Loading...
HomeMy WebLinkAbout28174 / 76-23❑ 0 `�`3y 6, 1976 # 23 RESOLUTION B� IT RESOLVED b� the Common Council of the City of Oshkosh tha� t�e fallowing Chax�ge Order No. 9 to Gontract "E" of the constructioz� of the wast�wa�.er treatment plant is hereby approved: C�:GE ORDER *TO. 9�- Adding the amount af $1, 0�4. 26 PIEPER EI,ECTRIC, Ir1C. Furnish and install nine (9) additional speakers for the intercom system i*� the tunnel area. Speakers shall be located equal dis�ance from the existing speakers. Speaker wire will not be e�cased in conduit, but shall be attached to the existing s�eaker wire conduit in a neat and workmanlike manner. Installa- tio� shall be cor�plete with all necessary labor and rr�aterials �or a compZete and operable s�stem. Upori completion the Contractor sha11 adjust and balance entire system. Purnose: Additional speakers reauired to provide better j co �unication in a high ambient noise level area. BL IT FURTHER RESOLVED by the Common Council that the above change ozder zs hereby apgroved and a eopyo uf whi,ch is herewzth at�ac�!`d to this resolution. Money for this purpose is hereby ap�ro�riated from its respective construction account. r,.,.+., .,, I � • _ . _..._�..._ .___ �+ Y^1{ t s�'JLi, ,. 1.., I - _ �_ _, _ . ... - r� I �r-x=���,-�:��"�� - 25 - �n .�— �._;.�C - � �-- CHAb,.'�3GE �RDE�: I�10. 9 pR,nzr City of Oshkosh, Wisconsin Project ti�7astewater Treatment Facilities � �x � .� �'/ 7 �� Date APril 9, 1976 Contra.ct "E" Contractor_ Pieper Electri� � Inc. Original Contract Award � 813 , 4 9 9. 0 0 Chan�e Ordered Herewith: Fnrnish and install nine (9) additi.onal speakers for the 7.ntercom system in the tunnei area. Speakexs shall be located equal distar�ce �ram the existing speakers. Speaker wire will no� be en�ased in cc�nduit� but snall be attached to the existing speaker wire �c�nduit in a neat and wor�anlike manner. Installation shall be comgl.ete with all r,ecessary labor and materials for a complete and operable system. Upan compietion ihe ContraGtor shall adjust and ba�an�e entire system. Reason for Change Order: 0 Additional speakers required to provide better communicatian in a high ambient noise level area. Original CONTRACT AMOUNT $_813,499.00 � Previous C.O.s (ADD/I��� $ 10 , 8 0 3. 6 5 This C.O. (ADD�K?� $ 1, 0 5 4. 2 6 REVISE� $825,356.91 CONTRACT TIME (CAL. DAYS) Original 8 0 0 Days Previous C.O.s (ADDjDEDUCT) -0- Days This C.O.- (ADD/DEDUCT) -�- Days REVISED 800 Cal. Days "I��IS DOCIJ1�iENT SNALL BECOj-fE AN A1biENDMENT TO THE CONT'RAC'I' AND ALL STIPULATIONS AivD CC_1VENATITS OF THE CO:`d7RACT SI-��LL AFPLY HERETO. Bonohue & Associat�s, Inc. Pieper Electric, Inc. C�ty of Oshkosh, Wisconsin Donohue & Associates, lnc. - -- ------- --- ---_-� By: ..�%�+�� . /�� 4- 9- 7 6 ,, i: r Peter F. Po ster, P.E: Date �� , By: G C` �- � ¢ �� ate By: ' � Date �� ���� i 2033E / 9 M N � � '�'�'; � �, � � s � �J v ao �", Cd • .� = c� W �� �� � � R, � c� � O O U � O � � O� •,-i p'l +� .� � r-i �-i O N U? '�j N S-� �� O � � O '� � O H � O � � O � ti m � � � � � .,� � k cd � � � �- � rn � � � � � ',�, titi ` � cti � R�-f � U