Loading...
HomeMy WebLinkAboutAECOM/2015 Leak Detection ServicesacoM October 1, 2015 Mr. Bill Genz City of Oshkosh Water Distribution Superintendent 757 W. 3`d Avenue Oshkosh, Wisconsin 54901 AECOM 920.235.0270 tel 558 North Main Street 920.235.0321 fax Oshkosh, Wisconsin 54901 RECEIVED OCT 0 8 2015 DEPT OF PUBLIC WORKS OSHKOSH, WISCONSIN Subject: Proposal for Completion of 2015 Leak Detection Services in Oshkosh, Wisconsin AECOM Proposal No. OPP-424771 Dear Mr. Genz, AECOM is pleased to submit this proposal to the City of Oshkosh (City) to conduct a Leak Detection Survey on approximately 100 miles of water main in the City of Oshkosh's water distribution system in 2015. The proposed services represent the second phase of investigation activities to be completed on the City of Oshkosh Municipal Water Supply which consists of approximately 100 miles of water main piping. Historically the City has completed the total comprehensive City wide leak detection survey over a three (3) year period (i.e. 100. miles per year). This proposal has been prepared based the second phase of those services and is intended for the area bound by Oregon and Jackson Street to the east, Interstate 41 to the west, Oshkosh Avenue to the north, and 2pin Avenue to the south to be completed in 2015. The purpose of the annual surveys is to identify specific points of leakage such that system rehabilitation can be undertaken and lost water reduced. The following discusses the scope of services to be completed, schedule, information/assistance required from the City, and fees associated with the proposed services. Scoae of Services Services to be provided for the Project are as follows: • Meet with City to review existing water distribution systems maps, pertinent water system reports, and the schedule for conducting the leak detection field services. • Conduct a leak detection and location survey with sonic detection and computer correlation equipment on approximately 100 miles of the water distribution system. Physical contact will be made with the system at exposed valves and fire hydrants. After the initial sonic leak survey of a portion of the system is completed, indications of leaks will be verified a second time, after which leaks will be located with a computer programmed leak correlator designed to pinpoint leak locations without drill holes or excavations. Where leakage into a storm or sanitary sewer is suspected, a visual examination of the appropriate sewer wili be conducted. All equipment used will be non-intrusive. Valves and hydrants will not normally require operation during the survey and pinpointing operations. This survey will be conducted This document includes proprietary data that shall not be duplicated, used or disclosed outside City of Oshkosh for any purpose other than to evaluate this document. This restriction does not limit City of Oshkosh's right to use information contained in this document if it is obtained from another source without restriction. OPP�24771_2015 Leak Detection Services Proposal.docx AECOM primarily during normal working hours, with additional leak detection being conducted during late evening and/or early morning hours in areas of high traffic volume. • Prepare an inventory of defective system components such as valves, hydrants, meters, and curb stops, which are noted in the course of carrying out field activities. • AECOM will furnish a fully equipped vehicle, including all sonic leak detection equipment, tools, and safety equipment for the duration of the project. Our Fluid Conservation System computer leak correlators will be utilized to pinpoint leaks. • Prepare a final report and submit five (5) copies of the report showing the results of the investigations. The report shall include a summary of the project and a list of leakage located by type, location, and estimated quantity of leakage. The final report will contain recommendations for future work based on the results of this survey. Schedule Leak Detection Phase: 4-5 weeks Yearly Final Report: 2-4 weeks after field work Citv Responsibilities The City, at its expense, shall do the following in a timely manner so as not to delay the Services. 1. Furnish AECOM the following information/reports/assistance, all of which AECOM may refy upon without independent verification in performing the Services. • All available street maps and water distribution system maps. • One (1) experienced person with a good working knowledge of the water distribution system to assist on a part-time basis in field activities such as location of system components. • Access to valves and curb stops by uncovering and cleaning valves and curb boxes, where required, prior to initiation of field activities. 2. The City of Oshkosh agrees to hold harmless and indemnify AECOM against any liability arising out of the items above for which the City is responsible. 