Subject: Contract Amendment Request 2, Adding Professional Land Surveying Services
Responsibilities Related to City Contract 14-10, Expansion of the Southwest
Industrial Park Construction, City Resolution No. 14-451
AECOM Project No. 60334236
Dear Mr. Rabe,
AECOM Technical Services, Inc. (AECOM) is requesting an amendment to the agreement dated
October 14, 2014, AECOM Proposal Number OPP-267826 for Construction Related Services for
the Construction related to this project.
Pursuant to our meeting on Tuesday, October 13, 2015, we are pleased to offer you the following
amendment for Professional Land Surveying services. This amendment is based on your
requirement for a Subdivision Plat of the lands contained within the 'Construction Drawings for City
Contract 14-10, Southwest Industrial Park Expansion (TID#23) Phases III & IV Utilities'. AECOM
appreciates the opportunity to furnish this amendment and it is based on criteria as detailed below.
General
AECOM will prepare a subdivision plat consisting of Out-Lots, utility easements and public right-of-
way dedications consistent with your requirements. Final lot configurations will be developed
through the life of this project and the assumption is that there will be 3-5 Out-Lots. Consistent with
the referenced Contract, the project will be prepared on the Wisconsin Coordinate Reference
System, (WISCRS or WCCS), Winnebago County datum.
In order to provide this service, AECOM proposes to complete the following tasks:
Research, Scoping and Project Preparation
Initial research of records available at the Register of Deeds, via Fidlar, has been completed,
(copies attached). Thus far, Deeds and Certified Survey Maps, that will provide the basis for exterior
boundary location, have been downloaded and printed. As of today, a thorough search of records at
the Winnebago County Courthouse has not been performed and we anticipate performing that
research as part of our due diligence. No documents, (provided by you or found during our
research), indicate that a current exterior boundary survey of the lands exist.
60334236_Amendment 2.docx
AECOM Expansion of the Southwest Industrial Park Construction
Contract 14-10, Amendment 2
In conjunction with our research, it is assumed that a current commitment for title insurance will be
furnished within three weeks of any authorization to proceed.
Estimated Fees: $1,000.00
Prior to platting the lands, an exterior boundary survey must be completed. AECOM will utilize the
public records found and provided during the research phase to develop the same. We WILL NOT
prepare any survey documents for this work other than filing PLSS Monument Records (if required),
and incorporating the boundary into the finai plat.
Estimated Fees: $4,300.00
Preliminary Plat
Given the unique nature of this proposed development, our assumption is that per Section 30-72 (B)
(1) of the City of Oshkosh Municipal Code, (Rev. 12/31/09), the preliminary platting requirement will
be waived by the Secretary of the Planning Commission. This proposal does not include any
amount for the development of a Preliminary Plat; should one be required, we could prepare a
proposal within two days of the request for the same.
Final Plat
AECOM will prepare a Subdivision Plat consisting of Out-Lots, utility-easements and public road
right-of-way dedications consistent with the requirements of the City of Oshkosh. The final number
of lots and configurations would be developed during future 'scoping' meetings. The plat will be
prepared consistent with the previously referenced Municipal Code and other land division
regulation including, but not limited to, Chapter 236 of Wisconsin Statutes and Chapter A-E7 of the
Administrative Rules. The quoted fee for this service includes and time and materials necessary for
surveying, drafting and monumenting the plat as required.
Estimated Fees: $5,700.00
Other Direct Charges, (ODC's)
GNSS and/or robotic equipment
Estimated Fees: $600.00
Fee Summarv
Research
$1,000.00
Development of external boundary $4,300.00
Final Plat
ODC
$5,700.00
�,.��.��
TOTAL: (Not including mailings, review fees, etc.) $11,600.00
K:\Projects\60334236_Southwest Industrial Park\100-CONTRACT�60334236_Amendment 2.docx
AECOM Expansion of the Southwest Industrial Park Construction 3
Contract 14-10, Amendment 2
Proiect Schedule
AECOM appreciates that time is of the essence for this project and will expedite the project to the
extent possible. In order to accomplish this goal, we encourage the following workflow along with
our anticipated timeline; which assumes an authorization to proceed.
• Submittal of Amendment
• Acceptance and authorization to proceed
• Within 2 weeks of authorization - Additional scoping meeting, (In-person or phone
conference)
• Within 2 weeks of authorization - Fieldwork commences
• Within 3 weeks of authorization — Title Commitment 8� supporting documents provided
AECOM
• Within 4 weeks of authorization - Boundary completed
• Within 6 weeks of authorization - Lot configurations submitted to City for comments, (emaii)
• Within 8 weeks of authorization - Final Plat submitted to the City of Oshkosh for final
approval
• Within 10 weeks of authorization the Final Plat, (mylar), will be submitted to the Department
of Administration, (DOA). The DOA has a 30 day approval timeframe.
