HomeMy WebLinkAbout13. 15-495NOVEMBER 24, 2015 15-495 RESOLUTION (CARRIED__7-0_____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVE CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT 15-07 WITH PTS CONTRACTORS, INC. (+$55,771.38) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: PTS CONTRACTORS, INC. 4075 Eaton Road Green Bay, WI 54311 Net Increase to contract: $55,771.38 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 315-0410-7480-00000 Street Improvement Fund Expenditures 317-0410-7480-03302 Special Assessments Fund – Sewer 317-0410-7480-03303 Special Assessments Fund – Water 317-0410-7480-03305 Special Assessments Fund – Storm Water 541-1810-1799-00000 Water Utility Construction in Progress 541-1867-6401-08673 Water Utility – Maintenance of Mains 551-1910-1799-00000 Sewer Utility - Construction in Progress 561-2010-1799-00000 Storm Water Utility Construction in Progress � O HKOlH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Workss"' 1 DATE: November 19, 2015 RE: Change Order No. 2 for Public Works Contract No. 15-07 Utility Repairs and Installation / Various Locations PTS Contractors, Inc. (+$55,771.38) BACKGROUND Change Order No. 2 for Contract 15-07 is scheduled for consideration by the Common Council at the November 24, 2015 meeting. The contract was originally awarded to PTS Contractors, Inc. in June of 2015 and Change Order No. 1 was approved in September of 2015. This change order is for final quantities and additional services provided. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • Streets/Sidewalk — Additional costs associated with work done for Wisconsin Public Services (WPS) within the project limits. • Storm Sewer — Additional costs associated with the removal of contaminated soils and warranty televising of outfalls. • Water Main — Additional costs associated with a longer bore under Sawyer Creek and a 6" water main on Fairlawn and South Park. FISCAL IMPACT Contract Section Chan e Order Amount New Contract Total CIP Bud et Amount Streets/Sidewalk $10,298.20 $10,298.20 '`*see below Storm Sewer $109,218.58 $328,724.61 $327,355.92 Sanita Sewer -$87,041.97 $1,192,573.27 $1,402,475.00 Water Main $29,327.55 $321,146.66 $321,146.66 Water Utilit Operatin -$6,030.98 $17,041.52 $25,842.00 Total $55,771.38 $1,869,784.26 $2,076,819.58 Adequate funds are available in the relating sections of the 2015 Capital Improvement Budget from other projects being under budget. Specifically, $121,355.89 of storm sewer funding and $41,946.66 of water main funding will be transferred from the available CIP budgets of Contract 15-04. *"WPS will be billed for the $10,253.94 for the street work and $1,368.72 for storm sewer work.. RECOMMENDATIONS I recommend approval of Change Order No. 2 to Contact No. 15-07 in the amount of +$55,771.38 to PTS Contractors, Inc. Approved: � -����- � Mark A. Rohloff City Manager SMG/tlt C\Engineering�2015 CONTRACTS\15-07 Misc Sewer Relays\Project_Information\Correspondence\Memo\15-07 Memo for CO #2_11-19-15.docx TO: PT5 CONTRACTORS, INC. 4075 EATON ROAD GREEN BRY, Wf 54311 CNANGE ORC3ER #2 (FINA�) DATE; NOVEMBER 11, 2Q15 Yaur present contracf wi#h the Ciiy of Oshkosh, Contract No. 15-07, aa�arded June 23, 2015, is hereby amended and