Loading...
HomeMy WebLinkAboutJos. Schmitt & Sons Construction/Chg Or 2/Phase III Public Works Field Operations Facility: o ==�= Document G701TM - 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 002 OWNER: ❑ Public Works Field Operations Facility - DATE: 9/24/2015 ARCHITECT: ❑ Phase III 639 Witzel Avenue CONTRACTOR: ❑ Oshkosh, WI 54902 TO CONTRACTOR (N'ame and address): ARCHITECT'S PROJECT NUMBER: FIELD: ❑ Jos. Schmitt & Sons Construction CONTRACT DATE: 3/30/2015 OTHER: ❑ Company, Inc CONTRACT FOR: General Construction PO Box 1084 2014 Union Avenue Sheboygan, WI53082-]084 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously ezecuted Construction Change Directives) The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is $ 2,889,000.00 $ -671,508.64 $ 2,217,491.36 $ 42,007.29 $ 2,259,498.65 NOTE: This Change Order dces not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Kueny Architects, LLC ARCHITECT (Firm name) 10505 Corporate Drive Suite l00 Pleasant Praire, WI 53158 DATE Jos. Schmitt & Sons Construction Company Inc. CONTRACTOR (Firm name) 2104 Union Avenue PO Box 1084 Sheboygan, WI 53082-1084 R S BY (Sign ture) � �hwSiln �( S�Y'a (Typed name) `� � 29� 20� � DATE City of Oshkosh OWNER (Firm name) 215 Church Avenue Oshkosh, WI54903-1103 AD SS BY (Signature) James Rabe (Typed na e) ll �ll � l5 DATE AIA Document G701 T"" — 2001. Copyright OO 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA� Document is protected by U.S. Copyright Law and Intemational Treaties. Unauthorized reproduction or distribution of this AIA� Document, or any � portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible underthe law. This documentwas produced by AIA software at 07:51:50 on 09/25/2015 under Order No.3296704242_1 which expires on 06/11/2016, and is not for resale. User Notes: (1968128326) Signed for and in behalf of the City of Oshkosh �-- � Mar A. Rohloff, City Manager ,� � .��-� ���� Pamela R. Ubrig, City Cler 1 �� I �' �-_,K% , - � � f � i�, %�.. � � � '� is�!'f_ �_,�---, � Z,ynn Lor8ns2�ri, `City At�orney Trena Larson, Director of inance I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. lA � T � � � U � U (6 � C � 41 U — — J -O s.. -Y v- O � � •� O 'i � � 3 � oA a; N = �"' C iC -a •— v � �, '+� a� � � v. � v L m�' � v 4— 7\ Q� l) (D @ L +-' .� a,�,, d Q L � � +� � � G1 +� Q N � ... i� � V !C � fl- � '� �F � C '� V 41 v� � � � p Q N � C� � � c co c v v O co �n � � U C.J p � � � a+ �- a-I T � i_+ C ci N ? =- ... ro c v o rn-� `n 'C N v� p � � U (V +' � � 3 � � i Q 6J 00 �'a 47 � � C 'L3 � '� a! � -p O � � l0 > � Y +�+ C � ca � � � � � y= O Q� O O O C v�i v.� p] � c�n O O m U +� -� � � � U o � � o O � U N � � m � � i 7 U C � i p_ pp � .- f'- � 7 . � N Q > � p O ? � C C ,� d ' � m � � U w O� O � � O � O N O� O j ��� O O��' O M o r� �p ui o o�n o�n m L u� r+ rn � �n vi r� � =- N�/�j, �--1 OJ 00 N � i/} VT Q V} L? i/� i/} yh ih i O O O O O O O O � cy �, 01 O cY) N � 00 V1 M N y `^ � �' rn i. I� .