HomeMy WebLinkAbout27943 / 75-24�� • (R E V I S E D)
��� l�, ����
(CARRIED LOST
# 24
LAID OVER
RESOLUTION
WITHDRAWN }
��+1FiEREAS, the City of Oshkosh has heretofore advertised for
bids for Public �9orks Contract No. 75-19, a comfort station at
Red Arrow Park, and
WHERc^.AS, upon the opening and tabulation of bids, it appears
that the following are the lowest and znost advantageous bids:
ED TESCH CONTR.ACTING GOMPANY
1847 Oregon Street
Oshkosh, WI 54901
JOHN E. MEYER COMPANY
716 W. 18th Avenue
Oshkosh, WI 54901
SOLAR ELECTRIC, INC.
1201 N. Main Street
Oshkosh, WI 54901
M. P. KELLY, INC.
665 N. biain Street
Oshkosh, WI 54901
$19,452.00
General Construction Work
$8,795.00
Plumbing Work
$2,281.00
Elec-trical Work
$4,178.00
Outside Utility
Construction
NOW, THERrFO�2E, BE IT RESOLVED by the Common Council of the
City of Oshkosh that the said bids are hereby accepted and the
proper City o�ficials are hereby authorized and directed to ent�r
into an apvropriate agreement for the purpose of same, al.l
accarding -co pl�ns, specifications ar.3 bids on fil.e. Money
for this purpose is hereby appropriated from the StanhiZber Trust.
i
;
`-__:a ._ .';r
�: _ ... . , ... _. _. , ,. �.._ ,.__._.,.,,,.._ _ :
;
� i :.�_'._.:.} ._...__�.. ��•_ .. _ -y ? ,1 —IL--
1
- 29 -
CONSTRUCTION CONTRACT
THTS AGREEMENT, made on the � day of December � lg 75�
by and between the CITY OF OSHKOSH, party of the first part, hereinafter
referred to as the CITY, and M. P, ICELLY, INC.
of 665 N. �sain Street, Oshkosh, T�7I 54941
party of the second part, hereinafter referred to as the CONTRACTOR,
WTTNESSETH: That the City and the Contractor, for the
considerations hereinafter named, agree as follows:
ARTICLE I. SCOPE_OF WORK
The Contractor hereby agrees to furnish all of the materials
and all of the equipment and labor necessary, and to perform a11 of
the work shown on the plans and described in the specifications for
the project entitled or described as follows:
PUBLIC `'�RIiS CONTRACT 75-1� - OUTSIDE UTILITY CONSTRUCTION only
for comfort station at Red Arrow Park
As approved by res. #24 of 12/4/75 by the Oshkosh Common Council
all in accordance and in strict compliance with the contractor's
proposal and the other contract documents referred to in ARTICLE V
of this contract.
ARTICLE II. TIME OF COMPLETION
The work to be performed under this contract shall be commenced
and the work completed within the time limits specified in the General
Conditions and/or Contractor's proposal.
ARTICLE TII. PAYMENT
�
(a) The Contract Sum.
The City shall pay to the Contractor for the performance of the
contract the sum of $�,17.8.00 , adjusted by
any changes as provide in t e enera on ltions, or any
changes hereafter mutually agreed upon in writing by the parties
hereto, provided, however, in the event the proposal and contract
documents are on a"Unit Price" basis, the above mentioned figure
is an estimated figure, and the City sha11, in such cases, pay
to the Contractor for the performance of the Contract the
amounts d�ter�ined for the tutal number of each of the units
of work as set forth in the Contractor's proposal; the number
of units therein contained is approximate only, and the final
payment shall be made for the actual number of units that are
incorporated in or made necessary by the work covered by the
contract.
(b) Progress Payments.
In the event the time necessary to co�plete this Contract is
such that progress payments are required, they shall be made
according to the provisions set forth in the General Conditions.