cf�anged as follows: NET DECREASE i0: NET iNCREAS� TQ: NET DECREASE TO: NET fNCREASE TO: SECT(ON I - PAVING SECTIO�1 11 - STORM S�WER SECTION I11 - SANITARY SEWER SEGTION IV - WATER MAIN NET INCREASE TQ CdNTRACT (�v1 �,846.93) $74,540.23 ($27, 511.94} $19,580.02 $55,771.38 S�CTIdN I S�CT10N fl SECTION II! 5ECTION 1V (PAVIiJG} {STORMj (SA�l1TARl') (WATER) TOTALS BID TOTAL $8�0,614.40 $163,802.32 $796,881.50 $281,077.25 $1,762,375.07 CO #1 $4,75fl.00 $8,678.51 $25,955.54 �12,253.76 $51,637.61 PREVIOUS CONTRACT TQTAL $6Db,364.00 $172,480.83 $742,837.04 $293,331.09 $1,814,012.88 CO #2 ($10,846.93) $74,540.23 ($27,511,94) $99,590.02 $55,771.38 ' CONTRACT T�TAL ' $59�t,517.07 $2q7,021.06 $7'15,325,10 $3'(2,921.Q3 $1,869,78A.26 ;-.. ,u-�.-. Director of Publie Works C1TY OF OSHKOSH BY: City Manager City Cierk Approved and accepted: � ��A.t.h.-„ C.� ��..i�.r....' Contractor I certify that provision has been made to pay the liabilify that wi(1 accrue to the City of Oshkosh, Wisconsin, under the wi#hin Change Order. Approved as to form; City Atforney Cnmptroiler GON7RAC715-07 CHANGE ORDER #2 {F'INAL} SECTION I - PAVING lTEM pESCRfP71pN Uh77 CONiRACT lNSTAtLBD NE7 NET UNJT /NCREASElN DECRF1tSE1N NUMBER QUANTltY QUAN17r�ES INCItEAS� OECFtE'AS�' PR1GE CONIKAC?"YR10E CONTtLiCTPRtCE Remov)ng pavemeni, Square � ' ' 1100 com lete as s eciFied Yards 1,200.OQ 1 341.40 141.40 $4.10 $579.74 Removing concrete and ~ asphait sidewalk and driveway, compiete as Square 1120 s ecified Feet 6,-025.OR 6,330.90 505.90 51.25 $632.38 Unclassified excavakion, Cubic 1200 com lete as s ecifled Yards 1,100.00 24A.80 -855.40 $16.40 $14,028.56 7" concrele pavement rernoval and repiacement; including sawing; pavement iies; integrai curb and grading; excavating; 6" CABC; tarracing; and traific controi; complete as Square 1308 s ecified Yards 5,275.00 4 259.50 -1,015.5Q 560.85 (561,793.� 8" concrefe pavement removal and replacement; including sawing; pavement ties; integrai curb and grading; excavaling; 6" CABC; ierracing; and traffic confrol; compiete as Square 1318 specified Yards 80�.00 A77.Bd -322.A0 372.75 $23,Q54.60 8" concrete pavement HES removal and replacernent; including sa�ving; pavement ties; integral curb and g�ading; excavaiing; 6" CABC; terracing; and traffic control; complete as Square 1319 s ecifiad Yards 180.00 64,40 -915.60 575.80 58 762.48 Adjust manhofas and lnlets, 1360 com lete as s ecified Each 28.Ob 40.40 12.40 �436.00 �5,232.00 Turf restorAllon, compiete as Syuare i370 s ecified Yards 2,200.00 7,4fi'!.&0 5,251.60 $9.25 �48,577.30 12° radius cur6 with 6" CABC and grading, compteie as Linear 141p s ecified Feet 65.Q0 199.20 13A.2D 514.35 �1825.17 4° concrete sldewalk wlth 3° CABC and grading, complete Square 1500 as s ecified Feet 3,92&.00 3 405.70 -519.30 54.15 $2,155.10 6' concreta sidewalk! drivewaylramp with 3' CABC and grading, complete as Square 1510 s eclfied Fec�i 1,5p0.40 2,i65.30 665.30 $4.65 �3,093.65 Curb ramp detaciabie warning (ield (naturaUnon- painted), complate as Square 1540 s ecifEed Feet 66A0 72.D0 6.00 �27.65 5165.90 No. A reintarcing rods - deformed, epoxy-coated, Linear 1550 com lata as s ecified Feei 1,400.00 1,272.d0 -128.40 $1,15 $141.20 Drilled No. 4 sidewalk tie bars -- deformed, epoary-coated, 1560 com lete as s ecified Each 218.00 189.0� -29.OQ $4.70 $136.30 Sawing exisfing pavc+ment, I.inear 1700 com lete as s ecified Feet 3,8A0.00 3,548.90 -291.10 $2.05 $586.76 TaCk Coat, complele as 1900 s ecified Galions 95.00 0.00 -95.00 $5.d5 �,479.75 Page 1 0( 9 CONTRACT 15-07 CNANGE QRDER #2 {FiNAt) 1TEM pPSCRIP770N UNlT �ONTRAC7 !A}5TALL�D NE7 NET UNJ7 lNCREASE /N pECREASE fN NUMBER QUAN717Y QUANTl71ES /NCRBISE OECREASE PR10E CONTRACT PRlCE CQNTRACT PRlCF. 