Loading...
HomeMy WebLinkAbout29587 / 78-20July 6, 1978 � 2 0 RESOI.,UI'ION PL7RPOSE: CFTi�NC� ORDER NO. 1'?�G COrv'I'RACT FOR t�LKWAY L�IEST, PHflSE IT 11VITIA'I'ED BY: COi��NNITY DEVF�,OPM�iIT BE IT RFSv^LVID by the ConHnon Council of �he City of Oshkosh that the follc�aing Change Order No. 1 to the contract for Walkway tVest It�r�ve�re.nts, Phase II, is hereby approved. CF3ANGE O�F�t N0. 1- Adding the ar,�ount not to exceed $1.,000.00 Yarbro--Keanpinger, ArGhitects Oshkosh, U7isconsin 54901 se: Architect to pre�are working drawing as required to include demolition and reconstxuction of stai.rs, platforn�, loading docks, etc. at all stores which abut subject project limits. Said work will be� a�art of the geneY-al constr_uction contract. Architect's work to incltx�e but not be limited to field ���ork, c�sign, draf_ting, meeti_ng with store ocV-�ers, meeting with City Representatives, and estimating of construction casts. Work to be performed on a time and material basis as per article 14.4.1 of -the original Can�ract for a sum not to exc�ed ONE `l�USAND DOLL�llZ.S ($1,000.00) . BE IT FURTFIFR RE.SOLUED l�y the Cam�on Council of the City of Oshkosh tha� i�z:� �-��ve c}�,�u��� or_r�r �s he:r�;ay �,p�ov�;' an�l a C�Ny C.� wiii.�� is a�taCi�ed to this resoluci�n. r�ne_y for this puroose is hereby appropriated from Ac�tint No. 3.',1-999, �F3�D ^rust. $UBMITTED BY - 20 - � . CHANGE ORDER OWNER - ARCHITECT CONTRACT CHANGE ORDLR N0. 1 A RCH I TE C TS DATE: 30 June 1978 OWNER: The City of Oshkosh, Wisconsin A Municipal Corporation ARCHITECT: Yarbro-Kempinger, Architects, Oshkosh, Wisconsin CONTR.ACT FOR: Walkway 6Vest Improvements, Phase II Soo Parkinq ArEa, 400 Block Oshkosh, Wisconsin It is hereby mutually agreed that the following change in the work as comprised in the original Contract, dated 12 April 1978 shall be incorporated into the Contract and subject to the terms of the Contract. Item No. 1: Architect to prepare working drawing as required to include demolition and reeonstruction of stairs, platforms, loading docks, etc at all stores which abut subject project limits. Said work will become a part of the general construction contraCt. Archi- tect's work to include but not be limited to field work, design, drafting, meeting with store owners, meeting with City Representatives, and estimating of co�struction costs. Work to be performed on a time and material basis as per article 14.4.I of the original Contract for a sum not to exceed ONE THOliSAND DOLLARS---------($1,000.00) - 20 Att -�- / � `� � Page 2 30 June 1978 Change Order No. 1 Owner-Architect Contract Yarbro-Kempinger, Architects City of Oshkosh, Wisconsin RE: Walkwa� West, Phase II Prior to this Order This Order Not to exceed Total To Date Original Contract Extra Orders Not to exceed Credit Orders Net Total To Date (not to exceed) ACCEPTED CITY OF OSHKOSH, WISCONSIN by William D. Freuh, City Manager bv j�onverse C. �larks, City Clerk ADD NONE $1,000.00 $1,000.00 $ 3,250.00 1,000.00 NONE $ 4,250.00 - 20 Att - DEDUCT NONE NONE NONE YARBRO-KEMPINGER, ARCHITECTS by by 0 z 0 N � C?��' � �', ,. �.. ti� � s'n ' �� � a� � � O N ^ VI CZO H .I-� � H U cd a� � � � U U� •rl cC3 ,i; N �"., U �a � o � �� �� � �� � �o o �� � c� � �� � o � a� � c� x +� 3 � � o �os� o .N .� � � a� � c� ��� .-. � � � N � d +� o � � a� � �� H c�'d � � 0 � � 0 � t•-- -_...,.__..._..._......__..._..._........� ..�..._.. � ; � ..__.� _, Y� �i'�fiTi��fv� � i - _ .�.��.__�..�.... � , � � �.�__. ___ ..::..__.. .�: �-�.��r: � ; _ �..._ _.__ __�. _ .�_. �.�.__._...__�._. --.� .� Fi N r-I U � � .� r-i `. �� � ` i.> � � ,�; � �� \ 0