--I I� N v v� v� v� v� Ol O Q1 O O N O N O O O O�� O� I� u1 O O tn O r�1 � Lfl �--I � ^ Ol l0 N -a tfl � 0 'C N ci 00 00 N � I� N Q i/T i!} i/} V} V} i/} �V} � � � � � � � � � � N ��1, a3+ O O O O O O O O O W L L L L L 1- L L � �° n� a a a_ a a a� � v� Q a a a a n a a a �, a a a a a a c a a a+' °J � v N�� o 0 0 0 0 0� o 0 rn a� � o 0 0 0 0 0� o 0 � � V � � � � � � Q � � {/1 L t_"I fC G1 t � s_ NO G1 `""� �-�-I a-�-I c�-i �-�-I � �—�1 �-�-I � > � � � � \ \ \ \ � \ \ \ O m m m m rn m m r s�� rn rn rn rn� rn rn rn Q O U rn N n O O N � � N 7� � � '� � N � c � � � a�/. � `;��r � � T ':'`� �, y , ,� .re r �. '� <,,,,.e, f3'�(,��^ 'h �3 y° � � 1 � �` It � '� f � . 3 t� ,r � �,�ip.' t �'��� �t�,�`�,t' �„�,./f.A,%.J./...�,,��� `��,,, ./ " r, � � ,�� � "� y, ,7 "r � t - , ���"'�,t': t.` •� ° June 24, 2014 Oshkosh Public Works Field Operations Facility Phase III Attn: Jon Wallenkamp � 2104 UNION AVE., P.O. BOX 1 084, SHEBOYGAN, WI 53082-1084 � TEL 920.457.4426 Fa,x 920.457.9474 RE: Oshkosh Public Works Field Operations Facility Phase III Change Request noe CR-1001 Jon: We are pleased to present you with the following Proposal for change order: Move transformer and power panel that feeds the fuel island (panel and transformer to face south). � Subcontractor Amount Description Varies $2,556.57� Various Changes — see attachment. All the above for the sum of :..................................................................................... $2,556.57 Accepted: Date: Thank you for the opportunity to present you with this pricing. If you have question regarding this Proposal please contact me. Sincerely, JOS. SCHMITT & SONS CONST. CO., INC. Nick Mueller Senior Project Manager 1.800.924. i 899 ���� �...� .�, WWW.JSCHMITT.CC g,�;, ��� ' � . � r"'��� `�ar $� �' '- e:ts 2104 UNION AVE., P.O. BOX 1084, SHEBOYGAN, WI 53082-T 084 ,.� 3/ ,�,,.�� •�"�°� ,,,r,� � ��,��� • � � TE� 920.457.4426 Fax 920.457.9474 J ;; � � t�� f �a'�a� ,_-��, _ � � �, � �-� ,. cR - �aaz Thursday, September 03, 2015 To: John Wallenkamp RE: Oshkosh Public Works Kueny Architects Field Operations Facility Phase 3 10505 Corporate Drive Suite #100 Pleasant Prairie, WI 53158 Change Request Number: '� �JE�� Description: Changes Per Construction Bulletin no. 1- moving salt storage building Contractors: JSS - Credit for type C concrete Paving Brine Building Containment area Calnin & Goss, Inc Mid Valley utilities Northeast Asphalt Lower Footings for coverage Additional Layout due to moving bldg Supervision - On site JSS OH&P Total Approved: Respectfully Submitted by, I ��:���� :�'� ', ' �. Keith Isken VP/COO JSS Subs $ (8,229.00) $ 1,580.00 $ (1,542.00) $ (1,150.00) $ (1,200.00) $ 1, 994.00 $ 924.00 $ 468.00 $ 142.00 $ (4,045.00) $ (2,968.00) (404.50) (148.40) (4,449.50) (3,116.40) Notes: Re-Layout locations Subtotal Add $ (7,565.90) Performance & Payment Bond $ (22.70) TOTAL � ��,589) Date: ,�� ��� 1 .800.924.1899 WWW.JSCHMITT.CC �(�ifh Isacen Fro�vr: Sent: Yo: Subject: Attachments: �_.