5" asphalUc pavemen! with 10" CABC and grading, Square 1905 com iete as s eciiied Ya�ds 2p0.00 52,60 -147.�i0 $49.20 �7,252.08 4" asphaltic pavement with 10" CABG and grading; Square 1906 corn lete as s aciiied Yards 2,975.OQ 3,491.90 516.90 �30.9Q g'f5 972.21 4" asphaltic surface with 6" CABG and gtading, compieie Square 1916 as s ecii+ed Yards 135.d0 166.30 33.30 533.05 $i,100.57 Prepare founcialion for asphaltic paving; complete as Lump 1960 s ecifled Sum 1.00 1.00 �1,OOO.QO SEGTtON t-{BID IT�MS 410Q-1980} - SUBTOTAL 577,219.62 {�118,806,01} SECTION I- ADDITi4NAl WORK R£QUIRED; CO �11 �T�� DESCRIP7fON UN17' CON7RAC7 (NSTALLED NE1" NET UN17 lNCREt1SElN DECf2EASE W NUMBER QUANTlTY QUfiN7fitES 1NCREASE DECREASE PRICE CONTRACTPRICE CON7WiCiPRIC� 1010 Clearing, complete as s ecified Staiions 5.00 5.00 $290.00 1011 Clearing, complete as Inch s ecitiad Diameter 10.00 10.00 $185.00 1020 Grubbing, complefe as s eCified Stations 5.60 5.00 �290.00 SECTI4N 1- (ADDITIONAI WORK REQUIRED: Cp #1 iTEMS 101 D-1620) • SUBTOTAt $0.00 $0.00 SECTIQN I- ADDITIONAL WORK REQUIi2ED: CQ #2 l7EM DESCRJP710N U�JI7 CON(RACT 1NSTAGtEp NET NEr UNIr lNCR�ASE/N DECREASElN NUMBPR QUANTITY QUANTlT1FS INCREASE D�CREASF. PRtC� CONiRAGTPRtCE CON7RAC7PR/CE 1309 7" concrete pavemenl HES removal and reptacement; Including sawing; pavement ties; integraf curb and grading; excavaling; 6" CABC; terracing; and traffic conlrol; complete as Square s ecified Yards 0.00 160.1ti 160.10 $88,25 $90 926.83 10000 Pariial depth sawing; Linear com leie as s ecified Feet Q.00 228.50 22fi.50 $2.89 $&54.59 10001 9" concrete pavement HES with 1-1/A" dowels; compiete Square as s ecified Yards 0.00 219.14 219.10 �80.85 517,714.24 10002 2" 7emporary Asphait Square Suriace Yards 0.04 65.90 65.90 $21.00 51383.90 SECTION !-(ADDITIONAL WORK REQUIREO: CO #2 ITEMS 1309-10001j • SUBTOTAL a30,679.66 �0.00 NET DECREASE TO: SEC7tOF! 1 {$10,846.83) SHCTIdN il - STORM SEWER fTEM DESCRlPT(ON UNlT CONTRACT fNSfA�.iFD NC:T NET UNli lNGRL'ASElN DECREflSE1tJ NUMBER QUAN717Y QUAN7771ES 1NCREASP DECREASE PRtCP CONTRACTPRlCE CONTRACTPRICE Storm sewer ulility line opening, complete as 2Q14 s eclfied [ach 2.00 1.04 -1.00 �0.01 $0.01 Furnish and install 60" storm l.insar 2102 sewer; complete as s ecifled Feet 426.00 416.40 •8.60 $2A1.OQ $2,072.60 nage 2 or a CONTRAGT 15-07 CHANGE ORDER #2 (FINAL} 17EM DESCRtPT10N UNIT CONTRAC7' /NS7ALLE'0 NE7 NET UNtT tNCREASEIN DECREASE7N NUMBER QUANTtTY QUANT/TlES 1NCREASE DEqREASE PR/CE CONTRACiPRtCE COM"RAC7PR/CE Fumish and i�stall8" storm � sewer Iateral, complete as linear 2280 s acified Faet 165.60 148.00 -'16.00 $76,65 �1,226.40 Furnish and install storm sewer marker bails, complete 2284 as s ecified Each 8.00 8A0 $45A0 �urnish and instail storm sewer clay