Loading...
HomeMy WebLinkAboutPW CNT 14-05 / CHG OR 1/ Degroot, Inc� DEPARTMENT OF PUBLIC �'VORKS 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903-1130 Ph. (920) 236-5065 Fax (920) 236-5068 November 19, 2015 Mr. Mark DeGroot DeGroot, Inc. 4201 Champion Road Green Bay, WI 54311 Subject: Change Order No. 1(Final) Contract 14-OS Dear Mr. DeGroot: � OlHKOlH ON THE WATER Enclosed is an executed copy of Change Order No. 1(Final) between the City of Oshkosh and DeGroot, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, � / �� J mes Rabe, P.E., CPESC ,/ � 1� irector of Public Warks JER/tlt Enclosure: Change Order No. 1(Final) cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) I:�Engineering�2014 CONTRACTSU4-OS Conc Paving & Ufil�Project_Information\Con[ract Info\Change OrdersU4-OS Page 1 of 1 Exewted CO kl (Final) Ltr_11-I9-15.docx TO: De Groot, Inc 4201 Champion Rd Green Bay WI 54311 CHANGE ORDER #1 (FINAL) DATED: November 17, 2014 Your present contract with the City of Oshkosh, Contract No. 14-05, awarded March 25, 2014, is hereby amended and changed as follows: NET DECREASE TO: SECTION I- PAVING NET DECREASE TO: SECTION II - STORM SEWER NET DECREASE TO: SECTION III - SANITARY SEWER NET INCREASE TO: SECTION IV - WATER MAIN NET INCREASE TO: ALTERNATE A NET DECREASE TO CONTRACT ($7,951.28) ($14,801.78) ($18,297.13) $23,015.11 $12,805.31 ($5,229.77) Section I Section II Section III Section IV Alternate A (Paving) (Storm) (Sanitary) (Water) Totals eidTotal $750,250.79 $1,432,135.92 $280,245.06 $381,51921 $33,468.54 $2,877,619.52 c.o. #i ($7,951.28) ($14,801.78) ($18,297.13) $23,015.11 $12,805.31 ($5,229.77) ContractTotal $742,299.51 $1,417,334.14 $261,947.93 $404,534.32 $46,273.85 $2,872,389.75 Recommended: Director of Public Works CITY OF OSHKOSH BY: .��--�-��+ City Manager i prov d and ac epted: ontractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. i. � � I► l� . � � � CONTRACT: 14-05 CHANGE ORDER # 1(FINAL) SECTION I - PAVING ITEM DESCRIPTION UN/T BID INSTALLED NET NET UN/T INCREASEIN DECREASEIN NUMBER QUANTITY QUANT/T/ES /NCREASE DECREASE PRICE CONTRACTPR/CE CONTRACTPRICE , 1010 C(earing, compiete as ' s ecified Stations 1 1.00 $126.25 i 1011 Clearing, complete as Inch a s ecified Diameter 76 72.00 -4.00 $19.94 $79.76 1020 Grubbing, complete as s ecified Stations 1 1.00 $126.25 1021 Grubbing, compiete as Inch s ecified Diameter 76 72.00 -4.00 $12.12 $48.48 1100 Removing pavement, Square com lete as s ecified Yards 3,260 3,277.00 17.00 $2.53 $43.01 1120 Removing concrete and asphalt sidewalk and driveway, complete as Square s ecified Feet 32,230 34,493.10 2,263.10 $0.51 $1,154.i8 1200 Excavation, complete as Cubic s ecified Yards 5,325 5,716.20 391.20 $8.53 $3,336.94 I 1220 Excavation special (paving), com lete as s ecified Tons 300 0.00 -300.00 $5.05 $1,515.00 1301 7" concrete pavement, with 5" CABC and grading, complete Square as s ecified Yards 7,535 7,734.90 199.90 $38.84 $7,764.12 1303 7" concrete pavement HES, with 5" CABC and grading, Square com lete as s ecified Yards 220 172.30 -47.70 $43,01 $2,051.58 1311 8" concrete pavement, with 6" CABC and grading, complete Square as s ecified Yards 622 1,184.20 562.20 $40,72 $22,892.78 1313 8" concrete pavement HES, with 6" CABC and grading, Square com leteass ecified Yards 1,820 1,189.70 -630.30 $44.88 $28,287.86 1332 8" concrete pavement speed hump, with 6" CABC and grading, complete as Square s ecified Yards 290 