3. Designate a representative for the Project who shall have the authority to transmit instructions, receive information, interpret and define ClienYs policies, and make decisions with respect to the Services. Fees AECOM propose to perform the above described scope of work on a lump sum bases for a fee of $19,750.00. Please note lump sum fee will be adjusted if segment length is reduced or increased. A breakdown of our fee is as follows: Survey — Area bound by Oregon and Jackson Street to the east, Interstate 41 � to the west, Oshkosh Avenue to the north, and 20th Avenue to the south (100 $18,250.00 miles Pre aration / Pro�ect Mana ement / Re ort $1,500.00 Total $19,750 K:\PROPOSAL\City of Oshkosh\OPP-424771_2015 Leak Detection Services\OPP-424771_2015 Leak Detection Services Proposal.docx AECOM Terms and Conditions Services described in this proposal will be performed on a time-and-expense/unit-cost basis. The project services will be performed in accordance with the 2015 Negotiated Fee Schedule and the April 2009 Negotiated Terms and Conditions between AECOM and the City of Oshkosh, which are expressly incorporated into, and are an integral part of, our contract for professional services. Please indicate your acceptance of this proposal by having an authorized individual of the City execute the attached Authorization Form and return it to our Oshkosh office. If you have any questions regarding the proposed scope of services and corresponding costs, please contact us at your convenience. We appreciate the opportunity to provide engineering services to the City of Oshkosh. If you have any questions regarding the proposed project approach or corresponding costs, please contact us at your convenience. Respectfully, AECOM Technical Services, Inc. "`��_� �C ��^ � • �ul F. Timm Account Manager Attachment Authorization �G����.�i{L � ` Patrick E. Clifford, P.E. �/a,Q, f..., __ Vice President K:\PROPOSAL\City of Oshkosh\OPP-424771_2015 Leak Detection Services\OPP-424771_2015 Leak Detection Services Proposal.docx A=COM Authorization October 1, 2015 R AECOM 920.235.0270 tel 558 North Main Street 920.235.0321 fax Oshkosh, Wisconsin 54901 I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. I hereby authorize AECOM to proceed with the scope of work for the Completion of 2015 Leak Detection Services in Oshkosh, Wisconsin as described in AECOM's proposal number OPP-424771 dated October 1, 2015, with a budget authorization of $19,750 under the general terms and conditions specified in the proposal. ,�-���f,� -� ____. Signature Mark A Rohloff Print Name City Manager Title/Organization :���, - ,� Signature Pamela R. Ubrig � ����C} .� C`� �'���1 Signature �� —!�i — Zo(� Date ic�-��--���� Date i ,�-1 ��il,c�'` Date AECOM I agree to accept invoices from AECOM via e-mail and not postal mail: (� Yes Signature: E-mail address: Recipient Mr./Ms: Return to: Name: Address: Email: Phone: Paul Timm 558 North Main Street Oshkosh, WI 54901 paul.timmCa?aecom.com 920.236.6718 5 K:\PROPOSAL\City of Oshkosh\OPP-424771_2015 Leak Detection Services\OPP-424771_2015 Leak Detection Services Proposal.docx CITY OF OSHKOSH DEPARTMENT OF PUBLIC WORKS 215 CHURCH AVENUE, P.O. BOX 1130, OSHKOSH, WI 54903-1130 PHONE: (920) 236-5065 FAX (920) 236-5068 LETTER OF TRANSMITTAL To: Mr. Steve Schmitt Building Better Together Suppiy, LLC PO Box 1084 Sheboygan, WI 53082-1084 Please find ❑ Copy of Letter ❑ Meeting Notes ❑ Specifications � Attached � Contracts ❑ Photos ❑ Estimates Quantit Description 1 Executed A reement Date: October 16, 2015 Sub�ect: Executed Agreement Contract 15-21 ❑ Under Separate Cover ❑ Amendment ❑ Mylars ❑ Diskette ❑ Report ❑ Agenda ❑ Change Order ❑ Plans ❑ Zip Disk ❑ Other These are being transmitted as indicated below: ❑ For Approval � For Your Use ❑ As Requested ❑ For Review & Comment Remarks: Enclosed is a copy of the executed agreement for the Public Works Field Operations Facility — Phase III. If you have any questions, please contact us. Kevin Uhen — Copy Jon Wallenkamp — Copy City Clerk's Office — Original cc: _ File — Original I:1Engineering12015 CONTRACTS\15-21 PW Field Ops Facility-Ph — Signed: Trac L. Taylor rmationlCorcespondencelLOTs\15- TS LOT-Exec 10-16-15.docx � � _ "' ����%/� RECEIVED =��r�-= Document A101TM - 2007 � OCT 1,32015 Standard Form of Agreement Between Owner and Supplier whDEe �ho ,basBs of WoRxs payment is a Stipulated Sum osHKOSH, WiSCONSW AGREEMENT made as of the Fourteenth day of October in the year Two Thousand Fifteen (2015) (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status, address and other information) City Of Oshkosh 215 Church Avenue Oshkosh, WI 54903 and the Suppler: (Name, legal status, address and other information) Buiiding Better Together Supply, LLC PO Box 1084 2104 