� 2 0 RESOI.,UI'ION
PL7RPOSE: CFTi�NC� ORDER NO. 1'?�G COrv'I'RACT FOR t�LKWAY L�IEST, PHflSE IT
11VITIA'I'ED BY: COi��NNITY DEVF�,OPM�iIT
BE IT RFSv^LVID by the ConHnon Council of �he City of Oshkosh that the
follc�aing Change Order No. 1 to the contract for Walkway tVest It�r�ve�re.nts,
Phase II, is hereby approved.
CF3ANGE O�F�t N0. 1- Adding the ar,�ount not to exceed $1.,000.00
Yarbro--Keanpinger, ArGhitects
Oshkosh, U7isconsin 54901
se: Architect to pre�are working drawing as required to include
demolition and reconstxuction of stai.rs, platforn�, loading
docks, etc. at all stores which abut subject project
limits. Said work will be� a�art of the geneY-al
constr_uction contract. Architect's work to incltx�e but not
be limited to field ���ork, c�sign, draf_ting, meeti_ng with
store ocV-�ers, meeting with City Representatives, and estimating
of construction casts. Work to be performed on a time and
material basis as per article 14.4.1 of -the original Can�ract
for a sum not to exc�ed ONE `l�USAND DOLL�llZ.S ($1,000.00) .
BE IT FURTFIFR RE.SOLUED l�y the Cam�on Council of the City of Oshkosh
tha� i�z:� �-��ve c}�,�u��� or_r�r �s he:r�;ay �,p�ov�;' an�l a C�Ny C.� wiii.�� is a�taCi�ed
to this resoluci�n. r�ne_y for this puroose is hereby appropriated from
Ac�tint No. 3.',1-999, �F3�D ^rust.
$UBMITTED BY
- 20 -
� .
CHANGE ORDER
OWNER - ARCHITECT CONTRACT
CHANGE ORDLR N0. 1
A RCH I TE C TS
DATE: 30 June 1978
OWNER: The City of Oshkosh, Wisconsin A Municipal Corporation
ARCHITECT: Yarbro-Kempinger, Architects, Oshkosh, Wisconsin
CONTR.ACT FOR: Walkway 6Vest Improvements, Phase II
Soo Parkinq ArEa, 400 Block
Oshkosh, Wisconsin
It is hereby mutually agreed that the following change in the
work as comprised in the original Contract, dated 12 April 1978
shall be incorporated into the Contract and subject to the terms
of the Contract.
Item No. 1:
Architect to prepare working drawing as required
to include demolition and reeonstruction of stairs,
platforms, loading docks, etc at all stores which
abut subject project limits. Said work will become
a part of the general construction contraCt. Archi-
tect's work to include but not be limited to field
work, design, drafting, meeting with store owners,
meeting with City Representatives, and estimating of
co�struction costs. Work to be performed on a time
and material basis as per article 14.4.I of the
original Contract for a sum not to exceed
ONE THOliSAND DOLLARS---------($1,000.00)
- 20 Att -�-
/
� `� �
Page 2
30 June 1978
Change Order No. 1
Owner-Architect Contract
Yarbro-Kempinger, Architects
City of Oshkosh, Wisconsin
RE: Walkwa� West, Phase II
Prior to this Order
This Order Not to exceed
Total To Date
Original Contract
Extra Orders Not to exceed
Credit Orders
Net Total To Date
(not to exceed)
ACCEPTED
CITY OF OSHKOSH, WISCONSIN
by
William D. Freuh, City Manager
bv
j�onverse C. �larks, City Clerk
ADD
NONE
$1,000.00
$1,000.00
$ 3,250.00
1,000.00
NONE
$ 4,250.00
- 20 Att -
DEDUCT
NONE
NONE
NONE
YARBRO-KEMPINGER, ARCHITECTS
by
by
0
z
0
N
�
C?��'
� �',
,. �..
ti� �
s'n '
��
�
a�
�
�
O
N ^ VI
CZO H .I-�
� H U
cd a�
� � �
U U� •rl
cC3 ,i;
N �"., U
�a �
o �
��
�� �
�� �
�o
o ��
� c� �
�� �
o � a�
� c� x
+� 3 �
� o
�os�
o .N .�
� �
a� � c�
���
.-.
�
�
�
N
�
d
+�
o �
� a�
� ��
H c�'d
�
�
0
�
�
0
�
t•-- -_...,.__..._..._......__..._..._........� ..�..._..
�
;
� ..__.� _, Y� �i'�fiTi��fv� �
i
- _ .�.��.__�..�....
� ,
�
� �.�__. ___ ..::..__.. .�: �-�.��r: � ;
_ �..._ _.__ __�. _ .�_. �.�.__._...__�._. --.�
.�
Fi
N
r-I
U
�
�
.�
r-i `. �� � ` i.>
�
� ,�;
�
��
\
0