�i', � � JKenneke@neasphalt.com Wednesday, September 02, 2015 5:48 PM Keith Isken Fw: Oshkosh - Salt Dome (2015) (K-Ol) OSHKOSH_site_(I<-01) 1.2 NEW SITE PLAN - 052915.pdf; ATTOOOOl.htm Below is the conversation between Nick and myself. Justin Kenneke Project Engineer Northeast Asphalt, Inc. (920) 342-4523 cell (920) 757-2906 fax ----- Foiwarded by Justin f<enneke/Userslcnpz on 09/02/2015 U5:47 PM ----- From Justin Kenneke/Users/cnpz �fo: nmuellerC�jschmitt.cc i)c. BEndersCneasphalLcom Dat�: 06/08/2015 01:26 PM 5u1.�jcct Fw: Oshkosh - Salt Dome Nick, It wiii be a credit of $1,200 per the asphalt paving changes. Tf ianks, Justin Kenneke Project Engineer Northeast Asphalt, Inc. (920) 342-4523 cell (920) 757-2906 fax i�roni Nick Mueller <nmuellerC�jschmitt.cc> To: "bendersC�3neasphalt.com" <benders@neasphalt.com> Cc. Michael Schneider <mschneider@jschmitt.cc> [�atr::. 06/05/2015 09:28 AM Sub�eci FW: Oshkosh • Salt Dome Grian, Please see the atlached Ca — we need to I:now tlie credit please for the lesser asphalt. Thanl:s! Nick Nicholas J. Muel!er 1 �������.������� �� ��������� ����o F`hoi�t� (9L0) 733-422� F�a>; (920) 733-�117 5G5 t�V. Eci��vvoac� C)r. P,p�aletor�, WI 5�i�13-9714 .1ure 16, 2015 Jos. 5chmiEt Goristruction 21�4 Unian Avenue Sheboygan, IhJI 530�31 P,ttrr: Nick �ueller Re: City of Usl��ko;sr� F'ubfic Warl<s f=i�ld Operatic�ns Pt-»se I{I CE3 Pricing Nick, These are the prir,es you rcquestecl. 1. Salt Don��� Less AsphalY Deduct: $119 00 2. Gontainment Area C7educt: �23.00 3. Salt Dome Less Ext�rior Concrete Pavemeni I�ecluct `,�1,069.00 4. Stora�e Buiiding 3/" Clear Stone In Lieu Of 1"/" Dense Base /�dd:$1,520.00 - 5. Salt D�me f�ecycied Concrete Iri Lieu Of 1'/�" Dense E3ase Deduck: $1,851,00 �- Sincerely, Calnin & Goss, Inc. Steve D. Wolfe r V��GI.�-ft /�• L�/' G�� �QW. bw �% ,� -�__� ti, X::- '7 i_._ �;.,':� - 1_ '.' 1..� �--- �,-� �` t=i" f ,_---- _.. , ber 2, 2095 �mitt Construction L ��� ���ion Avenue Sheboygan, WI 53081 Attn: Keith Isken ���� ���������� a�? ����� �����o Re: Oshkosh D!'lN f'hase � Keith, f'nc�ne c92c,� �;3�-4�zs Fas< (920) 733-4�'� 7 5�5 W. Er��evvaoc� Dr. Fk�x��letnn, V�tf 5�..°.13-�J7'i� The fallowing is the pricing th�t yau requested. 1. 2. 3. 4. 5. 6. 7. 8. CB#2 Price #1 Deduct CB#2 Pric� #2 Deduct CB#2 No Change CB#3 No Change CB#-4 No Change CB#5 No Change C8#6 No Change Lowering Footings At Brine Building Sincerely, Calnin & Goss, Inc. �' G�/ /� o�/ Steven D. Wolre SDW: bw $217.Od CB02.1 $688.00 CB02.2 CB02,3 CB03 CB04 CB05 Add: $924,00 �% ,�`� ��.�r Keith Isken From: Todd Calmes <todd@trcmidvalieyutilities.com> Sent: Monday, August 24, 2015 8:28 AM To: Keith Isken Subject: change in contract Oshkosh Good morning Keith I owe a credit of $1,150.00 for not putting the vent pipe in the salt building. Thank you Todd Todd Calmes, VP TRC MidValley Utilities James J. Calmes & Sons, Inc. N2193 Bodde Road Kaukauna, WI 54130 (920) 759-4443 (920) 609-5780 cell (920) 766-7942 Fax 1 � �7 I ! ��r � "t ;� �. ��� Ax � &�-w`�i � .,� v''' +` '.''