Union Avenue Sheboygan, Wisconsin 53082 for the following Project: (Name, location and detailed descriptionj ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to ihe standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201 T""-2007, City of Oshkosh Phase ]II public works faciliTy G30 Witzel Ave. Oshkosh WI 54902 the General Conditions of the Contract project will consist of construction of a 21,100 Sq. Ft. One (1) story building and a for Construction, is adopted in this separate salt storage facility. For the one-story building, the building framing system document by reference. Do not use will be steel columns, truss girders, truss joists or steel beams, and insulated precast with other general conditions unless concrete panel exterior/interior walls. The salt storage structure will be a manufactured this document is modified. storage structure. The Architect: (Name, legal status, address and other inforrnation) Kueny Architects, LLC 10505 Corporate Drive, Suite 100 Pleasant Prairie, Wisconsin 53158 The Owner and Supplier agree as follows. AIA Document A101T"' — 2007. Copyright O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Init. Institute of Architects. All rights reserved. WARNING: This AIA� 6ocument is protected by U.S. Copyright Law and International 7reaties. Unauthorized .� repwduction or disffibution of thfs AIAz Document, or any portlon of it, may result in severe civil and criminal penaltfes, and will be prosecuted to � the maximum exteni possible under the law. This document was produced by AIA software at 12:31:47 on 10/05/2015 under Order No.3296704242_1 which expires on 06/11/2016, and is not for resale. User Notes: (1999583097) TABLE OF ARTICLES 1 THE CONTRAC7 DOCUMENTS 2 THE WORK OF 7HlS CONTRACT 3 DATE OF C4MMENCEMEN7 AND SUBSTANTIAL COMPLE710N 4 CON7RACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISION5 9 ENUMERATfON OF CONTRACT DOCUMENTS 10 INSURANCE AND BQNDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Conh-act (General, 5upplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Ag-eement and Modifications issued after execution of this Agreement, all af which form the Contract, and are as ful ly a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either �vritten or orai. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. (Paragraphs deleted) AR1'ICLE 2 THE MATERIAL OF T!i{S CONTRACT The Supplier shall fully supply the materials described in the Contraet Documents, except as specifical ly indicated in the Contract DQCUments to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETIQN Removed in fill does not apply (Paragraphs cteleted) (Table deleted) (Paragraphs deleted) ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Supplier the CQntract Sum in current funds for the Supplier's supply of the materials. The Contract Sum shall be Six Hundred Fifty-One Thousand Three Dollars and Ninety Six Cents ($ 651,003.96 ), subject to additions and deductions as provided in the Contract Documents. § 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the rzunzbers or other identificalzon of acceptecl alternates. I,f the bidding or proposal documents permit the O�vner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alter,sates showing the amou»t for each and the date when that amount expires.) N/A § 4.3 Unit prices, if any: AIA Document A101'" — 2067. Copyright m 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, �974, 1977, 1987, 1991, 1997 and 2007 by The American Init. Institute of Architects. All rights reserved. WARNING: This AfA'^' Documec+t is proiecfed by U.S. Copyright �aw and lntemational Treaties. Unauthorized reproduction or distrihution of thf5 A{A� Docume�t, or any portion of it, may rosult in severe civil and ceiminaf penaities, and will be prosecuted to � the maximum extent possible w�der the faw. This document was produced by AIA software at 12:31:47 on 10l05/2015 under Order No.3296704242_� whiCh expires on 0611 1 /201 6, and is not for resale. User Notes: (1999583097) (Identify and state the unit price; state quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price Per Unit ($0.00) N/A § 4.4 Allowances included in the Contract Sum, if any: (Identify allowance and state exclusions, if arry, from the allowance price.) Item Price N/A ARTICLE 5 PAYMENTS § 5.1 PROGRESS PAYMENTS § 5.1.1 Based uponApplications for Payment submitted to the Architect by the Supplier and Certificates for Payment issucd by the Architect, the Owner shall make progress payments on account of the Contract 3um to the Supplier as pro��ided below and elsewhere in the Contract Documents. § 5.1.2 Thc period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as foltows: � Per 5.1.3 § 5.1.3 Provided that an Application for Payment is received by the Architect not later than the twenty-fifth (25�') day of a