dams, camplete 2286 as s ecified [ach 4.00 4.00 �86.00 FurNsh and insiail storm sewer laferal inlet, compiete 2288 as s ecified Each 4.00 0.00 -4.00 a372,00 $1,488.00 Furnish and insla�l 66" RCP Class III epron endwall witt� jaint ties; complefe as 2322 s ecilied Each 1.00 1.00 �3 5i5.00 Furnish and insfall standard storm sewer ma�hole (7' x 7' Vertical 2550 box ; com lele as s ecified Feei 7.55 7.34 -0.21 $1,100.00 $231.00 Furnish and instali standard storm sowar iniot ma�hole (7' x 7' box}; complete as Vertical 2574 s ocified Feet 8.15 7.51 -0.64 y1,115.00 $713.80 Connect to existing storm sewer main, complete as 2800 s ecified Each 2.00 0.00 -2.On $1,720.00 $3 440.00 Abandon 15" and larger storm sawer, complets as Linear 2822 s ecified Feet 'l30.00 i30,00 $37.00 Furnlsh, fnstall, malnkain, and remove Type D modified inlet protectlon, complete as 2858 s ecified �ach 77.00 9i.0a 14.OQ $82.00 $1,148.04 Sediment removal - Type P modified inlet protection, 2860 com lete as s ecifiad �ach 77.00 2,�0 -75.00 �5.15 �396.25 Furnish, install, maintain, and remove stone iracking pad, 2862 com iote as s ecified Each 3.00 1.00 -2.00 $465.00 5930.�0 Furnish; insfall; maintain; and remove sllt fence; complete Linear 2864 as s ecified Feel 40.00 0.00 -40.00 $3.10 $124,00 Furnish, install, maintain, and remove stona bag, compiete 2866 as s ecitied Each 9.OQ 15.00 14.00 517.00 $238.00 Furnish, instalE, ma'rntain, and remove 12" diameter sediment logs, complete as Linear 2868 s ecified Feat 20.00 90.00 70.00 �11.00 $770.00 Furnish; tnstall; maintain; and remove turbidity barrfar; 2876 com late as s ecified Each 1.00 1.00 $4,866.00 Furnish and instail topsoil 6" quare 2900 de th� com lete as s ecified Yards 75.00 169.Q0 94.00 $7.00 $658.00 Furnish and install iurt grass; Square 2920 �mpiete as speolRsd Yards 75.00 169.60 8A.00 g1.50 5141.00 Furnfsh and instail Class I; Urban; Type A erosion conlrol mat; complute as Square 2932 s eciffed Yards 75.00 189.00 94.00 $3.25 5305.50 Paga 3 0( 9 CQNTRACT 16•OT CHANGE ORpER #2 (FINAL) J7EM DESCRlPTION UN1T CONTRACT 1NSTALLEp NET NE7 UN71' lNCREASEIN DECRF4SGlN NUMBER QUANTlTY QUAN7/71ES INCREASE AF,CREASE PRICE CONTRAC7PRlCE CONTRACiPRfCE Furnish and install heavy rip- rap wlth fiiter fabric; compteie Square 2948 as s eCified Yards 36.tl0 AS.QQ 12.Q0 S88.OD 51,056.00 SECTI4N 11 -{B1D I7EMS 2014-2946) • SUBTOTAI 54,396.56 ($10,891.86) SECTION II - ADOITIONAG WORK REQUIRED: CO #�t /lEM p�SCRiP7tON UNI7 GpMRAGT INSiALtEO A��7 NE7 UNft INCREASEIN DECREASE/N fY(lMBER QUANT7TY CjUAN71TfES lNCREASE DECREASE AR7CF CON7RAC7PRlCE CQN7RACTPR/CE Furnish and install Tyge 1 Inlet (less casting), cornplete 2692 as s ecified Each 1,00 1.OQ $1 450.00 Furnish and Install Typa 3 inlet (with 18" sump), 2614 com lele as s ec3fied Each 't.00 1.00 51,890.00 Add(tional labor, equipment, and materials to replace storm sewer on Alaska Street and West 17th Avenue fvr Wisconsin Pubiic Service; Lump 20000 com lete as s eclfied Sum 1.00 1.D0 �fi40A0 AddiUonal IaboG equipmant, and materiats to rebuild storm manholes �vithin ihe concretQ limiis on West 6th Avenue; complete as spec3fied Lump 2000i Sum 9.00 i.