Loading...
HomeMy WebLinkAbout12. 15-494NOVEMBER 24, 2015 15-494 RESOLUTION (CARRIED___7-0_____LOST________LAID OVER________WITHDRAWN________) PURPOSE: APPROVE AMENDMENT TO ENGINEERING SERVICES AGREEMENT WITH CH2M HILL ENGINEERS, INC. FOR DESIGN AND BIDDING SERVICES FOR THE MARION ROAD WATER TOWER REPLACEMENT (+$237,485.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City and CH2M HILL Engineers, Inc. (CH2M HILL) previously entered into a professional services agreement in which CH2M HILL would provide the City with design and bidding services for the Marion Road water tower replacement; and WHEREAS, a new location was selected to allow the existing tower to stay in service while the new tower was being construction; and WHEREAS, additional engineering services are necessary that are related to the change in location. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are authorized and directed pursuant to Section 12- 16 of the Municipal Code to enter into an amended agreement with CH2M HILL. BE IT FURTHER RESOLVED that an amendment to the agreement with CH2M HILL is approved and said City officials are authorized and directed to take those steps necessary to implement the terms and conditions of the final agreement. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 541-1810-1799-00000 Water Utility Construction in Progress � O HKOlH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Stephan M. Brand, Public Works Utility Bureau Manager� �� DATE: November 19, 2015 RE: Amendment to Engineering Services Agreement for Design and Bidding Services for the Marion Road Water Tower Replacement / CH2M HILL Engineers, Inc. (CH2M HILL) (+$237,485) BACKGROUND The Marion Road Water Tower is an elevated 750,000 gallon water storage tank on Marion Road between the University of Wisconsin-Oshkosh and the City's downtown business district that was erected in 1936. This water tower has been well maintained and is routinely inspected, but it is near the end of its useful life. In previous engineering studies performed by CH2M HILL, it was recommended that the City maintain its current volume of elevated storage in order to continue to cost-effectively provide an adequate volume of high-quality drinking water and fire protection. CH2M Hill was chosen to perform the design and bidding services for this project. The original scope of work envisioned replacing the water tower at its current location with an updated tower design based on input from a stakeholder group. Early in the design discussions, it was suggested that we evaluate additional location options for this tower. Through the stakeholder meetings, several alternative locations were suggested. These suggestions were analyzed by CH2M HILL for feasibility and for the ability to provide the function needed for the water tower. In the end, a location currently owned by the City of Oshkosh Redevelopment Authority (RDA), was selected to locate the new water tower. This option was selected because it allowed the existing tower to stay in service while the new tower was being constructed, which reduced concerns about adequate fire protection while the tower was out of service. A number of ineetings were held with the RDA to discuss this option and to review questions and concerns. The RDA approved sale of this parcel to the Water Utility for this construction. ANALYSIS The level of water system modeling required to analyze the various new site alternatives is a significant effort that could not have been foreseen in developing the original scope of services. Changing the location of the tower is a major change in scope from the original design. The additional services necessary that are related to the change in location include: surveying and subsurface exploration of new tower site; expanded drainage plan and erosion control provisions; design and construction detailing to accommodate poor soils; piping connections for the new water tower to existing water mains; cell phone screening structures on the new water tower; architectural building structures for the cell phone equipment; additional site security; and site fencing and aesthetics to match current area development, which must be reviewed and approved by the Planning Commission. FISCAL IMPACT Staff has reviewed the amendment and costs. The amount of this contract amendment is $237,485. This will raise the total contract amount to $420,635. Funds are available in the Property Improvements Section (Water Utility Funds) of the 2015 Capital Improvement Budget. RECOMMENDATIONS Chapter 12 of the Municipal Code of the City of Oshkosh provides that professional services of a specialized nature, including engineering services, may be procured without the use of formal, sealed quotes. I have reviewed the amendment and in accordance with Section 12-16 of the Code, I am hereby recommending that the Common Council approve this amendment. Approved, ,��, /� Mark A. Rohloff City Manager - SMB/tlt I:\Engineering�2015 CONTR.4CTS\15-02 Marion Rd Wtr Twr Repl\Project_Information\Correspondence\Memo\15-02 CH2M Hill Des & Bid Agreemnt CA #1 Memo_11-19-1 S.docx