month, the Owner shall make payment of the certified amount to the Supplier not later than the last day of the fol lowing month. If an Application for Payment is received by the Arehitect after the application date fixed above, payment shall be made by the Owner not later than forty five (45) days after the Architect receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.j § 5.1.4 Each Application for Payment shall be based on the most recent sehedule of values submitted by the Supplier in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedute of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Supplier's Applications for Payment. § 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. (Paragraphs deleted) § 5.1.6: REMOVED DOES NOT APPLY § 5.1.7: REMOVED DOES NOT APPLY § 5.1.8 Reduction or limitation of retainage, if any, shall be as follows: (If it is intendec� prior to Substantial Completion of the entire Work, to reduce or limit the retainage resultingfrom the percentuges inserted in Sections 5.1.6.1 and 51.6.2 above, and this is not explained elsewhere in the Contract Docurnents, insert {iere provisions for such reduction or limitation.) I N/A § 5.1.9 Except with the Owner's prior approval, the Supplier shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. § 5.2 FINAL PAYMENT § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Supplier when AIA Document A101T" — 2007. Copyright � 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Init. Institute of Architects. All rights reserved. WARNINC; This AIA�' Document is protected by U.S. Copyright Law and Intemational Traaties. Unautharized reproduction or distribution of this AIAz Document, or any portion of it, may tesult in severe civil and criminal penafties, and will 6e prosecuted to � the maximum extent possible under the law. This document was produced by AIA software at 12:31:47 on 10/05/2015 under Order No.3296704242 1 which expires on 06/11/2D16, and is not for resale. User Notes: (1999583097) .1 the Supplier has fully performed the Contract except for the Supplicr's responsibility to correct Work as provided in Section 12.2.2 of AIA Document A201-2007, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final CertiBcate for Payment has been issued by the Architect. § 5.2.21'he Owner's finai payment to the Supplier shall be made no tater than 30 days after the issuance of the ArchitecYs final Certificate for Payment, or as follows: Final payment shal l be due �vithin thirty (30) days of the issuance of a final certificate of payment by the Architect. ARTICLE 6 DISPUTE RESOLUTION § 6.11NITIAL DECISION MAKER :; ,, The Architect witl serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201-2007, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (!f the ��arties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, � if other than the Architect.) � N/A § 6.2 BINDING DISPUTE RESOLUTION For any Claim subject t�, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A201-2007, the method olbinding dispute resolutio�t shall be as fo(lows. (Check the appropnate box. If the Owner and Supplier da not select a method of binding dispute resolutzon below, or do not subsequently agree in writing to a binding dispute r�esolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdictian.) [ ] Arbitration pursuant to Section 15.4 of AIA Document A201-2007 [ X] Litigation in a court of competentjurisdiction ] Other (Specify) ARTIC�E 7 TERMINATION OR SUSPENSION § 7.1 T7ie Contract may be terminated by the Owner or the Supplier as provided in Article 14 of AIA Document A201-2007. § 7.2'['he W�rk may be suspended by the Owner as provided in Article 14 of AIA Document A201-2007. ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A201-2007 or another Contract Document, the reference refers to tYaat provision as amended or supplemented by other provisions of the Contract Documents. �� § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereoF, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rule of interest agreed upon, if arry.) Zero % 0 § 8.3 The Owner's representative: (Name, address and other information) James Rabe Director of Public Works AIA Document A101 T" — 2007. Copyright � 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Init. Institute of Architects. All rights reserved. W,9RNiNG: This AIA'•' Dar.ument is prot�cted by U.S. Copyright �aw and lnternational Treaties. Unauthorized reproduction or distribution of this AIA"�' Oocumeni, or any portion of it, m�y result in severe civil and criminai penaltie5, and will t�e prosecuted to � the maximurn extent possible under the taw. This document was produced by AIA sottware et 12'.31�.47 on 10/05l2015 under Ordet No.3296704242_'1 which expires on 06/1112016, and is not for resale. UserNates: i�999583097) Init. 0 2l 5 Church Avenue Oshkosh, WI 