�� �3553.43 Additional labor, equipment, and matorials to repair. coilapsed storm sewar on West 6th Avenue and Lump 20002 Ore on Sireel; com lete as Sum 1.00 1.00 �4,235.08 5EC71�N il -(ADDIT(ONAI. WORK REQUIRED; CO #1 -(IT�MS 2$'12-20002} - SUBTOTAI 50.00 bOAQ SECTION It - ADDITIONAI WORK R�QUlRED; CO #2 IrEM pESCRlPTfON UNl7 COMRACT INSTALLEO NEi NET Uh11T INCH[ASFIN OECREASEIN NUMBER C7UANTIN 4UANI'l7lCS INCRFJiSE OECREASE ARlCE COMrf2ACrPRlCE CON7RACTPR(CF Additional labor, equipment, and meterials for plugging and pumping down Ihe stonn sewer on Nebraska Sireet; Lump 20003 com lete as s eciPied Sum 0.00 i.00 1.00 $5 600.00 55,600.00 Addilional lahor, equipment, and materials tor piugging and pumping down the storm sewer on WitzeE Avenue; Lump 20004 com lete as s ecifled Sum 0.00 1.00 1.00 $8,300.00 59,340.00 Additional lebor, equipment, and materials for plugging and pump(ng down the storm sewer on New York Avenue; �ump 20005 COmplete as speci(ied gum 0.00 1.00 1.00 $i6,400,00 S10 400.00 Addfiional labor, equipment, and materials for plugging and pumping down ihe sform sewer on 24th Avenue; �ump 20006 complete as specified Sum 0.00 1.00 1.00 �8 100,00 �,B 100.40 Pega 4 of 9 CONTRACT 15-07 CHANGE ORDER #t2 (FINALj ITEM DESCRIPT70N UNIT CONTRACT INSi"ACtFO NET NET UNIT 1NCREASEtN DECRERSEIN NUMBER QUAN7(7Y QUAN717/ES tNCRERSE DECREASE PRlCE CONTRAC7PRlGE CQNTRACTPRICE Additional labor, equipment, and materiais fot invoice numbers 15-866-01 for instaliing a storm lateral in a Lump 20007 UWO arkni lot. Sum O.D� 1.00 1.00 $6,257,47 �6,257.47 Additional labor, equlpment, and materiais for invoice numbers 15-866-02 through 15-666-08 For storing and removal of ihe contaminafed Lump 20008 soil on the oulfall. Sum 0.00 'fA0 i.OD �41,178.12 �41,178.12 SECTION II -{ADDITtONAL WORK REQUIREQ; GQ #2 -(ITEMS 20003-2fl008) - StJBTQTAL $8d,835.59 $OAd NET INCREABE Tfl: SECTION II $74,540.23 SECTION Ilf - SAN(TARY SEWER 1TfM DESCRtPTION UNl7 CONTRACT iNSiALLED NET NE7 UN17' /NCREASE (N UECREASE 1N NUMBER qUANi1TY QUAIU7JTIES lNCR�ASE pECftFASE PRlCE CONI'RACTPRlCE CONTRACTPRtCE Furnish and instal( 8" sanitary sewer (relay), complete as Linoar 3000 s ecified Feet 2,73Q,00 2,666.24 -63.80 $161,40 �6,Q69,32 Furnish and instail 8" sanitary sewer ralay (spot repairs}; Linear 3001 com lete as s ecified Feet '10.00 86.00 16.00 $141.00 �2,256.p0 Furnlsh and inslall 12" sanilary sewer (refay}; Unear 300h com lete as s ecified Feet 865.00 861.50 -3.50 $111.00 $388.50 Furn+sh and install 15" sanitary sswer (relay}; llnear 3006 com lets as s ecified Feet 245A0 244A0 -1.04 $138.00 $138.00 Furnish and instalf 18" sanitary sewer (relay); Linear 3008 wm lete as s ecified Feet 7.00 3.00 -4.00 $240.00 �960.00 Furnish and install 8" sanitary sewer drop; complete as Vertical 3060 s ecffied Feek 2.35 Q.00 -2.35 $450.00 $1 057.50 Furnlsh and install 12" sanitarysewerdrop; Verticai 3064 com lata as s ecified Feet 2.80 0,00 -2.80 $555,00 $1,55Q.00 Furnish and Instali standard sanitary sawer manhole (4' diameter), complete as Vertical 3100 5 eCiflBd Feet 178.00 162.66 -15.34 $263.00 �4 034.42 Furnish and instail e�ernai sanflary sewer manhole chimney seal, comptete as 311Q s ecffled Each 2a.b0 2fl.00 $525.Op Furnish and inslall externa! sanitary sewer manho(e chimney seal extension, 3116 com lete as s ecitled Each 2.00 