ARTICLE IV. CONTRACTOR TO HOLD CFTY HARMLESS
The Contractor covenants and agrees to protect and hold the
City of Oshkosh harmless against all actions, claims and demands of
any kind or character whatsoever which may in any way be caused by
the negligent digging up of streets, alleys or public grounds or
which may result from the faulty, carelessness or neglect oF said
Contractor, his agents, employees or workmen in the performance of
said work or caused by the violation of any City ordinance, and
shall refund to the City all sums which it may be obliged or adjudged
to pay on any such claims or demands within a reasonable time after
demand thereof.
ARTICLE V. COP4PONENT PARTS OF THE CONTRACT
This contract consists of the following component parts, all of
which are as fully a part of this contract as if herein set out
verbatim, or if not attached, as if hereto attached:
1. General Conditions
2. Advertisement for Bids
3. Instructions to Bidders
4. Specifications, including any addenda
5. Plans
6. Contractor's Proposal
7. This Instrument
In the event that any provision in any of the above component
parts of this contract conflicts with any pravision in any other of
the component parts, the provision in the component part first
enumerated above shall govern over any other component part which
follows it numerically except as may be otherwise specifically stated.
IT IS HEREBY DECLARED, UNDERSTOOD AND AGREED that the word
''Contractor" wherever used in this contract means the party of the
second part and its/his/their legal representatives, successors and
assigns.
- 2 -
IN WITNESS
contract to be seale
City Manager and Ci
and the party of the
seal the day and yea
In the presence of:
WHIItEOF, the City of Oshkosh, Wisconsin, has caused this
d with its corporate seal and to be subscribed to by its
ty Clerk and cotmtersigned by the Comptroller of said City,
second part her hereimto set its, his or their hand and
r first above written.
� .� ����..�
, �
(Seal of Contractor
if a Corporation)
I certify that provisions have been made to
pay the liability that will accrue to the
City of Oshkosh tmder the tiaithin contract.
, J � � � � /� O�'��
DEL L , City omptroller
oved as to form d execution:
�.. ,�-, f'j
;. ��
JO . PFNCE, City Attorney
J B. GUNZ, Assistant City Attorney
CON'IRACTOR
$y: ��;>,�. ���
(/%�� � �,>����-��
peci y Title
:
Specify Title
CITY OF OSHKOSH
�•
�' i �i/� I�
. �"u � : � �: ! ,�• s- , � _
1 a P�
� ' "
- 3 -
(Seal of City)
CONSTRUCTION CONTRACT
��y��
THTS AGREEMENT, made on the � day of December , 1975 ,
by and between the CITY OF OSHKOSH, party of the first part, hereinafter
referred to as the CITY, and SOI�AR ELECTRIC, 2��TC.
of 1201 North Main Street, Oshkosn, W2 54901 ,
party of the second part, hereinafter referred to as the CONTRACTOR,
WITNESSETH: That the City and the Contractor, for the
considerations hereinafter named, agree as follows:
ARTICLE I. SCOPE.OF WORK
The Contractor hereby agrees to furnish all of the materials
and all of the equipment and labor necessary, and to perform all of
the work shown on the plans and described in the specifications for
the project entitled or described as follows:
PUBLIC ::ORKS CONTRACT 75-19, ELECT�tICAL WORK ONLY tor comfo.rt station
at Red Arrow Park
As approved by res. #24 of 12/4/75 by the Oshkosh Common Council
all in accordance and in strict compliance with the contractor�s
proposal and the other contract documents referred to in ARTTCLE V
of this contract.
ARTICLE II. TIME OF COMPLETION
The work to be performed under this contract shall be commenced
and the work completed within the time limits specified in the General
Conditions and/or Contractor's proposal.
ARTICLE III. PAYMENT
(a) The Contract Sum.
The City shall pay to the Contractor for the performance of the
contract the sum of $ 2 2f31.00 , adjusted by
any changes as provide in t e enera on itions, or any
changes hereafter mutually agreed upon in writing by the parties
hereto, provided, however, in the event the proposal and contract
documents are on a"Unit Price'' basis, the above mentioned figure
is an estimated figure, and the City shall, in such cases, pay
to the Contractor for the performance of the Contract the
amounts d�ter�ined for th� total number of each of the units
of work as set forth in the Contractor's proposal; the number
�f units therein contained is approximate only, and the final
payment shall be made for the actual number of units that are
incorporated in or ma�e necessary by the work covered by the
contract.