283.90 -6.10 $49.94 $304.63 1340 Crushed aggregate base course, complete as specified Tons 1,995 826.00 -1,169.00 $9.41 $11,000.29 1350 Pavement ties, complete as s ecified Each 360 401.00 41.00 $8.32 $341.12 1360 Adjust manholes and inlets, com lete as s ecified Each 82 82.00 $257.55 1370A Terrace work on South Campbell Road, complete as Lump s ecified Sum 1 1.00 $832.24 1370B Terrace work on Central Street (Church Avenue to WestParkwayAvenue), Lump com lete as s ecified Sum 1 1.00 $5,409.56 1370C Terrace work on Central Street (West Parkway Avenue to West Irving Avenue), complete as Lump s ecified Sum 1 1.00 $8,910.17 1370D Terrace work on Ida Avenue, Lump Com Iete as s ecified Sum 1 1.00 $4,057.17 1370E Terrace work on West Irving Avenue, complete as Lump s ecified Sum 1 1.00 $1,560.45 Parkway Avenue, complete Lump as s ecified Sum 1 1.00 $&,137.77 1410 12" radius curb with 6" CABC and grading, complete as Linear s ecified Feet 693 714.90 21.90 $8.26 $180.89 1460 Sidewalk curb, complete as Linear s ecified Feet 215 116.70 -98.30 $23.10 $2,270.73 1500 4" concrete sidewalk with 3" CABC and grading, complete Square as s ecified Feet 14,975 16,014.50 1,039.50 $3.88 $4,033.26 Page 1 of 10 CONTRACT: 14-05 CHANGE ORDER # 1(FINAL) ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTIT/ES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 1510 6" cancrete sidewalk/driveway/ramp with 3" CABC and grading, Square com lete as s ecified Feet 14,935 14,800.10 -134.90 $4.35 $586.81 1520 8" concrete sidewalk/driveway/ramp with 3" CABC and grading, Square com lete as s ecified Feet 2,000 2,146.30 146.30 $5.38 $787.09 1540 Curb ramp detectable warning field (natural/non- painted), complete as Square s ecified Feet 320 304.00 -16.00 $29.13 $466.08 1550 No. 4 reinforcing rods - deformed, epoxy-coated, Linear com lete as s ecified Feet 4,215 4,155.00 -60.00 $1.04 $62.40 1560 Drilled No. 4 sidewalk tie bars - deformed, epoxy-coated, complete as specified Each 345 344.00 -1.00 $6.24 $6.24 1600 Furnish and install tree, com lete as s ecified Each 7 4.00 -3.00 $454.50 $1,363.50 1700 Sawing existing pavement, Linear com lete as s ecified Feet 494 589.50 95.50 $2.02 $192.91 1710 Sawing concrete pavement full depth, complete as Linear s ecifed Feet 1,030 958.90 -71.10 $3.54 $251.69 1720 Profle saw cut concrete curb, Linear com lete as s ecified Feet 10 9.30 -0.70 $15.15 $10.61 1900 Tack coat, complete as s ecified Gallons 6.3 0.00 -6.30 $5.20 $32.76 1905 5" asphaltic pavement with 10" CABC and grading, Square com lete as s ecified Yards 30 0.00 -30.00 $69.92 $2,097.60 1912 2" asphaltic transition with 10" CABC and grading, Square com lete as s ecified Yards 45 0.00 -45.00 $57.44 $2,584.80 1916 4" asphaltic surtace with 6" CABC and grading, complete Square as s ecified Yards 186 213.20 2720 $50.86 $1,383.39 SECTION I-(BID ITEMS 7010 - 1916) - SUBTOTAL $42,109.69 ($53,020.82) ADDITIONAL WORK REQUIRED: C.O. #1 - SECTION I ITEM DESCR/PTION UNIT B/D INSTALLED NET NE7 UNIT INCREASE/N DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PR/CE CONTRACT PR/CE 1442 30° Curb and Gutter, 8", with 5" CABC and Grading, Linear com lete as s ecified Feet 0 10 10.00 $25.00 $250.00 1514 6" Concrete S id ewal k/D riveway/Ra m p (HES) with 3" CABC and Grading, complete as Square s ecified Feet 0 489.4 489.40 $5.10 $2,495.94 10000 4" Concrete Sidewalk/Driveway/Ram p (HES) with 3" CABC and Grading, complete as Square s