0.40 -2.00 �350.Q0 $700.00 Furnish and install internal sanitary sewer manhole chimney seal, comp�ete as 3118 s aGfteci �ach 2.00 0.00 -2.00 5325.Oa $8b0.00 Furnish and install 8" x 6" sanitaiy sewer factary wyes or tees, complete as 3210 s ecified Each 35.40 44.00 9.00 $115.00 $1,035.D0 Page 5 or e CONTRAC715-07 CiiANGE ORDER #2 {F1NAl) 17EM DESCRIPTlOM UNfT CONTRACT INSTALl.ED NE7 NET UMT 1NGREASE IIY UECREASE IN NUMBER QUANTlTY QUANT777ES 1NCREASE CECREASE PRICE CONTRACTPRlC� CON7RACTPRICE Furnish and install 12" x 6" sanitary sawer fac{ory wyes or tees; comp(ete as 3214 s eci(led Each 3.00 18.Q0 15.00 �255.00 $3,825.00 Fumish and install6" saniiary sewer "insert-A-7ee" or "Kor- N-Teo"; compiete as 3222 s ecitied Each 2.00 1.00 -1.00 $285.00 5285.00 Furnlsh and instaii sanitary LL sewer PVC pipe saddie; 3224 com lete as s ecified Each 9.Q0 9.00 $215.00 Furnish and install a" sanifary sewar laterals (new}; Linear 3230 com fete as s ecified Feet 505.00 479.00 -26.Od 572.80 $1,892.80 Furnish and insiall 4"/6" sanitary sawer lateral (relay), Linear 3234 com lete as s ecified Feet 1,225.00 3,110.Q0 -115.00 $84.70 $9,284.5Q Furnish and instail sanitary sewer lateral marker balls, 3236 com lete as s eclfied Each 130.40 121.00 -9.00 $45.00 $405.00 Reconnecl existing sanitary Iaterais; complete as 3237 s ecified Each 30.00 28.OQ -4.00 3140.00 $560.00 FurNsh and fnsteli clay dams, 3238 compiote as specified Each 52.00 46.00 -8.00 $86.OD 3818.00 Furnish and instaB connection to existing 8" 3300 mafns, com lole as s ecified Each 10.00 8.00 -2.00 $575.00 �1 150.00 Furnish and instali connectfon to existing iQ" 3302 mains, com lete as s ecified Each 1.00 1.00 �720.Off Furnish and instali conneclfon to existing 12" 3304 mains; com lete as s ecifled Each 7.Q0 5.00 -2.04 5845.04 $'f,690.00 Furnish and fnstall connection to existing 15" sanitary sewer mains; 3306 corn lete as s ecified Each 1.QD 1,00 �1 020.40 Furn(sh and instefi connection fo exisfing 98" sanilary sewer mains; 3308 com lete as s ecified Each 1.00 O.dO -1.00 31,47�.D0 $1,470.00 Furnish and install connection fo axlsting 34" sanitary sewer mains; 3314 com lete as s acifiad Each 1.�d O.flO -1,00 $3,850.00 �3,980.00 Furnish and insiall sanitary sewer concrete co(lars, 3330 com lete as s ecffied �ach 2.IJ0 0.00 -2A0 $1fl6.00 $212.00 Core fnto exisling manhole, 3332 com Iete as s ecified Each 2.00 5.40 3,00 $1,030.04 S3 090.00 Abandon saniiary sewer manhoies, complete as 3800 s ecified Each 14.00 1d.06 $745.00 Abandan 8" saniiary sewer, Linear 3802 com lete as s ecifled Feet 95.D0 14.00 -1.Q0 �v28.00 $28.00 Abandon t0" saniiary sewer, Linear 380A camplete as specified Feet 400.00 395.00 -5.00 $6,25 �u31.25 Abandon 24" saniiary sewer; Linear 3814 com lete as s ecified Feet �,430.OQ 1 421.00 -9.00 �14.70 $132.30 Page 6 af 9 CONTRACT 15-07 CHANGE ORDER #2 (FINAt) ITEM CONTRAC7 JNS7fiLtED NET NET UNiT 1NCRF.ASEIN DF.CREASEIN NUMB£-R DESCR1PilON UMJT QUANTI7Y QUANTITlES tNCREASE DECRFASE PR10E CONTRACTPRICE CON7RACTPRlCE Abandon 27" sanitary sowor; Linear 3816 complate as specitied Fest 1,350.00 1,345.00 -9.00 $18.15 $i63.35 SECTlON Iil -(BID ITEMS 3000•3$16) - SU8707AL �10,20&.00 {$3T,717.94) SECTtON f!I - ADDITS�NAL WORK REQUiRED; GO �F1 1TEM