��� ��—�:�`.�` d` ��''� `��'�� 21 04 UNION AVE., P.O. BOX 1084, SHEBOYGAN, WI 53082-1084 � t� �/'�-. �'�' !„ K, i, ��,�. r f . d�.�?,�d,.+'.!'�� ,� f>� �� TE� 920.457.4426 FAx 920.457.9474 � "r / __ ±�C r� �-t`,�, � E ,�� -F; '- `r^� -_ Thursday, September 24, 2015 To: John Wallenkamp Kueny Architects 10505 Corporate Drive Suite #100 Pleasant Prairie, WI 53158 CR #�003 - Revised 9-24-2015 RE: Oshkosh Public Works Field Operations Facility Phase 3 Change Request Number: 1 Qf�3 Description: Construction Bulletin no. 2- prefinished flashing only and change Masonry to wood walls and siding - Concrete/site work in CB#7 Notes: Contractors: W&L Insulation & Roofing, Inc Deduct Masonry Add wood stud walls, fiber cement JSS OH&P Total Approved: Respectfully Submitted by, I, , Keith Isken VP/COO i .800.924.1899 JSS Subs $ - $ 1,450.00 $ (1,693.00) $ 1,591.00 $ (102.00) $ 1,450.00 (10.20) 72.50 (112.20) 1,522.50 Subtotal Add $ 1,410.30 Performance & Payment Bond $ 4.23 TOTAL $ 1,415 Date: f���'. ��� WVYW.JSCHMITT.CC ,�' ` — – ,� i r I � t r w�;: � f�� � �'� �,-���y�'�� 2104 Ur��oN AvE., P.O. Box 1084, SHEBOYGAN, WI 53082-1 084 '•t + ' � � r , ��'..t.�_.r-� � TE� 920.457.4426 FAx 920.457.9474 �`"���.'�ff ; .;� � �� ���> � }� CR - 1004 Thursday, September 03, 2015 To: John Wallenkamp RE: Oshkosh Public Works Kueny Architects Field Operations Facility Phase 3 10505 Corporate Drive Suite #100 Pleasant Prairie, WI 53158 Change Request Number: 1004 Description: Construction Bulletins no. 4 and 5- Pier Caps at pipe Contractors: JSS - Concrete JSS - Rebar (Gerdau) Supervision - On site JSS OH&P Total Approved: Respectfully Submitted by, I ,`� J . ` Keith Isken VP/COO Notes: JSS Subs $ 523.00 $ 216.00 $ 72.00 $ 811.00 $ 81.10 892.10 Subtotal Add $ 892.10 Performance & Payment Bond $ 2.68 TOTAL $ $95 Date: � � �� 1 .800.924.1899 www.�sCHMirr.cc Contract f�o: 40�48867 '1'0: Jos. Schmitt Conste-uctian Aftn: Nick Mueiler ,- � `s Ai ,�i e• Change Order �lo. 1 Page 1 of 1 �abject: Loc: �1 ~r �? / � (J� f �R .. __._...........n..�.....:.......,.._ Daie: August 11, 2015 Fields Operations �acitity Oshkosh, WY S11B1ECT i0 THE TERMS AND COtVDITlO�lS OF THE ORIGiNAL PURCNASE AGREEMEIUT, GERDAU AMERf5TEEL US Inc (the SELLER) 15 FURNISHING IfV ACCOR�Af�CE WITH YOUR If�STRUC710NS A5 OUTUNEb BELOW, .:. �� �r� .�� . Constructian Bulletin 05: 9'-0" x 2"-f3" footing at Grid �6 Original Lump suni Contract Amount Origival Contrs�ct Tota[ Change Orders Requested to Da�e This Change Ordex Revised Coutract Total to D�te � � � � � 18,056.00 216.00 is,�7i.aa A�L t�� �,bove p��u� �.