CHANGE ORDER - WASTE6VATER TREATMENT PLANT
__. , �..w�.�,,..�.�.�
BE IT RESOLVED by the Common Council of the City of Oshkosh
that the fcl?ew,ir_; Crange nr�?�r No> 11 tc C�:�tra�t ��.�.,� for th�
construction of the Wastewater Tr�atment Plant is hereby appraved:
CHANGE ORDER NO. 11 - A.dcling the amount af $24,872.20
FLUOR BROTHERS CONSTRUCTION COMPANY, INC.
Oshkosh, wisconsin 54901
Purpose: see attacY�ed Exhibit "A"
BE IT F:URTHE R R�SOLVED by th� Common Council of the City
of Oshkash that the foregoiiig change order is hereby approved and
a copy of which is attached to this resolution. Money f.or this
purpose is hereby appropria�ted from its respective construction
fund.
- 15 -
�
., �
CITY OF 05HKOSH
WASTEWATER TREATMENT FACILITIES
DoNOxtrE rz� zo33
CONTRACT "A"
CHANGE ORDER ,�11
( ATTACi�'�TT)
1. Paint ceilings over faur(!�) air floatation tanks not
originally called out to be painted.
2. �.irnish and insiall 3� fiz•e extingaishers required
for fire protection,
?� P*ov-�de wr3 yns�a�I h�a::ches at sec�ndary clariiiers
to support beams carrying tunnel roof slab. Required
to structurally support tunnel roof slab.
4• Increase size of fan support s1ah. Latger, more
powerful I.D. furnished by low bidder' MSI Industries,
necessitated a larger fan base.
5• Install bulkheads. Startup of first phase of plant
required bulkheading of chanr.els and openings to units
that were not used in first phase.
6. Revise railings around sluice gate openings on central
turu�el deck at chlorine chambers. Swi.ng of operator
handle required additional clearance.
7• Ad3 16 access manholes and additional reinforcing steel
to walkways ov-er aeration tanks that support bird aerators.
Required for maintenance access to bird aerator impellers
and shrouds.
8. Revise sliding doors in maintenance shop. P.equired to
p�ovi.�.e e1PvGl ance �f ovarnead struciural concrete beams
that could not be moved.
9. F'rovide presst:.re tite manY:ole covers with gaskets for
sludge storage tantcs. Covers originally called for were
insufficier_t to take pressures encountered.
?0. Excavate and replace material in parking lot that was
pumped up by tanker trucks duxin� hauling operations for
sludge disposal during construction phase.
11. Install new gas main to provide zatural gas for building
heating to existing disposal p:ia,zt during construc-tion of
new plant. The existing gas service main ran thru the
area where the new plant ha:: to be cons�ructed thereby
necessitating this temporary linf�.
(continued)
� 16 -
EXHIBTT A
to Res. �10
$ 2,100.00
$ I, 2t�1.00
$ 505. 00
� 234.00
� �rl / �Q�
g 70.00
$ b,�.z5.00
� 37pe75
$ 1, 821}.00
$ 2,1.65•95
$ 649.00
.
Change Qrder #�1.1
Page Two
, 12. Pour a concrete enveiope around effluent lines from
secondary clarifiers #�l and #2. Excavation for these
lines went to a depth where ground water springs were
uncovered in the hard pan overlaying the rock. This
concrete seal will sea? off these springs, thereby not
allowir� ground water to enter ground water drainage
system necessitating pumping by the City of Oshkosh
for the life of this facility.
13• Add two (2) coll:n-�ns urxier secondary splitter box in
central tunnel. Required to prov-i.de adequate support
for subject structure.
14• Remove and replace window to install control panel.
Required to provide for installation of control panel..
15• Core dri11 drains required to pr•ovidP drainage in
aeration pipe trough at grit charnbers.
16. Install steel plates over openings in raw sewage pump
room floor openings fer iuture pumps.
17. Core drill additional noles to prov.ide anchorage for
railings to provide ��;rsonal prot.ection at air fiotation
equipmen�.
18. Paint pumps and bird aerators.
19• F1�rnish and erect structl:ral steel su�z�ort for relocated
makeup air u��t on so�i�'s buildingo
�
CUL?F,IT`%T'.� �V .... _ �_. _... .. ,
_,�.,,�__... _,..__. �
;
-�-____,._. _ ..... . . ;
i
i
APPR0�7E�� •� • q`' �� �-,
'�3` " �
_. _��,......:....... ...........,.. _ � .. . .�:;::,?. �." -
- 17 -
Exhibit "A" cont'd.