OESCRtPTlON u�f7 CONTR.4C7' lNSTAtLFp PIE7 NET UNiT lNCREASEIN DECREASElN NUMBER QUANTfiY QUNJTITlES lrVCREASE OFCREASE PRlCE CONiRACiPi210E CONTRACTPRICE Furnish and instaU trenchless 12" sanitary sewar casing Linear 30000 i e; com lete as s eclfiied Feet 60,00 6Q.00 �2&6.OD Addiflonal equipment, labor, and materials to rebuild drop manhole Od-322 at ihe intersection of Merritt Av�nue and Monroa Streei; complete Lump 30001 as s ecified Sum 1.00 1.04 $2,700.00 Addilional equipmenf, labor, and materials io rebuiid ihe chfmney ot manhole 03-212 at the lntersac4ion of West 8th Avenue and Nebraska Lump 30002 Street; com tete as s ecified Sum 9.00 1.00 y250.aQ Additianal equfpment, labor, and maferlais to install new latsrals for 45 West 6th Avenue; complete as Lump 30003 s acified Sum 1.00 1.00 �1,3�8.27 Addiiionai equipment, labor, and materials to abandon 27" sanftary sewer and butkhead the maln In Manhole 09-28; l.ump 30004 com lete as s ecified Sum 'f.00 1.00 v�5,727,27 SEC7tON lll -(ADDl7(ONAL WORK REQUIR�D : C4 #1 -(17EMS 30000-30004} - SUBTOTAL $0.00 NET DECREASE TO: SECTI4N tlf ($27,511.94) SEC7lON iV - WAT�R MAIN So.00 ITEM OFSCRlPTION UNlT COMTRACT (NSTALLED NE7 NET UNIT 1NCREASElM DECREASEIN NUMfiER QUANi1TY QUANTfT/E-S 1NCREASE DECREAS� PRtCE CONTRACTPRIGE CONTRACTPRICE Fumish and instalf 6" ductile iron waler main (relay) with polywrap; complete as Linear 4002 s ecified Feet 64.00 144.50 8-0.50 $205.00 $17,322.50 Furnfsh and install 8" duclile iron water main (relay} with polywrap; compleia as �inear 4004 s ecified �eaf 875.OQ 863.50 -91.50 560.45 $695.18 Furnish and install 10"ductlle iron water main (retay) wilh polywrap; complate as Linear 4006 s edfled Feet 40.00 37.50 -2.50 $268.00 �670.00 Furnish and instali 1" waler service (relay); complete as l.inear 4036 s ecifled Feet 740.00 565.00 -156.00 �57.90 g8,974.50 �urnish and install 1" water service (new); complefe as Linear 4042 s ecifiad Feet 535,00 511.OQ -24.00 561.70 51,480.80 Paga 7 ot 9 CONTRAC715-07 CHANGE ORDER it2 {FINAL} l iEM DESCRlFTlON UN1T CON fRACT lNS7At�E0 NET NET UN1T INCREA3E /N DECREASE IN NUMBER QUAMil7Y QUAN7171ES lNCRtASE OECREASE PRlCr CONTRACTPRtCE CONTfL1CT7>R1Cf �urnish anci lnstall 1" corporation and stop box; 4Q48 com lete as s ecified �ach 38.00 32.00 -6,40 5285.Oa $1,710.a� Furnish and insEall wafer service cfay dants; compiete 4055 as s ecified �ach 38.0� 32.00 -6,00 �86.00 �516.00 Furnish and install connectlons to existing 6" waler main; complete as �i058 s ecified Each 3.00 5.00 2A0 S2,Od0,00 $4,OSQAO Fumish and install connecilons to ex{sUng 8" wafor main; complate as 4060 s ecified Each 3A0 3.00 $2100.00 Furnish and install connecfions to exisiing 10" water main; compiete as 4062 s ecified Each 2,00 2.00 $2 225.00 Furnish and Enstall 8" HbPE water main directionally 4lnear 4090 drilled; compiete as speclfled �eet 150.00 212.00 82.00 $i33.00 $8,2A6.00 Furnish and instail 6" x 6" waler main too; campi�te as 4101 s ecified �ach 1.00 1.00 $d38.00 Fumish sr�d insfall 8" x 6" waler main tee; compfete as � 4110 s ecffled Each 5.fl0 5.00 $508.06 Furnish and install 6" 45 degree water main bend; 4236 com Iete as s acified Each 8.00 5.04 -3.00 $390,00 $930,00 Furnish and install 8"45 degree water maln