(b) Progress Payments.
In the event the time necessary to cnsplete this Contract is
such that progress payments are required, they shall be made
according to the provisions set forth in the General Conditions.
ARTICLE IV. CONTRACTOR TO HOLD CITY HARMLESS
The Contractor covenants and agrees to protect and hold the
City of Oshkosh harmless against all actions, claims and demands of
any kind or character whatsoever which may in any way be caused by
the negligent digging up of streets, alleys or public grounds or
which may result from the faulty, carelessness or neglect of said
Contractor, his agents, employees or workmen in the performance of
said work or caused by the violation of any City ordinance, and
shall refund to the City all sums which it may be obliged or adjudged
to pay on any such claims or demands within a reasonable time after
demand thereof.
ARTICLE V. COP4PONENT PARTS OF THE CONTRACT
This contract consists of the following component parts, all of
which are as fully a part of this contract as if herein set out
verbatim, or if not attached, as if hereto attached:
1. General Conditions
2. Advertisement for Bids
3. Instructions to Bidders
4. Specifications, including any addenda
5. Plans
6. Contractor`s Proposal
7. This Instrument
In the event that any provision in any of the above component
parts of this contract conflicts with any pro�ision in any other of
the component parts, the provision in the �omponent part first
enumerated above shall govern over any other component part which
follows it numerically excegt as may be otherwise specifically staced.
IT IS HEREBY DECLARED, UNDERSTOOD AND AGREED that the word
''Contractor" wherever used in this contract means the party of the
second part and its/his/their legal representatives, successors and
assigns.
- 2 -
IN WITNESS WHIItEOF, the City of Oshkosh, Wisconsin, has caused this
contract to be sealed with its corporate seal and to be subscribed to by its
City Manager and City Clerk and coLmtersigned by the Comptroller of said City,
and the party of the second part her hereunto set its, his or their hand and
seal the day and year first above written.
In the presence of:
(Seal of Contractor
if a Corporation)
CON1'RACTOR ,
F�-�'-'�- ���� 'r�w�
$y : �� i ,� . �� v.�.�.a
�u���
�—peci�y Title
.
�� �
F
Specify Title
I certify that provisions have been made to
pay the liability that will accrue to the
City of Oshkosh �.mder the tivithin contract.
a � ���
DE L , C�ty ornptroller
as to
. PINCE, City
B. GIJNZ, Assis
execution:
ty Attorney
- 3 -
• � � '
..�/�.�-� :li./
�ir , �� ' ; •, • • - . • -
. �
`✓1 ' � +�. / 4 ..�
/ � � � '
(Seal of City)
,
y ���3
�
CONSTRUCTION CONTRACT
THTS AGREEMENT, made on the �� day of �eC�""��'^z , 1975 �
by and between the CITY OF OSHKOSH, party of the first part, hereinafter
referred to as the CITY, and `��� E• �YFTt COA".PA�tY
Of %!� W• Z.��I rAV@AULB, (�$�'llt0��]f WS $�i���.
party of the second part, hereinafter referred to as the CONTR.ACTOR,
WITNESSETH: That the City and the Contractor, for the
considerations hereinafter named, agree as follows:
ARTICLE I. SCOPE_OF WORK
The Contractor hereby agrees to furnish all of the materials
and all of the equipment and labor necessary, and to perform all of
the work shown on the plans and described in the specifications for
the pro�7'ect entitled or described as follows:
FUBLIC WO€tKS CO�TRACT 75-19 - PLU�tBING Wt�RK ONLY for comfort station
at R�d A�rot�v Y�.rk
As approved b� r�s, #24 on 12/4/75 by the► Q�hko�h Cvmman Council
all in accordance and in strict compliance with the contractor's
proposal and the other contract documents referred to in ARTICLE V
of this contract.