�plicable ����s - Please issue a ch�nge order far the amoant plus tax or si�n and return one copy of this letter as your approval. !f not returned within fifteen (15) days the change arder will be cansidered as accepted. ALL STATE, COUNTY AND LOCAL SALE5 TAXES EXCLUDED YERMS: Z030-30 days, invoice date ACCEPTED BY BUYEfi This day of Year euyer's name By Name / Title GERQAU AMERfS7EEL US Inc. BV date / /2Q15 Name / Title _ Approved this By fVame / 1'itle _ day of _ Year f �r' z _ `4 �� �� .$ ~'� ,.. r �:� r �.+ �`�t#.;,x xa'. ". \, + ` tio 2104 Ut.►►orJ AvE., P.O. Box 1084, SHEBOYGAN, WI 53082-1084 �; �`�,�_ �� �.N,;,, F;, ��f.,��f�l. � ,�� TE� 920.457.4426 Fax 920.457.9474 � *� .':�;,s�?, k " � / '-- �. ..'� �s Thursday, September 03, 2015 To: John Wallenkamp Kueny Architects 10505 Corporate Drive Suite #100 Pleasant Prairie, WI 53158 Description: Construction Bulletin no. 6- additional Scupper Contractors: W&L Insulation & Roofing JSS - Wood blocking Supervision - On site JSS OH&P Total Approved: Respectfully Submitted by, . '�� , Keith Isken VP/COO cF-�oa5 RE: Oshkosh Public Works Field Operations Facility Phase 3 Change Request Number: 1005 Notes: JSS Subs $ - $ 577.00 $ 109.00 $ 72.00 $ 181.00 $ 577.00 18.10 28.85 199.10 605.85 Subtotal Add $ 804.95 Performance & Payment Bond $ 2.41 TOTAL $ 807 Date: ������ ��,. 1.800.924.1899 1NWW.JSCHMITT.CC � � � In,�r���tio� � l��o�'���g I�co 112 S. Niilita,y Rcl. 920-439-1802 P.O. I3o.:� 237 920-439-Ib02 fax .Stocicb��idge, WL 5:3088 �is8-�90-61 �3 toll �"i-ee i��lf�oo� �irrg C� tds. t�.et r �,. _ � � .. '`�^_..._._.-�.�-,....._, Pr•opos�al # 151124 � �. Iricl�.�decl ro�/�se�rl. Oshkosh - DPW PH3 22-Sep-15 CBti7 - CR#1006 JSS 155 Subcontractors Price 1- Cost to provide asphalt per CB#7 all areas NE Asphalt $ 9,025.00 Calnin & Goss, Inc $ 2,468.00 JSS $ - Subtotai PRICE NO. 1 5 - $ 11,493.00 Markups 5 - $ 574.65 Subtotal w/Markups $ 12,067.65 Bonds $ 36.20 TOTAL PRICE N0. 1 S 12,103.85 J55 Subcontractors Price 2- Area �o. 1 Roes to concrete (provide credit from oriRinal bid NE Asphalt $ (8,052.00) Catnin & Goss, Inc $ (26.00) JSS $ 25,904.00 Price 2- Area no. 2 stays as asphalt (provide per new drawinR; NE Asphalt $ 3,077.00 Calnin & Goss, Inc $ 606.00 J55 $ - Subtotal PRICE NO. 2 $ 25,904.00 $ (4,395.00) Markups 5 z,s9o.ao S (�i9.�s) Subtotal w/Markups $ 23,879.65 Bonds $ 71.64 TOTAL PRICE NO. 2 $ 23,951.29 155 Subcontractors Price 3- Area no, 2 Roes to concrete (provide credit from oriRinal bid NE Asphalt $ (25,652.00) Calnin & Goss, Inc $ (72.00) JSS $ 54,188.00 Price 3- Area no, 1 stavs as asahalt (provide aer new drewin�� NE Asphalt $ 5,972.00 Cafnin & Goss, Inc $ 1,B62.D0 J55 $ - Subtotal PRICE N0. 3 $ 54,188.00 $ (17,890.00} Markups $ 5,418.80 $ (894.50) Subtotaf w/Markups $ 40,8Z2.30 Bonds $ 122.47 TOTAL PRICE NO. 3 $ 40,944.77 J55 Subcontractors Price 4- Area no. 1�oes to concrete NE Asphalt 5 (8,052.00) Calnin & Goss, Inc 5 (26.00) J55 $ 25,904.00 Price 4- Area no. 2 Roes to concrete NE Asphalt $ (25,652.00) Calnin & 6oss, Inc $ (72.00) JSS $ 54,188.00 Subtotal PRICE N0. 