bend; 4237 com lefe as s ecified Each 11.00 5:00 -6.40 �388.00 $2 328.00 Furnish and inslali 10" 45 degree water main bend; 4238 complete as specltled Esch 4.00 d.60 �687.00 Furnish and instali 8" x 6" water main reducer; compiete 4264 as s ecif[ed Each 1.00 1.q0 5345.00 Fumish and install 6"wafer ma(n gate valve; completa as 4401 s ecified Each 5.06 7.00 2.00 31 195.00 S2 390.00 �urnish and instali S" water main gate vaive; complete as dd02 s ecified Each 3.00 4.00 i.00 31,638.00 $1,638.00 Furnish and install 10" water 4403 main gate vaNe; complete as �ach 2.00 2.OQ �2,345.OQ Furnish and instail hydrant: 450� com lete as s ocifiod Each 4.p0 A.00 $3,490.00 Furnish and inslali standard watar valvg manhols {5' diameter); compteie as 4600 s ecifiod Each 2.00 2.00 g8,480.00 Futnish and install 18" steel water main casing pipe; Linear d726 com lete as s ecifred �eet 18.fl4 20.00 2.00 $2fid.40 $528.fl0 Abandon wafar maln on Hawk Sfreet; complete as Lump 4900 s ecified Sum 9.00 1.Ofl �2,2p0.00 Page B of 9 CONTRACT 15-OT CHANGE QRDER #2 (FINA�) ITEM ��SCRIP7tON UN/7 CCJNTRACT lNSiALLE6 ME7 NE7' UNlT INCREASEIN �F.CREASEIN NUMBER QUlWTlTY QUANTITfES INCREASE DECRF.i1SE PRlGE GON7RACTPRlCE CONTFUICTPRlCE Water meter vauit cover alleralions; compl6ta as 4999 s ecified �ach 2.0� 2.00 S6 080.00 SECTION iV •{�ip IT�MS 4002-4998) - SU8TO7AL b34,2d4.54 ($17,304.48) SECTiON IV - WATER MAIN SECT(�N IV - ADDITIONAL WORK REQUiREQ: CO #4 JT£M DESCRIP710N UNfT CONTRAC7 /NSTALLED NET NET UNl7 lNCREASE JN DECREASE 1N NUMBER QUAtJ7lTY QUANTITIES lNCREASE OFCREASF. PR10E CON(RAC7PR/CE CONTRAC7'PRtCE 4352 Cuf and cap existtng 6" water main, com lete as s ecified Each 4.00 4.00 $1,400.00 40001 Additianal labor, equipment, and materlafs io abandon water main off of Eagle Lump SUQat; com laf� as s ecifiad Sum 1.OQ 1.00 �2,559.7q 40002 Additfonal labor, equipment, and maferials to repair a water main break at West 6ih Avenue and South Sawyer Lump StraeY, com (ete as s ecified Sum 1.Od �.OQ g736,15 Q0003 Additional labor, equipment, end materlais to lawer 6" water main on West South Park Avanu� and Georgia Lump Street; com lete as s ecified Sum 1.Dp 1.00 �3 357.87 SECTION IV -(ADDITIONAI WQRK R�QUtRED: CO #1 ITEMS 4352-40603} -SUBTOi'AL $0.00 $O.OD SECTIQN IV -AODITtONA� WORK R�QUiREO: CO #2 1TFtA DESCRIPTiON !lN1T COMRAC7 !l+tS7ALLED NET NET' UNIi" lNCREAS�IN D�CR�ASEIN fJUMBER 4UAMilTY QUAN7IT/ES lNCREASE DECREASF P127CE GONTRACl PRlCE CONTRACT Pft7CE Furnish and install 6" �1-1/4 degree wafer maln bend; 4218 corn lete as s ecified Each 0.�0 1.06 1.00 �510.00 $510.00 Furnish and install6" 22-1l2 degree waler rnain bend; 4227 cvm 3ete as s ecified Each 0.00 4.00 1.00 g510.qQ $530.00 Furnlsh and Install8" 22-1J2 degree water main bend; 4228 com lete as s ocffied Each O.QO 3.00 3.00 $360.00 $1,084.00 Addilionat labor, equipmani, and materials to insfail a coropoation stop only; 40004 com lete as s ec+fied �ach 0.00 1.00 1.00 $590.00 �590,00 SECTlOtJ IV -(ADDITIONAL WORK REQUIR�D: Cd #21TEMS 421$-4DOQ4) - SUSTOiAL N�T INCi2�ASE i0: S�GiION IV 52,69�.00 bfl.00 $19,594.02 NET lNCREAS� 70 SECTI�NS I, li, lil, & iV NET OECREAS� TO SECTiONS 1, i1, [il, & IV N�r ir�cR�ks� ro car�rr�c�: Page9at9 $24q,214.87 SS�aa,aaa.2e> $55,771.38