RESOLUTION
0
CHANGE ORDER - WASTEWATER TREATMENT PLANT
BE IT RESOLVED by the Co:nmon Council of the City �f Oshk�sh
that the following Change Order to.Contract "B" for the construction
of the wastewater trea�ment plant is hereby approved:
CHANGE ORDER N0. 13
AZCO, INC. - Adding the amount of $9,706.28
- Purpose: To furnish complete plug valves on discharge
lines of primary sludge pumps; install counter weights
on check valves in pump room; and furnish vacaum sampler.
BE IT FURTHER RESOLVED by the Common Council that the
� faregaina change c�rdeY i� hereby a�pro��e�i and a copy of which
is attached hereto. Money for this purpose is hereby appropriate
from the Wastewater Treatment Plant Construction Fund.
- Z% -
r. -,., ,.;. ���,
�3 tIt].�:1 � � i'�;?)
�
1?.��'�i!�`��,��7. 41,
- � -� _. l �._
� � � CHANGE OiZDER NO. 13 �� �
�'��r-: Cit of Oshkosh Wisconsin �-�bo /
Date Dg��r 1�q75
��-�?]f.'.�,t jn7�Cfc��rd PT
Contract "B"
Contractor Azco, Inc .
Original Contract Award $ 2, 7 4 6, 0 0 0. 0 0
ni--- - -
����<<�� ��uCrea nerewith:
"See Attaciurient # iS0
� -
����_��:� j�� �,r:ange vraer:
1. Required to affect positive control of the primary sludge pumps,
2. Required to eliminate slamming of check valve when pumps are
shut off.
3. Required to sample incoming sewage fro use in process control,
not originally specified.
CONT'RACT AMpUNT
O�i'inal $ 2, 746, 000 00 �
Previc�us C.O.s (ADD/I�j�� $ 33 , 081 15
T1ais C.O. (ADD�� $ 9, 706 28
REVISED $ 2,788�787,43 I
CONTRACf TI�,�E �LAL. DAYS)
Original 8 0 0 Days
Previous C.O.s (ADD/Ai�� _ 17 0
Days
This C.O., (ADD/D�EDUCT) -0- Days
REVISED 9 � �
i ri�� uUCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRqC'I' qN�.ALL STIPULATIONS
AND COVENANTS OF THE CONTRACT SHAi.i. appr v u�n�T„ .
Donohue & Associates, Inc.
11zco, Inc.
�ity of Oshkosh, Wisconsin
:'�'�',r?�;�c � Associates, [nc
By: /✓�,�'�� �� � Z
eter F. Polster, P.E, ate
By: � •
�, /L Z .� 7
Date
By: c�- � �.
D e
. i���/�' ��ith � � ,' � ���,� .� .
�ons and llesign '-F�n �q�e s ,,f?!i
������j 2033—B � 1��
7 �oj. No. C (� Nn
;���
�
I
3
�
�
_ • -
� �
� ,
1.
_ ;; .
u ..:,r�.,�._._..�_
City of Oshkosh, Wisconsin
4�astewater Treatment Facilities
Attachment No. 1 To
CYlange Order No. 13, Contract "B"
December 15, 1975
Furnish and install, complete with electrical
connections,�four (4), 6 inch Homestead, air
operated, solenoid controlled, plug valves on
the discharge lines of the primary sludge
P�Ps� ADD. . . . .$4,038.00
2. Furnish and install counter weights on the
Ludlow-Reaussealer check valves in the pump
room to eliminate the slamming of the valves
when the pumps are shut down.
�D• • • • .$1,51�.Gu
3. Furnish and install one (1) Quality Control
Equipment Company, Model CVE vacuum sampler,
with refrigerated enclosure, 50 feet of
suction tubing, vacuum pump, and explosion
proof electrical wiring and controls.
�D. . . . .54,155.28
The work covered by this Change Order includes all necessary labor,
material, equipment, and service for a complete and usable installation.
This Change Order does not waive the Contractor's responsibility to
perform all work in accordance with the Contract Specifications and
applicable State and Local Codes.
Total Change in Contract Price. . . . . . . .�D. . . .
.$9,706.28
d��� ..`�!���.
�
�
�
�
�� •
� �
�_ �
���
�_ �
� Pa
� �
'� U J-�
O ct3 �
� F� N
r�~ G� � -�
�
�°`; «i O cd
�O � �
r y� -I-� O E-�
�
� �
om�
•r-! r-I -I�
-I-� � Cd
� 3
� � �
O � -I->
� '� �
- � �., cd
c� O 3
�
�
O
'�
�
O
H
�
O
.,�
-�-�
O
�
�
�
�
�
�
�
'�
N
�ri
�
S-�
CL3
U
r
,,.�-.._..,....... _ _. ...,..... . . � -�... -_.,�_. __
.� ,.,.... _ _ .... �
' .. _ .._,. .___.�....._ _ _ �
}
�
Y
^ r �
; . .y> R�, . . e. ... . .. ... . . .. .... .. . . . . . ...
�
ti
� `�
N �' ,�
N �
N
� �—I
� �` �
� . �
Q3 •ri
� U
i