ecifed Feet 0 46.2 46.20 $4.63 $213.91 SECTION II - STORM SEWER ITEM DESCRIPTION NUMBER 2014 Storm sewer utility lini opening, complete as -J,'��M�'F442��80(i1�k�B���A� ¢��bS85 ---s0.08 = - _ NET DECREASE TO: SECTION I ($7,951.28) UNIT I QUANTITY I Q ANTITIE� I INCREASE I DECREASE I PRICE ICONTRACTPRICEICONTRACTPRICE Each I 5 I 0.00 Page 2 of 10 50 � , CONTRACT: 14-05 CHANGE ORDER # 1(FINAL) ITEM DESCRIPTION UNIT BfD /NSTALLED NET NEi UNlT INCREASElN DECREASEIN NUMBER QUANTITY QUANTITIES /NCREASE DECREASE PRlCE CONTRACT PRICE CONTRACT PR/CE 2036 Furnish and install 12" storm sewer, complete as specified Linear Feet 445 473.20 2820 $48.08 $1,299.46 2038 Furnish and install 12" RCP Class III storm sewer, Linear com lete as s ecified Feet 135 151.20 16.20 $54.32 $879.98 2042 Furnish and insfall 15" storm sewer, complete as specified Linear Feet 330 421.50 91.50 $42.32 $3,872.28 2048 Furnish and install 18" storm sewer, complete as specified Linear Feet 110 102.10 -7.90 $51.56 $407.32 2066 Furnish and install 27" storm sewer, complete as specified Linear Feet 295 272.00 -23.00 $62.76 $1,443.48 2072 Furnish and install 30" storm sewer, complete as specified Linear Feet 32 21.30 -10.70 $80.76 $864.13 2078 Furnish and install 36" storm i sewer, compfete as specified Linear Feet 240 215.10 -24.90 $88.95 g2,214.86 2186 Furnish and install 4' x 8' box culvert storm sewer, Linear com lete as s ecified Feet 1,139 1,079.20 -59.80 $588.00 $35,162.40 2187 Furnish and install 4' x S' box culvert precast plug, com lete as s ecified Each 1 1.00 $1,395.86 2188 Furnish and install 5' x 8' box culvert storm sewer, Linear com lete as 5 ecified Feet 541 518.70 -22.30 $605.86 $13,510.68 2234 Furnish and install 4' x 8' box culvert storm sewer with manhole or inlet riser, Linear com lete as s ecified Feet 58.5 72.00 13.50 $575.70 $7,771.95 2236 Furnish and install 5' x 8' box culvert storm sewer w'rth manhole or inlet riser, Linear com lete as s ecified Feet 13 16.00 3.00 $585.80 $1,757.40 2280 Furnish and install 6" storm sewer lateral, complete as Linear s ecified Feet 1,270 1,659.60 389.60 $30.59 $11,917.86 2282 Furnish and install 8" storm sewer lateral, complete as Linear s ecified Feet 55 58.00 3.00 $35.35 $106.05 2284 Furnish and install storm sewer marker balls, complete as s ecified Each 130 136.00 6.00 $25.90 $155.40 2286 Furnish and install storm sewer day dams, complete as s ecified Each 65 63.00 -2.00 $50.50 $101.00 2288 Furnish and install storm sewer lateral inlet, complete as s ecifed Each 58 57.00 -1.00 $523.56 $523.56 253Z Furnish and instail standard storm sewer manhole (4' diameter), complete as Vertical s ecified Feet 21.5 26.47 4.97 $455.95 $2,266.07 2534 Furnish and install standard storm sewer manhole (5' diameter), complete as Vertical �______ __ Feet 5075 50.99 0.24 $477.46 �114.59 2580C sewer junction chamber E-12, com lete as s ecified Each 1 1.00 $25,857.17 Furnish and install storm sewer junction chamber E-13, compfefe as specified Each 1 1.00 $23.763.96 sewer junction chamber E-16, com lete as s ecified Each 1 1.00 $16,277.83 Furnish and install storm sewer junction chamber E-21, complete as specified Each 1 1.00 $25.109.22 Page 3 of 10 CONTRACT: 14-05 CHANGE ORDER # 1(FINAL) 1TEM DESCR/PTfON UN/T B�D lNSTALLED NET NET UNIT INCREASE /N DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PR/CE CONTRACT PRICE 2584 Furnish and install standard storm sewer manhole riser (4' diameter), complete as Vertical s ecifed Feet 33 71.39 38.39 $97.05 $3,725.75 2612 Fumish and install Type 1 inlet, com lete as s ecified Each 2 2.00 $1,515.87 2614 Furnish and install Type 3 inlet (with 18" sump), com lete as s ecified Each 28 28.00 $1,531.57 2618 Furnish and install Type 3 inlet riser, complete as s eCified Each 7 0.00 -7.00 $494.40 $3,460.80 2800 Connect to existing storm sewer main, complete as s ecified Each 8 15.00 7.00 $757.50 $5,302.50 2802 Connect to existing storm sewer lateral, complete as s eCified Each 5 5.00 3.00 $505.00 $1,515.00 2806 Connect to existing storm sewer manhole, complete as s eCified Each 2 1.00 -1.00 $2,020.00 $2,020.00 2820 Abandon 8" - 12" storm sewer, complete as specified Linear Feet 50 44.50 -5.50 $5.05 $27.78 2822 Abandon 15" and larger storm sewer, complete as Linear s ecified Feet 360 356.00 -4.00 $15.15 $60.60 2824 Remove 30" and smaller storm sewer, complete as Linear s ecified Feet 520 515.50 -4.50 $5.05 $22.73 2826 Remove 33" - 60" storm sewer, complete as specifed Linear Feet 25 21.00 -4.00 $10. i 0 $40.40 2830 Abandon storm sewer manholes and inlets, com lete as s cified Each 2 1.00 -1.00 $252.50 $252.50 2832 Remove storm sewer manholes and inlets, com lete as s ecified Each 17 16.00 -1.00 $202.00 $202.00 2858 Furnish, install, maintain, and remove Type D modified inlet protection, complete as s ecifed Each 102 98.00 -4.00 $72.82 $291.28 2860 Sediment removal - Type D modified inlet protection, com lete as s ecified Each 102 95.00 -4.00 $5.20 $20.80 2862 Furnish, install, maintain, and remove stone tracking pad, com lete as s ecified Each 1 0.00 -1.00 $656.50 $656.50 2866 Furnish, install, maintain, and remove stone bag, complete as s ecified Each 50 0.00 -50.00 $8.08 $404.00 2868 Furnish, install, maintain, and remove 12" diameter sediment logs, complete as Linear s ecified Feet 25 0.00 -25.00 $12.12 $303.00 2960 Rock excavation, complete Cubic as s ecified Yards 175 0.00 -175.00 $50.50 $8,837.50 SECTION 11- (BID ITEMS 2014 - 2960) - SUBTOTAL $40,684.29 ($74,109.82) • i : 'D � � � ' ��.�r�� _ : S. :x � �i� .��i ITEM DESCRIPTION UNIT BID (NSTALLED NEr NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANT/T/ES INCREASE DECI2EASE PRICE CONTRACT PR/CE CONTRACT PRICE 20000 Additional equipment, labor, and materials to perform spot repairs on existing storm sewer on Campbell Road, Lump complete as specified Sum 0.00 1.00 1.00 $2,800.00 $2,800.00 Page 4 of 10 CONTRACT: 14-05 CHANGE ORDER # 1(FINAL) ITEM DESCRlPTION UN/T B/D INSTALLED NET NET UNIT /NCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PR/CE CONTRACTPRICE CONTRACTPR/CE 20001 Furnish and install MH A-10 on Parkway Avenue, Vertical com lete as s ecified Foot 0.00 16.79 16.79 $625.00 $10,493.75 20002 Funish and install 8" storm lateral for 579 North Main Street, added to contract, Linear com lete as s ecified Foot 0.00 35.00 35.00 $48.00 $1,680.00 20003 Additional equipment, labor, and materials to replace existing 14" x 23" storm sewer on Frederick Avenue, Lump com lete as s ecified Sum 0.00 1.00 1.00 $3,650.00 $3,650.00 ADDITIONAL WORK: C.O. #1 -(ITEMS 20000 - 20006) - SUBTOTAL $18,623.75 $0.00 NET DECREASE TO: SECTION II ($14,801.78) SECTION III - SANITARY SEWER ITEM DESCR/PTION UN/T BID INSTALLED NET NET UNIT INCREASE IN DECREASE 1N NUMBER QUANT/TY QUANTITIES INCREASE DECREASE PR/CE CONTRACTPRICE CONTRACTPRICE 3000 Furnish and install 8" sanitary sewer (relay), complete as Linear s ecified Feet 1,880 1,814.00 -66.00 $5922 $3,908.52 Page 5 of 10 CONTRACT: 14-05 CHANGE ORDER # 1(FINAL) ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CON7RACTPRICE 3002 Furnish and install 10" sanitary sewer (relay), Linear com lete as s ecified Feet 275 271.10 -3.90 $66.01 $257.44 3100 Furnish and install standard sanitary sewer manhole (4' diameter), complete as VeRical s ecified Feet 90 78.95 -11.05 $305.95 $3,380.75 3114 Furnish and install external sanitary sewer manhole chimney seai, complete as $520.15 s ecified Each 12 12.00 3116 Furnish and install external sanitary sewer manhole chimney seal extension, com lete as s ecified Each 2 4.00 2.00 $468.14 $936.28 3118 Furnish and install internal sanitary sewer manhole chimney seal, complete as s ecified Each 1 0.00 -1.00 $312.09 $312.09 3210 Furnish and install 8" x 6" sanitary sewer factory wyes or tees, complete as -3.00 $184.90 $554.70 s ecifed Each 65 62.00 3212 Furnish and install 10" x 6" sanitary sewer factory wyes or tees, complete as s ecified Each 3 2.00 -1.00 $262.35 $262.35 3230 Furnish and install 4" sanitary sewer laterals (new), complete as specified Linear Feet 30 0.00 -30.00 $40.86 $1,225.80 3234 Furnish and install 4"/6" sanitary sewer Iaterai (relay), complete as specified Linear Feet 1,575 1,57020 -4.80 $40.35 $193.68 3235 Furnish and install 4"l6" sanitary sewer riser (reiay), Linear com lete as s ecified Feet 15 45.00 30.00 $75.75 $2,272.50 3236 Furnish and install sanitary sewer lateral marker balls, com lete as s ecified Each 129 126.00 -3.00 $25.91 $�7•�3 3238 Furnish and install clay dams, complete as specified Each 64 62.00 -2.00 $50.50 $101.00 3300 Furnish and install connection to existing 8" mains, complete as specified $1,515.00 Each 2 2.00 3302 Furnish and install connection to existing 10" mains, complete as specified Each 1 1.00 $1,767.50 3330 Furnish and install sanitary sewer concrete collars, 909.00 com lete as s ecified Each 2 0.00 -2.00 $454.50 $ 3332 Core into existing manhole, com leteass ecifed Each 2 1.00 -1.00 $1,868.50 $1,868.50 3700 Closed circuit televising, Linear com lete as s ecifed Feet 2,155 2,085.10 -69.90 $1.26 $$$ �� 3800 Abandon sanitary sewer com lete as ____ s eci ie 3802 Abandon 8" sanitary sewer, Linear com lete as s ecified Feet 70 69.00 -1.00 $5.05 $5.05 3804 Abandon 10" sanitary sewer, complete as specified Linear Feet 30 27.00 -3.00 $5.05 $15.15 3806 Abandon 12" sanitary sewer, complete as specified Linear Feet 400 399.00 -1.00 $5.05 $5.05 3852 Remove sanitary sewer manholes, complete as ....,.,.:r,.,,� Each 3 3.00 $303.00 Page 6 of 10 � CONTRACT: 14-OS CHANGE ORDER # 1(FINAL) ITEM pESCRIPTION UNIT B/D INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANT/TY QUANTIT/ES INCREASE DECREASE PR/CE CONTR9CT PRICE CONTRACT PRICE 3854 Remove sanitary sewer, Linear com lete as s ecified Feet 200 199.00 -1.00 $3.03 $3.03 3890 Sanitary sewer utility line opening, complete as s ified Each 1 1.00 $1,111.00 3891 Sanitary sewer lateral utility line opening, complete as s ecified Each 20 4.00 -16.00 $555.50 $8,888.00 3894 Bentonite slurry dam (sanitary), complete as s ecified Each 1 1.00 $757.50 SECTION III -(BID tTEMS 3000 - 3894) - SUBTOTAL $3,208.78 ($22,055.91) ADDITIONAL WORK REQUIRED: C.O. #1 - SECTION III ITEM DESCR/P7lON UNlT B/D INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE pR/CE CONTRACTPR/CE CONTRACTPRICE 30000 Furnish and install S" x 8" sanitary tee, complete as s ecified Each 0.00 1.00 1.00 $550.00 $550.00 ADDITIONAL WORK: C.O. #1 -(ITEM 30000) - SUBTOTAL $550.00 $0.00 NET DECREASE TO: SECTION 111 �$18,297.13) SECTION IV - WATER MAl1Y ITEM DESCli1PT10N UNIT B!D /NSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER 4UANTYTY QUANTITIES lNCREASE DECREASE PRlCE CON7RACT PRlCE CONTRACT PRICE i 4002 Furnish and instal! 