ARTICLE II. TIME OF COMPLETTON
The work to be performed under this contract shall be commenced
and the work completed within the time limits specified in the General
Conditions and/or Contractor's proposal.
ARTICLE TIT. PAYMENT
(a) The Contract Sum.
The City shall pay to th Contractor for the performance of the
contract the sum of $$t���•a0 , adjusted by
any changes as provide in t e enera on itions, or any
changes hereafter mutually agreed upon in writing by the parties
hereto, provided, however, in the event the proposal and contract
documents are on a"Unit Price" basis, the above mentioned figure
is an estimated figure, and the City shall, in such cases, pay
to the Contractor for the performance of the Contract the
,
amounts detercuined for the tutal number of each of the units
of work as set forth in the Contractor's proposal; the number
�f units therein contained is approximate only, and thE final
payment shall be made for the actual number of units that are
incorporated in or made necessary by the work covered by the
contract.
(b) Progress Payments.
In the event the time necessary to cosplete this Contract is
such that progress payments are required, they shall be made
according to the provisions set forth in the General Conditions.
ARTICLE IV. CONTRACTOR TO HOLD CITY HARMLESS
The Contractor covenants and agrees to protect and hold the
City of Oshkosh harmless against all actions, claims and demands of
any kind or character whazsoever which may in any way be caused by
the negligent digging up of streets, alleys or public grounds or
which may result from the faulty, carelessness or neglect of said
Contractor, his agents, employees or workmen in the performance of
said work or caused by the violaCion of any City ordinance, and
shall refund to the City all sums which it may be obliged or adjudged
to pay on any such claims or demar.ds within a reasonable time after
demand thereof.
ARTICLE V. COMPONENT PARTS OF THE CONTRACT
This contract consists of the following component parts, all of
which are as £ully a part of this contract as if herein set out
verbatim, or if nat attached, as if hereto attached:
1. General Coaditions
2. Advertisement for Bids
3. Instructions to Bidders
4. Specifications, including any addenda
5. Plans
6. Contractor's Proposal
7. This Instrument
In the event that any provision in any of the above component
parts of this contract conflicts with any provision in any other of
the component parts, the provision in the component part first
enumerated above shall govern over any other component part which
follows it numerically except as may be otherwise specifically stated.
IT IS HEREBY DECLARED, iTNDERST00D AND AGREED that the word
''Contractor" wherever used in this contract means the party of the
second part and its/his/their legal representatives, successors and
assigns.
- 2 -
IN WITNESS
contract to be seale
City Manager and Ci
and the party of the
seal the day and yea
In the presence of:
WHEREOF, the City of Oshkosh, Wisconsin, has caused this
d with its corporate seal and to be subscribed to by its
ty Clerk and coLm.tersigned by the Comptroller of said City,
second part her hereunto set its, his or their hand and
r first above written.
�_ �
(Seal of Contractor
if a Corporation)
I certify tha� provisions have been made to
pay the liability that will accrue to the
City of Oshkosh i�der the �vithin contract.
� G���
DEL LaMARCHE,'City� troller �
Ap rov d as to f and ecution:
yN��� ��
J . PINCE, City Attorney
S B. G[INZ, Assistant Cit Attorney
CONTRACTOR
By : � < < ��
�. �
peci y Title
,
By : - �c..i
� rir.�,Er��
Spe�ify Title
CITY OF OSHKOSH
�Y�
- 3 -
/ t/ i
CO RSE . MARKS, Clerk
(Seal of City)
�
�C.11
�
�
C�`
�
�
�
0
4-�I �
'ij O �
.r{ � �
'Q � UZ
� � �
� � � �
O N O �
�i (Y, •r-I •
� � �
CCl ' -I-� O �
� � � �
O r-1 � �
� lCl Sa O �
� �� H U
�ri d-� �
� U O •
� c�3 U �
�—I F-� O
O J� .`s�' •ri
� � � �
� O 4i O
�UP� �
�
� �
ti �
�
� �
� x
�
� �
N
,Q �
�
� �
U ; -1�
N •rl
�l U