Res. ##10
� 3,928.00
� 306.Gv
� 136.00
� 95•00
� 53 • 00
$ 346.00
$ 1,7z1�.50
$ 1,520.00
$24,872.20
�
CHANGE ORDER NO. 9
Owner Citv of Oshkosh. `disconsin Date Julv 21. 1975
Pro;ect '�+astewa�er Treatment Facilities
,
Cor,tract_ _'�A" Contractor Flt?o?" Rros, Gonstru�ti �n Cn _� Lnc
Original Contract Award $ 4, 53Z, Z07.00
Change Ordered Herewith:
�xtend.contrac�;completion time from 983 consecutive �alendar days
to �98 consecutive calendar days af�er wr.it�en Natice to Proceed.
. '� S C
Reason for Change Order: M
Ta extend cantract tima for causes outside of tl�� cor,tx�a�. �f' th�
Contractor per his r.equest. Na.mely, a stri.ke by T,oc��. #1 �°, a� the
International.Union oi �perati.ng Engi,�ee�� that occurred between
June: 28, 1975 and. �uly 14, 1975. A�1 puz�suant ta Pa�agraph 36,
o�' the General Conditiona, of the specifi�ca.tions;. .
Original
CONTRACT AMOUNT
� i ••
I'revious C.O.s (ADD f ��j� $ ��,141 _ 07
This C.O. (ADD/DEDLr�� $ ..____p.._,�_
REVISED
4,�68,848.07
CUNTRACT TIME (CAL. DAYS)
Original
�On Days
,�'revious C.O.s (ADD/DEDUCT) �,�, Days
This C.O. (ADD/DEDUCT) 1'S Days
REVISED
..�
THIS DOCU�IENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS
ANn COVE�IANTS OF THE CONTRACT SHALL APPLY HERETO.
Donohue & Associates, Inc. .
F1uoz Bros. Canst�uction Co.�
�Y• ��- j
, ,
� �,
�� L; %% ��� f �,�-
�'�ter F� Pols,ter ;�E. Date
In:c BY � 'l J� , .; ` ��- �� ��-c. � f�.�t-. % f� 7, `
Wi�.l.l��fr, M�Enroe, PresidentDate ,
City of Oshkosh, W.iaconsi�n BY'
Donohue & Associates, Inc. .
�
e
�g and Design �� n�ers ���� � -
� 2.033A / q �� �
Proi_ N�_ C_(�. Nn
w,:,� �,✓
..'l_ 't._,�1
• a CHANGE ORDER NO. Zl ' -
' .,
t;�vner City of Oshkosh, Wis. Date Augu.�t 28, 1975
0
�a3��t Wastewater Treatment Facilities
�OI1t�.Ct "A" Contractor Flt�or Ar s. f:nnst,_ Cn_ _ Tnr_
Orioinal Contract Award $ 4� 537.7�'7•afl
��.ange Ordered Herewith: .
Provide additianal items as detailed on attachment.
P.eason for Change Order: :
See attachment
Original
CONTRACT AMOUNT
$ 4,537,707.00
Previous C.O.s (AD�: ��w`��� �;; $ 67, 61b.07
t ���
This C.O. (ADL°, : . < �' ° $ 24, 8'i2� 20
REVISED
�+,630,195•27
CONTRACT TIN1E (CAL. DAYS)
Original
� Days
Previous C.O.s (ADD .,, � lg3 D2ys
This C.O_ (ADD/DEDUCT) —0— Days
REVISED
983
THIS DOCUhiENT SHALL BECOi�1E AN AMENDMENT TO THE CONTRAC'T AND ALL STIPULATIONS
AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
I3onohue & Associates, Inc.
Fluor Brvs. Constr. Co. Inc.
City Of Oshkosh, Wis.
i7..mohue �C Associates, Inc.
By
By
By:
r�,�i�,c-f ��;%- ; ' /� �L��—
Peter_. F. Polster� P.E. - Date
�� � r ,
. . ��'� . . . . . i
Wm. ri Enroe Pres. Date
��7 � G � ��>_�
%�G - � _
�� Date �
„� � ,
�
�
Consu ting an esig�ri�ineers
` � %%% ��`� ``�` �33A � 11
/rI, � �
�`' `� � yyl�'- �-�roj. No. C.O. No.
t�r
�,��� �� �
�
O
r�
�
�
�p
�
�
'�"'�
�
�
'�
�t
O
�
ta0 �
.� �
C.� f
N tl1�
O N
� F-!
C13 O
P�l
O
-I-� F-[
O
� � O
O rI N
•ri �t
.�.� N
� O l�
� ��
p ..
U] ri �-
N �—i N
���
-E-�
�
O
�
�
O
H
�
O
�-1
�
O
�
�
._.
�
N
�
�
z3
N
.�
�
Fi
�
U
Lfl
ti
rn
� \�
� �
�-c �
A,t N
.C2
�
�
�. �
� �--I
U2 �
� �