6" ductile iron water main (relay) with polywrap, complete as Linear s ecified Feet 55 72.00 17.00 4004 Furnish and install 8" ductile iron water main (relay) with polywrap, complete as Linear s ecifed Feet 2,100 2.086.50 4008 Furnish and install 12" ductile iron water main (relay) with pofywrap, complete as Linear s ecified Feet 715 4036 Furnish and install 1" water service (relay), complete as Linear s ecified Feet 1,30( 4037 Furnish and install 1'/<" water service {relay), complete as Linear s ecified Feet 12 4042 Furnish and install 1" water service (new), complete as Linear s ecified Feet 40 4048 Furnish and install 1" corporation and stop box, com lete as s ecified Each 63 4050 Furnish and install 1'/<" corporation and stop box, com lete as s ecified Each 1 4055 Furnish and install water service clay dams, complete 4058 Furnish and install connections to existing 6" water main, complete as s ecified Each 3 4060 Furnish and install connections to existing 8" water main, complete as 1, 644.00 14.00 0.00 3.00 $58.69 $997.73 -13.50 $68.61 $926. -12.50 $90.53 $1,131 $35.31 $12.146.64 -1.00 3_ � 2.00 � � -1.00 I$1.606.60 Page 7 of 10 CONTRACT: 14-05 CHANGE ORDER # 1(FINAL) ITEM DESCRIPTION UN/T B/D /NSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 4064 Furnish and install connections to existing 12" water main, complete as s ecified Each 4 2.00 -2.00 $2,005.50 $4,011.00 4110 Furnish and install 8" x 6" water main tee, complete as s ecified Each 3 4.00 1.00 $482.30 $482.30 4128 Furnish and install 12" x 6" water main tee, complete as s ecified Each 2 1.00 -1.00 $795.30 $795.30 4129 Furnish and install 12" x 8" water main tee, complete as s ecified Each 2 2.00 $851.24 4189 Furnish and install 8" x S" water main cross, complete as s ecified Each 1 1.00 $847.34 4191 Furnish and install 8" x 12" water main cross, complete ass ecified Each 1 1.00 $1,131.25 4219 Furnish and install 8" 11'/a water main bend, complete as s ecified Each 1 0.00 -1.00 $357.52 $357.52 4236 Furnish and install 6" 45° water main bend, complete as s ecifed Each 15 12.00 -3.00 $277.41 $832.23 4237 Furnish and install 8" 45° water main bend, complete ass ecifed Each 10 7.00 -3.00 $347.33 $1,041.99 4239 Furnish and instail 12" 45° water main bend, complete as s ecified Each 4 4.00 $717�29 4264 Furnish and install S" x 6" water main reducer, complete as s ecified Each 3 3.00 $333.86 4401 Furnish and install 6" water main gate valve, complete as s ecified Each 5 5.00 $1,357.62 4402 Furnish and install 8" water main gate valve, complete as s ecified Each 12 11.00 -1.00 $1,841.81 $1,841.81 4404 Furnish and install 12" water main gate valve, complete as s ecified Each 7 6.00 -1.00 $318.56 $318.56 4500 Furnish and install hydrant, com lete as s ecified Each 5 5.00 $3,458.46 4920 Remove water main, Linear com lete as s ecified Feet 240 234.00 -6.00 $4.04 $2424 4950 Water main utility line opening, complete as s ecified Each 1 1.00 $757.50 4900 Abandon water main on Central Street, complete as Lump s ecified Sum 1 1.00 $505.00 4902 Abandon water main on Ida Avenue, complete as Lump s ecified Sum 1 1.00 $505.00 4904 Abandon water main on West Parkway Avenue, Lump com lete as s ecified Sum 1 1.00 $656.50 4992 Bentonite slur dam water Each 1 0.00 -1.00 $656.60 $656.60 r s � ai �,- s- a+1 - • ' � -.