4 $ 80,092.00 $ (33,802.D0) Markups $ 8,009.20 $ (1,690.1d) Subtotal w/Markups $ 52,609.10 Bonds $ 157.83 TOTAL PRICE NO. 4 $ 52,766.93 ...... � . ;_;'� '�� � RE: Oshkosh Public Works - CB Concrete Drawing � �• � ECcith Isl:�n io: 'JKenneke�a neasphalt.com' 09/03/2015 09:08 AM Cc: Keith Isken This is what we discussed and i need — 3 numbers total Price no. 1; / O t� � CGl �� C� "T�= 0/1 J r,i�. � Co�'�r4 c�� Cost to provide asphalt per CB#7 ail areas $ � ���h� K��� `�/3/�s- Price no. 2: Area no. 1 goes to concrete (provide credit from original bid) $�, � s� Area no. 2 stays as asphalt (provide per new drawing) $ 3, ��� Total price no. 2 $ `Ti �1 %`� �cr��-�� �-iZ, o��y �,�.( �'�.��'��cf� Jc.>iin �nnc� `1/ 3�S" Price no, 3; Area no. 2 goes to concrete (provide credit from original bid) $�`�i ��� Area no. 1 stays as asphalt (provide per new drawing) $ �� ��� Total price no. 3$ �9 ��'C� �re�+f � on�i.,�t( c�n�r�� i-� J�.yh 1 K�.,�. E-, �/a��� Hope this makes sense to you. Keith A. Isken Vice President/Chief Operations Officer Jos. Schmitt & Sons Const, Co., Inc Office: 920-694-3602 �xt���:rv����� �y� ���+��� W��V�a �I�one (920) 733-4219 �ax (920) 733-4`i 17 505 V�. EcO��woc,d Clr. / p��letnr�, Wf 54�13-�37'I� September 21, 2U15 Jas. Schmitf Construction 2104 Union Averiu� Sh�i�pygan, WI 53081 Attn: I:eith isi<en R�: Osh4tosh DPW Phase 3 Keith, The fallowing is trie r�e��isecl pricir�� that you requcsted for GB#�. Price #1 Cost To Provide Asphali Per CB#�7 ��Il Areas Af�D: Price #2 Area #1 G�es To Concrete [�EDUCT: Area #2 Stays nspha(t ADD: TOTAL f'RiCE #�`L /�C�C�: Price #3 Area #2 GQE'.S f 0 C;ancret� DEC�UC7: Area #1 Stays Asphalt ADQ: 70TAL PRICE #3 ADD: Sincerely, Calnin & Goss, Inc. �4;���G�G'�'.� • G%�G� Steven D. Wolfe ��/ SDW: bw $2,�a�i3.00 �26.t30 4��Q6.Oa �58(7.00 $72.�Q ��,��z.�a $ i,7'9C1.0�J ,�G,,,>j .� g i �+ < � ,� �''�`� -^� ' '�,f +� ;� 2104 Ut�►oN AvE., P.O. Box 1084, SHEBOYGAN, WI 53082-1084 �,��' f ''<}-` � /����C� . /.r•��=�"� �i,(',/��,/� �a TE� 920.457.4426 Fax 920.457.9474 �° y � � J r � �,� �;...k .�.� t � � � ..- f�ryA i4 ���� 1007 -Revised Tuesday, September 08, 2015 To: John Walienkamp RE: Oshkosh Public Works Kueny Architects Field Operations Facility Phase 3 10505 Corporate Drive Suite #100 Pleasant Prairie, WI 53158 Change Request Number: '� ��'7 - �.e���s�� Description: Thru August 25, 2015 hauled 4,982.91 tons to Valley Trail Landfill in Berlin as directed by the Owner. Contractors: JSS/Calnin & Goss, Inc Unit Price of $10/Ton of 5,160.39 tons Less 1,000 tons ailowance = 4,160.39 Tons JSS OH&P Total Approved: Respectfully Submitted by, �� � �t.''4�i' -� ( � .+.'�dt.