54903-1 1 30 § 8.4 The Supplier's representative: (Narne, adctress and other information) Steven J. Schmitt Building Better Together Supply, Inc. YO Box 1084 2104 Union Avenue Sheboygan, Wisconsin 53082 § 8.5 Neither the Owner's nor the Supplier's representative shall be changed without ten days written notice to the other party. § 8.6 Other provisions: N/A ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 1fie Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. � § 9.1.1 The Agreement is this executed AIA Document A101-2007, Standard Form of Agreement Between Owner and Supplier. § 9.1.2 The General Conditions are AIA Document A201-2007, General Conditions of the Contract for Construction. § 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Date Section 00 73 00 Supplementary General 2/16/2015 Conductions § 9.1.4 The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Title of Specifications — See E�thibit 2 Pages 10 pages Section Title Date Pages See Exhibit #2 Table of Contents Fehruary 16, 2015 4 pages § 9.1.5 The Drawings: (Either listthe Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings: - See Exhibit #3 Number See Exhibit #3 § 9.1.6 The Addenda, if any: Title Date Table of Contents February 16, 2015 Number Date Pages Addendum #1 February 26, 2015 37 Pages Addendum #2 February 27, 2015 13 Pages Addendum #3 March 2, 2015 10 Pages AIA Document A101 T" — 2007. Copyright m �915, 19'I8, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architeds. All rights reserved. WARNING: This rAIA' Document is protocted by U.S. Copyright Law and intemational Treaties. Unauthorized reproductio� or distribution of this AIAe' Dowment, or any portion of it, may result in severe civil and criminal penaltfes, and will 6e prosecuted to the maximum extent possible underthe law. This document was produced by AIA software at 12:31:47 on 10/OS12015 under Order No.3296704242_1 which expires on 06/11/2016, and is not for resale. User Notes: (1999583097) 5 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Additional documents, if any, forming part of the Contract Documents: .1 AIA Document E201T"'-2007, Digital Data Protoco( E�chibit, if completed by the parties, or the fol lowing: N/A .2 Other documents, if any, listed below: (List here arry additional documents that are intended to form part of the Contract Documents. AIA /�ocumerzt A201-2007 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Supplier's bid are not part of the Contract Documents unless enunzerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) N/A ARTICLE 10 INSURANCE AND BONDS The Supplicr shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A201-2007. (State bonding requirement.s, if any, and limits of liabiliry for insurance required in Article 11 of AIA Document A201-2007.� Type of insurance or bond Limit of liability or bond amount ($0.00) Material Payment Bond in the amount 100% of Contract equal to 100 Percent of the contract. This Agreement entered into as of the day and year first written above. /��'.�- ��.�-C✓l�i OW ER (Signature) Mark A. Rohloff, City Manager (Prt d name and title) - - .� �. "� �.0 �� �l 0 NER (,Signature) J Pamela R, Ubc•ig, City Clerk (Printed name und title) ��ri�' �i'�-�Y�� �.i ',��+i� 0�1V�R (b'ignature) Trena Larson, City Comptroller (Printed name and title) ������� �' �[�ll:!R:1!'1� PLI Stev�fi J. Schmitt, President (P ir n ed name and title) AIA Document A101'"' — 2007. CopyrigM � 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, t967, 1974, 1977, 1987, 1991, � 997 and 2007 by The American Init. �nstitute of Architects. All rights reserved. WARNING: This AIA`"� Rocument is prol:�cted by U.S. Copyright Law and Intemational Treatles. Unauthorized reproduction or distribution of this AIA" Document, or any portion of it, may result in severe civil and criminal penalties, and will k�e prosecuted to � tho maximum extent possihle under the law. This document was produced by AIA software at 12:31:47 on 10/OS/2015 under Order No.3296704242 1 which expires on 06/11/2016, and is noi for resale. — User Notes: (�999583097) � OW R i nature) Lynn Lorenson, City Attorney (Printed name and title) �':: ;� ��;; �' �'! AIA Document A10� ^" — 2007. Copyright 0 1915, 1918, 1925, 1937; 195�, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Init. Institute of Arohitects. All rights reserved. WARNING: This AIF1�� Document is protected by U.S. Copyright Law and Intemational Treaties. Unauthorized 7 reproduction or ciistribution of this AIA� Qocument, or any portion of It, may result in severe civii and criminal penalties, and will be prosecuted ta � the mazimum extent possible under the law. This document was produced by AIA soRware at 12:31:47 on 10lOS/2015 under Order No.3296704242_1 which expires on 06/11/2016, and is not for resale. User Notes: (1999583097)