
1�
f
� l
� � I
� �
z � �
o g � �� �
�� ��m �
� Q� m
� �
�' m � RI
�; p� � � � o �
, rE Z -� rn
� �� �� � �
m � �
� � 2 � � /�
� .�
..��� � =
N �, � o0
��;p�
>��ii*i 4 z g � m "�
�� ���
�� � �
�: � �
E UNE OF NW 1/4,. NW 7 4 Z
���
� ��
�
^� SEE SHEEf 2 OF 3 FOR
� �� �
.
����� �
�. �,:
��
�
���
��'��
����
��
z� �
�
�,�ii
� ��r
�,
� ���
u �
�
� . . _
��G
�f
I�
�
i.
f�
�
2804.93'
(
{ � �
� �
I�
�
�i
�
*
I �:.
�
I
l
SfE SNEET 1 OF 3 FOR COt�RiNUAT10N
� �
��
>�(*�
��
�W �
�
��
�. �
�`.
� s� � �
z �¢ �
m
I� �/
m .�,.
r
JI � I
�# �,.
�
�' _� •
�
� •' � o
# ��
��
�
v
�
Im s��i
��±� �'� I� ��+�
�¢ (� � �*i��
�� I�
& UNE. OF MM';t 4�„�,OF-:SEC. 3!f _.
:...�...+.r....,.�r►.. �.. r �� �,:w.a�-:... ' —..�u—��..�.:' �� ���,...,
SQO'f��E1'W' t222.28''
.,, r�it.
JO',
I�I�
+
(� (m
1{
r,
�
� ��
Y
�
_''�
��
�
�
��
�
��
m��
��
___ �
��� ;
�� �� .y
� �� �:.;-:
r,; �.. ..
. �lF, UNE�O � 1 �i. NE 1/4
0
. .� , �
; ,,,, • •
�► � �" �� '� ''
i� �¢ �
� . �� � ���
- . . T� NTANA ST. � �� T
lN� �
N• j 1 I ! 1 t 1
» �, � �.
�.w �,. ;l�� ..�.:., ;,..�. .J.._. -}:•.'l
(6I . y �: �
t j� ►` 1 1 1 i: �I
y j � 'Y
� ,�' ') (� ( .�) :f ': �!�
� �
a �
���
��
��m
���
���
X
���
2 �W
d }
�
�. p
�
8��
���
.�
� �
�
z
�
rn
m
�
�
�
�
��.�
�� � �
�� ��i
`"� �r �
W�
�
.
EASEMENT EXHIBIT
PAR75 OF 'THE NE 1/4 OF SEC710N 34. /WD 7HE NE 1/4 do
NW 1/4 OF SECTION 35� TOWNSHIP 18 NOR'iH.
RANGE 16 EAST, CtTY OF OSHKOSH. WINNEBAGO COUN7Y� WISCONSIN
LEGAL DESCRIPTION
A strip of land, 30 feet in width, being a pah of the NE 1/4 of the NE 1/4 of
Saction 34 and port of the NW 1/4 of the NE 1/4. the NE 1/4 of the NW 1/4, and
the NW 1/4 of the NW 1/4 of Section 35, 7ownahip 18 North, Range 16 Eaat, City
of Oshkosh, �nnebago County, Wioconain, the centerl�ne of said 30—foot wide etrip
being deac�ibed ae:
Commencing at the Northeast corner of satd Section 34;
thenca 500'-23"-03"W, aiong the eaet line of the NE t/4 of said Section 34. 640.59
feat;
thence N89'-31'-50"W� 18.20 feet to the Point of beginning of satd easement
centerllne:
thence S00'-42'-56"VY, 578.53 feet;
thance S89'-24'-25"E. 3016.66 feet;
thence N49'-51'-50"E, 625.02 feet;
thence S71'-45'-04"E. 537.27 foet to the east line of the NW 1/4 of the NE 1/4 of
said Sectfon 35, soid point alao being on the west Itne of vacated lowa Street. as
shown on the South Sido Auto Piot, aafd polnt also betng the end of this easement
cantarltne.
. .� . ., .,._ , �
�
SHEET 3 OF 3 AUY, 2015
���
.�."r �,
Pao,t. ra. eoaaee2z