��i � �1 �. ,�:�� Keith Isken VP/COO Notes: JSS Subs $ 41,603.90 $ 41,603.90 $ Inc 41,603.90 Subtotal Add $ 41,603.90 Performance & Payment Bond Inc TOTAL $ 41,604 Date: �'��� ��; 1 .800.924.1899 WWW.JSCHMITT.CC Oshkosh Public Works Facility Phase III Summary of Landfill Soil Disposal Utility Excavations Date (Tons) Site Preparation Area of Soil Excavation 05/29/15 109.32 Phase III Excess Berm Material 06/01/15 506.83 Phase III Excess Berm Material 06/02/15 521.76 Phase III Excess Berm Material 06/03/15 346.91 Phase III Excess Berm Material 06/04/15 378.24 Phase III Excess Berm Material 06/05/15 250.79 Phase III Excess Berm Material 06/08/15 248.51 Phase III Excess Berm Material 06/09/15 169.06 Phase III Excess Berm Material 06/16/15 530.49 Phase III Mix of Clay, Gravel, Rubble 06/29/15 88.23 Salt Dome Footings 07/13/15 184.53 Cold Storage Bldg. footings 07/15/15 160.38 Cold Storage Bldg. footings 07/16/15 330.20 Cold Storage Bldg. footings 07/29/15 80.95 Salt Dome Water Line 07/30/15 152.81 Phase III Excess Berm Material 07/31/15 162.91 Phase III Excess Berm Material OS/03/15 159.96 Berm Material/Approx. 80 tons from canopy piers 08/04/15 383.45 Phase III Excess Berm Material 08/05/15 66.55 Phase III Excess Berm Material 08/24/15 177.48 Salt Dome Conveyor Pit 08/25/15 151.03 Salt Dome Conveyor Pit SUB TOTAL 80.95 5,079.44 TOTAL 5,160.39 \\usosh1fp001\12projects\Projects�0�19�_City Garage Enviro-CM\400-TECHNICAL\Phase III\Phase III Landfill\Ph-III Landfill Soil Summary.xlsx . .i ti iC w �� ��� F ,�.{�� ;,�, t . ,,- _ . • �, y ,:� � � ' �� r ,'�� i ,� x +� �� �' � f J� � r � r � � i r�ir i'�,�+ f� � r,: `�����••sa�`'� ��' ` a ?-���' � �,w ____ ----._ -�-- _- 1 Thursday, September 03, 201 2 t 04 UNtot� AvE., P.O. Box 1084, SHEBOYGAN, WI 53082-1 �84 TE� 920.457.4426 F�+x 920.457.9474 To: John Wallenkamp Kueny Architects 10505 Corporate Drive Suite #100 Pleasant Prairie, W� 53158 CR-1008 RE: Oshkos e atiolnsvFac lity Phase 3 Field Op �Od� Change Request Number: Description: e building Elimnate the painting of the deck of the cold storag Notes: ��_ Subs Contractors � _ � (13,768.00) Omni Glass & Paint, Inc JSS OH&P Total _ qpproved Respectfully Submitted by, ,, � '� ,�,. Keith Isken VPICOO 1.800.924.1899 $ ____�— $ (13,768.00) 688.40 (14,456.40) $ (14,456.40) Subtotal Add $ (43.37) Performance & Payment Bond � (�4,500) TOTAL Date: �- ,€���� � :�, yyVyW.J5CHM1'1"T•CC OMNI GLASS & PAINT, INC. 3530 OMNI DRIVE * OSHKOSH, WISCONSIN 54904 * COMPANY ID#1100807 PHONES: �OSHKOSH (920) 233-3333 ❑GREEN BAY (920) 434-7772 ❑SCHOFIELD (715) 355-893 PAINT JOB CHANGE #PT65041 Deduct for Cold Storage Date: August 27, 2015 To: Joseph Schmitt Construction Attn: Keith Isken Project: Oshkosh DPW Phase 3 Oshkosh, WI CHANGE FOR THE ABOVE LISTED PROJECT: • Per email dated 8-23-15 we find the following change o Not to install paint to deck of cold storage ■ DEDUCT ................. $13,768.00 Thank you far the opportunity to do this project. If you have any questions, please call me at our office. John Bishop, Project Manager Office: (920)236-2352 Cell: (920)410-0697 