BE IT RESOLVED by the Common Council of the City of Oshkosh
that the following Change Order No. 6 to Contract "F" of the
construction of the wastewater treatment plant is hereby approvec�:
CHANGE ORDER N0. 6- Adding the amount of $3,445.00
ALLAN ENGINEERING COMPANY, INC.
1. Provide regulated 15 VDC power supply for
aer. tank weir gates
2. Provide interim raw sewaqe flow totalizer
3. Provide relays in solids handling panel to
provide run fail signals to main graphic
4. Provide interim RAS flow totalizer
5. Reprogram computer to include pacing primary
sampler
Purpose:
l.
2.
3.
4.
5.
+• : ��
• ��
..
381,00
380.00
821.00
Required to provide power for weir gate position indication
r.ot or:i.g? nally _rA ;u� r��:
Required to record raw sewaae flow for reporting purposes
and operational control during Phase II construction.
Not originally requested, required for operational
monitoring.
Required to recorc? RAS flow for operational control during
Phase II construction.
Required to pace primary samp?er which was added for better
operational control.
BE IT FURTHER RESOLVED by the Common Council that the above
Change Order is hereby appzoved and a copy of which is herewith
attached to this resoi�:tion. Alor�ey for this purpose is hereby
appropriated from its respective construction account.
- 37 -
�
C��A,NGE ORDE�? IVO.
Owner City of Oshkosh, Wisconsin
PrOjeCt Wastewater Treatment Facilities
Contract �� F ��
0
�
�.. ;'
�i
Date
2/9/76 °��`'�y
Contractor Allan Engineering Company, Inc.
Original Contract Award $ 2 12 , 8 5 0, 0 0
Change Ordere� Herewith: �
l. Provide regulated 15 VDC power supply for aer. tank weir gates $978.00
2. Provide interim raw sewage flow totalizer 885.00
3. Provide relays in solids handling panel to provide run fail
signals to main graphic 381.00
4. Provide interim RAS flow totalizer 380.00
5. Reprogram computer to include pacing primary sampler 821.00
Reason for Change Order:
1. Required to provide power for weir gate position indication not
originally required.
2. Required to record raw sewage flow for reporting purposes and
operational control during Phase II construction.
3. Not originally requested, required for operational monitoring.
4. Required to record RAS flow for operational control during Phase II
construction.
5. Required to pace primary sampler which was added for better
operational control.
CONTRACT AMOUNT
Original $ 2 12 , 8 5 0. 0 0
Previous C.O.s (ADD/��#��Jk,�') $ 5, 3 3 9. 0 0
This C.O. (ADD/L�F�II���) $ 3, 4 4 5. 0 0
REVISE�D $221,634.00
CONTRACT TIME (CAL. DAYS)
Original
8 0 o Days
Previous C.O.s (ADD��� 18 3 Days
I This C.O.� (ADD/DEID�JCT) — � — Days
REVISED
983
1ri15 UUCUMENr S��ALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPiJLAT10NS
AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
Donohue & Associates, Inc. By: Ti /O ��,
- /1 Date
Allan Engineering Co., Inc.
���c�
i _
City of Oshkosh, Wi
By:
! , I , ._ -1��"r
r
� = �:� �'��
� �, �.
..� ...�����
�. -
Donohue & Associates, Inc. �TY ATTORNEY���Consulting and I)esign Er�gipee�
� �i � �C?SH, W I SCON � 11; � �-�' �,� �6�,,�-= e� �,�:�.-c�.�
P F P/ j 1 .°- ___,�.._
2033F
ni Nc�. ('.C1. Nn.
�
f'"�
�
�'
�
�
Fi
� �
� � �
�-1 �i c��
� •r�in Fi
lAil �
��n � �
�-�l/ W � �
�--I r�-i'
� 7�-I C� `�
V 1_') C . • ^i�`
^` � W1, � W
W � �1--' � �
� � �
�-^a�i� •
i]+ w -I-� �' .i-� '
c[3 ' cii M p �
O U � � � •�
+� ct7 I � �
�
� +� • � H U
O � O
•r-i O U O
-I-� � .�.� ..
� i�D �
r-I O �'., -N O
O +� rl ,S"., •ri
U� F-i cd J-�
N \o N r-! O
(�� NPa �
�
:t y
W
�
�J
r 1
�
�
U
S�
cd
�
� �C1�
�-1
� �
,\ \ J -�
v�`
•,-i
U