Pi,?�� - j•�N'r. BI�S F�'v� �ITER IN'Il� CO�I`IR.�CT ��TIT'd CENTRAL CON`iTRACTING CORP . �
F�� R�AIRS TO 16" ti�'�ER b1AI�I i
Z;! �' �`—`D �i': D���i' �`i .P OF PUBLIC �ti�ORKS
Y�'?, ,�S, the 16" water main in the Fox River, underneath the Main Street
���, is in need of repairs; and
j•«�.`�, Central Contracting Corporation has agreed to provide the
Y:a��ial.s a*�.-�. labor required to ret.a.ir the brea}c at a cost not to exceed
$2?,200_00; .
r:CJ9 lr"�'�.r�OZE, BE IT RESOLUED by the Coir�non Council of the City of
Cs����z t�a� �e prq�r City officials are hereby authorized and directed to
��?;:� bics and en�er into a contract with Central Contracting Cozporation of
Cs�'���, t•i1SC,�0?iSLT'1, for the repa.ir of the above n�ntioned water main at a cost
r�� ���� $21,200.00. N3oney for this purpose is hereby appropriated from
��•k-!� '�:o. 812601, ti�7ater Utility D�preciation Fund.
.
- '3 6 -
, .�
�
�--.
AREA CODE 414
TELEPHONE
231-1900
�
ctM �4
. �es
`n' M[I� �`
�
CENTRAL CONTRACTING CO
General and Public Utility Contractors
Mr. Jack Schneider
Director of Public Works
City Ha11
Gshkosh Wi. 5�901
�,�,°�°
Dear Sir:
R E C E�3���A BLVD.� �SHHOSIi� wIS. 54901
AUG 2 - 1977
CITY ATTORNEY'S
OFFICE
July 28, 1977
Re: 16" Water Main Crossing
�East of Main Street Bridge
Oshkosh, Wi.
We refer to your request for a proposal to repair the subject
16" Lock Jo3nt Prestressed Concrete �nbedded Cylinder pipe in the Fox Ri4er.
We have requested the engineering department of the Lock-Joint
Company (Interpace, Inc.) to make up a shop dra�ring for yours and our
approval of the short sections and M.J. sleeve which we feel can be used
for replacing the one sixteen foot section of pipe which has been damaged
and punctured. The cost of these basic materials will probably be
somewhat higher than the amounts shown in Richard Graver's letter of
July 5, 1977 but should not exceed � 2�000.00.
We hereby propose to furnish all materials, labor, tools and
equipment (including specialized equipment) to (1) remove the debris fax
enough from the known location of the break in the pipe so that one-16 foot
length of pipe can be removed, (2) cut and remove the damaged pipe section
and (3) replace the damaged section with 16' of new pipe ma.terials
assembled as shown on the acconpa.nying aketch. (If you feel that the
sleeved section should be encased in concrete we can place an envelope
by the tremie method.)
We propose to do this work on a time and material basis, using
10� for overhead and 15p for maxgin on the materials and labor items and
using current equipment rental prices for the construction equipment needed.
By following these guidelines, if you approve, we propose a cost to the
City not to exceed -�Z/, zoo.00 ,
AJP : en
Encl.
Very truly yours,
CENTRAL CONTRACTING CORPOF.ATION
� �0��
�_
A. � Phair
�
m
�
�
cd
��
��
� ��
� N
tti U O
-f-�
� �
� � �
.� � ,-i
N 1 � Ra
� U N
�ri CCi F-I
LC3 �
� J-� �t
� O
O O 4-+
-N U
�
� O � �
O -{-� O •rl
•r-I �" -I-� cC3
d-� �r-I C) �
� «3
� � � F�
O N -1-� N
� � � �
N � O cd
� N U 3
.__ ...�
i
.-.
ti
�
�
N
�
�
-I-� •
Q �
O N
� 9-i
d S�
S�
O cC3
H U
�
O
�
�
O
�
t �, i
i
l
,
� �ti
� �
-�" � N
r-I
J-�
�
� �
i�0 .1.�
� K-i
� U