CC: JS Saved as PT 65041 Deduct for cold storage, 8-28-15 IMPORTANT — PLEASE READ • Terms are Net 10 Days from date of invoice • Past due accounts are subject to interest at the rate of 1-1/2% per month (18% annually) • Retainages (when allowed) are due immediately upon payment from owner • All materials used are under warranty by the manufacturer. Warranties may vary by manufacturer. Omni Giass & Paint, Inc. does not warranty materiats • Quotation excludes any overtime unless otherwise noted • All workmanship is warranted for one year from date of installation • It is understood that if you use your own contract form, the conditions of this quotation fully apply, unless specifically written out and mutually agreed upon • Backcharges for any services not specifically agreed to in writing, and/or backcharges of any other nature for delays to the project caused by conditions beyond our control will not be honored and is not part of this quotations • Seller reserves the right to stop work or delivery whenever an account is in arrears, without recourse by affected parties Accepted OMNI GLASS & PAINT, INC. Date By f � � } „�r��R -� . �� #� � a. �:� s „� ;`� p + . r �� : �z�� � °'� �°"�•F�r � • • . - • c . • : • : . • : • : • Yi�i C: �, t ,�r ��� . } �as.�c�es Sa e+' �i ,�fa r'� * p"°�`a.�` � � � � �,.� a R+3��fy#�.�} � r,, y: �.�"� '� �z F+S, '��ys�. "` �����?'�y �..�^"' , Thursday, September 03, 2015 To: John Wallenkamp Kueny Architects 10505 Corporate Drive Suite #100 Pleasant Prairie, WI 53158 CR - 1009 RE: Oshkosh Public Works Field Operations Facifity Phase 3 Change Request Number: 1 U09 Description: Eliminate installation of the dry system for the exterior canopy per email request. Notes: Contractors: JSS Subs Fireline $ - $ (6,773.00) JSS OH&P Total $ - $ (6,773.00) - (338.65) 1 (7,111.65) Subtotal Add $ (7,111.65) Performance & Payment Bond $ (21.33) TOTAL $ (7,133) Approved: Date: Respectfully Submitted by, ;', Keith Isken VP/COO �� �'� �.� 1.800.924.1899 WWW.JSCHMITT.CC r �4:- � E . .. � h ✓-> ,, ; � : I f �a� �,r.xy������¢��� � SPRINKLER CORPORATION 5036 Clairemont Dr. Appieton, WI 54913 August 20, 2015 Attn: Keith Isken Jos. Schmitt & Sons Const. Co., inc. 2104 Union Avenue Sheboygan, WI 53081 Phone: 920-694-3602 CeiL• 920-946-0992 Email: I<isl<en[a�jschmitt.cc RE: Oshkosh DPW Change Order #1 (10382-15) Dear Keith, Office: (920) 757-9590 Fax: (920) 757-9591 We are pleased to provide for your consideration the following change order request for Qshkosh DPW. Our scope of work will be to eliminate the installation of the dry system for the exterior canopy per the emaif dated August Z0, 201S. Credit Price: $ 6,773.00 — Six thousand seven hundred seventy three doilars and QO/20D We would like to thank you for the opportunity to provide this quotation. If you have any questions or comments piease contact me. Sincerely, Ed Esselman Jr. President — � _ �