NOTE: The Winnebago County Planning & Committee has objecting authority for plats
within the City of Oshkosh. The DOA will make the required submittal to all objecting
authorities.
• Within 1 week of receiving the Final plat from the DOA - Plat circulated for signatures
• Within 1 week after receiving the plat signed by ail parties — Piat recorded.
Revised Budqet
The project was authorized with a budget of $362,540 for services as outlined in our original
proposal dated October 14, 2014. The total budget was divided into $205,180 for private and
$157,360 for public improvements. Amendment 1 services were distributed between both public
and private budgets as necessary. The requested proposed additional services for Amendment 2
can be added to the existing public budget. If the addition of the services results in exceedance of
the approved budgets due to increased effort hours by the noted project team, a contract
amendment request detailing the level of effort and costs will be prepared and submitted to the City
for consideration. No increase in budget is requested for these services at this time.
The services provided will be performed in accordance with the 2015 Negotiated Fee Schedule and
conditions of the General Conditions of Service — City of Oshkosh, April 2009 as provided in our
original proposal number OPP-237433, dated February 7, 2014, which are expressly incorporated
into, and are an integral part of, our agreement for professional services. AECOM can begin
providing these services immediately upon receipt of the signed Amendment Authorization Form
(attached).
K:\Projects\60334236_Southwest Industrial Park\100-CONTRACT�60334236_Amendment 2.docx
AECOM Expansion of the Southwest Industrial Park Construction 4
Contract 14-10, Amendment 2
If you have any questions or need to clarify a point, please call any of the undersigned at
920-235-0270.
Sincerely yours,
'l.l,,��,{ _�.�.1'�,�i � ��� - """
teven�. chubrin � P.G. Jason R. Houle, P.L.S.
9 � ��ry�� �
Oper�tions Manager SuNey Manager
I F. Timm
A count Manager
Attachments: Amendment to Agreement
Amendment to Agreement Authorization
Cc: Tracy Taylor, City of Oshkosh Department of Public Works
K:\Projects\60334236_Southwest Industrial Park\100-CONTRACT�60334236_Amendment 2.docx
AECOM
558 North Main Street, Oshkosh, WI 54901
T 920.236.6718 F 920.235.0321
Amendment to Agreement
Amendment No. 2
Soutwest Industiral Park
AECOM Project No. 60334236
City of Oshkosh Resolution No. 14-451
RETURN TO:
SUMMARY:
Amendment #
AECOM
558 North Main Street
Oshkosh, WI 54901
Attn: Paul Timm
Original Contract Amount:
Total Previous Change Orders:
Amount this Change Order:
Revised Contract Amount
DESCRIPTION
2 AECOM will prepare a subdivision plat
consisting of Out-Lots, utility easements and
public right-of-way dedications consistent
with your requirements. Final lot
configurations will be developed through the
life of this project and the assumption is that
there will be 3-5 Out-lots. Consistent with the
referenced Contract, the project will be
prepared on the Wisconsin Coordinate
Reference System, (WISCRS or WCCS),
Winnebago County datum. Estimated Cost
$11,600 will be incurred against the
approved public improvements task budget.
K:\Projects160334236_Southwest Industrial Park\100-CONTRACT160334236_Amendment 2.docx
A=COM
Date: October 30, 2015
$362,540
$0
$0
$362,540
AMOUNT
$0
A=COM
AECOM
558 North Main Street, Oshkosh, WI 54901
T 920.236.6718 F 920.235.0321
Amendment to Agreement Authorization
October 30, 2015
I hereby certify that the necessary provisions have been made to pay the liability which will accrue
under this contract.
I hereby authorize AECOM to proceed with the scope of work outlined in Amendment Request No 2
Adding Professional Land Surveying Services Responsibilities Related to City Contract 14-10,
Expansion of the Southwest Industrial Park Construction, AECOM Project No. 660334236, City
Resolution Number 14-451, with a zero budget authorization increase under the general terms and
conditions specified in the proposal.
�� �����
Sign ture
Mark A Rohloff
Print Name
City Manager
TitleLOrganization
Signature �
Pamela R. Ubri4
Print Name
l �����5
Date
� � � �
�
Date
City Clerk
Title ganizatio
;' S
' at e � Date
Lynn A. Lorenson
Print Name
City Attorney
Title/Organization
/� r � r.� �,, jT rk,^.1";�ri,�
� � Xd
Signature
Trena Larson
Print Name
Director of Finance
Title/Organization
?l��'��i��
Date
K:\Projects\60334236_Southwest Industrial Park\100-CONTRACT160334236_Amendment 2.docx