�� -- - ADDITIONAL WORK REQUIRED: C.O. #1 - SECTION IV ITEM DESCR/PTION NUMBER 4230 Furnish and install 12-inch ; 1/2 Degree bend, complete as specified _ UNIT Each QUANTITY I QUANTITIES I INCREASE I DECREASE I PR�CE 2.00 Page 8 of 10 INCREASE /N DECREASE IN CONTRACTPRICE CONTRACTPR/CE 00 1 e 0 CONTRACT: 14-OS CHANGE ORDER # 1(FINAL) ITEM B/D INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCR/PTION UNIT QUANTITY QUANTITIES (NCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 4299 Furnish and install 6" solid sleeve, complete as specified Each 0.00 2.00 2.00 $350.00 $700.00 4300 Furnish and install 6" solid sleeve, complete as specified Each 0.00 4.00 4.00 $395.00 $1,580.00 4302 Furnish and install 6" solid sleeve, complete as specified Each 0.00 3.00 3.00 $500.00 $1,500.00 4352 Cut and cap existing 6-inch water main, complete as s ecified Each 0.00 1.00 1.00 $1,650.00 $1,650.00 4354 Cut and cap existing 8-inch water main, complete as s ecified Each 0.00 1.00 1.00 $1,950.00 $1,950.00 4358 Cut and cap existing 12-inch water main, complete as s ecified Each 0.00 4.00 4.00 $2,350.00 $9,400.00 40000 Additional equipment, labor, and materials to live tap water main on West Irving Avenue and Central Street, Lump com lete as s ecified Sum 0.00 1.00 1.00 $2,650.00 $2,650.00 40001 Additional equipment, labor, and materials to remove existing water manhole on West irving Avenue, Lump com lete as s ecified Sum 0.00 1.00 1.00 $2,025.00 $2,025.00 40002 Additional equipment, labor, and materials to remove existing vale and cap tee on West Irving Avenue, Lump com lete as s ecified Sum 0.00 1.00 1.00 $1,950.00 $1,950.00 ADDITIONAL WORK: C.O. #1 (ITEMS 4230 - 40002) - SUBTOTAL $24,845.00 $0.00 NET INCREASE TO: SECTION IV $23,015.11 ALTERNATE A ITEM BID INSTALLED NET NET UNIT INCREASElN DECREASEIN DESCRIPTION UNIT UANTIT/ES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE NUMBER QUANTITY Q 1200 Excavation, complete as Cubic s ecified Yards 240 466.70 226.70 $12 1220 Excavation special (paving), -50.00 $5.( com lete as s ecified Tons 50 0.00 1360 Adjust manholes and inlets, $454 com lete as s ecified Each 1 1.00 1370G Terrace work on South Campbell Road, compiete as Lump g2,52 s ecified Sum 1 1.00 1800 Base aggregate dense,'/<", com lete as s ecified Tons 15 25.00 10.00 $13 1801 Base aggregate dense, 1'/:', com lete as s ecified Tons 190 200.90 10.90 $� Z 1802 Base aggregate dense, 3", com lete as s ecified Tons 450 1,383.30 933.30 $12 1900 Tack coat, complete as s ecified Gallons 20 0.00 -20.00 $5. 1902 HMA Pavement Type E-1.0, 1960 Prepare foundation for asphaltic paving, complete as Lump $2 3� s ecified Sum 1 1.00 ALTERNATE A-(BID ITEMS 1200 -1960) - SUBTOTAL NET INCREASE TO: ALTERNATE A NET INCREASE TO SECTIONS I, II, III, IV & ALTERNATE A NET DECREASE TO SECTIONS I, II, III, IV & ALTERNATE A Page 9 of 10 50 i.00 13 $131.30 44 $135.60 73 $11,880.91 $14,895.41 ($2,090.10) $12,805.31 $167,580.20 ($166,809.97) � CONTRACT: 14-05 CHANGE ORDER # 1(FINAL) NUMBER I DESCR/PTION I UNfT QUANTITY I QUANTITIE3 INCREASE I DEC EASE I PR�CE ICONTRACTPRICEI CONTRAECTPR/CE NET DECREASE TO CONTRACT: ($5,229.77) Page 10 of 10